TIDMHUM

RNS Number : 2125U

Hummingbird Resources PLC

01 April 2021

Hummingbird Resources plc / Ticker: HUM / Index: AIM / Sector: Mining

1 April 2021

Hummingbird Resources plc

("Hummingbird" or the "Company")

Significant Drill Results Continue at Yanfolila, Mali

Hummingbird Resources plc (AIM: HUM) is pleased to provide an update on the Company's 2021 exploration drilling programme at the Yanfolila gold mine, Mali. For the release details and graphics, please follow the link here http://www.rns-pdf.londonstockexchange.com/rns/2125U_1-2021-3-31.pdf .

As noted in the Company's Mineral Resource Estimate ("MRE") announcement on 30 March 2021, the Company's 2021 exploration drilling programme is focused on increasing mineral resources at known deposits and testing new greenfield targets. Approximately 5,800 metres ("m") have been drilled so far in 2021, which includes 3,367 m of reverse circulation ("RC") drilling at Sanioumale East ("SE") and 2,474 m of diamond core drilling at Komana East ("KE"). The drill results from SE and KE show continued resource upside potential at both deposits, as recently highlighted in the MRE announcement.

SE highlights

-- With the SE drill holes continuing to intersect mineralisation, the results highlight the potential for SE to be a material deposit, building on the positive 2020 exploration results which led to an increase of SE's JORC compliant MRE to 204,000 ounces ('oz')

-- Notable drill results from SE include:

-- 38 m at 5.39 g/t gold from 58 m depth (SNERCO421)

-- 5 m at 3.07 g/t gold from 79 m depth (SNERCO420: interval1)

-- 16 m at 2.94 g/t gold from 107 m depth (SNERCO420: interval 2)

-- 8 m at 4.58 g/t gold from 154 m depth (SNERC0419)

-- 14 m at 2.63 g/t gold from 51 m depth (SNERC0413)

-- 14 m at 2.27 g/t gold from 77 m depth (SNERC0410)

-- 16 m at 2.32 g/t gold from 12 m depth (SNERC0411)

KE highlights

   --      The drilling at KE is targeting mineralisation for underground development ("KEUG") 

-- Of the KEUG drill holes completed to date in the 2021 exploration programme all nine drill holes have intersected the targeted mineralised zones

   --      Notable ongoing drill results from KEUG include: 

-- 5.2 m at 3.83 g/t gold from 156 m depth (KEUGDD015)

-- 8.8 m at 2.87 g/t gold from 205 m depth (KEUGDD017)

-- 1.3 m at 7.00 g/t gold from 242.7 m depth (KEUGDD018)

-- 3.4 m at 5.35 g/t gold from 221 m depth (KEUGDD022)

-- 5 m at 2.23 g/t gold from 203 m depth (KEUGDD022)

Dan Betts, CEO of Hummingbird, commented:

"These results for both SE and KEUG continue on from last year's drilling success, showing further upside growth potential in resources for both deposits. The SE results are indicating that the deposit is potentially of a material size and could be mined in the coming years. Hole SNERC0421, 38 m at 5.39 g/t gold from 58 m depth, is one of the best intersected drill results in the history of Hummingbird which is a pleasing achievement!"

"Our ongoing work at the KEUG deposit is progressing well, with the aim of bringing an underground mine into our future mine plans once final drilling, permitting, portal hole access and economic studies have been finalised."

SE drilling summary (see graphics below for more details on the deposit)

-- The 2021 drilling at SE has intersected mineralisation in 11 of the 12 holes drilled, with mineralisation remaining open

-- Drilling is now proceeding to extend the mineralisation further to the south of the central pit and at depth below the 'New Zone' discovery

-- Hole SNERC0421 (38 m at 5.39 g/t gold from 58 m depth) was drilled to confirm the widths and grade of the original discovery hole of the 'New Zone' by SNERC0402 (42 m at 4.07g/t gold from 80 m) as highlighted in the Company's announcement dated 3 February 2021

-- This 'New Zone' remains open at depth and will be drilled further with a diamond core rig to better understand its structural controls and style of mineralisation in order to ensure its mineral resource potential is targeted effectively

-- There is further exploration upside at the SE deposit, with only 1.5 kilometres ('km') having been tested along the highly prospective 3 km Sankarani Shear gold zone anomaly where SE is situated, with more than one zone of mineralisation having already been identified

-- 15,000 m of drilling is planned at SE in 2021

KEUG drilling summary (see graphics below for more details on the deposit)

-- Following the discovery of the continuation of mineralisation to the north of the deposit in the 2020 drilling programme, the 2021 programme is focussing on expanding and drill testing for further mineralisation in that region. So far nine holes have been drilled for 2,474m

-- These results continue to confirm mineralisation exists at depth at the northern part of the deposit, giving the Company increased confidence of further resource growth potential for the planned KE UG mining operation

-- Key next steps for KEUG include:

-- Finalising the surface drilling programme

-- Gaining permitting approval for the KEUG mine

-- Finalising portal location and underground mine design

-- Finalising economic studies in order to bring the underground mine into future mine plans

Sanioumale East Selected Drill Results

 
 Hole Number*    Depth From   Depth To   Intercept Description 
 SNERC0410               77         91          14m @ 2.27 g/t 
                -----------  ---------  ---------------------- 
 SNERC0411               12         28          16m @ 2.32 g/t 
                -----------  ---------  ---------------------- 
 SNERC0413               51         65          14m @ 2.63 g/t 
                -----------  ---------  ---------------------- 
 SNERC0414              162        210          48m @ 0.57 g/t 
                -----------  ---------  ---------------------- 
 SNERC0415               27         33           6m @ 5.70 g/t 
                -----------  ---------  ---------------------- 
 SNERC0415              118        140          22m @ 0.53 g/t 
                -----------  ---------  ---------------------- 
 SNERC0419              154        162           8m @ 4.58 g/t 
                -----------  ---------  ---------------------- 
 SNERC0420               79         84           5m @ 3.07 g/t 
                -----------  ---------  ---------------------- 
 SNERC0420              107        123          16m @ 2.94 g/t 
                -----------  ---------  ---------------------- 
 SNERC0421               58         96          38m @ 5.39 g/t 
                -----------  ---------  ---------------------- 
 SNERC0421              102        125          23m @ 0.69 g/t 
                -----------  ---------  ---------------------- 
 

*Holes with the same number represent different interval sections

Komana East Deposit Selected Drill Results

 
 Hole Number*    Depth From   Depth To   Intercept Description 
 KEUGDD015              156      161.2         5.2m @ 3.83 g/t 
                -----------  ---------  ---------------------- 
 KEUGDD015              170        172           2m @ 2.06 g/t 
                -----------  ---------  ---------------------- 
 KEUGDD016           173.85     177.35         3.5m @ 1.76 g/t 
                -----------  ---------  ---------------------- 
 KEUGDD017            172.8        176         3.2m @ 1.17 g/t 
                -----------  ---------  ---------------------- 
 KEUGDD017              205      213.8         8.8m @ 2.87 g/t 
                -----------  ---------  ---------------------- 
                                                  1.55m @ 3.75 
 KEUGDD018            217.8     219.35                     g/t 
                -----------  ---------  ---------------------- 
 KEUGDD018            242.7        244         1.3m @ 7.00 g/t 
                -----------  ---------  ---------------------- 
 KEUGDD018              247        248           1m @ 3.20 g/t 
                -----------  ---------  ---------------------- 
 KEUGDD018              254      255.5         1.5m @ 1.98 g/t 
                -----------  ---------  ---------------------- 
                                                  2.35m @ 2.56 
 KEUGDD019           205.65        208                     g/t 
                -----------  ---------  ---------------------- 
                                                  1.25m @ 2.69 
 KEUGDD020            250.4     251.65                     g/t 
                -----------  ---------  ---------------------- 
 KEUGDD021              224        226           2m @ 3.48 g/t 
                -----------  ---------  ---------------------- 
 KEUGDD022            204.5        208         3.5m @ 3.05 g/t 
                -----------  ---------  ---------------------- 
 KEUGDD022            231.6        235         3.4m @ 5.35 g/t 
                -----------  ---------  ---------------------- 
 KEUGDD023              264      270.5         6.5m @ 1.16 g/t 
                -----------  ---------  ---------------------- 
 

*Holes with the same number represent different interval sections

SE drilling long intersection deposit map

SE cross section view showing newly discovered 'New Zone' at the north end of the central pit

KEUG long intersection view with planned mine development

Qualified Person Review:

Murray Paterson has reviewed and approved the technical information contained within this announcement in his capacity as a Qualified Person, as required under the AIM Rules for Companies. Murray Paterson is the Chief Geologist for the Company and is a member of good standing with the Australasian Institute of Mining and Metallurgy (MAusIMM).

**S**

For further information please visit www.hummingbirdresources.co.uk or contact:

 
 Daniel Betts,         Hummingbird Resources       Tel: +44 (0) 20 7409 
  CEO                   plc                         6660 
  Thomas Hill, FD 
  Edward Montgomery, 
  CSO & ESG 
 James Spinney         Strand Hanson Limited       Tel: +44 (0) 20 7409 
  Ritchie Balmer        Nominated Adviser           3494 
                      --------------------------  --------------------- 
 James Asensio         Canaccord Genuity Limited   Tel: +44 (0) 20 7523 
  Thomas Diehl          Broker                      8000 
                      --------------------------  --------------------- 
 Tim Blythe            Blytheweigh                 Tel: +44 (0) 20 7138 
  Megan Ray             Financial PR/IR             3205 
  Rachael Brooks 
                      --------------------------  --------------------- 
 

Notes to Editors:

Notes to Editors:

Hummingbird Resources (AIM: HUM) is a leading multi-asset, multi-jurisdiction gold production, development and exploration company and member of the World Gold Council ('WGC'). Hummingbird's vision is to continue to grow its asset base, producing highly profitable ounces, while continuing to focus on its Environmental, Social & Governance ('ESG') policies and practices. The Company currently has two core gold projects, the producing Yanfolila Gold Mine in Mali, and the Kouroussa gold development project in Guinea. Further, the Company has a controlling interest in the Dugbe Gold Project in Liberia that is being developed by Pasofino Gold Limited through an earn-in agreement.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

DRLSDMFAFEFSESD

(END) Dow Jones Newswires

April 01, 2021 02:00 ET (06:00 GMT)

Hummingbird Resources (LSE:HUM)
Historical Stock Chart
From Mar 2024 to Apr 2024 Click Here for more Hummingbird Resources Charts.
Hummingbird Resources (LSE:HUM)
Historical Stock Chart
From Apr 2023 to Apr 2024 Click Here for more Hummingbird Resources Charts.