TSXV:OIII | OTCQX:OIIIF - O3 Mining
TORONTO, June 30,
2022 /CNW/ - O3 Mining Inc. (TSXV: OIII)
(OTCQX: OIIIF) ("O3 Mining" or the "Corporation) is
pleased to announce it has received results and interpretation from
its 6,338 metres drilling campaign on the Camflo Extension
deposit, on the Marban Project in Val-d'Or, Quebec, Canada.
Drilling Highlights
- 1.1 g/t Au over 94.3 metres including 13.8 g/t Au
over 1.1 metres in hole O3MA-22-253-W1.
- 0.7 g/t Au over 116.5 metres and 26.8 g/t Au over 1.0
metre in hole O3MA-21-253.
- All holes and wedges returned large mineralized intervals
within the Camflo Plug.
The Camflo deposit was first discovered in 1962 by Camflo Mines,
and was in production for 30 years from 1962 to 1992. It produced a
total of 1.89 million ounces of gold from 10.3 million tonnes of
ore grading 5.7 g/t Au. From this amount, 0.24 million
ounces of gold were extracted within the current O3 Mining Marban
project claims (Source: QERPUB-M.E.R. Publication DV93-01
Rapports des Géologues Résidents sur l'Activité Minière Régionale,
1993). Historically, gold production was mainly restricted to
the Camflo Plug, a cigar shaped quartz-monzonitic intrusion that
plunges 60° towards the north-east. Although the Camflo plug at
surface is outside O3 Mining's property claims, the extension of
the plug and the mine below 800 vertical metres is within the
Marban project, as it plunges toward the north-east.
Exploration efforts by O3 Mining aimed to test the
depth extensions of the historic Camflo deposit, as well as test
for additional high-grade zones. A total of 6,338 metres
in 2 drill holes and 3 wedges were drilled on the Camflo Extension,
with results summarized in Table 1. Assay results are pending for
hole O3MA-22-254-W1.
O3 Mining's President and Chief Executive Officer, Mr.
Jose Vizquerra commented, "The
Camflo mine was the first mine from which Barrick Gold started its successful journey, and
was stopped due to a challenging gold price environment but not due
to a lack of ore. O3 Mining owns 100% of the Camflo Extension
deposit which we successfully tested and verified that it remains a
rich mineralized area at depth. We believe more drilling in this
area will unveil its full potential, however, it demands more
financial resources which we are allocating to our current
brownfield drilling at Marban Engineering to maximize returns to
our shareholders."
O3 Mining drilled two-parent holes with one and two daughter
branches that successfully intersected the plug at the predicted
depth. All branches intercepted a very wide envelope of
mineralization mainly located on the northern side (hanging wall)
of the plug with discrete high-grade intercepts. The best results
came from hole O3MA-22-253-W1 which returned 1.1 g/t Au
over 94.3 metres with a high-grade interval that yielded
13.8 g/t Au over 1.1 metres.
Figure 1: Marban Property Map
Figure 2: Camflo Extension cross section
Table 1: Drill Hole Intercepts (only intercepts above 5
g/t Au * m are reported)
Drill
Hole
|
|
From
(m)
|
To
(m)
|
Interval
(m)
|
Au(g/t)
|
Zone
|
O3MA-21-253
|
|
1268.0
|
1384.5
|
116.5
|
0.7
|
Camflo
|
O3MA-21-253
|
and
|
1453.0
|
1454
|
1.0
|
26.8
|
Camflo
|
O3MA-21-253
|
and
|
1517.0
|
1520.8
|
3.8
|
1.9
|
Camflo
|
O3MA-22-253-W1
|
|
1258.9
|
1353.2
|
94.3
|
1.1
|
Camflo
|
O3MA-22-253-W1
|
including
|
1274.8
|
1275.9
|
1.1
|
13.8
|
Camflo
|
O3MA-22-253-W1
|
and
|
1541.4
|
1543.0
|
1.6
|
2.6
|
Camflo
|
O3MA-22-253-W1
|
and
|
1551.0
|
1556.0
|
5.0
|
1.9
|
Camflo
|
O3MA-22-253-W2
|
|
1391.5
|
1477.0
|
85.5
|
0.7
|
Camflo
|
O3MA-22-253-W2
|
and
|
1501.9
|
1506.1
|
4.2
|
1.4
|
Camflo
|
O3MA-22-253-W2
|
and
|
1657.0
|
1660.0
|
3.0
|
5.3
|
Camflo
|
O3MA-21-254
|
|
98.9
|
99.8
|
0.9
|
69.1
|
Orion
|
O3MA-21-254
|
and
|
1536.0
|
1538.0
|
2.0
|
5.2.
|
Diorite Ore
|
O3MA-21-254
|
and
|
1750.3
|
1914.2
|
163.9
|
0.5
|
Camflo
|
O3MA-21-254
|
and
|
2036.0
|
2037.5
|
1.5
|
14.2
|
Camflo
|
Qualified Persons
The scientific and technical content of this news release has
been reviewed, prepared, and approved by Mr. Sébastien Vigneau.
(OGQ #993), Principal Geologist, who is a "qualified person" as
defined by National Instrument 43-101 – Standards of Disclosure for
Mineral Projects ("NI 43-101").
About O3 Mining Inc.
O3 Mining Inc., an Osisko Group company, is a gold explorer and
mine developer on the road to produce from its highly prospective
gold camps in Québec, Canada. O3
Mining benefits from the support, previous mine-building success,
and expertise of the Osisko team as it grows towards being a gold
producer with several multi-million-ounce deposits in Québec.
O3 Mining is well-capitalized and owns a 100% interest in all
its properties (66,000 hectares) in Québec. O3 Mining trades on the
TSX Venture Exchange (TSXV: OIII) and OTC Markets (OTCQX: OIIIF).
The Corporation is focused on delivering superior returns to its
shareholders and long-term benefits to its stakeholders. Further
information can be found on our website at https://o3mining.com
Neither the TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this news release. No stock exchange, securities
commission or other regulatory authority has approved or
disapproved the information contained herein.
View original content to download
multimedia:https://www.prnewswire.com/news-releases/o3-mining-expands-mineralization-corridor-at-camflo-extension-intersecting-94-metres-at-1-1-gt-au-301578548.html
SOURCE O3 Mining Inc.