Osisko Development Corp. (“Osisko Development” or the “Company”) (ODV TSX.V & NYSE) is pleased to announce the remaining and final drilling results from the 2021 exploration and category conversion drill campaign at the Valley Zone of its Cariboo Gold Project (“Cariboo”) in central British Columbia.

Summary

  • A total of A total of 49,500 meters were drilled in 114 holes at the Valley Zone in 2021.
  • Results released below are from holes CM-21-094 to CM-21-112 (see Figures 1 and 2 for the drill hole location maps).
  • Highlights include 164.92 g/t Au over 10.50 m in hole CM-21-097 at a depth of 200 meters from surface with high grade samples of 67.10 g/t Au over 0.50 m, 18.60 g/t Au over 0.60 m, 16.35 g/t Au over 1.00 m, 8.15 g/t Au over 1.00 m, 1,605 g/t Au over 1.00 m (with visible gold observed), 13.25 g/t Au over 1.00 m and 20.30 g/t Au over 1.00 m (see Figure 3 cross section).
  • CM-21-099 intersected a vein corridor that assayed 15.26 g/t Au over 14.40 m and included high grade samples of 104.5 g/t Au over 1.00 m and 61.10 g/t Au over 1.00 m.
  • The drill results confirmed anomalous gold values within multiple modelled vein corridors as shown in the cross section below. Additional noteworthy highlights are listed below.
  • Detailed drilling results and a drill hole location plan map are presented at the end of this release.

Assay Highlights

  • 9.26 g/t Au over 6.15 meters in hole CM-21-094 including
  • 99.20 g/t Au over 0.50 meter
  • 16.74 g/t Au over 3.00 meters in hole CM-21-094 including
  • 29.50 g/t Au over 0.75 meter
  • 5.66 g/t Au over 12.60 meters in hole CM-21-094
  • 10.82 g/t Au over 7.20 meters in hole CM-21-094
  • 81.50 g/t Au over 0.50 meter in hole CM-21-095
  • 16.19 g/t Au over 6.70 meters in hole CM-21-095 including
  • 54.90 g/t Au over 0.95 meter in hole CM-21-095
  • 284.00 g/t Au over 0.50 meter in hole CM-21-096
  • 7.25 g/t Au over 6.35 meters in hole CM-21-097
  • 164.92 g/t Au over 10.50 meters in hole CM-21-097 including
  • 1,605.00 g/t Au over 1.00 meter
  • 18.99 g/t Au over 3.85 meters in hole CM-21-097 including
  • 44.10 g/t Au over 1.20 meters
  • 104.50 g/t Au over 0.95 meter in hole CM-21-099
  • 15.26 g/t Au over 14.40 meters in hole CM-21-099 including
  • 104.50 g/t Au over 1.00 meter in hole CM-21-099 and
  • 61.10 g/t Au over 1.00 meter in hole CM-21-099
  • 104.50 g/t Au over 0.80 meter in hole CM-21-099
  • 20.71 g/t Au over 7.60 meters in hole CM-21-100
  • 12.18 g/t Au over 11.85 meters in hole CM-21-100
  • 6.48 g/t Au over 10.50 meters in hole CM-21-104
  • 8.44 g/t Au over 6.80 meters in hole CM-21-106
  • 24.55 g/t Au over 7.85 meters in hole CM-21-106 including
  • 332.00 g/t Au over 0.50 meter in hole CM-21-106
  • 7.93 g/t Au over 12.40 meters in hole CM-21-106 including
  • 84.40 g/t Au over 0.70 meter in hole CM-21-106
  • 14.14 g/t Au over 4.10 meters in hole CM-21-107
  • 15.68 g/t Au over 4.20 meters in hole CM-21-107
  • 6.59 g/t Au over 8.20 meters in hole CM-21-107
  • 10.15 g/t Au over 10.85 meters in hole CM-21-109

Sean Roosen, CEO of Osisko Development commented,

“We are excited and encouraged by the final results received at the Valley Zone of the Cariboo Gold Project. The Valley Zone is one of seven important mineralized zones within the broader Cariboo Gold Project, and the Valley Zone contains 536,000 ounces of gold (4.4 million tonnes grading 3.8 g/t Au) in the indicated category and 235,000 ounces of gold (2.1 million tonnes grading 3.4 g/t Au) in the inferred category. The updated Mineral Resource Estimate has an effective date of May 17, 2022 and published in the recent Preliminary Economic Assessment filed on SEDAR on May 24th, 2022. The purpose of this drilling was to expand known vein corridors and increase confidence to support further technical work, and the goal was successfully achieved.”  

Vein corridors are defined as high-density networks of mineralized quartz veins within the axis of the deposit’s last folding event. These mineralized structures are predominantly hosted within a brittle meta-sandstone or calcareous meta-sandstone. Vein corridors are modelled at a minimum thickness of 2.00 meters and average approximately 4.50 meters true width. Individual mineralized veins within these corridors have widths varying from centimeters to several meters and strike lengths from a few meters to over 50 meters. These corridors have been defined from surface to a vertical depth averaging 300 meters and remain open for expansion at depth and along strike. Gold grades are intimately associated with quartz vein-hosted pyrite as well as pyritic, intensely silicified wall rock vein selvages.

True widths are estimated to be 60% to 75 % of reported core length intervals. Intervals not recovered by drilling were assigned zero grade. Top cuts have not been applied to high grade assays. Complete assay highlights are presented in Table 1 and drill hole locations are listed in Table 2.

Figure 1: Cariboo Gold Project areas overview map (mineralized zones are shown in red)https://www.globenewswire.com/NewsRoom/AttachmentNg/e4f0dad7-a0e3-47d6-9c37-36919e299de0

Figure 2: Valley Zone select drilling highlightshttps://www.globenewswire.com/NewsRoom/AttachmentNg/36cbd0b8-63e8-4c78-8fcf-e86d2c5a3178

Figure 3: Cross Section of CM-21-097https://www.globenewswire.com/NewsRoom/AttachmentNg/3abd8f39-31cb-437c-8c72-78852e16384d 

Qualified Persons

Per National Instrument 43-101 Standards of Disclosure for Mineral Projects, Maggie Layman, P.Geo. Vice President Exploration of Osisko Development Corp., is a Qualified Person and has prepared, validated, and approved the technical and scientific content of this news release.

Quality Assurance – Quality Control

Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently stored on site at a secured facility in Wells, BC. Numbered security tags are applied to lab shipments for chain of custody requirements. Quality control (“QC”) samples are inserted at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd.

Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed, and 250 grams is pulverized. Analysis for gold is by 50g fire assay fusion with atomic absorption (“AAS”) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 1,000g screen metallic fire assay. A selected number of samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (“ICP-AES”) and Inductively Coupled Plasma Mass Spectroscopy (“ICP-MS”).

About Osisko Development Corp.

Osisko Development Corp. is uniquely positioned as a premier gold development company in North America to advance the Cariboo Gold Project and other Canadian and Mexican properties, with the objective of becoming the next mid-tier gold producer. The Cariboo Gold Project, located in central British Columbia, Canada, is Osisko Development's flagship asset. The considerable exploration potential at depth and along strike distinguishes the Cariboo Gold Project relative to other development assets. Osisko Development's project pipeline is complemented by its interest in the San Antonio gold project, located in Sonora, Mexico and the Trixie gold test mine, located in Utah, USA.

For further information, please contact Osisko Development Corp.:
Jean Francois LemondeVP, Investor Relationsjflemonde@osiskodev.comTel: 514-299-4926  

Forward-looking Statements

Certain statements contained in this press release may be deemed “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. These forward‐ looking statements, by their nature, require Osisko Development to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward‐ looking statements. Forward‐ looking statements are not guarantees of performance. Words such as “may”, “will”, “would”, “could”, “expect”, “believe”, “plan”, “anticipate”, “intend”, “estimate”, “continue”, or the negative or comparable terminology, as well as terms usually used in the future and the conditional, are intended to identify forward‐ looking statements. Information contained in forward‐ looking statements is based upon certain material assumptions that were applied in drawing a conclusion or making a forecast or projection, including management’s perceptions of historical trends, current conditions and expected future developments, results of further exploration work to define and expand mineral resources, expected conclusions of optimization studies, that vein corridors continue to be defined as a high-density network of mineralized quartz within the axis of the last folding event and hosted within the sandstones and that the deposit remains open for expansion at depth and down plunge, as well as other considerations that are believed to be appropriate in the circumstances, and any other information herein that is not a historical fact may be “forward looking information”. Material assumptions also include, management’s perceptions of historical trends, current conditions and expected future developments, results of further exploration work to define and expand mineral resources, as well as other considerations that are believed to be appropriate in the circumstances. Osisko Development considers its assumptions to be reasonable based on information currently available, but cautions the reader that their assumptions regarding future events, many of which are beyond the control of Osisko Development, may ultimately prove to be incorrect since they are subject to risks and uncertainties that affect Osisko Development and its business. Such risks and uncertainties include, among others, risks relating to capital market conditions, regulatory framework, the ability of exploration activities (including drill results) to accurately predict mineralization; errors in management’s geological modelling; the ability of to complete further exploration activities, including drilling; property and stream interests in the Project; the ability of the Company to obtain required approvals; the results of exploration activities; risks relating to exploration, development and mining activities; the global economic climate; metal prices; dilution; environmental risks; and community and non-governmental actions and the responses of relevant governments to the COVID-19 outbreak and the effectiveness of such responses. Readers are urged to consult the disclosure provided under the heading "Risk Factors" in the Company’s annual information form for the year ended December 31, 2021, as amended, which has been filed on SEDAR (www.sedar.com) under the Company's issuer profile and on the U.S. Securities Exchange Commission’s EDGAR website (www.sec.gov), for further information regarding the risks and other factors applicable to the exploration results. Although the Company’s believes the expectations conveyed by the Forward-looking Statements are reasonable based on information available at the date of preparation, no assurances can be given as to future results, levels of activity and achievements. The Company disclaims any obligation to update any Forward-looking Statements, whether as a result of new information, future events or results or otherwise, except as required by law. There can be no assurance that these Forward-looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-looking Statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Table 1: Cariboo Gold Project 2021 Length Weighted Drill Hole Gold Composites

HOLE ID   FROM (M) TO (M) LENGTH (M) AU (G/T)
CM-21-094   67.50 73.65 6.15 9.26
  Including 67.50 68.00 0.50 99.20
    80.85 81.35 0.50 5.43
    106.40 109.40 3.00 16.74
  Including 107.30 108.05 0.75 29.50
  and 108.65 109.40 0.75 25.40
    121.40 121.90 0.50 7.81
    127.00 131.30 4.30 3.22
  Including 127.00 127.50 0.50 8.01
  and 130.80 131.30 0.50 9.94
    133.40 146.00 12.60 5.66
  Including 133.90 134.40 0.50 13.30
  and 137.60 138.10 0.50 10.30
  and 141.90 142.60 0.70 13.15
  and 143.20 144.70 1.50 23.30
    148.80 149.45 0.65 7.64
    161.85 162.35 0.50 19.10
    170.70 175.05 4.35 4.21
  Including 171.70 172.20 0.50 11.05
  and 173.95 174.45 0.50 16.85
    377.85 378.35 0.50 6.04
    383.10 384.35 1.25 8.17
    390.90 398.10 7.20 10.82
  Including 392.25 393.75 1.50 17.35
  and 393.75 394.50 0.75 16.70
  and 395.85 397.10 1.25 25.50
    416.70 417.20 0.50 4.73
    441.15 445.80 4.65 7.30
  Including 442.00 443.00 1.00 8.04
  and 444.30 445.80 1.50 13.80
    452.80 456.75 3.95 9.08
  Including 455.30 456.25 0.95 28.60
CM-21-095   96.00 96.50 0.50 3.53
    147.20 148.35 1.15 9.05
    242.75 244.00 1.25 11.55
    300.90 303.10 2.20 9.36
  Including 300.90 301.60 0.70 17.15
  and 302.60 303.10 0.50 15.30
    309.95 310.80 0.85 3.26
    350.35 350.85 0.50 11.85
    361.50 362.00 0.50 81.50
    400.00 400.75 0.75 6.62
    454.50 455.00 0.50 7.69
    495.30 502.00 6.70 16.19
  Including 496.00 496.95 0.95 54.90
  and 496.95 498.10 1.15 22.40
  and 498.10 498.80 0.70 25.60
  and 500.30 500.80 0.50 13.45
    506.80 511.05 4.25 6.84
  Including 506.80 507.90 1.10 6.99
  and 509.90 510.50 0.60 9.76
  and 510.50 511.05 0.55 21.70
CM-21-096   119.50 120.00 0.50 284.00
    195.80 196.30 0.50 8.66
    223.50 224.00 0.50 3.90
CM-21-097   124.15 130.50 6.35 7.25
  Including 124.15 125.65 1.50 18.15
  and 125.65 126.40 0.75 10.70
    135.30 136.00 0.70 5.00
    158.00 158.70 0.70 3.70
    251.50 252.15 0.65 4.94
    255.05 265.55 10.50 164.92
  Including 255.05 255.55 0.50 67.10
  and 255.55 256.15 0.60 18.60
  and 257.00 258.00 1.00 16.35
  and 260.00 261.00 1.00 8.15
  and 262.00 263.00 1.00 1605.00
  and 263.00 264.00 1.00 13.25
  and 264.00 265.00 1.00 20.30
    273.55 274.05 0.50 14.25
    280.00 283.00 3.00 12.20
  Including 282.00 283.00 1.00 22.90
    310.50 314.35 3.85 18.99
  Including 310.50 311.00 0.50 15.90
  and 311.00 311.50 0.50 12.65
  and 312.65 313.85 1.20 44.10
    388.00 389.15 1.15 24.30
CM-21-098   217.35 217.85 0.50 4.22
    223.05 224.00 0.95 5.24
CM-21-099   68.00 68.50 0.50 14.20
    96.00 98.30 2.30 2.75
  Including 96.50 97.05 0.55 6.77
    105.35 106.30 0.95 104.50
    118.75 119.70 0.95 7.36
    124.20 125.90 1.70 5.63
  Including 124.20 124.70 0.50 14.15
    149.60 164.00 14.40 15.26
  Including 149.60 150.60 1.00 104.50
  and 150.60 151.60 1.00 61.10
  and 153.60 154.10 0.50 20.50
  and 159.05 159.55 0.50 10.75
  and 162.20 163.05 0.85 22.30
    242.65 246.80 4.15 4.34
  Including 242.65 243.80 1.15 13.00
    273.00 273.80 0.80 104.50
    323.60 324.20 0.60 29.10
CM-21-100   94.75 96.75 2.00 4.33
  Including 96.10 96.75 0.65 11.90
    104.05 104.55 0.50 3.20
    115.40 123.00 7.60 20.71
  Including 115.40 115.90 0.50 23.00
  and 115.90 116.80 0.90 11.55
  and 119.00 120.00 1.00 22.20
  and 120.00 121.00 1.00 88.20
  and 121.50 122.00 0.50 18.65
  and 122.50 123.00 0.50 22.20
    132.00 133.20 1.20 23.56
  Including 132.50 133.20 0.70 37.60
    148.00 150.00 2.00 5.11
  Including 148.00 148.50 0.50 6.73
  and 149.00 149.50 0.50 12.35
    154.00 165.85 11.85 12.18
  Including 154.00 155.00 1.00 15.35
  and 156.00 157.00 1.00 39.80
  and 157.50 158.15 0.65 37.90
  and 160.50 161.25 0.75 28.40
  and 163.25 163.85 0.60 12.70
  and 164.35 164.85 0.50 44.90
    198.50 199.00 0.50 28.20
    282.70 283.20 0.50 11.10
    379.80 380.50 0.70 3.20
    405.80 406.30 0.50 7.94
    452.00 456.35 4.35 3.12
  Including 455.75 456.35 0.60 8.63
    477.70 479.90 2.20 9.91
  Including 477.70 478.20 0.50 9.92
    479.35 479.90 0.55 17.35
    497.80 501.25 3.45 3.12
  Including 497.80 498.30 0.50 5.48
  and 499.30 499.80 0.50 6.56
  and 500.65 501.25 0.60 6.71
    550.85 555.40 4.55 5.98
  Including 551.85 553.00 1.15 7.35
  and 553.50 554.00 0.50 30.20
    609.10 613.40 4.30 5.05
  Including 612.10 612.75 0.65 12.20
  and 612.75 613.40 0.65 11.70
CM-21-101 Hole Abandoned      
CM-21-102   164.20 164.70 0.50 17.75
    199.80 200.40 0.60 23.80
    215.35 218.40 3.05 13.06
  Including 215.85 216.50 0.65 22.90
  and 217.30 217.80 0.50 15.40
  and 217.80 218.40 0.60 26.90
    220.80 221.40 0.60 6.94
    263.95 266.00 2.05 16.12
  Including 263.95 264.80 0.85 28.50
CM-21-103   111.50 112.00 0.50 20.50
    210.50 212.00 1.50 3.56
    215.15 215.70 0.55 4.06
    259.20 259.90 0.70 11.90
CM-21-104   117.50 118.10 0.60 4.70
    256.50 267.00 10.50 6.48
  Including 256.50 257.90 1.40 12.05
  and 265.85 266.35 0.50 30.90
CM-21-105   152.50 153.20 0.70 16.75
    186.10 187.60 1.50 5.93
    216.85 217.50 0.65 3.56
CM-21-106   104.10 105.30 1.20 7.42
    121.00 122.30 1.30 5.56
  Including 121.80 122.30 0.50 9.20
    126.40 133.20 6.80 8.44
  Including 126.40 126.90 0.50 11.50
  and 126.90 127.50 0.60 14.65
  and 127.50 128.85 1.35 16.95
  and 132.10 132.60 0.50 32.10
    137.90 138.40 0.50 7.08
    140.70 141.20 0.50 14.70
    151.65 159.50 7.85 24.55
  Including 154.50 155.00 0.50 19.65
  and 156.80 157.30 0.50 332.00
  and 158.90 159.50 0.60 12.55
    163.00 170.15 7.15 3.87
  Including 163.00 163.60 0.60 12.60
  and 164.10 165.00 0.90 6.80
  and 167.85 168.35 0.50 8.01
  and 169.65 170.15 0.50 7.88
    186.60 187.10 0.50 10.15
    430.50 434.60 4.10 4.91
  Including 430.50 431.00 0.50 14.05
  and 431.75 432.25 0.50 9.54
  and 433.25 434.10 0.85 7.85
    453.60 455.60 2.00 5.32
    453.60 454.10 0.50 15.50
    495.90 508.30 12.40 7.93
  Including 495.90 496.70 0.80 31.30
  and 504.00 504.50 0.50 6.35
  and 507.60 508.30 0.70 84.40
    530.00 533.00 3.00 5.12
  Including 530.00 530.50 0.50 12.10
    544.50 545.10 0.60 3.18
    550.80 551.30 0.50 3.93
    568.05 568.90 0.85 10.20
    586.30 586.90 0.60 41.20
CM-21-107   97.30 98.05 0.75 31.50
    104.85 105.85 1.00 10.64
  Including 104.85 105.35 0.50 17.80
    114.60 118.70 4.10 14.14
  Including 114.60 115.30 0.70 37.30
  and 115.30 115.80 0.50 34.40
  and 118.20 118.70 0.50 26.10
    121.00 121.50 0.50 8.85
    128.45 133.70 5.25 3.40
  Including 130.20 130.70 0.50 11.65
    154.20 156.85 2.65 4.03
  Including 156.00 156.85 0.85 8.68
    162.80 167.00 4.20 15.68
  Including 162.80 163.35 0.55 15.35
  and 165.35 166.00 0.65 15.60
  and 166.00 167.00 1.00 43.70
    176.50 177.50 1.00 15.70
  Including 176.50 177.00 0.50 21.40
    269.95 270.60 0.65 4.17
    319.50 321.00 1.50 12.70
    398.65 400.00 1.35 3.93
  Including 398.65 399.50 0.85 5.50
    494.00 502.20 8.20 6.59
  Including 494.00 494.50 0.50 15.45
  and 495.20 495.80 0.60 8.68
  and 498.90 499.65 0.75 11.45
  and 500.80 501.30 0.50 28.90
  and 501.30 502.20 0.90 9.81
    515.00 520.90 5.90 2.73
  Including 517.70 518.30 0.60 5.12
  and 519.30 519.80 0.50 13.35
    522.90 523.40 0.50 27.50
    526.00 526.50 0.50 3.83
    536.90 537.60 0.70 3.60
CM-21-108 Hole Abandoned      
CM-21-109   68.35 68.85 0.50 9.78
    126.65 137.50 10.85 10.15
  Including 126.65 127.15 0.50 46.60
  and 127.15 128.35 1.20 26.30
  and 128.35 128.85 0.50 37.70
  and 130.00 131.00 1.00 10.75
  and 131.00 132.15 1.15 12.90
    140.25 141.00 0.75 3.47
    177.35 178.15 0.80 25.20
    240.80 241.45 0.65 10.35
    249.00 253.70 4.70 2.90
  Including 249.00 249.50 0.50 5.32
  and 250.50 251.50 1.00 7.63
    270.25 270.75 0.50 3.52
    367.00 367.50 0.50 3.56
    370.15 370.65 0.50 6.78
CM-21-110   73.70 74.25 0.55 5.17
    129.65 133.20 3.55 7.73
  Including 131.50 132.00 0.50 42.10
    137.60 143.20 5.60 7.52
  Including 137.60 138.45 0.85 30.00
  and 142.20 143.20 1.00 12.45
    222.60 223.70 1.10 4.76
CM-21-111 Hole Abandoned      
CM-21-112   111.95 112.45 0.50 5.77
    149.75 150.25 0.50 51.90
    308.50 312.50 4.00 13.00
  Including 308.50 309.00 0.50 26.20
  and 310.70 311.20 0.50 51.20
    321.50 322.00 0.50 11.35
    356.70 358.25 1.55 6.88
  Including 356.70 357.75 1.05 9.34
    409.65 410.15 0.50 6.11

Table 2: Drill Hole Locations and Orientations

HOLE ID EASTING NORTHING ELEV DIP AZI DEPTH (M)
CM-21-094 595482 5884197 1207 -53 295 498
CM-21-095 595375 5884149 1204 -47 307 625
CM-21-096 595376 5884149 1203 -50 308 306
CM-21-097 595316 5884080 1201 -47 305 453
CM-21-098 595315 5884079 1201 -46 293 282
CM-21-099 595482 5884198 1207 -53 308 393
CM-21-100 595482 5884198 1207 -52 304 654
CM-21-101 595481 5884197 1207 -49 296 75
CM-21-102 595346 5884123 1202 -48 306 309
CM-21-103 595346 5884123 1202 -49 296 264
CM-21-104 595345 5884123 1202 -48 286 267
CM-21-105 595345 5884123 1202 -46 302 261
CM-21-106 595482 5884197 1207 -51 301 645
CM-21-107 595482 5884197 1207 -52 306 594
CM-21-109 595394 5884020 1202 -52 320 387
CM-21-110 595394 5884021 1202 -55 328 351
CM-21-111 595376 5884149 1203 -48 310 48
CM-21-112 595376 5884148 1203 -48 310 470

 

Osisko Development (TSXV:ODV)
Historical Stock Chart
From Mar 2024 to Apr 2024 Click Here for more Osisko Development Charts.
Osisko Development (TSXV:ODV)
Historical Stock Chart
From Apr 2023 to Apr 2024 Click Here for more Osisko Development Charts.