Costain, the smart infrastructure solutions company, announces its results for the year ended 31 December 2020.

Highlights

   --    Operating effectively and profitably 

- in responding to COVID-19 all contracts continue to operate effectively with clear safety measures and remote working in place

- adjusted operating profit of GBP18.0m (2019: GBP37.9m), despite financial impact of COVID-19, in line with revised expectations

- statutory reported loss before tax of GBP96.1m (2019: GBP6.6m) includes significant charges in relation to the Peterborough & Huntingdon (P&H) and A465 road contracts

   --    Significant operational improvements made 
   -      new leadership team 
   -      de-layered organisational structure 
   -      improved contract selection and risk management processes 
   --    Continued momentum in securing new work in line with strategic focus 

- GBP2.3bn of new contract awards and extensions, including GBP1.1bn of new contract awards and extensions and GBP1.2bn of preferred bidder at year end

   -      GBP4.2bn order book 
   --    Strong year end cash 
   -      net cash of GBP102.9m (2019: GBP64.9m) 
   --    Confident outlook for 2021 and beyond 

- substantial and growing infrastructure market, positioned on significant long-term underwritten investment programmes

   -      confident in delivering growth in profits and margins in 2021 
 
 Financial Summary                  2020      2019 
                                    GBPm      GBPm 
---------------------------------  --------  -------- 
 Group revenue 
     -adjusted (1)                  1,070.5   1,175.6 
     -statutory reported            978.4     1,155.6 
 Operating profit/(loss) 
     -adjusted(2)                   18.0      37.9 
     -statutory reported            (92.0)    (3.2) 
 Profit/(loss) before tax 
     -adjusted(2)                   13.9      34.6 
     -statutory reported            (96.1)    (6.6) 
 Net cash balance(3)                102.9     64.9 
---------------------------------  --------  -------- 
 Basic earnings/(loss) per share 
     -adjusted(2)                   5.8p      25.1p 
     -statutory reported            (36.7)p   (2.3)p 
 Dividend per share                 Nil       3.8p 
---------------------------------  --------  -------- 
 

1. Before revenue impact of significant contract provision adjustments of GBP92.1m (2019: GBP20.0m) (see financial statements note 3).

2. Before net other items of GBP10.3m (2019: GBP21.1m) and significant contract provision adjustments of GBP99.7m (2019: GBP20.0m) (see financial statements note 3).

3. Net cash balance is cash and cash equivalents less interest-bearing loans and borrowings (before arrangement fees of GBP1.2m).

Alex Vaughan, chief executive officer, commented:

"Last year was a challenging year but I am proud of how well everyone at Costain responded and the resilience shown across our business which enabled us to continue to operate effectively with strict COVID-19 safety measures in place.

"We are pleased to report an adjusted operating profit of GBP18.0m, despite the financial impact from COVID-19. The significant charges reported at the half-year relating to two contracts are clearly disappointing, and importantly we have taken robust steps to prevent such issues from reoccurring.

"Last year, we continued to be successful in winning new contracts and preferred bidder positions worth over GBP2.3bn with an increasing proportion of this work incorporating our broader service offering in line with our strategy.

"The UK Government has provided a clear strategic framework for UK infrastructure investment, underpinned by long-term underwritten investment programmes to support the UK Government's drive to level-up economic growth and to meet decarbonisation commitments. I am confident that Costain is in a good position to capitalise on the opportunities in front of us and to grow our profits in 2021."

Enquiries:

 
 Costain                                 Tel: 01628 842 444 
 Alex Vaughan, Chief executive officer 
 Helen Willis, Chief financial officer 
 Sara Lipscombe, Group communications 
  director 
 
 MHP Communications                      Tel: 020 3128 8771 
 Tim Rowntree                            Costain@mhpc.com 
 Peter Hewer 
 Robert Collett-Creedy 
 

There will be a live online presentation for analysts today at 09:00. To register your attendance please contact costain@mhpc.com

An on-demand webcast will be available via www.costain.com/investors from 2pm today.

Notes to Editors

Costain helps to improve people's lives with integrated, leading edge, smart infrastructure solutions across the UK's transportation, water, energy and defence markets. We help our clients improve their business performance by increasing capacity, improving customer service, safeguarding security, enhancing resilience, decarbonising and delivering increased efficiency. Our vision is to be the UK's leading smart infrastructure solutions company. We will achieve this by focusing on blue chip clients whose major spending plans are underpinned by strategic national needs, regulatory commitments, legislation or essential performance requirements. We offer our clients leading edge solutions that are digitally optimised through the following five services which cover the whole lifecycle of their assets: future-shaping strategic consultancy; consultancy and advisory; digital technology solutions; asset optimisation and complex programme delivery. Our culture and values underpin everything we do.

For more information visit www.costain.com

2020 OVERVIEW

Summary

In responding and adapting to COVID-19, our priority has been ensuring the safety and wellbeing of our people and the communities in which we work, as well as protecting our business and continuing to serve our clients. We are proud of how well everyone has adapted to achieve this and would again like to pay tribute to our people, partners and clients who have done everything they can to look after one another and to do the right thing.

Last year was an exceptionally challenging year as we worked hard to successfully manage the operational impact from COVID-19 and maintain effective operations for our clients. We also completed our capital raising which strengthened our balance sheet and was a positive catalyst for a number of new contract wins.

We finished the year with an adjusted operating profit of GBP18.0m, a positive performance given the challenges created by the pandemic and one we are confident we can build on this year.

These results reflect GBP94.7m of significant charges from two long-standing contracts in relation to Peterborough & Huntingdon (P&H) and the A465 road construction (both disclosed at the half-year) and a one-off charge of GBP5.0m in relation to closing out a legacy contract (ASF South). Clear lessons have been learnt from these events and we have taken decisive action to prevent such issues reoccurring. We have strengthened the senior leadership team, introduced greater accountability from top to bottom, improved our governance and controls and completed a root and branch exercise to identify and manage potential contract risk. As a result, Costain is a more resilient business and one which we are convinced will move forward with confidence to capitalise on the many opportunities ahead of us.

The infrastructure markets in which we operate have remained strong and this is reflected in the level of new work we have won. Supported by the strength of our balance sheet following our capital raising last May, we secured GBP2.3bn of new work awards including GBP1.2bn of preferred bidder positions last year. Our order book stood at GBP4.2bn at the year end and we have a good level of secured revenue for 2021 at cGBP1.0bn (compared to cGBP940m at FY2020). We will also benefit from positions on some 60 major live frameworks, with 27 won in 2020.

Our markets are supported by significant long-term investment programmes underwritten by UK Government policy, regulation, legislation and critical national need. The UK Government has committed to further investment to support its drive to level up economic growth and to meet decarbonisation commitments. Crucially, we have positioned our offer to meet the changing needs of our clients through our complex construction programmes, consultancy contracts and digital performance improvement unlocking the opportunity to deliver safer, faster, greener, better and more efficient solutions.

As well as taking advantage of these market opportunities, improving our business performance is paramount. Our focus on delivering projects to plan, managing our risks effectively, prioritising cash generation and continuing our efficiency programme are the bedrock to delivering the improved business performance we expect in 2021.

Costain is committed to leading on conducting business responsibly and we have aligned our purpose of improving peoples' lives to the United Nation's Sustainable Development Goals. Our focus areas are creating a greener future, working towards being net zero by 2035, ensuring Costain is a safe, inclusive and great place to work where everyone can be at their best and enhancing the value that Costain contributes to society.

Trading and financial performance

Results

Statutory reported Group revenue for the year was GBP978.4m (2019: GBP1,155.6m). The reduction in revenue results from a lower level of capital project activity, in line with our planned strategic change in mix of services and the revenue impact of contract adjustments on the A465, P&H and ASF South contracts.

Statutory reported loss before tax was GBP96.1m (2019: loss of GBP6.6m) and statutory reported loss per share was 36.7 pence (2019: 2.3 pence).

Adjusted operating profit was GBP18.0m (2019: GBP37.9m) and adjusted basic earnings per share were 5.8 pence (2019: 25.1 pence). The adjusted operating profit reflects the estimated GBP9.2m impact of COVID-19, as well as the impact of an extensive contract review during the year assessing end-of-life assumptions and changes in margin mix and volume.

Order book

We have maintained our strong order book at GBP4.2bn (as at 31 December 2020) with over 90% being repeat orders, of which GBP1.1bn is new contract awards and extensions. In addition, we have a strong preferred bidder position on contracts worth over GBP1.2bn (including GBP1.0bn in respect of the allocated work under the Highways England Smart Motorway Programme) and have secure positions on some 60 major live frameworks, with 27 won in 2020. The level of tendering activity across our target markets remains high.

Operational changes

Leadership team

We have made further significant changes to bolster the Executive Board over the past year. Helen Willis joined as chief financial officer in November 2020, Sue Kershaw was appointed managing director of the transportation division in March 2020, and Sharon Harris was appointed general counsel and company secretary in October 2020. Other new members of the leadership team completed their first year, including Nathan Marsh in the newly-created position of chief digital officer, Maxine Mayhew as managing director of the natural resources division and Catherine Warbrick as human resources director. These changes have brought a refreshed approach and diversified the experience of our executive management team, placing us in an even stronger position to take advantage of the market opportunity open to us.

Improved contract risk management

The Group's contract selection, tender and contract management processes and behaviours have been enhanced over the past 18 months, resulting in lower contract risk and better cost management throughout the lifecycle of our projects. In reassessing our contract selection criteria we have decided not to pursue one-off energy EPC contracts, focusing instead on long term investment programmes.

To enhance tender governance the Group has updated its policies for commercial expectations and risk appetite for all new contracts, including reducing the acceptable level of downside risk and increasing the minimum level of acceptable profit for all new contracts. The Group has also implemented a five-gated approval process prior to signing any contract, including independent risk and assurance review prior to target cost and contract conditions approval.

In addition, the Group has implemented its 'Operational Excellence Model' on all new contracts and existing long-term frameworks. The monitoring and administration of scope of works changes to identify and escalate potential cost increases at an early stage have been enhanced, including the rigour of monthly reviews of all contracts in a standard and mandatory format, and detailed measurement of work in progress and cash collection.

Response to COVID-19

In responding and adapting to COVID-19, our priority has been ensuring the safety and wellbeing of our people and the communities in which we work, as well as protecting our business and continuing to serve our clients.

At the start of the pandemic, we took decisive actions to reduce our cost base, including management taking a reduction to their salaries. Overall, in 2020 the estimated financial impact of COVID-19 was mitigated to a reduction in our profitability of GBP9.2m. The Group received GBP2.0m from the COVID-19 Job Retention Scheme and also took the decision to defer VAT of cGBP10.0m under an agreed UK Government scheme.

In the second half of the year we adapted and maintained strong and effective safety measures which ensured the effective operation of our business across every contract. We remain alert to the continuing challenges and will ensure that we maintain the necessary safety measures in place on all our contracts to both keep our teams safe, and to maintain our productivity.

Our markets

Long-term investment plans are shaping the increased investment in the UK's strategic infrastructure to meet key national priorities. In order to meet and benefit from these key infrastructure priorities for the UK, Costain has positioned itself as one of the UK's leading smart infrastructure solutions companies operating across the transportation, water, energy and defence markets supporting the delivery, enhancement and operation of the UK's critical infrastructure.

These markets have significant long-term investment programmes underwritten by UK Government policy, regulation, legislation and critical national need. They are evolving rapidly and positioned for accelerated growth responding to population increases, climate change, customers' enhanced expectations of improved service, ageing assets and the need for greater efficiency and performance including a growing adoption of technology. All are resulting in Costain's clients changing their business strategies and investment priorities.

UK Government investment

UK Government has set out the critical role of new and modernised infrastructure in supporting the levelling up of a growing and globally competitive economy, and in decarbonising our environment.

National Infrastructure Strategy

In response to the National Infrastructure Commission's Infrastructure Assessment, the UK Government published its National Infrastructure Strategy in November 2020, committing to the investment of GBP27.0bn in economic infrastructure in 2021-22.

Energy White Paper

In December 2020, the UK Government published its Energy White Paper which provides further clarity around the Prime Minister's Ten Point Plan and introduces a strategy to achieve it.

Defence spending

In November 2020 UK Government announced the biggest programme of investment in British defence since the end of the Cold War with a GBP16.5bn increase above its 2019 manifesto commitment to be spent over the next four years. This includes a multi-year settlement to allow the Ministry of Defence to invest in next-generation military capability, building on the previously pledged increase in defence spending.

Devolved authorities

UK Government is investing in numerous local infrastructure programmes in addition to its Levelling Up fund. These programmes aim to increase connectivity, upgrade local road and rail networks and strengthen local environmental protections with record levels of investment in strategic roads, rail, broadband and flood defences.

Regulated and private investment

In addition to UK Government's commitments, the scale of private sector investment in infrastructure is also increasing:

-- In the water market the regulator, Ofwat, has approved investment programmes for the water companies amounting to GBP51.0bn over the next five years to improve water quality standards, supply resilience, decarbonisation and efficiency of operations; and

-- In energy, the UK Government estimates its Ten Point Plan will stimulate further significant private investment by 2030 across energy, buildings, transport, innovation and the natural environment. In addition, Ofgem has confirmed its major investment programme into Britain's energy infrastructure from 2021-26 (RIIO-2) with GBP30.0bn upfront funding to deliver a clean and reliable energy system over and above the Ten Point Plan.

Transforming performance

UK Government is also demanding that our industry transforms the way infrastructure programmes are delivered in the UK to be faster, greener and better. This will be achieved through wide-ranging reforms improving the way projects are chosen, procured and delivered, and the greater use of cutting-edge construction technology. Costain was directly involved in creating, and is a signatory to, the UK Government's Construction Playbook which sets out its proposals for this transformation.

Strategy and evolution of our business

We have made good progress implementing our Leading Edge strategy, aligning our services to meet the changing needs of our clients across the markets which are benefiting most from long term strategic investment programmes. As we broaden our offer from purely complex construction to one which also incorporates more innovative consultancy and digital capabilities, we become increasingly valuable to our clients resulting in a higher level of profitability while at the same time reducing our overall risk profile.

The progress we have made to date, in particular the additional work we have secured over the past 18 months gives us confidence that we will achieve our medium-term strategic objective of 6-7% divisional margins with 55% of profits derived from our higher margin services.

The growth of the business and increase in margins is being delivered through:

   --    Complex construction programme delivery 

Costain continues to build a strong position on the strategic long term (5 to 10 year) capital investment programmes for our clients. Through these programmes we are implementing improved ways of working; delivering safer, faster, greener, better, and more efficient construction solutions, both reducing risk and increasing margins in line with our targets.

   --    Value and implementation orientated consultancy. 

Leveraging our programme delivery skills and expertise we are securing new work as a consultant and advisor, unlocking value for our clients, and ensuring the solutions are delivered effectively. These higher margin consultancy frameworks and contracts, with now over 1,000 consultants deployed, will deliver margins within our targeted range.

   --    Digital performance improvement 

Through leveraging our client relationships, insight, and digital expertise we are improving performance and productivity by delivering digital solutions including improved ways of working, automated services and new technology centric solutions, which will deliver margins in our targeted range.

Details of the contracts secured and being delivered are included within the Operational Review.

As part of our strategy to improve profitability, we are also on track to meet our operational efficiency targets aimed at delivering GBP20.0m of annualised efficiencies by the end of 2024. We will be over half-way to achieving this target at the end of 2021, which will enhance our competitiveness and business efficiency, with some of these efficiencies shared with our clients as well as reinvesting in the development of our business.

Everyone at Costain is focused on ensuring all projects are delivered to plan and project risks are managed effectively. This absolute focus alongside the delivery of our strategic plan is the bedrock to delivering the improved performance we expect next year and over the years ahead.

People

Our people are essential to the success of our business and we are proud to have such a highly skilled and experienced employee base of c3,100 people, including over 400 chartered professionals with a diverse range of capabilities and c80 graduates and c115 apprentices on a structured development programme.

Diversity and inclusion remain a business imperative for us and we were very proud to be named as a Times Top 50 Employers for Women for a third year running. During the year, we stood in solidarity with our black colleagues, showing support for the Black Lives Matter movement. We signed up to the CBI 'Change the Race Ratio' and Business In the Community's 'Race at Work' pledge. In addition, we are a proud signatory of the Valuable 500, a global initiative to raise awareness of disability inclusion and commit businesses to action on this important topic.

Environment, social purpose and governance (ESG)

Costain is committed to leading on conducting business responsibly and this is a business imperative for the Group. The safety of our people and the general public is our number one priority. We have maintained a world-leading safety performance, with only 10 reportable accidents occurring in over 31 million hours of work. Our accident frequency rate (AFR) of 0.03 continues to lead the industry and we are pleased to report that we had no major environmental incidents in 2020. In February 2020 we published our Climate Change Action Plan which set out the Group's commitment to deliver low carbon solutions to every client by 2023 and to be net zero by 2035 at the latest without offsetting. In delivering our Responsible Business Commitments, the Costain business was included in the FTSE4Good Index for the first time, demonstrating our strong Environmental, Social and Governance (ESG) practices.

Board

On 19 June 2020, Bishoy Azmy joined the Board as non-independent non-executive director and representative of ASGC, which has a 15.15% shareholding in the Company following the capital raising completed in 2020. David McManus, non-executive director, stepped down from the Board on 19 June 2020 after six years of service.

Helen Willis was appointed chief financial officer on 30 November 2020 succeeding Anthony Bickerstaff who stepped down from the Board on the same date after 14 years in the role.

Tony Quinlan has been appointed to the Board as a non-executive director with effect from 1 February 2021. As announced on 27 January 2021, Jane Lodge, senior independent director and chair of the audit committee, will be stepping down from the Board after nine years of service at the conclusion of the Company's 2021 AGM to be held on 6 May 2021 and it is intended Tony Quinlan will succeed Jane as chair of the audit committee after the AGM.

Dividend

The Group does not recommend a dividend for 2020. The Board recognises the importance of dividends to shareholders and will continue to review the timing of the reinstatement of future dividends in the light of the Group's performance, cash flow requirements and the importance of maintaining a strong balance sheet.

Outlook

Looking ahead, while mindful of the macro-economic uncertainties, we are confident in delivering growth in profits and margins this year. Costain is in a strong position with a high volume of secured long-term programmes and a positive market outlook, in particular the UK Government's commitment to invest in infrastructure to support the levelling up of our economic activity and decarbonisation of our environment.

DIVISIONAL REVIEW

Our strategy has positioned Costain to benefit from the key investment priorities, with an increasing proportion of the new business being from higher margin services. The table below (non-exhaustive) demonstrates our alignment to the UK's strategic national investment programmes.

 
Key strategic national  Costain's contract alignment to strategic 
 investment programmes   national investment programmes 
Strategic Highway 
 Networks                             *    Complex Programme delivery 
 (Highways England 
 - RIS2) 
                                     o M1 smart motorway programme 
                                     o A14 Integrated Delivery Partnership 
                                     o Regional Delivery Programme - A1, A12, 
                                     A19, A30, 
                                     o Smart Motorway Alliance 
                                      *    Maintenance contracts, areas 12 & 14 
 
 
                                      *    Consultancy partner 
 
 
                                     o SPaTS2 
                                      *    Digital frameworks - TMT II 
                        -------------------------------------------------------------------- 
HS2 
                          *    HS2 Enabling works and HS2 S1 and S2 Main works 
 
 
                          *    Consultancy partner on Phase 2 
                        -------------------------------------------------------------------- 
Ofwat Regulated Water 
 Investment                           *    Thames Tideway Tunnel 
 
 
                                      *    AMP 7 capital delivery frameworks - Thames Water, 
                                           Severn Trent Water and Southern Water 
 
 
                                      *    Strategic Pipeline Alliance with Anglian Water, 
                                           including digital twin 
 
 
                                      *    United Utilities managed maintenance services 
                                           programme 
 
 
                                      *    Consultancy 
 
 
                                     o Yorkshire Water Technical Services Framework 
                                     and Assurance Services 
                                     o United Utilities Manchester Resilience 
                                     programme 
                                     o Thames Water PMO 
                                     o Asset optimisation consultancy for Southern 
                                     Water 
                                     o South Staffs Water consultancy and asset 
                                     management services 
                                     o Welsh Water Hy-Value project 
                        -------------------------------------------------------------------- 
Network Rail CP6 
                          *    Gatwick Station upgrade 
 
 
                          *    Design Services Framework 
                        -------------------------------------------------------------------- 
Investment in local 
 infrastructure           *    Lancashire County Council Preston Western Distributor 
 Devolved Authorities          Road 
 
 
                          *    East Sussex County Council highway services asset 
                               management programme 
 
 
                          *    Bradford Council street lighting - project 
                               management/consultancy 
 
 
                          *    TFL A40 Westway and Hammersmith Bridge and 
                               Professional Services Framework 
                        -------------------------------------------------------------------- 
Central Government 
                          *    Crown Commercial Services Management Consultancy 
                               Framework 
 
 
                          *    DOS4 Central Government Digital Framework 
 
 
                          *    Government G-Cloud 12 Framework - consultancy/digital 
                        -------------------------------------------------------------------- 
Green Industrial 
 Revolution               *    Sellafield Decommissioning Delivery Partner 
 
 
                          *    Cadent CMO 
 
 
                          *    Cadent FEEDs 
 
 
                          *    South Wales Industrial Cluster - decarbonisation work 
 
 
                          *    Hydrogen design service contracts 
 
 
                          *    INEOS Breagh Gas plant FEED 
 
 
                          *    Pale Blue Dot - Acorn Carbon Capture FEED 
 
 
                          *    EDF Project Controls Framework 
                        -------------------------------------------------------------------- 
Defence 
 Equipment Programme      *    AWE - Project MENSA 
 
 
                          *    Devonport Royal Dockyard P3M consultancy services and 
                               Delivery Partner roles 
 
 
                          *    Dreadnought Alliance 
                        -------------------------------------------------------------------- 
 

Transportation

 
GBPm                      2020 Adjusted(1)  2020 Statutory  2019 Adjusted(1)  2019 Statutory 
Revenue                   724.2             674.1           740.6             720.6 
------------------------  ----------------  --------------  ----------------  -------------- 
 
Operating profit/(loss)   20.1              (30.3)          29.7              9.7 
------------------------  ----------------  --------------  ----------------  -------------- 
 

(1) Refer to financial statements notes 3 and 4

The division has a forward order book of GBP3.1bn (2019: GBP3.1bn), which includes our Regional Delivery Partnership (RDP) position of GBP1.1bn and a preferred bidder position on the Smart Motorways Alliance with allocated work of GBP1.0bn.

Notable contract wins in 2020 include: the Smart Motorway Alliance (GBP1.3bn), RDP addition of A30 (GBP250m) and Specialist Professional and Technical Services framework (SPaTS2) for Highways England; commencement of phase 1 of the Main Works Civils Contract joint venture for HS2 (GBP1.4bn); a smart street lighting project for Bradford Council helping them deliver their targeted efficiency programme and Network Rail's Design Services Framework.

Highways

As a strategic partner for Highways England, we opened the flagship A14 Cambridge to Huntingdon project early and to budget. This project combats congestion, improves safety and unlocks regional growth by connecting people in the region. On RDP, which is delivering schemes set out in the Road Investment Strategy through a longer-term, integrated approach to improve benefits and eliminate waste, we are continuing to deliver the A19 Testo's scheme and have started work on the adjacent Downhill Lane Junction scheme. We have also mobilised the A30 contract and we continue to develop innovative solutions with Highways England on three road improvement contracts on the A1 and the A12 widening.

Costain has worked with Highways England for many years to improve the safety, capacity and journey experience on the nation's strategic road network. As well as delivering smart motorways as part of the Smart Motorway Alliance, we are providing highways maintenance services on the M1 and M62 smart motorways in Yorkshire and Humber as part of our Area 12 contract. We are delivering R&D projects to support the continuing development of digital roads and we successfully completed our 'Connected Digital Roads' project, which explored opportunities for integrating smart motorway technology with connected vehicle technology to enhance the benefits of smart motorways. In addition, we continue to support Highways England's operations division with a number of asset management contracts.

We continue to support devolved investment in infrastructure. We are working with East Sussex County Council on its highways services asset management programme, Lancashire County Council on the Preston Western Distributor Road to improve connectivity and economic growth in the region and Bradford City Council on its green street lighting programme.

In developing our position as a valued implementation-biased consultant, we are working with Transport for London (TfL) in consultancy roles on Hammersmith Pedestrian Bridge and the A40 Westway upgrade. We continue to support the Department for Transport as a prime supplier on its STARTwo consultancy framework, under which we offer advice to the Government on a range of strategic, nationally important transportation issues. Working with Highways England through the SPaTS2 framework, we are supporting the shaping of the future roads network and improved methods of programme delivery. Our technology centre continues to develop and implement new systems to meet the needs of an increasingly digital strategic road network.

Rail

In this period, due to the impact of COVID-19 on Crossrail's budget and programme, our joint venture mutually agreed settlement and termination on Crossrail's Bond Street station. Work continues on the systems and technology required for commissioning the Elizabeth Line, and we have secured, by client request, a one year extension on this contract to help the client successfully deliver the new railway. As this is published, we are working hand in hand with Crossrail to deliver Paddington and secure opening deadlines for the station.

Our activity on High Speed 2, Britain's low carbon, high capacity railway is progressing well and growing significantly. We are delivering the Enabling Works and have mobilised the Phase 1 Main Civils Contracts on two major sections of the route. Our consulting team has continued to support the design work associated with the Hybrid Bill for Phase 2a and the development of the route for Phase 2b.

The upgrade of Gatwick Airport Station for Network Rail to improve capacity of this critical UK transportation hub is progressing well. We continue to work with Network Rail on our reliable, solar powered, wireless, radar-based warning system (Meerkat) and this will be deployed across the majority of Network Rail's remote level crossings in 2021.

Pushing the pace on digitisation and innovation to drive better, faster and greener delivery of infrastructure, we are working together with key partner SAP and a consortium of industry leading enterprises (such as Transport for London (TfL), HE, HS2 and Network Rail) called the 'Transport Infrastructure Efficiency Strategy Living Lab' (TIES Living Lab) to create a demonstrator for a new cloud-based data platform called the Intelligent Infrastructure Control Centre (IICC).

Aviation

Despite early success in securing consultancy frameworks for Manchester Airports Group, Heathrow Airport Limited and Gatwick Airport, we have adjusted the focus of our aviation business as the industry is in stasis due to COVID-19, reaching out to regional airports and widening our offering to border issues and alternative fuel usages such as hydrogen.

Central government

Costain has built a new portfolio of work with central government and continues to win and deliver important and influential services to key clients in this sector. We delivered throughout 2020 as a technical and commercial partner to the Department for Transport on highly complex time sensitive and critical projects facing the UK economy during COVID-19 and in preparation for BREXIT. In addition to this work we have also undertaken strategic consulting assignments for Infrastructure and Projects Authority, the Cabinet Office and for the Department for Business, Energy and Industrial Strategy to lay the foundations for building back a better, more sustainable Britain in line with the SPEED Strategy.

Natural Resources

 
GBPm                      2020 Adjusted(1)  2020 Statutory  2019 Adjusted(1)  2019 Statutory 
Revenue                   345.1             303.1           429.4             429.4 
------------------------  ----------------  --------------  ----------------  -------------- 
 
Operating profit/(loss)   5.7               (43.6)          15.4              15.4 
------------------------  ----------------  --------------  ----------------  -------------- 
 

(1) Refer to financial statements notes 3 and 4

As at 31 December 2020, the division had a forward order book of GBP1.1bn (2019: GBP1.1bn), reflecting wins of GBP0.4bn in 2020.

Notable contract wins across the range of our broader services include the Strategic Pipeline Alliance for Anglian Water; the Technical Services Framework for Yorkshire Water; the AMP7 PMO contract for Thames Water; the programme management consultancy for Cadent and P3M consultancy and delivery partner roles for Babcock at Devonport Royal Dockyard.

Water

We are focused on helping our clients respond to the Ofwat regulatory requirements for water companies, enabling them to meet stretching performance targets and efficiency challenges in the period to 2025. We have secured positions with our broadest ever number of clients as we move into AMP7. We continue our complex capital delivery programme delivery with Severn Trent Water, Southern Water and Thames Water, driving efficient and innovative solutions such as asset optimisation. We are appointed as sole Maintenance Service Provider for United Utilities, providing overall management and delivery of United Utilities' larger-scale water and wastewater asset maintenance activities across the entirety of its network. Our appointment on Yorkshire Water's Technical Services Framework will see us providing a broad range of integrated consultancy and digital services to support our client in driving efficient transformation and optimisation of its water and wastewater assets during the first four years of AMP7. We are working alongside Anglian Water in its Strategic Pipeline Alliance to develop an enterprise-ready digital twin which will optimise management of the water network throughout the lifecycle of the new strategic pipeline and provide a much better, more stable, 24/7 service to all of its customers. We provide consultancy services to Thames Water as PMO, driving efficient delivery across its whole AMP7 programme. We also continue to provide consultancy and asset management services to South Staffs Water. We are working to support the UK water sector to achieve net zero carbon by 2030. In collaboration with Welsh Water, we have been awarded funding by Innovate UK for the Hy-Value project, demonstrating significant progress towards converting sewage-derived biogas into zero-emission fuel.

We are now finalising works on the AMP6 five-year programmes for Thames Water, Severn Trent Water and Southern Water. Our AMP6 contract with Thames Water includes an element of incentivisation, aligned to the client's objectives, estimated through the life of the contract and finalised at the end of the programme.

The Thames Tideway project, on which we are in a joint venture to deliver the east section, continues to progress well. We have recently reached an important milestone on the project, with both tunnel boring machines launched in 2020 and overall completion is scheduled for 2024.

Energy

We continue to drive the transformation of our energy sector with a renewed market focus on expanding our consultancy services in decarbonisation and maximising existing asset performance.

In 2020, we secured leading roles in the future decarbonisation of the UK through three UK carbon capture and storage cluster schemes, as well as delivering a number of firsts in the UK decarbonisation space; first trial of hydrogen into regional distribution network; first in network gas compression for Biogas; first carbon capture scheme; and first microgrid and resilience as a service project for Scottish and Southern

Electricity Networks. We continued our important roles in both the South Wales and Scotland industrial clusters and demonstrated the feasibility of the concept of hydrogen 'deblending' for a first of its kind programme that brings together all the gas distribution networks to collaboratively develop innovative hydrogen solutions that will decarbonise energy for heat, transport, industry and power generation. While the pace of the UK transitioning to a decarbonised energy network is slower than expected, we have secured key positions which allow us to continue to support our clients today, while working with them to shape and deliver the energy networks of the future.

In addition, in 2020, Costain has provided strategic planning and programme management to Cadent as part of its 10 year capital investment programme. This contract builds on the established partnership Costain has with Cadent as one of its partners overseeing the HS2 gas main diversions. We are also Cadent's strategic partner in the transition to the decarbonisation of energy networks including the hydrogen economy through the North West Hydrogen Alliance and the OptiNet project to research gas compression technology.

Our Sellafield decommissioning framework and EDF Project Controls framework contracts continue to perform in line with expectations.

Defence

In 2020, Costain strengthened its market position as a valued consultant with a number of key client wins. Today, we are involved in the Continuous at Sea Deterrent programme at several levels, working with defence primes including AWE, Rolls Royce and BAE and directly with the Ministry of Defence via the Crown Commercial Services framework. In addition, we are providing P3M consultancy services and delivery partner roles for Babcock at Devonport Royal Dockyard. Our programme management contract for AWE continues to meet performance expectations, allowing us to secure opportunities to support AWE on additional projects.

OTHER FINANCIAL INFORMATION

Other items and adjusted profit

To aid understanding of the underlying performance of the Group, adjusted operating profit and adjusted profit before tax have been used as alternative performance measures. These measures exclude items which are considered to be one-off and unusual in nature or related to accounting treatment of acquisitions and fall into two categories:

1. the contract adjustments of GBP94.7m on the A465 and Peterborough & Huntingdon contracts detailed below as well as the GBP5.0m final settlement charge against a contract (ASF South) that completed five years ago; and

2. 'other items' of GBP10.3m, which are shown in a separate column in the consolidated income statement include amortisation of acquired intangible assets, deferred consideration treated as an employment expense, impairments and profits and losses on sales of non-core assets (impairment of non-core assets GBP1.2m, profits on the sale of non-core assets in Zimbabwe GBP1.0m and Spain GBP0.4m, the sale of 'Building Schools for the Future' interests GBP1.6m) and a GBP9.0m impairment of goodwill in our natural resources division, one-off costs associated with advice received in renegotiating the Group's bank facilities GBP1.2m and a GBP0.9m charge relating to GMP equalisation of certain transfers of pension liabilities following another Lloyds pension scheme court ruling in late 2020.

Peterborough & Huntingdon Contract

On 29 June 2020, Costain announced that a termination and settlement agreement (the "Agreement") had been reached with National Grid to cease work on the Peterborough & Huntingdon gas compressor project (the "Contract") following a significant change in scope. The Agreement includes a legal process, through adjudications, to agree up to GBP80.0m of identified compensation events, recover costs to date and eliminate a potential liability to National Grid for completing the works.

In its interim results for the six months ended 30 June 2020, Costain recorded a charge to the income statement of GBP49.3m reflecting the cash position at termination. The legal process is ongoing and all adjudications will be filed by December 2021. Supported by external advice, Costain believes it has a strong entitlement to retain, as a minimum, the reported position, with no further cash outflow.

Under the terms of the Agreement, the cumulative outcome for Costain of these adjudications could range from an additional cash receipt of up to a maximum of GBP50.0m to a cash payment (which would not affect Costain's banking arrangements) of up to a maximum of GBP57.3m. Any such cash adjustments would be made in the first quarter of 2022.

A465 Contract

As announced on 17 February 2021, a settlement agreement was entered into with the Welsh Government in relation to the A465 contract. The financial terms of the settlement are in line with the provision made by the Group at the half-year of GBP45.4m. As a result of the settlement, the Company has certainty of the final account sum payable by the Welsh Government to the Company, including further milestone payments. Work on the contract is nearing completion, and the Company continues to be responsible for the delivery and the management of associated project risks for the remaining works, which are scheduled to be completed in September 2021.

ASF South

Following an extensive contract review, a decision was taken to take a one-off charge of GBP5.0m to settle a legacy contract with Highways England where works were completed in 2016.

Sale of non-core assets

Alcaidesa

In August 2020, the Group sold its marina concession for EUR4.75m, the disposal of which completes the Group's strategy to divest its non-core business assets in Spain. The aggregate loss on the sale was GBP0.2m, including an impairment charge in the first half of the year. Revenue in this non-core division in the period was GBP1.2m (2019: GBP5.6m) with a GBP0.1m operating loss (2019: GBP0.7m).

Legacy asset disposals

In the first half of the year, the Group completed the sale of its legacy company that held property assets in Zimbabwe for GBP1.0m (net of costs), which as the assets were held at no value represents the profit on the disposal. In August 2020, the Group also completed the sale of its equity share in its two remaining 'Building Schools for the Future' partnership companies for a combined consideration of GBP3.7m. The Group's full year results include the profit of GBP1.6m from the sale.

Net financial expense

Net finance expense amounted to GBP4.3m (2019: GBP3.7m). The interest payable on bank overdrafts, loans and other similar charges was GBP4.1m (2019: GBP3.3m) and the interest income from bank deposits and other loans and receivables amounted to GBP0.6m (2019: GBP0.9m). In addition, the net finance expense includes the interest income on the net assets/liabilities of the pension scheme of GBP0.2m (2019: GBP0.1m income) and the interest expense on lease liabilities of GBP1.0m (2019: GBP1.3m) under IFRS16. 2019 included an unwind of discount on deferred consideration of GBP0.1m.

Tax

The Group has a tax credit of GBP18.1m (2019: GBP3.7m credit) giving an effective tax rate of 18.8%. The 2020 tax credit arose from recognising a deferred tax asset in respect of losses that will be utilised against future taxable profits. We expect the effective tax rate to remain close to the statutory tax rate of 19% until 2023, when it will increase to 25% as announced in the recent Budget.

Debt, cash conversion

The Group had a positive net cash balance of GBP102.9m as at 31 December 2020 (2019: GBP64.9m); comprised of a Costain cash balance of GBP89.8m (2019: GBP97.4m), cash held by joint operations of GBP61.1m (2019: GBP83.5m) and borrowings of GBP48.0m (before arrangement fees of GBP1.2m) (2019: GBP116.0m). Approximately GBP17.0m of the net cash balance (2019: GBP35.0m) reflects positive timing of receipts at the year-end which reversed in the early part of 2021. During the year, the Group's average month-end net cash balance was GBP73.8m (2019: GBP41.2m) improving to GBP94.4m in the second-half.

The cash inflow in the period reflects the positive cash flow from the capital raising, operations and asset sales offset by operating outflows on P&H and A465, working capital movements, and associated pension deficit contributions.

Contract bonding and banking facilities

The Group has in place banking and bonding facilities from banks and surety bond providers to meet the current and projected usage requirements. The Group has banking facilities of GBP179.0m with its relationship banks with a maturity date of 24 September 2023. These facilities are made up of a GBP131.0m revolving credit facility and a GBP48.0m term loan.

In addition, the Group has in place committed and uncommitted bonding facilities of GBP320.0m. Utilisation of the total bonding facilities on 31 December 2020 was GBP112.3m (31 December 2019: GBP122.0m).

Pensions

As at 31 December 2020, the Group's pension scheme deficit in accordance with IAS 19, was GBP5.6m (2019: GBP4.9m surplus).

Based on the actuarial valuation as at 31 March 2019, the Company has in place a deficit reduction plan, agreed with the pension scheme Trustee, which requires a contribution of GBP10.2m per annum (increasing annually with inflation). In addition, as previously implemented, the Group will continue to make an additional contribution so that total deficit contributions match the total dividend amount paid by the Company each year.

DIRECTORS REPORT

Going concern

The Directors have reviewed the budgets for 2021 and the projections for 2022 developed during the 2020 annual strategic planning cycle. They have assessed the future funding requirements of the Group and compared them with the level of available borrowing facilities. They have also assessed the ongoing impact on the Group's trading arising from the UK's departure from the EU, which is not anticipated to be significant in the context of the Group's operations. Our projects have been operational through the majority of the COVID-19 lock down period and this is expected to continue. Based on this, the Directors are satisfied that the Group has adequate resources to continue in operational existence for at least 12 months from the date of approval of the financial statements. For this reason, they confirm that it is appropriate to adopt the going concern basis in preparing the financial statements.

Principal risks and uncertainties

The Board has conducted a thorough assessment of the principal risks facing the Group during the year, including those that would threaten the successful and timely delivery of its strategic priorities, future performance, solvency and liquidity. A full discussion can be found at the end of this document and will be set out in our Annual Report and Accounts.

Responsibility statement

The responsibility statement below has been prepared in connection with (and will be set out in) the Group's Annual Report and Accounts for the year ended 31 December 2020 (the 'Annual Report and Accounts').

Each of the persons who is a Director at the date of approval of the Annual Report and Accounts confirms that to the best of his or her knowledge:

-- The Group financial statements, prepared in accordance with IFRS as adopted by the EU, give a true and fair view of the assets, liabilities, financial position and profit of the Company and of the Group taken as a whole;

-- The Strategic report and the Directors' report in the Annual Report and Accounts includes a fair review of the development and performance of the business and the position of the Company and the Group taken as a whole, together with a description of the principal risks and uncertainties that they face; and

-- The Annual Report and Accounts, taken as a whole, is fair, balanced and understandable and provides the information necessary for shareholders to assess the Group's financial position, performance, business model and strategy.

A list of current directors and their respective responsibilities is maintained on the Costain website at www.costain.com .

For and on behalf of the Board

Alex Vaughan

Chief Executive Officer

Helen Willis

Chief Financial Officer

16 March 2021

Cautionary statement

This report contains forward-looking statements. These have been made by the Directors in good faith based on the information available to them up to the time of their approval of this report. The Directors can give no assurance that these expectations will prove to have been correct. Due to the inherent uncertainties, including both economic and business risk factors underlying such forward-looking information, actual results may differ materially from those expressed or implied by these forward-looking statements. The Directors undertake no obligation to update any forward-looking statements whether as a result of new information, future events or otherwise.

CONSOLIDATED INCOME STATEMENT

 
 Year ended 31 December                           2020                               2019 
                                        Before                           Before 
                                         other    Other                   other    Other 
                             Notes       items    items       Total       items    items       Total 
                                          GBPm     GBPm        GBPm        GBPm     GBPm        GBPm 
--------------------------  ------  ----------  -------  ----------  ----------  -------  ---------- 
 Group revenue                 4         978.4        -       978.4     1,155.6        -     1,155.6 
--------------------------  ------  ----------  -------  ----------  ----------  -------  ---------- 
 Cost of sales before 
  other items                        (1,027.0)        -   (1,027.0)   (1,105.1)        -   (1,105.1) 
 Arbitration award 
  on historical building 
  project                                    -        -           -           -    (9.7)       (9.7) 
--------------------------  ------  ----------  -------  ----------  ----------  -------  ---------- 
 Cost of Sales                       (1,027.0)        -   (1,027.0)   (1,105.1)    (9.7)   (1,114.8) 
--------------------------  ------  ----------  -------  ----------  ----------  -------  ---------- 
 Gross (loss)/profit                    (48.6)        -      (48.6)        50.5    (9.7)        40.8 
--------------------------  ------  ----------  -------  ----------  ----------  -------  ---------- 
 Administrative 
  expenses before 
  other items                           (33.1)        -      (33.1)      (32.6)        -      (32.6) 
 Impairment of Alcaidesa 
  marina                                     -    (0.6)       (0.6)           -    (5.9)       (5.9) 
 Impairment of other 
  investment                                 -    (0.6)       (0.6)           -        -           - 
 Profit on sales 
  of interests in 
  joint ventures 
  and associates                             -      1.6         1.6           -        -           - 
 Profit/(loss) on 
  disposal of subsidiary 
  undertakings                               -      1.4         1.4           -    (3.0)       (3.0) 
 Refinancing advisory 
  fees                                       -    (1.2)       (1.2)           -        -           - 
 Pension GMP equalisation 
  charge                      12             -    (0.9)       (0.9)           -        -           - 
 Amortisation of 
  acquired intangible 
  assets                       9             -    (1.0)       (1.0)           -    (2.3)       (2.3) 
 Impairment of goodwill        9             -    (9.0)       (9.0) 
 Employment related 
  and other deferred 
  consideration                              -        -           -           -    (0.2)       (0.2) 
--------------------------  ------  ----------  -------  ----------  ----------  -------  ---------- 
 Administrative 
  expenses                              (33.1)   (10.3)      (43.4)      (32.6)   (11.4)      (44.0) 
--------------------------  ------  ----------  -------  ----------  ----------  -------  ---------- 
 Group operating 
  (loss)/profit                         (81.7)   (10.3)      (92.0)        17.9   (21.1)       (3.2) 
 Share of results 
  of joint ventures 
  and associates                           0.2        -         0.2         0.3        -         0.3 
--------------------------  ------  ----------  -------  ----------  ----------  -------  ---------- 
 (Loss)/profit from 
  operations                   4        (81.5)   (10.3)      (91.8)        18.2   (21.1)       (2.9) 
 Finance income                5           0.8        -         0.8         1.0        -         1.0 
 Finance expense               5         (5.1)        -       (5.1)       (4.6)    (0.1)       (4.7) 
--------------------------  ------  ----------  -------  ----------  ----------  -------  ---------- 
 Net finance expense                     (4.3)        -       (4.3)       (3.6)    (0.1)       (3.7) 
--------------------------  ------  ----------  -------  ----------  ----------  -------  ---------- 
 (Loss)/profit before 
  tax                                   (85.8)   (10.3)      (96.1)        14.6   (21.2)       (6.6) 
 Taxation                      6          17.5      0.6        18.1       (0.1)      3.8         3.7 
--------------------------  ------  ----------  -------  ----------  ----------  -------  ---------- 
 (Loss)/profit for 
  the year attributable 
  to equity holders 
  of the parent                         (68.3)    (9.7)      (78.0)        14.5   (17.4)       (2.9) 
--------------------------  ------  ----------  -------  ----------  ----------  -------  ---------- 
 (Loss)/earnings 
  per share 
 Basic                         7                            (36.7)p                           (2.3)p 
 Diluted                       7                            (36.7)p                           (2.3)p 
--------------------------  ------  ----------  -------  ----------  ----------  -------  ---------- 
 

The impact of business disposals in either year was not material and, therefore, all results are classified as arising from continuing operations.

 
 CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME AND EXPENSE 
 Year ended 31 December 
                                                                2020     2019 
                                                                GBPm     GBPm 
 ---------------------------------------------------------   -------  ------- 
 Loss for the year                                            (78.0)    (2.9) 
----------------------------------------------------------   -------  ------- 
 
 Items that may be reclassified subsequently to 
  profit or loss: 
 Exchange differences on translation of 
  foreign operations                                             0.2    (1.4) 
 Exchange differences on translation transferred 
  to the income statement                                      (1.2)    (3.7) 
 Net investment hedge: 
     Effective portion of changes in fair value 
      during year                                                0.1      1.6 
     Net changes in fair value transferred 
      to the income statement                                    0.4      2.0 
 Cash flow hedges : 
  Effective portion of changes in fair 
   value during year                                           (0.3)    (0.4) 
  Net changes in fair value transferred 
   to the income statement                                       0.5    (0.8) 
 Total items that may be reclassified subsequently 
  to profit or loss                                            (0.3)    (2.7) 
-----------------------------------------------------------  -------  ------- 
 Items that will not be reclassified to 
  profit or loss: 
 Remeasurement of retirement benefit (obligations)/asset      (19.9)    (7.0) 
 Tax recognised on remeasurement of retirement 
  benefit (obligations)/asset                                    3.8      1.2 
-----------------------------------------------------------  -------  ------- 
 Total items that will not be reclassified 
  to profit or loss                                           (16.1)    (5.8) 
-----------------------------------------------------------  -------  ------- 
 Other comprehensive expense for the year                     (16.4)    (8.5) 
-----------------------------------------------------------  -------  ------- 
 Total comprehensive expense for the year 
  attributable to equity holders of the 
  parent                                                      (94.4)   (11.4) 
----------------------------------------------------------   -------  ------- 
 
 
 CONSOLIDATED STATEMENT OF FINANCIAL POSITION 
 As at 31 December                   Notes     2020    2019 
                                               GBPm    GBPm 
---------------------------------   -------  ------  ------ 
 Assets 
 Non-current assets 
 Intangible assets                     9       52.1    59.0 
 Property, plant and 
  equipment                            10      39.9    44.1 
 Equity accounted investments                   0.4     2.5 
 Retirement benefit 
  asset                                           -     4.9 
 Trade and other receivables                    3.5     2.1 
 Deferred tax                                  23.6     4.6 
----------------------------------  -------  ------  ------ 
 Total non-current 
  assets                                      119.5   117.2 
----------------------------------  -------  ------  ------ 
 Current assets 
 Inventories                                    0.6     1.3 
 Trade and other receivables                  218.7   247.6 
 Taxation                                       0.2     5.5 
 Cash and cash equivalents             11     150.9   180.9 
----------------------------------  -------  ------  ------ 
 Total current assets                         370.4   435.3 
----------------------------------  -------  ------  ------ 
 Total assets                                 489.9   552.5 
----------------------------------  -------  ------  ------ 
 Liabilities 
 Non-current liabilities 
 Retirement benefit 
  obligations                          12       5.6       - 
 Other payables                                 1.1     0.7 
 Interest bearing loans 
  and borrowings                               39.6    48.0 
 Lease liabilities                             20.8    17.2 
 Total non-current 
  liabilities                                  67.1    65.9 
----------------------------------  -------  ------  ------ 
 Current liabilities 
 Trade and other payables                     246.0   247.4 
 Interest bearing loans 
  and borrowings                                7.2    68.0 
 Lease liabilities                             12.5    12.8 
 Provisions for other 
  liabilities and charges                       0.6     0.7 
----------------------------------  -------  ------  ------ 
 Total current liabilities                    266.3   328.9 
----------------------------------  -------  ------  ------ 
 Total liabilities                            333.4   394.8 
----------------------------------  -------  ------  ------ 
 Net assets                                   156.5   157.7 
----------------------------------  -------  ------  ------ 
 Equity 
 Share capital                         13     137.5    54.1 
 Share premium                                 16.4    16.4 
 Translation reserve                            0.6     1.1 
 Hedging reserve                              (0.3)   (0.5) 
 Retained earnings                              2.3    86.6 
----------------------------------  -------  ------  ------ 
 Total equity                                 156.5   157.7 
----------------------------------  -------  ------  ------ 
 
 
 CONSOLIDATED STATEMENT OF CHANGES IN 
  EQUITY 
 
                              Share      Share   Translation    Hedging     Merger    Retained     Total 
                            capital    premium       reserve    reserve    reserve    earnings    equity 
                               GBPm       GBPm          GBPm       GBPm       GBPm        GBPm      GBPm 
------------------------  ---------  ---------  ------------  ---------  ---------  ----------  -------- 
 At 1 January 2019             53.5       15.0           2.6        0.7          -       110.5     182.3 
 
 Loss for the year                -          -             -          -          -       (2.9)     (2.9) 
 Other comprehensive 
  expense                         -          -         (1.5)      (1.2)          -       (5.8)     (8.5) 
 Issue of ordinary 
  shares under employee 
  share option plans            0.3        0.4             -          -          -       (0.2)       0.5 
 Shares purchased 
  to satisfy employee 
  share schemes                   -          -             -          -          -       (0.7)     (0.7) 
 Equity-settled 
  share-based payments            -          -             -          -          -         0.5       0.5 
 Dividends paid                 0.3        1.0             -          -          -      (14.8)    (13.5) 
------------------------ 
 At 31 December 
  2019                         54.1       16.4           1.1      (0.5)          -        86.6     157.7 
------------------------  ---------  ---------  ------------  ---------  ---------  ----------  -------- 
 At 1 January 2020             54.1       16.4           1.1      (0.5)          -        86.6     157.7 
 
 Loss for the year                -          -             -          -          -      (78.0)    (78.0) 
 Other comprehensive 
  (expense)/ income               -          -         (0.5)        0.2          -      (16.1)    (16.4) 
 Shares purchased 
  to satisfy employee 
  share schemes                   -          -             -          -          -       (0.2)     (0.2) 
 Equity-settled 
  share-based payments            -          -             -          -          -         0.9       0.9 
 Capital raise (note 
  13)                          83.4          -             -          -        9.1           -      92.5 
 Transfer                         -          -             -          -      (9.1)         9.1         - 
------------------------  ---------  ---------  ------------  ---------  ---------  ----------  -------- 
 At 31 December 
  2020                        137.5       16.4           0.6      (0.3)          -         2.3     156.5 
------------------------  ---------  ---------  ------------  ---------  ---------  ----------  -------- 
 
 
 CONSOLIDATED CASH FLOW STATEMENT 
 Year ended 31 December                                  Notes      2020     2019 
                                                                    GBPm     GBPm 
------------------------------------------------------  ------  --------  ------- 
 Cash flows from/(used by) operating activities 
 Loss for the year                                                (78.0)    (2.9) 
 Adjustments for: 
 Share of results of joint ventures and associates                 (0.2)    (0.3) 
 Finance income                                            5       (0.8)    (1.0) 
 Finance expense                                           5         5.1      4.7 
 Taxation                                                  6      (18.1)    (3.7) 
 Impairment of Alcaidesa marina                                      0.6      5.9 
 Impairment of other investment                                      0.6        - 
 Profit on sales of interests in joint ventures                    (1.6)        - 
  and associates 
 (Profit)/loss on disposal of subsidiary undertakings              (1.4)      3.0 
 Pension GMP equalisation charge                                     0.9        - 
 Depreciation of property, plant and equipment            10        15.0     17.7 
 Amortisation of intangible assets                         9        10.5      2.6 
 Employment related and other deferred consideration                   -      0.2 
 Shares purchased to satisfy employee share 
  schemes                                                          (0.2)    (0.7) 
 Share-based payments expense                                        0.9      0.5 
------------------------------------------------------  ------  --------  ------- 
 Cash (used by)/from operations before changes 
  in working capital and provisions                               (66.7)     26.0 
 Decrease in inventories                                             0.7      0.1 
 Decrease in receivables                                            25.5     30.2 
 Decrease in payables                                              (0.1)   (63.5) 
 Movement in provisions and employee benefits                     (10.4)   (16.3) 
------------------------------------------------------  ------  --------  ------- 
 Cash used by operations                                          (51.0)   (23.5) 
 Interest received                                                   0.8      1.0 
 Interest paid                                                     (5.1)    (4.6) 
 Taxation received/(paid)                                            8.3    (5.1) 
------------------------------------------------------  ------            ------- 
 Net cash used by operating activities                            (47.0)   (32.2) 
------------------------------------------------------  ------  --------  ------- 
 Cash flows from/(used by) investing activities 
 Dividends received from joint ventures and 
  associates                                                         0.2      0.2 
 Additions to property, plant and equipment                        (0.5)    (3.8) 
 Additions to intangible assets                                    (3.6)    (3.1) 
 Proceeds of disposals of property, plant and 
  equipment and intangible assets                                    0.3      0.3 
 Repayment of loans by joint ventures and associates                   -      0.1 
 Proceeds of sales of interests in joint ventures                    3.7        - 
  and associates 
 Acquisition related deferred consideration                            -    (1.5) 
 Proceeds of sales of subsidiary undertakings                        4.6     11.8 
 Net cash from investing activities                                  4.7      4.0 
------------------------------------------------------  ------  --------  ------- 
 Cash flows from/(used by) financing activities 
 Issue of ordinary share capital                                    92.5      0.5 
 Ordinary dividends paid                                               -   (13.5) 
 Repayments of lease liabilities                                  (12.1)   (13.6) 
 Drawdown of loans                                                  71.5     70.0 
 Repayment of loans                                              (139.0)   (23.6) 
 Net cash from financing activities                                 12.9     19.8 
------------------------------------------------------  ------  --------  ------- 
 Net decrease in cash and cash equivalents                        (29.4)    (8.4) 
 
 Cash and cash equivalents at beginning of the 
  year                                                    11       180.9    189.3 
 Effect of foreign exchange rate changes                           (0.6)        - 
------------------------------------------------------  ------  --------  ------- 
 Cash and cash equivalents at end of the year             11       150.9    180.9 
------------------------------------------------------  ------  --------  ------- 
 

Notes to the financial statements

1 Basis of preparation

Costain Group PLC ("the Company") is a public limited company domiciled in England and incorporated in England and Wales. The consolidated financial statements of the Company for the year ended 31 December 2020 comprise the Group and the Group's interests in associates, joint ventures and joint operations and have been prepared and approved by the directors in accordance with both international accounting standards in conformity with the requirements of the Companies Act 2006 and international financial reporting standards adopted pursuant to Regulation (EC) No 1606/2002 as it applies in the European Union.

A duly appointed and authorised committee of the Board of Directors approved the preliminary announcement on 16 March 2021. The financial information set out above does not constitute the Company's statutory accounts for the years ended 31 December 2020 and 2019 but is derived from those accounts. Statutory accounts for 2019 have been delivered to the Registrar of Companies and those for 2020 will be delivered in due course.

The auditor has reported on these accounts. Their report for 2020 was (i) unqualified and (ii) did not contain a statement under section 498(2) or (3) of the Companies Act 2006. Their report for the accounts of 2019 was (i) unqualified, (ii) contained a material uncertainty in respect of going concern to which the auditor drew attention by way of emphasis without modifying their report and (iii) did not contain a statement under section 498(2) or (3) of the Companies Act 2006.

Whilst the financial information included in this preliminary announcement has been prepared in accordance with International Financial Reporting Standards (IFRS), this announcement does not itself contain sufficient information to fully comply with IFRS.

The accounting policies have been applied consistently by the Group to each period presented in these financial statements.

Going concern

In determining the appropriate basis of preparation of the financial statements for the year ended 31 December 2020, the Directors are required to consider whether the Group can continue in operational existence for the foreseeable future. Having undertaken a rigorous assessment of the financial forecasts, the Board considers that the Group has adequate resources to remain in operation for the foreseeable future and, therefore, has adopted the going concern basis for the preparation of the financial statements.

In assessing the going concern assumptions, the Board has reviewed the base case plans. They have assessed the ongoing impact on the Group's trading arising from the UK's departure from the EU, which is not anticipated to be significant in the context of the Group's operations. Our projects have been operational through the majority of the COVID-19 lock down period and this is expected to continue. The Board has identified severe but plausible downsides and after applying these downside scenarios, the Board concluded that there is liquidity headroom in a reasonable worst case scenario, headroom on the committed facilities and that headroom on the associated financial covenants is adequate.

Alternative performance measures

Income statement presentation - Other items

In order to aid understanding of the underlying and overall performance of the Group, certain amounts are shown in the consolidated income statement in a separate column headed 'Other items'. Items are included under this heading where the Board considers them to be of a one-off and unusual nature or related to the accounting treatment of acquisitions. These results present underlying profit and EPS, which is a Non-GAAP measure. Other items include:

-- amortisation of acquired intangibles, employment related deferred consideration, impairment charges on the Alcaidesa marina and profits and losses on sales of residual businesses;

-- in 2020, the goodwill impairment, the pension GMP equalisation charge, finance advisory costs associated with the capital raise and the bank facilities, the impairment of a minor stake in a hotel company investment and the profit on sale of the Group's remaining interests in "Buildings Schools for the Future" partnership companies; and

-- in 2019, the one-off exceptional costs of an arbitration award in respect of the remedial works deemed required to the roof in relation to a building contract completed in 2006.

The tax impact of the above is shown on the taxation line below the other items.

The Group also has non-GAAP adjusted profit and earnings per share measures, which exclude both other items and the three significant contract adjustments, and an adjusted revenue measure, that excludes the revenue element of the three contract adjustments (note 3).

All these items are adjusted because they are not long term in nature and, hence, will not reflect the long-term performance of the Group.

2 Significant areas of judgment and estimation

The estimates and underlying assumptions used in the preparation of these financial statements are reviewed on an ongoing basis. Revisions to accounting estimates are recognised in the period in which the estimate is revised if the revision affects only that period, or in the period of the revision and future periods if the revision affects both current and future periods.

The most critical accounting policies and significant areas of estimation and judgement arise from the accounting for long-term contracts under IFRS 15 'Revenue from Contracts with Customers', the carrying value of goodwill and acquired intangible assets, the assumptions used in the accounting for defined benefit pension schemes under IAS 19 'Employee benefits', the recognition of deferred tax assets in relation to tax losses and the items classified as 'other items' and contract adjustments.

Long-term contracts

The majority of the Group's activities are undertaken via long-term contracts and IFRS 15 requires the identification and separation of individual, distinct performance obligations, which are then accounted individually. The most common type of contracts undertaken by the Group with multiple performance obligations are framework contracts. In most cases, the obligations are satisfied over time and estimates are made of the total contract costs and revenues. In many cases, these obligations span more than one financial period. Both cost and revenue forecasts may be affected by a number of uncertainties that depend on the outcome of future events and may need to be revised as events unfold and uncertainties are resolved. Cost forecasts take into account the expectations of work to be undertaken on the contract. Revenue forecasts take into account compensation events, variations and claims and assessments of the impact of pain/gain arrangements to the extent that the amounts the Group expects to recover or incur can be reliably estimated and are highly probable not to reverse based on most likely outcome.

Management bases its estimates of costs and revenues and its assessment of the expected outcome of each long-term contractual obligation on the latest available information, this includes detailed contract valuations, progress on discussions over compensation events, variations and claims with customers, progress against the latest programme for completing the works, forecasts of the costs to complete and, in certain limited cases, assessments of recoveries from insurers where virtually certain. Revenue is recognised to the extent that amounts forecast from compensation events, variations and claims are agreed or considered in management's judgement highly probable to be agreed.

During the course of the contract, there is often significant change to the scope of the works and this has an impact on the programme and costs on the contract. The amount of resulting compensation events can be substantial and at any time these are often not fully agreed with the customer due to the timing and requirements of the contractual process. Also, many will relate to work yet to be undertaken or completed. Therefore, assessments are based on an estimate of the potential cost impact of the compensation events.

The Group's five largest compensation events positions included in contract assets at the year-end are summarised in aggregate below. In 2019, the most significant amounts related to the A465 and the Peterborough & Huntingdon contracts both of which contracts are discussed in note 3. Neither of these contracts are included in the 2020 analysis. The Peterborough & Huntingdon contract is discussed separately below.

 
                                          2020      2019 
                                          GBPm      GBPm 
------------------------------------  --------  -------- 
 
 Overall contract value                1,135.6   1,334.0 
 Revenue in year                         176.9     281.3 
 
 Total estimated end of contract 
  compensation events                     83.1     472.1 
 Total estimated unagreed end of 
  contract compensation events            51.3     238.6 
 
 Total unagreed compensation events 
  valued at year end and included 
  in contract assets                      22.5      45.7 
------------------------------------  --------  -------- 
 

The financial impact of changes to the value of compensation events finally agreed will depend on the precise terms of the contract and the interaction with incentive arrangements, such as pain/gain mechanisms and bonus or KPI arrangements, and any assessments made about costs disallowed under the contract. If the estimated value of the unagreed end of contract compensation events in relation to the currently estimated change in these contracts was increased or decreased by 10%, the impact on the financial results over the life of the contract could be an increase or decrease of up to GBP7.0m (2019: up to GBP15.0m). Additional compensation events for further change may also arise over the remaining contract period.

The estimates of the contract position and the profit or loss earned to date are updated regularly and significant changes are highlighted through established internal review procedures. The impact of any change in the accounting estimates both positive and negative is then reflected in the financial statements.

Management believes it is reasonably possible, on the basis of existing knowledge, that outcomes within the next financial year could require material adjustment. Given the pervasive impact of judgements and estimates on revenue, cost of sales and related balance sheet amounts, it is difficult to quantify the impact of taking alternative assessments on each of the judgements above.

On 29 June 2020, Costain announced that a termination and settlement agreement (the "Agreement") had been reached with National Grid to cease work on the Peterborough & Huntingdon gas compressor project (the "Contract") following a significant change in scope. The Agreement includes a legal process, through adjudications, to agree up to GBP80.0m of identified compensation events, recover costs to date and eliminate a potential liability to National Grid for completing the works.

In its interim results for the six months ended 30 June 2020, Costain recorded a charge to the income statement of GBP49.3m reflecting the cash position at termination. The legal process is ongoing and all adjudications will be filed by December 2021. Supported by external advice, Costain believes it has a strong entitlement to retain, as a minimum, the reported position, with no further cash outflow.

Under the terms of the Agreement, the cumulative outcome for Costain of these adjudications could range from an additional cash receipt of up to a maximum of GBP50.0m to a cash payment (which would not affect the Group's banking arrangements) of up to a maximum of GBP57.3m. Any such cash adjustments would be made in the first quarter of 2022.

Carrying value of goodwill and intangible assets

Reviewing the carrying value of goodwill and intangible assets recognised on acquisition requires estimation and judgement, principally, in respect of operating margins, growth rates and future cash flows of cash generating units, the useful lives of intangible assets and the selection of discount rates used to calculate present values.

The carrying value of development expenditure is reviewed against the expected future cash flows that will be generated from that asset. Development costs of products for sale are assessed against contracted sales and internal sales forecasts.

Defined benefit pension schemes

Defined benefit pension schemes require significant estimates in relation to the assumptions for inflation, future pension increases, investment returns and member longevity that underpin the valuation. Each year in selecting the appropriate assumptions, the directors take advice from an independent qualified actuary. The assumptions and resultant sensitivities are set out in note 12.

Deferred tax

Included in deferred tax assets is an asset for tax losses recorded in the year. The asset is recognised on the basis that the losses will be used against future taxable profits of the Group over the next six years.

Other items

Management has used judgement to determine the items classified as other items and to determine the contract adjustments set out in note 3.

3 Reconciliation of reported revenue and operating (loss)/profit to adjusted revenue and operating profit

Adjusted revenue, operating profit and earnings per share are being used as non-GAAP performance measurements. The adjustments exclude the impact of significant one-off changes in the accounting treatments of three contracts, Peterborough & Huntingdon (P&H), the A465 Heads of the Valley road (A465) and the ASF South contracts, as described below, as well as the other items of GBP10.3m. The revenue adjustment represents the reversal of the contract asset recorded in the statement of financial position immediately prior to the write down. The Board considers the adjusted measures better reflect the underlying trading performance of the Group.

The Peterborough & Huntingdon contract charge followed the agreement with National Grid to mutually terminate the contract in June 2020. The position is described further in Significant areas of judgement and estimation in note 2.

At the date of termination, the Group had a contract asset of GBP42.0m associated with this contract and this was forecast to increase to GBP49.3m at the end of the works. Reflecting the commercial resolution process incorporated in the termination agreement and in accordance with IFRS 15, a one-off charge to the income statement of GBP49.3m was reflected to adjust the revenue recognised to the level of cash received and to cover the cost of remaining works. 2020 adjusted revenue includes GBP32.3m of revenue on Peterborough & Huntingdon up to the termination date.

The A465 Heads of the Valley road contract was entered into in 2015 for the Welsh Government. At 30 June 2020, the Group had a contract asset of GBP45.4 million. The client had escalated a specific matter relating to the responsibility for design information for a specific retaining wall and whether it qualified as a compensation event to arbitration under the dispute resolution mechanism in the contract. While the issue was decided in the Group's favour by way of previous adjudication awards, the arbitrator found that responsibility for the design information rests with Costain and, consequently, the additional costs associated with the building of the retaining wall is not a compensation event under the contract. The arbitration award determined a matter of principle only, and not quantum, and was non-appealable. As a result of the decision, the Group adjusted the revenue recognised based on the level of cash received to date under the contract and reflected a write down of the GBP45.4m contract asset. Subsequently, the account has been agreed with the client in line with this write down. The Group will continue to fulfil its obligations under the contract, with completion scheduled in 2021. 2020 adjusted Group revenue includes GBP18.0m of revenue on the A465 contract.

The ASF South contract was in respect of works undertaken for Highways England that were completed in 2016. Following an extensive contract review, the Group has taken a one-off charge of GBP5.0m to close out this legacy contract.

 
 Year ended                                                              Before 
  31 December                                                  ASF        other     Other 
  2020                      Adjusted       P&H      A465     South        items     items        Total 
                                GBPm      GBPm      GBPm      GBPm         GBPm      GBPm         GBPm 
 
 Revenue before 
  contract adjustments       1,070.5         -         -         -      1,070.5         -      1,070.5 
 Contract adjustments              -    (42.0)    (45.4)     (4.7)       (92.1)         -       (92.1) 
-----------------------  -----------  --------  --------  --------  -----------  --------  ----------- 
 Group revenue               1,070.5    (42.0)    (45.4)     (4.7)        978.4         -        978.4 
-----------------------  -----------  --------  --------  --------  -----------  --------  ----------- 
 
 Cost of sales             (1,019.4)     (7.3)         -     (0.3)    (1,027.0)         -    (1,027.0) 
-----------------------  -----------  --------  --------  --------  -----------  --------  ----------- 
 
 Gross profit/(loss)            51.1    (49.3)    (45.4)     (5.0)       (48.6)         -       (48.6) 
 
 Administrative 
  expenses before 
  other items                 (33.1)         -         -         -       (33.1)         -       (33.1) 
 Other items                       -         -         -         -            -    (10.3)       (10.3) 
-----------------------  -----------  --------  --------  --------  -----------  --------  ----------- 
 Administrative 
  expenses                    (33.1)         -         -         -       (33.1)    (10.3)       (43.4) 
 
 Group operating 
  profit/(loss)                 18.0    (49.3)    (45.4)     (5.0)       (81.7)    (10.3)       (92.0) 
-----------------------  -----------  --------  --------  --------  -----------  --------  ----------- 
 Share of results 
  of joint ventures 
  and associates                 0.2         -         -         -          0.2         -          0.2 
-----------------------  -----------  --------  --------  --------  -----------  --------  ----------- 
 Profit/(loss) 
  from operations               18.2    (49.3)    (45.4)     (5.0)       (81.5)    (10.3)       (91.8) 
-----------------------  -----------  --------  --------  --------  -----------  --------  ----------- 
 
 Net finance 
  expense                      (4.3)         -         -         -        (4.3)         -        (4.3) 
-----------------------  -----------  --------  --------  --------  -----------  --------  ----------- 
 Profit/(loss) 
  before tax                    13.9    (49.3)    (45.4)     (5.0)       (85.8)    (10.3)       (96.1) 
-----------------------  -----------  --------  --------  --------  -----------  --------  ----------- 
 
 Taxation                      (1.5)       9.4       8.6       1.0         17.5       0.6         18.1 
-----------------------  -----------  --------  --------  --------  -----------  --------  ----------- 
 Profit/(loss) 
  for the period 
  attributable 
  to equity holders 
  of the parent                 12.4    (39.9)    (36.8)     (4.0)       (68.3)     (9.7)       (78.0) 
-----------------------  -----------  --------  --------  --------  -----------  --------  ----------- 
 
 Basic earnings/(loss) 
  per share                     5.8p                                                           (36.7)p 
 
 
 Year ended                                                              Before 
  31 December                                                  ASF        other     Other 
  2019                      Adjusted     P&H        A465     South        items     items        Total 
                                GBPm    GBPm        GBPm      GBPm         GBPm      GBPm         GBPm 
 
 Revenue before 
  contract adjustment        1,175.6       -           -         -      1,175.6         -      1,175.6 
 Contract adjustment               -       -      (20.0)         -       (20.0)         -       (20.0) 
-----------------------  -----------  ------  ----------  --------  -----------  --------  ----------- 
 Group revenue               1,175.6       -      (20.0)         -      1,155.6         -      1,155.6 
-----------------------  -----------  ------  ----------  --------  -----------  --------  ----------- 
 
 Cost of sales             (1,105.1)       -           -         -    (1,105.1)     (9.7)    (1,114.8) 
-----------------------  -----------  ------  ----------  --------  -----------  --------  ----------- 
 
 Gross profit/(loss)            70.5       -      (20.0)         -         50.5     (9.7)         40.8 
 
 Administrative 
  expenses before 
  other items                 (32.6)       -           -         -       (32.6)         -       (32.6) 
 Other items                       -       -           -         -            -    (11.4)       (11.4) 
-----------------------  -----------  ------  ----------  --------  -----------  --------  ----------- 
 Administrative 
  expenses                    (32.6)       -           -         -       (32.6)    (11.4)       (44.0) 
 
 Group operating 
  profit/(loss)                 37.9       -      (20.0)         -         17.9    (21.1)        (3.2) 
-----------------------  -----------  ------  ----------  --------  -----------  --------  ----------- 
 Share of results 
  of joint ventures 
  and associates                 0.3       -           -         -          0.3         -          0.3 
-----------------------  -----------  ------  ----------  --------  -----------  --------  ----------- 
 Profit/(loss) 
  from operations               38.2       -      (20.0)         -         18.2    (21.1)        (2.9) 
-----------------------  -----------  ------  ----------  --------  -----------  --------  ----------- 
 
 Net finance 
  expense                      (3.6)       -           -         -        (3.6)     (0.1)        (3.7) 
-----------------------  -----------  ------  ----------  --------  -----------  --------  ----------- 
 Profit/(loss) 
  before tax                    34.6       -      (20.0)         -         14.6    (21.2)        (6.6) 
-----------------------  -----------  ------  ----------  --------  -----------  --------  ----------- 
 
 Taxation                      (3.9)       -         3.8         -        (0.1)       3.8          3.7 
-----------------------  -----------  ------  ----------  --------  -----------  --------  ----------- 
 Profit/(loss) 
  for the period 
  attributable 
  to equity holders 
  of the parent                 30.7       -      (16.2)         -         14.5    (17.4)        (2.9) 
-----------------------  -----------  ------  ----------  --------  -----------  --------  ----------- 
 
 Basic earnings/(loss) 
  per share                    25.1p                                                            (2.3)p 
 

4 Operating segments

The Group has two core business segments: Natural Resources and Transportation plus the non-core business Alcaidesa in Spain. The core segments are strategic business units with separate management and have different core customers or offer different services. This information is provided to the Chief Executive who is the chief operating decision maker. The segments are discussed in the divisional review section of this preliminary announcement.

The Group evaluates segment performance on the basis of profit or loss from operations before interest and tax expense before and after other items and contract adjustments. The segment results that are reported to the Chief Executive include items directly attributable to a segment as well as those that can be allocated on a reasonable basis. Other items are allocated to the operating segments where appropriate, but otherwise are viewed as Central items.

 
 2020                                 Natural                                    Central 
                                    Resources     Transportation     Alcaidesa     costs     Total 
                                         GBPm               GBPm          GBPm      GBPm      GBPm 
 Segment revenue 
 Adjusted revenue                       345.1              724.2           1.2         -   1,070.5 
 Contract adjustments                  (42.0)             (50.1)             -         -    (92.1) 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 Group revenue                          303.1              674.1           1.2         -     978.4 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 
 Segment profit/(loss) 
 Adjusted operating profit                5.7               20.1         (0.1)     (7.7)      18.0 
 Contract adjustments                  (49.3)             (50.4)             -         -    (99.7) 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 Operating loss before 
  other items                          (43.6)             (30.3)         (0.1)     (7.7)    (81.7) 
 
 Share of results of 
  joint ventures and associates           0.2                  -             -         -       0.2 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 Loss from operations 
  before other items                   (43.4)             (30.3)         (0.1)     (7.7)    (81.5) 
 Other items: 
 Impairment of Alcaidesa 
  marina                                    -                  -         (0.6)         -     (0.6) 
 Impairment of other 
  investment                                -                  -             -     (0.6)     (0.6) 
 Profit on sales of interests 
  in joint ventures and 
  associates                              1.6                  -             -         -       1.6 
 Profit on disposal of 
  subsidiary undertakings                   -                  -           0.4       1.0       1.4 
 Refinancing advisory 
  fees                                      -                  -             -     (1.2)     (1.2) 
 Pension GMP equalisation 
  charge                                    -                  -             -     (0.9)     (0.9) 
 Amortisation of acquired 
  intangible assets                     (0.7)              (0.3)             -         -     (1.0) 
 Impairment of goodwill                 (9.0)                  -             -         -     (9.0) 
 Loss from operations                  (51.5)             (30.6)         (0.3)     (9.4)    (91.8) 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 Net finance expense                                                                         (4.3) 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 Loss before tax                                                                            (96.1) 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 
 
 2019                                 Natural                                    Central 
                                    Resources     Transportation     Alcaidesa     costs     Total 
                                         GBPm               GBPm          GBPm      GBPm      GBPm 
 Segment revenue 
 Adjusted revenue                       429.4              740.6           5.6         -   1,175.6 
 Contract adjustments                       -             (20.0)             -         -    (20.0) 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 Group revenue                          429.4              720.6           5.6         -   1,155.6 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 
 Segment profit/(loss) 
 Adjusted operating profit               15.4               29.7         (0.7)     (6.5)      37.9 
 Contract adjustments                       -             (20.0)             -         -    (20.0) 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 Operating profit/(loss) 
  before other items                     15.4                9.7         (0.7)     (6.5)      17.9 
 
 Share of results of 
  joint ventures and associates           0.3                  -             -         -       0.3 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 Profit/(loss) from operations 
  before other items                     15.7                9.7         (0.7)     (6.5)      18.2 
 Other items: 
 Exceptional costs of 
  arbitration award on 
  historical building 
  project                               (9.7)                  -             -         -     (9.7) 
 Impairment of Alcaidesa 
  marina                                    -                  -         (5.9)         -     (5.9) 
 Loss on disposal of 
  subsidiary undertaking                    -                  -         (3.0)         -     (3.0) 
 Amortisation of acquired 
  intangible assets                     (1.4)              (0.9)             -         -     (2.3) 
 Employment related and 
  other deferred consideration          (0.2)                  -             -         -     (0.2) 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 Profit/(loss) from operations            4.4                8.8         (9.6)     (6.5)     (2.9) 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 Net finance expense                                                                         (3.7) 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 Loss before tax                                                                             (6.6) 
--------------------------------  -----------  -----------------  ------------  --------  -------- 
 

5 Net finance expense

 
                                                  2020    2019 
                                                  GBPm    GBPm 
 Interest income from bank deposits                0.5     0.7 
 Interest income on loans to related parties       0.1     0.2 
 Interest income on the net assets of the 
  defined benefit pension scheme                   0.2     0.1 
----------------------------------------------  ------  ------ 
 Finance income                                    0.8     1.0 
----------------------------------------------  ------  ------ 
 
 Interest payable on interest bearing bank 
  loans, borrowings and other similar charges    (4.1)   (3.3) 
 Interest expense on lease liabilities           (1.0)   (1.3) 
 Unwind of discount on deferred consideration        -   (0.1) 
 Finance expense                                 (5.1)   (4.7) 
----------------------------------------------  ------  ------ 
 
 Net finance expense                             (4.3)   (3.7) 
----------------------------------------------  ------  ------ 
 

Other similar charges includes arrangement and commitment fees payable. Interest income on loans to related parties relates to shareholder loan interest receivable from investments in equity accounted joint ventures and associates.

6 Taxation

 
                                                     2020    2019 
                                                     GBPm    GBPm 
-------------------------------------------------  ------  ------ 
 On loss for the year 
 UK corporation tax at 19.0% (2019: 19.0%)          (1.9)     1.1 
 Adjustment in respect of prior years                 3.0     1.9 
-------------------------------------------------  ------  ------ 
 Current tax credit for the year                      1.1     3.0 
-------------------------------------------------  ------  ------ 
 
 Deferred tax expense for the current year           19.7   (1.2) 
 Adjustment in respect of prior years               (2.7)     1.9 
 Deferred tax credit for the year                    17.0     0.7 
-------------------------------------------------  ------  ------ 
 
 Tax credit in the consolidated income statement     18.1     3.7 
-------------------------------------------------  ------  ------ 
 
 
                                                       2020    2019 
                                                       GBPm    GBPm 
--------------------------------------------------  -------  ------ 
 Tax reconciliation 
 
 Loss before tax                                     (96.1)   (6.6) 
--------------------------------------------------  -------  ------ 
 
 Taxation at 19.0% (2019: 19.0%)                       18.3     1.3 
 Amounts qualifying for tax relief and disallowed 
  expenses                                            (1.3)   (1.2) 
 Tax decrease from other tax effects                    0.6       - 
 Rate adjustment relating to deferred taxation 
  and overseas profits and losses                       0.2   (0.2) 
 Adjustments in respect of prior years                  0.3     3.8 
--------------------------------------------------  -------  ------ 
 
 Tax credit in the consolidated income statement       18.1     3.7 
--------------------------------------------------  -------  ------ 
 

7 Loss per share

The calculation of earnings per share is based on a loss of GBP78.0m (2019: loss GBP2.9m) and the number of shares set out below.

 
                                                             2020         2019 
                                                           Number       Number 
                                                       (millions)   (millions) 
----------------------------------------------------  -----------  ----------- 
 
 Weighted average number of ordinary shares 
  in issue for basic earnings per share calculation         212.8        107.6 
 Dilutive potential ordinary shares arising 
  from employee share schemes                                 2.9          0.2 
----------------------------------------------------  -----------  ----------- 
 Weighted average number of ordinary shares 
  in issue for diluted earnings per share 
  calculation                                               215.7        107.8 
----------------------------------------------------  -----------  ----------- 
 

The 2019 shares number has been restated following the capital raise in 2020.

8 Dividends

 
                                         Dividend   2020    2019 
                                        per share 
                                            pence   GBPm    GBPm 
-------------------------------------  ----------  -----  ------ 
 
 Final dividend for the year ended 
  31 December 2018                          10.00      -    10.7 
 Interim dividend for the year ended 
  31 December 2019                           3.80      -     4.1 
-------------------------------------  ----------  -----  ------ 
 Amount recognised as distributions 
  to equity holders in the year                        -    14.8 
 
 Dividends settled in shares                           -   (1.3) 
-------------------------------------  ----------  -----  ------ 
 Dividends settled in cash                             -    13.5 
-------------------------------------  ----------  -----  ------ 
 

Consistent with the rationale for the equity raise, the Company paid no final dividend in respect of the year ended 31 December 2019, therefore resulting in a total dividend paid for the prior year being the interim dividend, of 3.8 pence per share. No dividends were paid or proposed in respect of the year ended 31 December 2020.

9 Intangible assets

 
                                              Customer   Other acquired 
                             Goodwill    relationships      intangibles   Other intangibles   Total 
                                 GBPm             GBPm             GBPm                GBPm    GBPm 
--------------------------  ---------  ---------------  ---------------  ------------------  ------ 
 Cost 
 At 1 January 2019               54.1             15.4              9.7                 7.7    86.9 
 Additions                          -                -                -                 3.1     3.1 
--------------------------  ---------  ---------------  ---------------  ------------------  ------ 
 At 31 December 
  2019                           54.1             15.4              9.7                10.8    90.0 
--------------------------  ---------  ---------------  ---------------  ------------------  ------ 
 
 At 1 January 2020               54.1             15.4              9.7                10.8    90.0 
 Additions                          -                -                -                 3.6     3.6 
--------------------------  ---------  ---------------  ---------------  ------------------  ------ 
 At 31 December 
  2020                           54.1             15.4              9.7                14.4    93.6 
--------------------------  ---------  ---------------  ---------------  ------------------  ------ 
 
 Accumulated amortisation 
 At 1 January 2019                  -             12.5              8.9                 7.0    28.4 
 Charge in year                     -              1.8              0.5                 0.3     2.6 
--------------------------  ---------  ---------------  ---------------  ------------------  ------ 
 At 31 December 
  2019                              -             14.3              9.4                 7.3    31.0 
--------------------------  ---------  ---------------  ---------------  ------------------  ------ 
 
 At 1 January 2020                  -             14.3              9.4                 7.3    31.0 
 Charge in year                     -              0.7              0.3                 0.5     1.5 
 Impairment                       9.0                -                -                   -     9.0 
--------------------------  ---------  ---------------  ---------------  ------------------  ------ 
 At 31 December 
  2020                            9.0             15.0              9.7                 7.8    41.5 
--------------------------  ---------  ---------------  ---------------  ------------------  ------ 
 
 Net book value 
 At 31 December 
  2020                           45.1              0.4                -                 6.6    52.1 
--------------------------  ---------  ---------------  ---------------  ------------------  ------ 
 At 31 December 
  2019                           54.1              1.1              0.3                 3.5    59.0 
--------------------------  ---------  ---------------  ---------------  ------------------  ------ 
 At 1 January 2019               54.1              2.9              0.8                 0.7    58.5 
--------------------------  ---------  ---------------  ---------------  ------------------  ------ 
 

Goodwill has been allocated to the applicable cash generating units of the transportation segment (GBP15.5 million (2019: GBP15.5 million)) and the natural resources segment (GBP29.6 million (2019: GBP38.6 million)).

As described in note 2, the Group reviews the value of goodwill and in the absence of any identified impairment risks, tests are based on internal value in use calculations of the cash generating unit (CGU). The key assumptions for these calculations are: operating margins, discount rates and growth rates.

Discount rates have been estimated based on pre-tax rates that reflect current market assessments of the Group's weighted average cost of capital and the risks specific to the CGU. The rate used to discount the forecast cash flows for the transportation CGU was 12.4% and for the natural resources CGU was 12.5%. In 2019, the discount rates used for the two CGUs were transportation 10.9% and natural resources 10.2%.

At 31 December 2020, based on the internal value in use calculations, management concluded that the recoverable value of the transportation cash generating units exceeded its carrying amount with substantial headroom on goodwill. Accordingly, in the view of the directors there is no reasonably foreseeable change in a key assumption that would result in an impairment charge. In respect of natural resources, the sensitivity of the assessment to a lower revenue and/or underlying operating margins has resulted in an impairment of the goodwill by GBP9.0 million, reducing the amount allocated to natural resources to GBP29.6 million.

10 Property, plant and equipment

 
                                                         Right-of-use assets 
                                                      ------------------------ 
                                                                     Vehicles, 
                                 Land &      Plant &       Land &      plant & 
                              Buildings    Equipment    Buildings    equipment    Total 
                                   GBPm         GBPm         GBPm         GBPm     GBPm 
--------------------------  -----------  -----------  -----------  -----------  ------- 
 Cost 
 At 1 January 2019                 32.1         32.2         20.0         13.0     97.3 
 Currency movements               (1.1)        (0.2)            -            -    (1.3) 
 Additions                          0.1          3.7          1.7         12.1     17.6 
 Disposal of subsidiary 
  undertakings                   (18.4)        (1.0)            -            -   (19.4) 
 Disposals                        (0.2)        (2.4)        (2.2)        (3.9)    (8.7) 
--------------------------  -----------  -----------  -----------  -----------  ------- 
 At 31 December 2019               12.5         32.3         19.5         21.2     85.5 
--------------------------  -----------  -----------  -----------  -----------  ------- 
 
 At 1 January 2020                 12.5         32.3         19.5         21.2     85.5 
 Currency movements                 0.8          0.3            -            -      1.1 
 Additions                            -          0.5          1.2         19.1     20.8 
 Disposal of subsidiary 
  undertakings                   (12.5)        (4.0)            -            -   (16.5) 
 Disposals                        (0.2)        (2.1)        (0.2)       (10.0)   (12.5) 
--------------------------  -----------  -----------  -----------  -----------  ------- 
 At 31 December 2020                0.6         27.0         20.5         30.3     78.4 
--------------------------  -----------  -----------  -----------  -----------  ------- 
 
 Accumulated depreciation 
 At 1 January 2019                  3.8         20.5            -            -     24.3 
 Currency movements               (0.3)        (0.1)            -            -    (0.4) 
 Charge in year                     0.8          2.9          4.6          9.4     17.7 
 Impairment                         5.9            -            -            -      5.9 
 Disposal of subsidiary 
  undertakings                    (0.5)        (0.4)            -            -    (0.9) 
 Disposals                        (0.2)        (2.1)        (0.3)        (2.6)    (5.2) 
--------------------------  -----------  -----------  -----------  -----------  ------- 
 At 31 December 2019                9.5         20.8          4.3          6.8     41.4 
--------------------------  -----------  -----------  -----------  -----------  ------- 
 
 At 1 January 2020                  9.5         20.8          4.3          6.8     41.4 
 Currency movements                 0.6          0.1            -            -      0.7 
 Charge in year                       -          2.7          4.3          8.0     15.0 
 Impairment                         0.6            -            -            -      0.6 
 Disposal of subsidiary 
  undertakings                   (10.0)        (1.9)            -            -   (11.9) 
 Disposals                        (0.1)        (1.9)        (0.2)        (5.1)    (7.3) 
--------------------------  -----------  -----------  -----------  -----------  ------- 
 At 31 December 2020                0.6         19.8          8.4          9.7     38.5 
--------------------------  -----------  -----------  -----------  -----------  ------- 
 
 Net book value 
 At 31 December 2020                  -          7.2         12.1         20.6     39.9 
--------------------------  -----------  -----------  -----------  -----------  ------- 
 At 31 December 2019                3.0         11.5         15.2         14.4     44.1 
--------------------------  -----------  -----------  -----------  -----------  ------- 
 At 1 January 2019                 28.3         11.7         20.0         13.0     73.0 
--------------------------  -----------  -----------  -----------  -----------  ------- 
 

11 Cash and cash equivalents

Cash and cash equivalents are analysed below and include the Group's share of cash held by joint operations of GBP61.1m (2019: GBP83.5m).

 
                                2020     2019 
                                GBPm     GBPm 
---------------------------  -------  ------- 
 Cash and cash equivalents     150.9    180.9 
 Borrowings - current          (7.2)   (68.0) 
 Borrowings - non-current     (39.6)   (48.0) 
---------------------------  -------  ------- 
 Net cash                      104.1     64.9 
---------------------------  -------  ------- 
 

The borrowings of GBP46.8m are net of arrangement fees of GBP1.2m.

12 Pensions

A defined benefit pension scheme is operated in the UK and a number of defined contribution pension schemes are in place in the UK and overseas. Contributions are paid by subsidiary undertakings and, to the defined contribution schemes, by employees. The total pension charge in the income statement was GBP12.7m comprising GBP12.9m included in operating costs less GBP0.2m interest income included in net finance expense (2019: GBP12.3m, comprising GBP12.4m in operating costs less GBP0.1m interest income included in net finance expense).

Defined benefit scheme

The defined benefit scheme was closed to new members on 31 May 2005 and from 1 April 2006 future benefits were calculated on a Career Average Revalued Earnings basis. The scheme was closed to future accrual of benefits to members on 30 September 2009. A full actuarial valuation of the scheme was carried out as at 31 March 2019 and this was updated to 31 December 2020 by a qualified independent actuary. At 31 December 2020, there were 2,869 retirees and 2,730 deferred members. The weighted average duration of the obligations is 17.1 years.

 
                                        2020      2019      2018 
                                        GBPm      GBPm      GBPm 
----------------------------------  --------  --------  -------- 
 Present value of defined benefit 
  obligations                        (886.5)   (812.1)   (752.7) 
 Fair value of scheme assets           880.9     817.0     748.5 
----------------------------------  --------  --------  -------- 
 
 Recognised (liability)/asset for 
  defined benefit obligations          (5.6)       4.9     (4.2) 
----------------------------------  --------  --------  -------- 
 

Movements in present value of defined benefit obligations

 
                                                  2020     2019 
                                                  GBPm     GBPm 
---------------------------------------------  -------  ------- 
 
 At 1 January                                    812.1    752.7 
 Past service cost - GMP equalisation charge       0.9        - 
 Interest cost                                    16.3     20.6 
 Remeasurements - demographic assumptions        (2.9)    (7.5) 
 Remeasurements - financial assumptions           99.0     74.6 
 Remeasurements - experience adjustments         (4.6)      9.0 
 Benefits paid                                  (34.3)   (37.3) 
---------------------------------------------  -------  ------- 
 At 31 December                                  886.5    812.1 
---------------------------------------------  -------  ------- 
 

Movements in fair value of scheme assets

 
                                        2020     2019 
                                        GBPm     GBPm 
-----------------------------------  -------  ------- 
 At 1 January                          817.0    748.5 
 Interest income                        16.5     20.7 
 Remeasurements - return on assets      71.5     69.1 
 Contributions by employer              10.6     16.3 
 Administrative expenses               (0.4)    (0.3) 
 Benefits paid                        (34.3)   (37.3) 
-----------------------------------  -------  ------- 
 At 31 December                        880.9    817.0 
-----------------------------------  -------  ------- 
 

Expense recognised in the income statement

 
                                                   2020    2019 
                                                   GBPm    GBPm 
-----------------------------------------------  ------  ------ 
 Administrative expenses paid by the pension 
  scheme                                          (0.4)   (0.3) 
 Administrative expenses paid directly by 
  the Group                                       (1.7)   (1.7) 
 GMP equalisation charge                          (0.9)       - 
 Interest income on the net liabilities/assets 
  of the defined benefit pension scheme             0.2     0.1 
-----------------------------------------------  ------  ------ 
                                                  (2.8)   (1.9) 
-----------------------------------------------  ------  ------ 
 

Fair value of scheme assets

 
                              2020    2019 
                              GBPm    GBPm 
--------------------------  ------  ------ 
 Global equities             125.0   162.4 
 Multi-asset growth funds    118.4   162.2 
 Multi-credit fund           139.8   160.3 
 LDI plus collateral         421.4   251.8 
 PFI Investments              44.7    51.0 
 Property                     15.7    17.7 
 Cash                         15.9    11.6 
--------------------------  ------  ------ 
                             880.9   817.0 
--------------------------  ------  ------ 
 

Principal actuarial assumption (expressed as weighted averages)

 
                             2020   2019 
                                %      % 
--------------------------  -----  ----- 
 Discount rate               1.35   2.05 
 Future pension increases    2.85   2.85 
 Inflation assumption        2.95   2.95 
--------------------------  -----  ----- 
 

Weighted average life expectancy from age 65 as per mortality tables used to determine benefits at 31 December 2020 and 31 December 2019 is:

 
                                    2020               2019 
                              Male    Female      Male    Female 
                           (years)   (years)   (years)   (years) 
------------------------  --------  --------  --------  -------- 
 Currently aged 65            22.3      24.1      22.3      24.2 
 Non-retirees currently 
  aged 45                     23.3      25.3      23.6      25.7 
------------------------  --------  --------  --------  -------- 
 

The discount rate, inflation and pension increase, and mortality assumptions have a significant effect on the amounts reported. Changes in these assumptions would have the following effects on the defined benefit scheme:

 
                                                          Pension   Pension 
                                                        liability      cost 
                                                             GBPm      GBPm 
-----------------------------------------------------------------  -------- 
 Increase discount rate by 0.25%, decreases pension 
  liability and reduces pension cost by                      35.8       0.5 
 Decrease inflation, pension increases by 0.25%, 
  decreases pension liability and reduces pension 
  cost by                                                    30.6       0.4 
 Increase life expectancy by one year, increases 
  pension liability and increases pension cost 
  by                                                         41.7       0.6 
----------------------------------------------------  -----------  -------- 
 

As highlighted above, the defined benefit scheme exposes the Group to actuarial risks such as longevity, interest rate, inflation and investment risks. The LDI portfolio is designed to respond to changes in gilt yields in a similar way to a fixed proportion of the liabilities. With the LDI portfolio, if gilt yields fall, the value of the investments will rise to help partially match the increase in the trustee valuation of the liabilities arising from a fall in the gilt yield-based discount rate. Similarly, if gilt yields rise, the value of the matching asset portfolio will fall, as will the valuation of the liabilities because of an increase in the discount rate. The leverage within the LDI portfolio means the equivalent of 95 per cent of the value of the assets is sensitive to changes in interest rates and inflation and mitigates the equivalent movement in the liabilities.

In accordance with the pension regulations, a triennial actuarial review of the Costain defined benefit pension scheme was carried out as at 31 March 2019. In March 2020, the valuation and an updated deficit recovery plan were agreed with the scheme Trustee resulting in cash contributions of GBP10.2m for each year commencing 1 April 2020 (increasing annually with inflation) until the deficit is cleared, which would be in 2029 on the basis of the assumptions made in the valuation and agreed recovery plan.

In addition, as previously implemented, the Group will continue to make an additional contribution so that the total deficit contributions match the total dividend amount paid by the Company each year. Any additional payments in this regard would have the effect of reducing the recovery period in the agreed plan. The Group will also pay the expenses of administration in the next financial year.

Any surplus of deficit contributions to the Costain Pension Scheme would be recoverable by way of a refund, as the Group has the unconditional right to any surplus once all the obligations of the Scheme have been settled. Accordingly, the Group does not expect to have to make provision for these additional contributions arising from this agreement in future accounts.

Defined contribution schemes

Several defined contribution pensions are operated. The total expense relating to these plans was GBP9.9m (2019: GBP10.4m).

13 Share capital

 
                                           2020                      2019 
------------------------------  --------------------------  ---------------------- 
                                                                           Nominal 
                                      Number       Nominal        Number     value 
                                  (millions)    value GBPm    (millions)      GBPm 
------------------------------  ------------  ------------  ------------  -------- 
 Issued share capital 
 Shares in issue at beginning 
  of year - ordinary shares 
  of 50p each, fully paid              108.3          54.1         107.0      53.5 
 Issued in year (see below)            166.7          83.4           1.3       0.6 
------------------------------  ------------  ------------  ------------  -------- 
 Shares in issue at end of 
  year - ordinary shares of 
  50p each, fully paid                 275.0         137.5         108.3      54.1 
------------------------------  ------------  ------------  ------------  -------- 
 

The Company's issued share capital comprised 274,949,741 ordinary shares of 50 pence each as at 31 December 2020.

On 7 May 2020, the Company announced details of a proposed Firm Placing and Placing and Open Offer (the "Capital Raising") to raise gross proceeds of GBP100m (GBP92.5m after expenses), approximately GBP80m by way of a Firm Placing of 133,348,799 ordinary shares and approximately GBP20m by way of a Placing and Open Offer of 33,317,868 ordinary shares. The Capital Raising was approved by the Company's shareholders on 27 May 2020. On 29 May 2020, 166,666,667 ordinary shares of 50 pence each were issued in connection with the Capital Raising at an offer price of 60 pence per share. The capital raise was effected through a structure, which resulted in a merger reserve arising under Section 612 of the Companies Act 2006. Following the receipt of the cash proceeds through the structure, the excess of the net proceeds over the nominal value of the share capital issued has been transferred to retained earnings.

All shares rank pari passu regarding entitlement to capital and dividends.

14 Related party transactions

The Group has related party relationships with its major shareholders, subsidiaries, joint ventures and associates and joint operations, in relation to the sales of construction services and materials and the provision of staff and with The Costain Pension Scheme. The total value of these services in 2020 was GBP160.5m (2019: GBP218.5m) and transactions with The Costain Pension Scheme are included in Note 11.

519653503

Our Principal Risks

 
Principal 
 Risk             Description and impact                 Controls and key mitigations 
1. Prevent        Costain operates in natural,           Safety, Health and Environment 
 and effectively   complex and                            Management policies 
 manage a          hazardous environments. Failure        and procedures. 
 major accident,   to 
 hazard,           manage the inherent risk and           Ongoing reviews and improvement 
 or incident       hazards,                               of our Safety, Health 
                   including pandemics, may results       and Environment performance 
                   in illness,                            through routine 
                   loss of life or significant            continuous improvement processes. 
                   damage to the 
                   environment. Failure to manage         The Costain behavioural management 
                   this risk                              programme. 
                   could result in reputational 
                   damage, loss of                        Wellbeing, safety and environment 
                   business and financial penalties.      strategy and plans. 
                   Risk trend: Neutral 
                   (FY19: Neutral) 
                   Excellent controls and practices 
                   have 
                   reduced the incident rate, 
                   but we always 
                   remain vigilant and undertake 
                   continuous 
                   improvements in this area. 
                  =====================================  ======================================= 
2. Accelerate     The effective implementation           Detailed implementation plan, 
 the deployment    of Costain's                           with timetabled 
 of our higher     Leading Edge strategy is critical      deliverables, clear performance 
 margin services   to the                                 measures and 
                   Group's ability to accelerate          accountable Executive Board 
                   the                                    sponsor. 
                   deployment of our higher margin 
                   services                               Annual business Budget includes 
                   alongside our complex programme        performance measures 
                   delivery. Failure to manage            and actions linked to the 
                   this risk could                        delivery of the strategy. 
                   have an adverse effect on 
                   our business,                          Work winning budget aligned 
                   operating results, and shareholder     to investment that 
                   value.                                 supports our strategy. 
 
                   Risk trend: Increasing                 Clear communications plan 
                   (FY19: Neutral)                        tailored to each of our key 
                   The financial impact of the            stakeholders (internal and 
                   issues with two                        external) outlining how our 
                   long standing contracts illustrates    Leading Edge strategy enables 
                   the                                    our purpose to improve 
                   importance of delivering our           people's lives by being safer, 
                   Leading Edge                           better, greener, faster and 
                   strategy.                              more efficient in delivering 
                                                          major infrastructure 
                                                          projects. 
                  =====================================  ======================================= 
3. Maintain       A strong balance sheet is              Treasury function experienced 
 a strong          a fundamental                          in the management and 
 balance           requirement to qualify for             oversight of the bank and 
 sheet             and support the                        surety bonding facilities 
                   contract sizes and duration            to 
                   required by our                        meet finance requirements. 
                   clients. Failure to manage 
                   this risk could                        A robust joint venture partner 
                   effect our ability to achieve          selection criterion: all 
                   our business                           partnerships and alliances 
                   goals and our resilience to            signed off by the Board. 
                   withstand 
                   economic downturns.                    Monitoring and management 
                                                          of amounts receivable. 
                   Risk trend: Neutral 
                   (FY19: Increasing)                     Effective balance sheet reconciliation 
                                                          process. 
                   Strengthened balance sheet, 
                   enabling the                           Continued focus on net asset 
                   Group to capitalise on the             growth with key areas for 
                   growing                                continuous development. 
                   infrastructure market opportunities. 
                  =====================================  ======================================= 
4. Secure         Costain's future growth and            Executive investment panel 
 new work          profitability is                       ensuring strategic focus on 
                   dependent on our ability to            Costain's target markets and 
                   secure new                             prioritisation of resources 
                   work in our competitive marketplace.   and activity. 
                   To be 
                   successful we need to maintain         Customer relationship management 
                   strong                                 system - to identify, 
                   client relationships and broaden       manage and review all key 
                   our                                    stakeholders, ensuring that 
                   service offering by delivering         key relationships are proactively 
                   innovative                             identified and 
                   solutions across complex delivery,     maintained. 
                   digital 
                   and consulting activities.             Sales transformation programme 
                                                          in place - ensuring we 
                   Risk trend: Neutral                    have the right people, with 
                   (FY19: Increasing)                     the right skills empowered 
                   Changes made in 2020 (see              to deliver opportunities in 
                   pages 22 and                           line with our growth strategy. 
                   23 of the Annual Report), 
                   have enabled us to react to            Close client relationships 
                   and                                    enabling us to understand 
                   address our clients' priorities.       and 
                                                          shape clients' needs, respond 
                                                          proactively to changes 
                                                          and ensure our work winning 
                                                          team are fit for purpose. 
5. Culture        The successful implementation          In-house recruitment team, 
 and people        of our                                 focused on identifying and 
                   strategy is dependent on our           recruiting the right people 
                   ability to                             for Costain. 
                   attract and retain talent, 
                   grow the                               A fair remuneration policy 
                   capabilities and performance           monitored via the central 
                   of our                                 reward team and annual pay 
                   employees and maintain a high          gap reporting. 
                   performing, 
                   ethical and caring culture             A defined people strategy 
                   where our team                         based on culture, inclusion, 
                   can be at their best.                  engagement and wellbeing. 
                   Risk trend: Neutral 
                   (FY19: Neutral)                        Learning and development budget 
                                                          aligned to the 
                                                          Leading Edge strategy and 
                                                          business requirements. 
 
                                                          Leadership development programmes 
                                                          to enable 
                                                          empowerment, assurance and 
                                                          performance outcomes. 
 
                                                          Thrive plans in place for 
                                                          each project and functional 
                                                          team to help all our team 
                                                          be at their best. 
6. Deliver        Failure to enter into contracts        Clear contract negotiation 
 projects          that are                               guidelines, with any 
 effectively       aligned with our risk appetite         deviations requiring approval 
                   or deliver                             from the Executive Board 
                   projects to the agreed time,           investment panel. 
                   budget and 
                   quality could result in financial      Working to our Operational 
                   loss,                                  Excellence Model and 
                   regulatory and contractual             Costain Way requirements and 
                   breaches and                           guidelines. 
                   loss of reputation with our 
                   clients and                            Ensuring a robust change control 
                   investors.                             process is in place 
                   Risk trend: Neutral                    across all projects. 
                   (FY19: Neutral) 
                                                          Effective risk and design 
                                                          management process in place 
                                                          to provide early warning of 
                                                          potential issues. 
 7. Manage        Failure to manage the legacy           A third-party pension expert 
  the legacy       defined                                provides independent 
  defined          benefit pension scheme so              advice. 
  benefit          that the 
  pension          liabilities are within a range         Monitoring the funding position 
  scheme           appropriate to                         of the scheme via 
                   our capital base and do not            quarterly funding updates 
                   adversely impact our balance           provided by scheme's 
                   sheet.                                 investment consultant. 
 
                   Risk trend: Neutral                    Investment performance monitored 
                   (FY19: Neutral)                        and input to the 
                                                          scheme's investment strategy. 
 
                                                          Regular monitoring in conjunction 
                                                          with the trustee of 
                                                          asset performance, pensions 
                                                          regulations, Company 
                                                          covenant and liability management. 
 8. Ensure        Our ability to enable safe,            Our core IT strategy integrates 
  that our         secure, and                            information systems, 
  technology       resilient business operations          personnel and physical aspects 
  is robust,       (including                             to prevent, detect and 
  our systems      finding, winning, and delivering       investigate information security 
  are secure       work                                   threats and incidents. 
  and our          supported by efficient corporate 
  data protected   services)                              Process in place to engage 
                   is dependent on the delivery           with key technology partners 
                   of our core IT                         and suppliers, to ensure potentially 
                   strategy. The delivery of              vulnerable systems 
                   this strategy is                       are identified and updated. 
                   also key to our ability to 
                   safely and securely                    Our architecture design provides 
                   acquire, host, use, and dispose        the appropriate 
                   of Costain,                            protections and distance between 
                   client, and third party data.          project systems and 
                                                          our core Costain systems. 
                   Risk trend: Neutral 
                   (FY19: Neutral)                        Annual penetration tests and 
                   The increased cyber threat             24 hour threat monitoring 
                   is offset by                           by reputable third parties. 
                   increased investment and a 
                   continuous                             A secure environment for our 
                   focus on security.                     internal and client data 
                                                          across projects enabled by 
                                                          a menu of digital core 
                                                          products provided by our Smart 
                                                          Delivery Platform. 
 9. Anticipate    We have seen changes in the            Client service and perception 
  and respond      business                               surveys focused on our 
  to changes       operations and investment              ability to provide foresight 
  in client        priorities of our                      to help navigate emerging 
  circumstances    core clients and clients challenged    trends and feedback accurate 
                   by ever                                and real time insights for 
                   evolving policy, funding,              action. 
                   operational and 
                   regulatory changes. Failure            Our Gartner partnership provides 
                   to anticipate                          independent market, 
                   the changes that are affecting         trend, sector, client and 
                   our clients                            competitor analysis. 
                   and respond effectively, could 
                   restrict our                           Sales transformation programme 
                   ability to grow margins and            is driving the 
                   increase                               executive investment panel 
                   market share.                          protocols to enable 
                   Risk trend: Neutral                    risk-controlled faster growth. 
                   (FY19: Neutral) 
                                                          Innovation leaders are embedded 
                                                          in all sectors and 
                                                          accounts. 
                  =====================================  ======================================= 
 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

FR JAMBTMTIBTPB

(END) Dow Jones Newswires

March 16, 2021 03:00 ET (07:00 GMT)

Costain (LSE:COST)
Historical Stock Chart
From Mar 2024 to Apr 2024 Click Here for more Costain Charts.
Costain (LSE:COST)
Historical Stock Chart
From Apr 2023 to Apr 2024 Click Here for more Costain Charts.