Batero Gold Corp. ("Batero," "the Company") (TSX
VENTURE:BAT)(FRANKFURT:68B)(PINKSHEETS:BELDF) is pleased to report results from
the final 28 holes drilled at the La Cumbre deposit ("La Cumbre") at the
Company's 100% owned Batero-Quinchia project ("the Project"), located in
Risaralda, Colombia. These 28 holes represent the conclusion of the Company's
2012 development drill program.
La Cumbre Drill Highlights:
-- LC070: from 6.5 m to 150 m (end of hole) grading 1.36 g/t gold and 2.58
g/t silver (compare LC023, LC017)
-- LC057: vertical drill hole from 4.00 m to 100.00 m (end of hole) grading
1.20 g/t gold and 2.16 g/t silver, including from 94.00 m to 100.00 m
(end of hole) grading 1.69 g/t gold and 3.66 g/t silver
-- LC061: from 0.0 m to 82.7 m (hole terminated due to technical issues)
grading 1.07 g/t gold and 3.40 g/t silver
-- All drill holes reported ended in gold mineralization
See Figure 1, Figure 2 and Figure 3 at the end of this release for a Plan View
Map and Long Sections of 2012 Drill Hole Locations.
See Table 1 for 2012 Drill Hole Results and Table 2 for Drill Hole Specifications.
Current infill drill results at La Cumbre continue to outline additional volumes
in the deposit's core of higher grade oxidized gold mineralization, which grades
in excess of 1.0 g/t gold and occurs near and at surface. Infill drilling
results also extend the trend of La Cumbre's high grade core to the northwest
and to the southeast. Drill hole LC070 comprises the highest gold grades
reported to date at the Project and LC057 comprise the second highest gold
grades reported to date at the Project located on the north side of the high
grade central core at La Cumbre. The total 2012 drill program consisted of 35
holes over 4,947 metres. These holes are located within a 600 metre
northwest-southeast strike length zone of continuous gold mineralization located
from surface. All drill holes reported ended in gold mineralization.
"We are pleased that the results from our 2012 drill program continue to outline
grades of over 1+ g/t gold in the large continuous zones of mineralization at La
Cumbre," stated Brandon Rook, Batero's President and Chief Executive Officer.
"These positive drill results serve as encouraging signs for the future of the
Batero-Quinchia project. As a result of our alliance with Consorcio Minero
Horizonte, we now possess the financial and technical capabilities required to
move this project forward."
With the 2012 drill plan complete, Batero is working towards the preparation of
an updated resource estimate, focusing only on La Cumbre's high grade oxidized
gold mineralization at surface as the basis of a comprehensive technical report
that will encompass all of the work completed to date at La Cumbre. Remodeling
of the La Cumbre oxidized deposit and resources are expected to be completed in
early 2013. The high grade core at La Cumbre is expected to improve both the
average grade and ounces in an updated mineral resource estimate, as the 1+ g/t
gold core is well above the average grade of the oxide mineral resource estimate
previously reported in the initial resource estimate (see below).
The Company is currently evaluating the most efficient and cost effective mine
scenario, including a leach processing circuit and the optimum starter pit
production rate from the high grade oxidized mineralization at La Cumbre. The
Company will also include La Cumbre's transition zone, which was not included in
the initial oxide resource estimate, in its evaluation. This mine scenario is
anticipated to be the first stage of a potentially larger mine plan.
Batero is focused on accelerating the La Cumbre deposit towards a development
decision. Engineering, environmental impact assessment, archaeological studies,
and social baseline studies are all sufficiently advanced to support any
development option. Pending the positive results of the technical report, the
Company will assess the merits of advancing the development of the La Cumbre
deposit.
Batero recently announced a $20.0 million financing deal and the formation of a
strategic alliance with Consorcio Minero Horizonte ("Horizonte"), a privately
owned Peruvian company with annual production exceeding 200,000 gold ounces, the
fifth largest gold producer in Peru. Horizonte will provide technical expertise
as the Company advances La Cumbre deposit through to a production decision.
Complete details of this transaction are available within the Company's news
release dated November 1, 2012.
Given the positive results from the infill drill program, a revision and
updating of the mineral resources at La Cumbre should maintain or better the
categorization of the resources in this deposit. The initial mineral resource
estimate of the La Cumbre deposit (effective January 25, 2012) at a 0.3 g/t gold
cut-off grade and within a Whittle pit shell are as follows (see www.sedar.com
for Technical Report amended on April 19, 2012):
-- Indicated resources containing 2.3 million ounces gold in 131.0 million
tonnes averaging 0.56 g/t gold
-- Inferred resources containing 0.7 million ounces gold in 39.0 million
tonnes averaging 0.52 g/t gold
The initial oxide resource estimate of the La Cumbre deposit (effective January
25, 2012) at a 0.16 g/t gold cut-off grade and within a Whittle pit shell are as
follows (see www.sedar.com for Technical Report amended on April 19, 2012):
-- Indicated resources containing 275,000 ounces gold in 15.4 million
tonnes averaging 0.56 g/t gold
-- Inferred resources containing 81,000 ounces gold in 6.7 million tonnes
averaging 0.37 g/t gold
La Cumbre Deposit Highlights
-- Large continuous zones of at and near surface oxidized gold
mineralization grading greater than 0.7 g/t gold
-- 2012 drill program indicates expansion of 1+ g/t gold in central core
area
-- Greater than 1.0 g/t gold intercepts occur within the oxide zone of gold
mineralization that extends from surface to a depth of up to 70 metres
and through the underlying transition zone that exists over a vertical
distance of 150 metres to 250 metres
-- Metallurgical bottle role testing in 2012 yielded gold recoveries of 93%
and 94% for gold mineralization in the oxide zone and recoveries from
82% to 86% in the transition zone
-- Topography and location of gold mineralization suggest a low strip ratio
-- Permitting process to initiate exploitation activity is ongoing
-- 100% ownership of surface rights at La Cumbre deposit
Ongoing Work Programs
Metallurgical samples from the 2012 drilling have been submitted to SGS (Lima)
for gold deportment studies, column leach tests, and supporting bottle roll
tests. The Company anticipates all results to be released in the first quarter
of 2013. Review of geotechnical results associated with orientated drilling in
approximately 50% of the 2012 drill holes will feed into a preliminary open pit
design and associated engineering to support a development decision at the La
Cumbre deposit.
Drill Hole Program Results
The 2012 development drill program commenced on July 15, 2012 and was completed
on September 25, 2012. The drill program was designed to (i) infill the areas of
interpolated higher grade mineralization along a northwest-southeast trending
corridor, (ii) step out to the northwest and southeast to extend the areas of
interpolated higher grade mineralization, and (iii) step out to the north of La
Cumbre towards the El Centro zone to test near surface higher grade linkage
between the deposits. The drill hole lengths vary from 100 metres to 200 metres,
and were multitasked to provide both geological and geotechnical information and
sample material for metallurgical test work. Fresh samples of drill core
material have been submitted for bottle roll and column leach testing.
Infill Drilling at La Cumbre - North, Central and Southeast
(LC041, 052, 057; LC056, 058, 059, 060, 061, 070; LC066, 067, 068, 069)
Drilling confirmed and delimited the near and at surface high grade
mineralization, +1 g/t gold, that starts in the oxidized zone and continues at
depth through a low total sulphur transition zone. All holes ended in gold
mineralization.
Step Out Drilling at La Cumbre - Northwest and Southeast
(LC044, 046, 047, 050, 055; LC062, 063, 064, 065)
Drilling confirmed continued mineralization along both step out directions. To
the northwest the near surface mineralization is limited by a fault structure
and non-mineralized volcanic breccia. However, mineralization was encountered at
depth across the fault and remains open to the northwest at depth. To the
southeast mineralization above 0.5 g/t gold was confirmed to continue in trend
and supported by narrow high grade, +1g/t gold, veinlet systems.
Step out Drilling towards El Centro
(LC045, 048, 049, 051, 053, 054)
Results from drilling near El Centro indicate there is little near surface high
grade mineralization across the Amarillo Structural Corridor, but confirm narrow
high grade epithermal style mineralization located above the deeper porphyry
style mineralization previously drilled at El Centro. Further interpretation of
the drill data in this sector is required to properly establish the epithermal/
porphyry target at El Centro. This will be further evaluated in 2013.
Table 1 - 2012 Drill Hole Results
Infill Drilling - North
----------------------------------------------------------------------------
From To Length Au Ag Cu
Drill Hole (m) (m) (m) (g/t) (g/t) (%)
----------------------------------------------------------------------------
LC041 0.00 150.00 150.00 0.64 1.70 0.12
----------------------------------------------------------------------------
including 0.00 46.00 46.00 0.97 1.45 0.15
----------------------------------------------------------------------------
subinterval 5.60 28.00 22.40 1.18 0.76 0.19
----------------------------------------------------------------------------
including 50.00 56.00 6.00 0.53 1.72 0.10
----------------------------------------------------------------------------
including 63.80 78.60 14.80 0.65 1.80 0.12
----------------------------------------------------------------------------
including 85.20 110.00 24.80 0.60 2.10 0.12
----------------------------------------------------------------------------
including 116.00 122.00 6.00 0.53 2.28 0.10
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC052 2.00 170.00 168.00 0.49 1.09 0.07
----------------------------------------------------------------------------
including 2.00 33.80 31.80 1.00 1.45 0.09
----------------------------------------------------------------------------
subinterval 14.00 22.00 8.00 1.38 1.58 0.09
----------------------------------------------------------------------------
subinterval 28.00 32.00 4.00 1.23 1.70 0.06
----------------------------------------------------------------------------
including 40.20 47.20 7.00 0.55 1.33 0.06
----------------------------------------------------------------------------
including 52.25 53.40 1.15 0.58 2.55 0.20
----------------------------------------------------------------------------
including 93.27 95.00 1.73 0.71 1.48 0.11
----------------------------------------------------------------------------
including 119.80 121.28 1.48 0.83 1.73 0.13
----------------------------------------------------------------------------
including 133.00 139.86 6.86 0.88 1.34 0.09
----------------------------------------------------------------------------
subinterval 135.00 138.60 3.60 0.99 1.27 0.09
----------------------------------------------------------------------------
including 151.00 153.00 2.00 0.76 2.02 0.13
----------------------------------------------------------------------------
including 168.00 170.00 2.00 0.55 0.93 0.07
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC057 4.00 100.00 96.00 1.20 2.16 0.15
----------------------------------------------------------------------------
including 25.00 39.00 14.00 1.59 1.81 0.17
----------------------------------------------------------------------------
including 43.00 66.05 23.05 1.24 1.93 0.16
----------------------------------------------------------------------------
including 74.50 86.00 11.50 1.32 2.96 0.18
----------------------------------------------------------------------------
including 94.00 100.00 6.00 1.69 2.88 0.25
----------------------------------------------------------------------------
Infill Drilling- Central
----------------------------------------------------------------------------
From To Length Au Ag Cu
Drill Hole (m) (m) (m) (g/t) (g/t) (%)
----------------------------------------------------------------------------
LC056 6.50 200.00 193.50 0.59 1.86 0.10
----------------------------------------------------------------------------
including 75.50 76.50 1.00 4.47 35.60 0.34
----------------------------------------------------------------------------
including 113.60 200.00 86.40 0.90 2.43 0.16
----------------------------------------------------------------------------
including 179.00 200.00 21.00 1.09 2.60 0.18
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC058 9.25 200.00 190.75 0.64 2.20 0.14
----------------------------------------------------------------------------
including 9.25 137.00 127.75 0.76 2.24 0.15
----------------------------------------------------------------------------
subinterval 11.00 23.30 12.30 1.25 1.87 0.09
----------------------------------------------------------------------------
subinterval 15.50 19.00 3.50 1.52 1.48 0.11
----------------------------------------------------------------------------
including 150.00 170.00 20.00 0.63 2.36 0.13
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC059 6.45 160.00 153.55 0.76 2.06 0.15
----------------------------------------------------------------------------
including 6.45 30.00 23.55 1.13 1.21 0.12
----------------------------------------------------------------------------
subinterval 6.45 22.50 16.05 1.23 1.77 0.17
----------------------------------------------------------------------------
including 32.00 55.20 23.20 0.69 2.35 0.17
----------------------------------------------------------------------------
including 61.00 97.00 36.00 0.62 2.20 0.16
----------------------------------------------------------------------------
including 103.00 160.00 57.00 0.82 1.96 0.15
----------------------------------------------------------------------------
subinterval 115.00 140.45 25.45 1.00 1.94 0.17
----------------------------------------------------------------------------
subinterval 115.00 116.28 1.28 2.43 3.01 0.28
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC060 3.00 150.00 147.00 0.92 2.05 0.17
----------------------------------------------------------------------------
including 23.00 150.00 127.00 0.99 2.05 0.18
----------------------------------------------------------------------------
subinterval 25.00 66.00 41.00 1.57 2.83 0.26
----------------------------------------------------------------------------
subinterval 44.00 49.50 5.50 4.28 5.76 0.56
----------------------------------------------------------------------------
including 90.50 95.00 4.50 1.03 2.48 0.21
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC061 0.00 82.70 82.70 1.07 3.40 0.18
----------------------------------------------------------------------------
including 54.00 82.70 28.70 1.46 3.37 0.23
----------------------------------------------------------------------------
subinterval 66.00 82.70 16.70 1.70 3.48 0.27
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC070 6.50 150.00 143.50 1.36 2.58 0.17
----------------------------------------------------------------------------
including 6.50 15.50 9.00 1.80 1.15 0.13
----------------------------------------------------------------------------
including 20.00 150.00 130.00 1.36 2.71 0.17
----------------------------------------------------------------------------
subinterval 28.00 34.00 6.00 1.47 2.64 0.08
----------------------------------------------------------------------------
subinterval 44.00 112.00 68.00 1.65 3.11 0.18
----------------------------------------------------------------------------
and 48.20 66.00 17.80 2.24 3.53 0.16
----------------------------------------------------------------------------
and 86.00 104.00 18.00 1.92 2.68 0.22
----------------------------------------------------------------------------
subinterval 120.00 131.70 11.70 1.58 3.20 0.23
----------------------------------------------------------------------------
Infill Drilling - Southeast
----------------------------------------------------------------------------
From To Length Au Ag Cu
Drill Hole (m) (m) (m) (g/t) (g/t) (%)
----------------------------------------------------------------------------
LC066 0.00 200.00 200.00 0.51 2.01 0.12
----------------------------------------------------------------------------
including 0.00 14.00 14.00 0.68 4.23 0.07
----------------------------------------------------------------------------
including 53.00 67.00 14.00 0.75 2.10 0.16
----------------------------------------------------------------------------
including 104.00 115.20 11.20 0.65 2.21 0.14
----------------------------------------------------------------------------
including 120.50 130.00 9.50 0.71 2.26 0.13
----------------------------------------------------------------------------
including 162.00 177.70 15.70 0.65 1.70 0.12
----------------------------------------------------------------------------
including 187.00 200.00 13.00 0.66 2.93 0.15
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC067 0.00 100.00 100.00 0.49 2.23 0.08
----------------------------------------------------------------------------
including 0.00 30.60 30.60 0.74 3.74 0.06
----------------------------------------------------------------------------
including 70.00 100.00 30.00 0.64 1.99 0.12
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC068 1.23 100.00 98.77 0.60 2.31 0.13
----------------------------------------------------------------------------
including 1.23 11.30 10.07 0.86 2.63 0.15
----------------------------------------------------------------------------
including 37.00 51.60 14.60 0.62 2.76 0.13
----------------------------------------------------------------------------
including 57.00 84.00 27.00 0.79 2.33 0.13
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC069 0.00 100.00 100.00 0.45 4.03 0.30
----------------------------------------------------------------------------
including 0.00 31.00 31.00 0.58 2.90 0.12
----------------------------------------------------------------------------
Step Out Drilling - Northwest
----------------------------------------------------------------------------
From To Length Au Ag Cu
Drill Hole (m) (m) (m) (g/t) (g/t) (%)
----------------------------------------------------------------------------
LC044 4.00 100.00 96.00 0.32 1.30 0.03
----------------------------------------------------------------------------
including 19.00 27.00 8.00 0.57 1.52 0.04
----------------------------------------------------------------------------
including 32.10 38.00 5.90 0.97 1.80 0.05
----------------------------------------------------------------------------
including 67.00 73.70 6.70 0.87 2.32 0.13
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC046 2.00 150.00 148.00 0.08 0.47 0.01
----------------------------------------------------------------------------
including 98.00 102.00 4.00 0.63 1.80 0.07
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC047 0.00 150.00 150.00 0.03 0.44 0.00
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC050 2.00 170.00 168.00 0.24 0.64 0.03
----------------------------------------------------------------------------
including 25.50 27.00 1.50 1.76 0.87 0.02
----------------------------------------------------------------------------
including 31.00 34.60 3.60 1.10 1.09 0.01
----------------------------------------------------------------------------
including 117.00 127.00 10.00 0.84 1.12 0.09
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC055 3.00 200.00 197.00 0.52 1.24 0.07
----------------------------------------------------------------------------
including 26.00 28.00 2.00 0.58 1.37 0.05
----------------------------------------------------------------------------
including 33.70 37.00 3.30 0.60 0.87 0.06
----------------------------------------------------------------------------
including 41.00 43.00 2.00 14.70 2.00 0.04
----------------------------------------------------------------------------
including 70.00 72.00 2.00 0.51 1.78 0.11
----------------------------------------------------------------------------
including 83.60 87.00 3.40 0.58 1.09 0.09
----------------------------------------------------------------------------
including 111.00 115.00 4.00 0.58 1.17 0.11
----------------------------------------------------------------------------
including 127.00 139.00 12.00 0.62 1.53 0.11
----------------------------------------------------------------------------
including 155.00 168.50 13.50 0.80 2.44 0.15
----------------------------------------------------------------------------
including 188.00 192.00 4.00 0.53 1.22 0.09
----------------------------------------------------------------------------
including 196.00 200.00 4.00 0.52 1.79 0.13
----------------------------------------------------------------------------
Step Out Drilling - Southeast
----------------------------------------------------------------------------
From To Length Au Ag Cu
Drill Hole (m) (m) (m) (g/t) (g/t) (%)
----------------------------------------------------------------------------
LC062 0.00 200.00 200.00 0.53 2.33 0.14
----------------------------------------------------------------------------
including 59.50 69.50 10.00 0.65 2.57 0.12
----------------------------------------------------------------------------
including 79.00 88.00 9.00 0.80 2.78 0.19
----------------------------------------------------------------------------
including 174.00 192.00 18.00 0.65 1.22 0.10
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC063 2.00 200.00 198.00 0.40 1.40 0.07
----------------------------------------------------------------------------
including 2.00 7.00 5.00 1.01 1.57 0.06
----------------------------------------------------------------------------
including 13.90 25.00 11.10 0.60 1.19 0.11
----------------------------------------------------------------------------
including 43.10 45.40 2.30 4.79 1.83 0.22
----------------------------------------------------------------------------
including 51.00 55.00 4.00 1.13 0.87 0.07
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC064 0.00 200.00 200.00 0.43 1.80 0.12
----------------------------------------------------------------------------
including 20.00 22.00 2.00 1.80 2.11 0.13
----------------------------------------------------------------------------
including 69.00 74.00 5.00 0.69 2.19 0.17
----------------------------------------------------------------------------
including 111.00 132.00 21.00 0.54 1.90 0.12
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC065 0.00 200.00 200.00 0.45 1.14 0.08
----------------------------------------------------------------------------
including 16.00 34.00 18.00 0.69 2.01 0.11
----------------------------------------------------------------------------
including 65.50 76.20 10.70 0.76 2.03 0.19
----------------------------------------------------------------------------
including 88.80 103.00 14.20 0.65 1.02 0.11
----------------------------------------------------------------------------
including 167.00 169.00 2.00 1.58 0.87 0.05
----------------------------------------------------------------------------
El Centro Drilling
----------------------------------------------------------------------------
From To Length Au Ag Cu
Drill Hole (m) (m) (m) (g/t) (g/t) (%)
----------------------------------------------------------------------------
LC045 0.00 100.00 100.00 0.12 0.26 0.01
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC048 0.00 100.00 100.00 0.17 0.82 0.04
----------------------------------------------------------------------------
including 0.00 6.85 6.85 0.74 0.30 0.01
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC049 0.00 100.00 100.00 0.37 1.65 0.02
----------------------------------------------------------------------------
including 26.50 32.30 5.80 0.82 0.76 0.03
----------------------------------------------------------------------------
including 36.80 41.00 4.20 0.54 0.49 0.03
----------------------------------------------------------------------------
including 45.60 53.00 7.40 0.76 0.60 0.02
----------------------------------------------------------------------------
including 68.50 73.00 4.50 0.88 27.16 0.03
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC051 0.00 100.00 100.00 0.15 1.07 0.03
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC053 0.00 150.00 150.00 0.14 0.86 0.03
----------------------------------------------------------------------------
----------------------------------------------------------------------------
LC054 2.80 150.00 147.20 0.29 1.24 0.05
----------------------------------------------------------------------------
including 2.80 9.00 6.20 0.83 0.39 0.05
----------------------------------------------------------------------------
subinterval 100.00 103.00 3.00 0.82 1.49 0.07
----------------------------------------------------------------------------
(i) Interval length represents downhole length. Intervals are selected using a
cut-off grade of 0.5g/t and may include a maximum dilution of one sample
interval under cut-off. Sample intervals are typically 2 metres.
Table 2 - Current 2012 Drill Hole Specifications
----------------------------------------------------------------------------
Drill Elevation Depth
Hole Easting Northing (m) Azimuth Dip (m)
----------------------------------------------------------------------------
Infill Drilling - North
----------------------------------------------------------------------------
LC041 420826 585437 1910 57 -75 150.00
----------------------------------------------------------------------------
LC052 420750 585450 1938 0 -90 170.00
----------------------------------------------------------------------------
LC057 420842 585496 1888 0 -90 100.00
----------------------------------------------------------------------------
Infill Drilling - Central
----------------------------------------------------------------------------
LC056 420885 585307 1874 57 -60 200.00
----------------------------------------------------------------------------
LC058 420858 585344 1884 237 -60 200.00
----------------------------------------------------------------------------
LC059 420844 585379 1892 57 -60 160.00
----------------------------------------------------------------------------
LC060 420897 585349 1884 57 -60 150.00
----------------------------------------------------------------------------
LC061 421025 585250 1824 57 -65 82.70
----------------------------------------------------------------------------
LC070 421081 585315 1854 57 -85 150.00
----------------------------------------------------------------------------
Infill Drilling - Southeast
----------------------------------------------------------------------------
LC066 420950 585190 1824 57 -65 200.00
----------------------------------------------------------------------------
LC067 421000 585190 1796 57 -60 100.00
----------------------------------------------------------------------------
LC068 421115 585157 1760 0 -90 100.00
----------------------------------------------------------------------------
LC069 421100 585190 1780 0 -90 100.00
----------------------------------------------------------------------------
Step Out Drilling - Northwest
----------------------------------------------------------------------------
LC044 420660 585502 1960 0 -90 100.00
----------------------------------------------------------------------------
LC046 420675 585587 1944 57 -60 150.00
----------------------------------------------------------------------------
LC047 420675 585587 1944 237 -60 150.00
----------------------------------------------------------------------------
LC050 420717 585529 1964 0 -90 170.00
----------------------------------------------------------------------------
LC055 420759 585540 1952 0 -90 200.00
----------------------------------------------------------------------------
Step Out Drilling - Southeast
----------------------------------------------------------------------------
LC062 420900 585149 1802 57 -65 200.00
----------------------------------------------------------------------------
LC063 421009.7 585033.7 1720 57 -60 200.00
----------------------------------------------------------------------------
LC064 421000 585110 1776 57 -60 200.00
----------------------------------------------------------------------------
LC065 421000 585110 1776 237 -60 200.00
----------------------------------------------------------------------------
El Centro Drilling
----------------------------------------------------------------------------
LC045 421000 585620 1860 0 -90 100.00
----------------------------------------------------------------------------
LC048 421000 585800 1800 0 -90 100.00
----------------------------------------------------------------------------
LC049 420930 585730 1852 0 -90 100.00
----------------------------------------------------------------------------
LC051 421090 585750 1800 0 -90 100.00
----------------------------------------------------------------------------
LC053 421079 585794 1764 237 -65 150.00
----------------------------------------------------------------------------
LC054 421105 585715 1820 57 -65 150.00
----------------------------------------------------------------------------
To see all maps, figures and strip logs please visit www.baterogold.com
Sample Preparation, Assays, and Quality Assurance/Quality Control
Core is collected and logged (geological & geotechnical), cut and sampled at
Batero Gold's drilling camp at the project area. All QC samples are introduced
before shipment to ALS Minerals' sample preparation facilities in Medellin,
Colombia. Prepared samples are then shipped to ALS Minerals' analytical
facilities in Lima, Peru for analyses. Gold is fire-assayed using a 50 gram
aliquot sample and Atomic Absorption finish. Multi-element analysis is achieved
by Four Acid Digestion and an Induced Coupled Plasma- Emission Spectroscopy
finish.
The Company's QA/QC program includes the regular insertion of blanks, multiple
certified assay standards and duplicate samples into the sample shipments. These
QC samples are inserted in every assay batch, each batch comprising 24 samples.
Monitoring of these QC samples is a critical part of Batero Gold Corp's QA/QC
protocols that involve the re-analyses of a minimum of 10 samples bounding any
failed control sample. A third party check laboratory receives 5% of all samples
to verify the original assay analyses.
Darryl Lindsay, Ph.D., P.Geo., Senior Vice President and Chief Operating Officer
at Batero Gold, is the qualified person as defined by National Instrument 43-101
and is responsible for the technical information provided in this release and
all future news releases.
ON BEHALF OF THE BOARD OF BATERO GOLD CORP.
Brandon Rook, President & CEO
ABOUT BATERO GOLD
Batero Gold Corp. is a precious and base metals exploration and development
company focused in the emerging and prolific Mid-Cauca porphyry gold and copper
belt in the Quinchia district of Colombia. Batero has a 100% interest in the
Batero-Quinchia gold project and is currently focused on advancing La Cumbre
deposit toward a production decision optimizing the most efficient leach
processing circuit. The Company is first targeting the near and at surface
higher grade oxidized gold mineralization. Batero has assembled a strong
management and technical team that have contributed to significant discoveries
and mineral development programs in Colombia and South America. Batero plans to
leverage its strategic share structure with strong local and regional
relationships, and long-term financial partners, to develop its Batero-Quinchia
exploration project into a gold producing operation. Shares of the
Vancouver-based company trade on the Toronto Venture Exchange under the symbol
BAT.
FORWARD-LOOKING STATEMENTS
Certain of the statements and information in this press release constitute
"forward-looking statements" or "forward-looking information" Any statements or
information that express or involve discussions with respect to predictions,
expectations, beliefs, plans, projections, objectives, assumptions or future
events or performance (often, but not always, using words or phrases such as
"expects", "anticipates", "believes", "plans", "estimates", "intends",
"targets", "goals", "forecasts", "objectives", "potential" or variations thereof
or stating that certain actions, events or results "may", "could", "would",
"might" or "will" be taken, occur or be achieved, or the negative of any of
these terms and similar expressions) are not statements of historical fact and
may be forward-looking statements or information.
Forward-looking statements or information relate to, among other things:
developing the most efficient and cost-effective leach processing circuit for
the Cumbre gold deposit, the timing and scope of expected diamond drilling;
resource estimate, grades on the Batero-Quinchia project; scope of
mineralization within the Batero-Quinchia project; timing of receipt of permits
and regulatory approvals; the sufficiency of the Company's capital to finance
the Company's operations; geological interpretations and potential mineral
recovery processes.
Forward-looking statements or information are subject to a variety of known and
unknown risks, uncertainties and other factors that could cause actual events or
results to differ from those reflected in the forward-looking statements or
information, including, without limitation, risks relating to: fluctuations in
the spot and forward price of gold or certain other commodities; changes in
national and local government legislation, taxation, controls, regulations and
political or economic developments in Canada, Colombia or other countries in
which the Company may carry on business in the future; the uncertainties
involved in interpreting geological data; business opportunities that may be
presented to, or pursued by, the Company; operating or technical difficulties in
connection with mining activities; the speculative nature of gold exploration
and development, including the risks of obtaining necessary licenses and
permits; diminishing quantities or grades of reserves; and contests over title
to properties, particularly title to undeveloped properties. In addition, there
are risks and hazards associated with the business of gold exploration,
development and mining, including environmental hazards, industrial accidents,
unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion
losses (and the risk of inadequate insurance, or the inability to obtain
insurance, to cover these risks).
This list is not exhaustive of the factors that may affect any of the Company's
forward-looking statements or information. Forward-looking statements or
information are statements about the future and are inherently uncertain, and
actual achievements of the Company or other future events or conditions may
differ materially from those reflected in the forward-looking statements or
information due to a variety of risks, uncertainties and other factors,
including, without limitation, those referred to in the Company's Filing
Statement dated as of June 22, 2010 under the heading "Risk Factors". Although
the Company has attempted to identify important factors that could cause actual
results to differ materially, there may be other factors that cause results not
to be as anticipated, estimated, described or intended. Accordingly, readers
should not place undue reliance on forward-looking statements or information.
The Company's forward-looking statements and information are based on the
assumptions, beliefs, expectations and opinions of management as of the date of
this press release, and other than as required by applicable securities laws,
the Company does not assume any obligation to update forward-looking statements
and information if circumstances or management's assumptions, beliefs,
expectations or opinions should change, or changes in any other events affecting
such statements or information. For the reasons set forth above, investors
should not place undue reliance on forward-looking statements and information.
To view Figure 1 - Plan View of La Cumbre showing Current Release Drill Holes,
please visit the following link: http://media3.marketwire.com/docs/Bat-F1.pdf
To view Figure 2 - Long Section Showing Current Release Drill Holes, please
visit the following link: http://media3.marketwire.com/docs/Bat-F2.pdf
To view Figure 3 - Long Section Showing Histograms, please visit the following
link: http://media3.marketwire.com/docs/Bat-F3.pdf
Please visit http://www.baterogold.com/en/maps/la-cumbre-plan-and-section-maps
if you are unable to view these maps.
FOR FURTHER INFORMATION PLEASE CONTACT:
Batero Gold Corp.
604.568.6378
info@baterogold.com
www.baterogold.com
Batero Gold (TSXV:BAT)
Historical Stock Chart
From Dec 2024 to Jan 2025
Batero Gold (TSXV:BAT)
Historical Stock Chart
From Jan 2024 to Jan 2025