Brett Resources Inc. ("Brett") (TSX VENTURE: BBR) is pleased to
provide an update on its drill program at its Hammond Reef Project,
in northwestern Ontario. Over 35,000 metres of drilling or 116
diamond drill holes have been completed since January 2010. Assay
results for an additional 25 holes are reported in this news
release.
Assay results in this release include data from infill and
exploration holes. Infill holes reported have been completed in the
A-Zone and the 41-Zone. Results are also reported for exploration
holes that tested the areas south of the A-Zone (South A-Zone), the
RAB, Sande Stewart, Snail Bay and to the East of the 41 Zone.
Please refer to attached plan views
(http://www.brettresources.com/i/pdf/may18/all.pdf) for the
locations of these holes.
A-Zone and 41 Zone infill and step-out drilling
A-Zone infill drilling continues to return both good thicknesses
and good grades. Hole BR-207 intersected 206.4 metres of 1.02 g/t
Au, BR-218 returned 156.0 metres of 1.04 g/t Au, and BR-219 cored
157.50 metres of 1.05 g/t Au. Other significant intersections from
the A-Zone are listed in Table 1.
Table 1. A-Zone intersections
(http://www.brettresources.com/i/pdf/may18/100517_Drilling_PR_AZone.pdf)
X_Sect Hole-ID From To Int (m) Au g/t
---------------------------------------------------------------------
1820_E BR-207 141.8 348.2 206.4 1.02
Incl 248.5 261.5 13.0 3.79
Incl 283.5 296.4 13.0 1.54
381.9 393.2 11.3 0.43
1470_E BR-216 11.0 20.0 9.0 0.75
56.0 185.0 129.0 0.63
197.0 285.5 88.5 0.78
1370_E BR-218 54.5 72.5 18.0 1.02
110.0 156.5 46.5 0.82
182.0 338.0 156.0 1.04
Incl 279.5 299.0 19.5 3.31
1570_E BR-219 50.0 107.0 57.0 0.34
123.5 156.5 33.0 0.45
170.0 327.5 157.5 1.05
Incl 176.0 186.5 10.5 5.20
Incl 272.0 279.5 7.5 3.90
1270_E BR-223 14.0 41.0 27.0 0.77
66.5 113.0 46.5 0.90
125.0 165.5 40.5 1.11
1470_E BR-226 96.5 123.5 27.0 1.12
134.0 173.0 39.0 0.63
221.0 363.5 142.5 0.93
Incl 248.0 275.0 27.0 1.88
1870_E BR-227 209.0 228.5 19.5 0.47
272.0 287.0 15.0 1.12
303.5 315.5 12.0 0.47
348.5 365.0 16.5 0.75
1320_E BR-228 20.0 156.5 136.5 0.49
176.0 219.5 43.5 1.11
231.5 303.5 72.0 0.40
1320_E BR-233 174.5 273.5 99.0 0.69
305.0 335.0 30.0 0.33
1320_E BR-235 2.0 18.5 16.5 0.46
75.5 105.5 30.0 0.67
123.5 303.5 180.0 0.63
317.0 327.5 10.5 0.57
1770_E BR-236 20.5 25.0 4.5 1.09
160.0 196.0 36.0 0.37
224.5 236.5 12.0 0.59
263.5 337.0 73.5 0.53
1320_E BR-242 14.0 77.0 63.0 0.54
110.0 236.0 126.0 0.80
Incl 192.5 207.5 15.0 2.37
224.0 236.0 12.0 0.46
1720_E BR-246 188.0 200.0 12.0 0.60
242.0 252.5 10.5 0.48
Hole BR-261, drilled on cross section 1670_E
(http://www.brettresources.com/i/pdf/may18/may2010-1670E.pdf),
represents a 400m step out south of the A-Zone. This hole tested an
area that is further down-dip than any previous hole. BR-261
intersected intervals of anomalous gold mineralization starting at
68m and these intervals continue to the end of the hole at
497m.
A broad interval of gold mineralization, from 252.5 to 474.5,
reports 222m of 0.68 g/t Au. This zone has higher intervals that
include 159m of 0.71 g/t Au from 252.0 to 411.5m and 46.5m of
0.76g/t Au from 426.0 to 471.5m. Furthermore, a 7.5m interval
within 7.5m of the bottom of the hole assayed 2.28 g/t Au.
The anomalous intervals of gold mineralization intersected in
BR-261 are detailed in Table 2. It is recognized that the intervals
between those reported in Table 2, are of very low grade and some
portions are barren of gold mineralization, however it is
encouraging that this newly discovered gold system straddles a 411m
interval in a single drill hole. The results of BR-261 are shown on
the schematic vertical cross section 1670_E attached.
Hole BR-261 is a follow up to results previously announced
(April 22, 2010) in hole BR-214, and appears to confirm that
significant down-dip potential exists southeast of the A-Zone.
BR-216 returned five gold-bearing intervals above a 0.30 g/t Au
cut-off.
Table 2. Summary of results in South A-Zone
X_Sect Hole-ID From To Int (m) Au g/t
---------------------------------------------------------------------
1670_E BR-261 68.00 86.00 18.00 0.16
120.50 155.00 34.50 0.28
177.50 183.50 6.00 0.58
224.00 236.00 12.00 0.88
252.50 479.00 222.00 0.68
Incl 252.50 411.50 159.00 0.71
Incl 288.50 299.00 10.50 3.21
Incl 411.50 425.00 13.50 0.12
Incl 425.00 471.50 46.50 0.76
Incl 464.00 471.50 7.50 2.28
Assays have been received for two holes completed in the
41-Zone. BR-241, completed on section 3245_E, report 82.5 metres of
1.01 g/t Au, and hole BR-244 intersected 93m of 1.33 g/t Au from
104m to 197m. Summary of significant mineralized intervals from 41
Zone are listed in Table 3.
Table 3. Significant assay intervals from 41 Zone
X_Sect Hole-ID From To Int (m) Au g/t
---------------------------------------------------------------------
3245_E BR-241 14.00 18.50 4.50 1.37
32.00 50.00 18.00 1.01
102.50 185.00 82.50 1.01
Incl 117.50 132.50 15.00 2.53
3205_E BR-244 38.00 86.00 48.00 0.15
104.00 197.00 93.00 1.33
Incl 143.00 161.00 18.00 3.10
New Areas Exploration Drilling
Up to four drills have been testing exploration targets on the
Hammond Reef property over the last few months. Drill results from
the RAB, Sande Stewart, and Snail Bay areas have been
encouraging.
Results for three RAB holes are reported and these results
include assay data from holes BR-230, BR-232, and partial assays
from BR-278. The geological interpretation of the mineralization in
these holes, and other holes previously completed in the RAB,
suggests a westerly dip direction to the mineralization. This trend
of mineralization is not consistent with that found in the main A
and 41 Zones and this orientation may represent structural controls
not identified elsewhere on the property. Table 4 details the
mineralized intervals from RAB
Table 4. RAB Assay results
(http://www.brettresources.com/i/pdf/may18/100517_Drilling_PR_RAB_41_SB.pdf)
X_Sect Hole-ID From To Int (m) Au g/t
---------------------------------------------------------------------
3095_E BR-224 197.00 206.00 9.00 0.36
3135_E 276.50 287.00 10.50 0.38
3135_E BR-230 20.00 30.50 10.50 0.61
39.50 45.50 6.00 0.36
3135_E BR-232 35.00 39.50 4.50 0.36
39.50 71.00 31.50 0.10
71.00 74.00 3.00 0.31
92.00 101.00 9.00 0.14
111.50 140.00 28.50 0.07
285.50 293.00 7.50 0.22
3160_E BR-237 7.00 27.50 20.50 0.48
19850_N BR-278 3.59 93.50 89.91 0.26
Incl 9.50 36.50 27.00 0.44
Incl 54.50 63.50 9.00 0.32
Assays have been received from three of four holes completed
along the Sande Stewart trend. Holes BR-239 on section 3900_E
intersected five mineralized intervals that are summarized in Table
5. The gold mineralization intersected at Sande Stewart is of low
grade but is noted to have significant thickness and will require
follow-up exploration work. Sande Stewart Assays are detailed in
Table 5.
Table 5. Sande Stewart assay summary
(http://www.brettresources.com/i/pdf/may18/100517_Drilling_PR_RAB_SS.pdf)
X_Sect Hole-ID From To Int (m) Au g/t
---------------------------------------------------------------------
3900_E BR-239 32.00 42.50 10.50 0.107
86.00 152.00 66.00 0.106
171.50 224.00 52.50 0.124
257.00 278.00 21.00 0.269
293.00 320.00 27.00 0.275
3800_E BR-247 66.50 89.00 22.50 0.216
117.50 141.50 24.00 0.163
Assay results for the first two of seven holes planned at Snail
Bay have been received. Hole BR-245, drilled on section 5200_E,
intersected elevated gold mineralization from 11 to 116 meters down
hole. The significance of this mineralization will be reviewed once
the other five holes are completed and their assays are received.
Table 6 details the mineralization intersected in BR-245.
Table 6. Snail Bay drill hole intersection summary
X_Sect Hole-ID From To Int (m) Au g/t
---------------------------------------------------------------------
5200_E BR-245 105.50 116.00 10.50 0.33
5050_E BR-252 78.50 89.00 10.50 0.70
A single hole was completed to the East of the 41 Zone. BR-238
did not intersect any significant mineralization that assayed above
0.30g/t Au.
Hammond Reef drilling has been temporarily reduced to two drills
with the purpose of expanding camp from a 40 to an 80-person camp.
Two new drill contracts for 30,000 metres each are expected to be
awarded in the very near term. One of the new drill contractors
will deploy the first two of several drills in mid May. One of the
first areas expected to be drilled is South A-Zone to follow up
results in BR-214 and BR-261.
Barge drilling on Mitta Lake will begin as soon as permits are
received and the geotechnical drill program is anticipated to begin
shortly after the May long weekend.
Patrick Soares, President and CEO, comments, "We are excited by
these drill results which continue to demonstrate the growth
potential of the Hammond Reef Deposit. In particular the results in
hole BR-261, along with those in hole BR-214 reported on April 22,
2010, indicate that the untested area to the south, and down-dip,
of the A-Zone could develop into a significant new resource area.
Extensive follow-up drilling will be undertaken in this untested
area."
Brett has begun the 2010 surface exploration program with work
underway in the Kabaskong area. The Kabaskong area is on strike
with the A-41Zone Trend, and is 1.0km East-Southeast of the A-Zone.
Exploration work has also been initiated in two condemnation areas.
These two condemnation areas are potential tails disposal
sites.
Osisko Mining Corp. Offer for Brett
On March 22nd, 2010, Osisko Mining Corp. agreed to offer
shareholders of Brett 0.34 of an Osisko common share for each
common share of Brett held. The consideration under the Offer at
the time represented a premium of 52.5% using the 20-day volume
weighted average prices of Osisko and Brett on the TSX and TSX
Venture, respectively for the 20 trading day period ending March
16, 2010. The value of the total consideration offered to the
Shareholders is approximately $372 million calculated on a
fully-diluted basis, implying an enterprise value of approximately
$308 million. The boards of directors of both companies have
unanimously approved this transaction and the board of directors of
Brett has recommended that Shareholders tender to the Offer. The
offer to Brett shareholders is open until close of trading May 19,
2010.
Brett's exploration and development teams have been working with
their Osisko counterparts, bringing them up to speed on the
project's latest developments to ensure a smooth, uninterrupted
workflow as the project advances.
Quality Assurance and Quality Control
The Company utilizes standard industry practices in quality
control and quality assurance with insertion of blind standards,
blanks, and duplicates, in addition to the quality assurance and
quality control practiced by the assay laboratory. Sample
preparation and analysis are conducted by ALS Chemex Laboratories
with sample preparation in Thunder Bay, ON, and analyses of pulps
in North Vancouver, BC, ISO/IEC guideline 17025 accredited
facilities. The geologist and Qualified Person under the terms of
National Instrument 43-101 responsible for the verification of work
and data acquisition at Hammond Reef is John Zbeetnoff, P.Geo.
Assay results used in this news release may have some minor out
of range control samples. As such, these control samples as well as
some of their related core samples could be currently undergoing
analytical rerun analyses for gold at the analytical lab. The assay
results for these reruns are expected within four to six weeks. It
is not expected that there will be any noticeable impact on the
final length weighted grade calculations. All significant grade
changes will be reported in future new releases, minor changes will
be posted on the website.
The Qualified Person responsible for this news release under the
terms of National Instrument 43-101 is Patrick Soares, P.Geo.
Contacts: Brett Resources Inc. Tony Perri Manager, Investor
Relations 604-488-0008 604-669-2543 (FAX) tperri@brettresources.com
www.brettresources.com Wani Capital Raju Wani 403-240-0555
Brett Resources (TSXV:BBR)
Historical Stock Chart
From Oct 2024 to Nov 2024
Brett Resources (TSXV:BBR)
Historical Stock Chart
From Nov 2023 to Nov 2024