TORONTO, July 23, 2019 /CNW/ - Barkerville Gold Mines
Ltd. (TSXV: BGM. the "Company" or "BGM") is
pleased to announce the new drilling results from the 2019 Island
Mountain exploration and category conversion program at the
Company's flagship Cariboo Gold Project in central British Columbia.
New results from 24 recent holes on Island Mountain include
45.94 g/t Au over 5.2 meters including a sample of 399
g/t Au over 0.50 meter in exploration hole IM-19-043 located on
the Island Mountain Mosquito Creek deposit and 95 meters down
plunge from an existing vein corridor. Infill hole IM-19-029
intersected multiple vein corridors at Shaft Zone that assayed
14.91 g/t Au over 4.40 meters including a sample of 55.90
g/t Au over 0.80 meters. These results, as well as the
highlights summarized below, demonstrate continuity of grade and
widths within the modelled vein corridors, expansion of
mineralization at depth and anomalous mineralization between the
vein corridors.
A total of 20,000 meters in 47 holes were drilled at Shaft Zone
and Mosquito Creek on Island Mountain in 2019. The program focused
on infill drilling modelled vein corridors and conducting
exploration along strike and down dip of existing vein corridors to
determine the depth extent of the mineralization.
Select Drilling Highlights:
- IM-19-029: 14.91 g/t Au over 4.40 meters including
55.9 g/t Au over 0.80 meters
- IM-19-032: 31.8 g/t Au over 1.20 meters
- IM-19-036: 46.8 g/t Au over 0.65 meters
- IM-19-039: 61.8 g/t Au over 0.5 meters
- IM-19-039: 53.3 g/t Au over 0.5meters
- IM-19-039: 27.23 g/t Au over 2.15 meters
- IM-19-040: 8.94 g/t Au over 6.20 meters
- IM-19-040: 21.18 g/t Au over 3.20 meters including
54.1 g/t Au over 0.90 meters
- IM-19-040: 7.31 g/t Au over 7.85 meters including
68.5 g/t Au over 0.5meters
- IM-19-043: 45.94 g/t Au over 5.20 meters including
399 g/t Au over 0.5meters
- IM-19-045: 7.75 g/t Au over 6.50 meters including
40.4 g/t Au over 0.70 meters
- IM-19-047: 45.5 g/t Au over 0.65 meters
True widths are estimated to be 50 to 75% of reported core
length intervals. Intervals not recovered by drilling were assigned
zero grade. Top cuts have not been applied to high grade
assays.
A complete table of assay highlights for IM-19-024 to IM-19-47
is present below. The Cariboo Gold Project 3D deposit model with
assay highlights is located on the Company's website:
Barkerville Gold Mines Ltd. 3D Deposit Model
Mineralized quartz veins on the Cariboo Gold Project are overall
sub-vertical dip and northeast strike. Vein corridors are
defined as a high-density network of mineralized quartz within the
axis of the F3 fold and hosted within the sandstones. These
corridors have been defined from surface to a vertical depth
averaging 300 meters and remain open for expansion at depth and
down plunge. Gold grades are intimately associated with vein-hosted
pyrite as well as pyritic, intensely silicified wall rock haloes in
close proximity to the veins.
Qualified Persons
Exploration activities at the Cariboo Gold Project are
administered on site by the Company's Project Geologists,
Kyle Orr and Felipe Castaneda. As per National
Instrument 43-101 Standards of Disclosure for Mineral Projects,
Maggie Layman, P.Geo. Vice President
Exploration, is the Qualified Person for the Company and has
prepared, validated and approved the technical and scientific
content of this news release. The Company strictly adheres to CIM
Best Practices Guidelines in conducting, documenting, and reporting
its exploration activities on the Cariboo Gold Project.
Quality Assurance – Quality Control
Once received from the drill and processed, all drill core
samples are sawn in half, labelled and bagged. The remaining
drill core is subsequently stored on site at the Company's secure
facility in Wells, BC. Numbered security tags are applied to
lab shipments for chain of custody requirements. The Company
inserts quality control (QC) samples at regular intervals in the
sample stream, including blanks and reference materials with all
sample shipments to monitor laboratory performance. The QAQC
program was designed and approved by Lynda
Bloom, P.Geo. of Analytical Solutions Ltd.
Drill core samples are submitted to ALS Geochemistry's
analytical facility in North Vancouver,
British Columbia for preparation and analysis. The ALS
facility is accredited to the ISO/IEC 17025 standard for gold
assays and all analytical methods include quality control materials
at set frequencies with established data acceptance criteria. The
entire sample is crushed, and 250 grams is pulverized. Analysis for
gold is by 50g fire assay fusion with atomic absorption (AAS)
finish with a lower limit of 0.01 ppm and upper limit of 100 ppm.
Samples with gold assays greater than 100 ppm are re-analyzed using
a 1,000g screen metallic fire assay. A selected number of samples
are also analyzed using a 48 multi-elemental geochemical package by
a 4-acid digestion, followed by Inductively Coupled Plasma Atomic
Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass
Spectroscopy (ICP-MS).
About Barkerville Gold Mines Ltd.
The Company is focused on developing its extensive mineral
rights package located in the historical Cariboo Mining District of
central British Columbia.
Barkerville's Cariboo Gold Project mineral tenures cover 1,950
square kilometres; along a strike length of 67 kilometres which
includes several past producing placer and hard rock mines, making
it one of the most well-endowed land packages in British Columbia. Since the management change
in mid-2015, the Company has unlocked the fundamental structural
controls of gold mineralization. The Company's Brownfield's
exploration team is focused on upgrading and expanding the
May 2018 43-101 compliant resource
within the 8 kilometers of principle project area located near the
town of Wells, British Columbia. The Company's Greenfield's
team is developing quality exploration assets throughout the
remaining land package through systematic, scientific,
exploration. The operation's team is focused on completing
required studies in order to permit underground mining on Cow and
Island Mountains.
Cautionary Statement on Forward -Looking
Information
Neither the TSX Venture Exchange ('TSXV') nor
its Regulation Services Provider (as that term is defined in the
policies of the TSXV) accepts responsibility for the adequacy or
accuracy of this release. No stock exchange, securities commission
or other regulatory authority has approved or disapproved the
information contained herein. This news release contains
forward-looking information which is not comprised of historical
facts. Forward-looking information involves risks, uncertainties
and other factors that could cause actual events, results,
performance, prospects and opportunities to differ materially from
those expressed or implied by such forward-looking information.
Forward looking information in this news release includes, but is
not limited to, the Company's objectives, goals or future plans,
statements regarding exploration results and exploration plans.
Factors that could cause actual results to differ materially from
such forward-looking information include, but are not limited to,
capital and operating costs varying significantly from estimates,
the preliminary nature of metallurgical test results, delays in
obtaining or failures to obtain required governmental,
environmental or other project approvals, uncertainties relating to
the availability and costs of financing needed in the future,
changes in equity markets, inflation, fluctuations in commodity
prices, delays in the development of projects and the other risks
involved in the mineral exploration and development industry, and
those risks set out in the Company's public documents filed on
SEDAR. Although the Company believes that the assumptions and
factors used in preparing the forward-looking information in this
news release are reasonable, undue reliance should not be placed on
such information, which only applies as of the date of this news
release, and no assurance can be given that such events will occur
in the disclosed time frames or at all. The Company disclaims any
intention or obligation to update or revise any forward-looking
information, whether as a result of new information, future events
or otherwise, other than as required by law.
Table 1: Length Weighted Gold
Composites
HOLE
ID
|
|
DEPTH
FROM
(M)
|
DEPTH
TO
(M)
|
LENGTH
(M)
|
AU
(G/T)
|
TARGET
|
PURPOSE
|
IM-19-024
|
|
387.60
|
389.50
|
1.90
|
7.99
|
Mosquito
Creek
|
Exploration
|
|
Including
|
388.35
|
389.50
|
1.15
|
11.55
|
|
|
|
|
398.80
|
400.25
|
1.45
|
5.64
|
|
|
|
Including
|
398.80
|
399.30
|
0.50
|
9.74
|
|
|
|
|
442.50
|
444.60
|
2.10
|
4.70
|
|
|
|
Including
|
442.50
|
443.00
|
0.50
|
18.30
|
Shaft Zone
|
Exploration and
Infill
|
IM-19-025
|
|
13.75
|
14.35
|
0.60
|
13.40
|
|
|
|
|
26.40
|
32.70
|
6.30
|
6.80
|
|
|
|
Including
|
28.85
|
29.35
|
0.50
|
11.85
|
|
|
|
and
|
32.20
|
32.70
|
0.50
|
20.30
|
|
|
|
|
76.60
|
78.40
|
1.80
|
3.20
|
|
|
|
|
191.50
|
192.00
|
0.50
|
4.69
|
|
|
IM-19-026
|
|
239.00
|
246.00
|
7.00
|
0.81
|
Willow
|
Exploration
|
IM-19-027
|
|
125.00
|
135.90
|
10.90
|
1.72
|
Mosquito
Creek
|
Exploration and
Infill
|
|
|
177.00
|
177.50
|
0.50
|
5.86
|
|
|
|
|
181.50
|
182.00
|
0.50
|
5.02
|
|
|
|
|
269.75
|
271.00
|
1.25
|
5.71
|
|
|
IM-19-028
|
|
117.00
|
119.00
|
2.00
|
5.27
|
Shaft Zone
|
Infill
|
|
Including
|
118.00
|
119.00
|
1.00
|
9.61
|
|
|
IM-19-029
|
|
86.50
|
88.50
|
2.00
|
4.23
|
Shaft Zone
|
Exploration and
Infill
|
|
Including
|
86.50
|
87.40
|
0.90
|
7.67
|
|
|
|
|
201.00
|
201.80
|
0.80
|
3.50
|
|
|
|
|
222.40
|
226.80
|
4.40
|
14.91
|
|
|
|
Including
|
223.10
|
223.90
|
0.80
|
55.90
|
|
|
|
|
343.70
|
344.50
|
0.80
|
4.66
|
|
|
|
|
414.15
|
414.65
|
0.50
|
21.50
|
|
|
|
|
465.80
|
467.50
|
1.70
|
6.45
|
|
|
|
Including
|
465.80
|
466.80
|
1.00
|
9.08
|
|
|
|
|
477.30
|
478.30
|
1.00
|
6.26
|
|
|
|
Including
|
477.30
|
477.80
|
0.50
|
7.80
|
|
|
IM-19-030
|
|
131.50
|
132.00
|
0.50
|
15.35
|
Mosquito
Creek
|
Exploration and
Infill
|
|
|
142.65
|
143.40
|
0.75
|
5.87
|
|
|
|
|
145.70
|
146.55
|
0.85
|
4.84
|
|
|
IM-19-031
|
|
57.60
|
59.10
|
1.50
|
3.53
|
Shaft Zone
|
Infill
|
|
|
98.45
|
100.15
|
1.70
|
15.02
|
|
|
|
Including
|
98.45
|
99.20
|
0.75
|
33.30
|
|
|
IM-19-032
|
|
196.50
|
197.70
|
1.20
|
31.80
|
Shaft Zone
|
Exploration and
Infill
|
|
|
259.50
|
260.00
|
0.50
|
3.87
|
|
|
|
|
261.30
|
262.20
|
0.90
|
8.23
|
|
|
|
|
415.40
|
416.50
|
1.10
|
24.30
|
|
|
|
|
623.95
|
624.45
|
0.50
|
21.40
|
|
|
|
|
629.80
|
630.40
|
0.60
|
4.61
|
|
|
|
|
698.00
|
700.00
|
2.00
|
5.75
|
|
|
|
Including
|
698.00
|
698.50
|
0.50
|
18.20
|
|
|
|
|
747.30
|
747.85
|
0.55
|
7.03
|
|
|
IM-19-033
|
|
252.25
|
253.10
|
0.85
|
6.02
|
Mosquito
Creek
|
Exploration
|
|
|
305.20
|
306.50
|
1.30
|
5.41
|
|
|
|
|
309.50
|
310.00
|
0.50
|
3.54
|
|
|
|
|
321.30
|
322.00
|
0.70
|
3.65
|
|
|
|
|
322.50
|
323.10
|
0.60
|
3.11
|
|
|
|
|
331.10
|
332.00
|
0.90
|
4.29
|
|
|
IM-19-034
|
No Significant
Assays
|
|
|
|
Willow
|
Exploration
|
IM-19-035
|
|
187.25
|
187.75
|
0.50
|
6.19
|
Shaft Zone
|
Exploration and
Infill
|
|
|
254.50
|
255.00
|
0.50
|
3.57
|
|
|
|
|
274.35
|
275.80
|
1.45
|
8.16
|
|
|
|
Including
|
274.35
|
274.90
|
0.55
|
20.70
|
|
|
|
|
412.00
|
412.90
|
0.90
|
8.81
|
|
|
|
|
445.75
|
446.60
|
0.85
|
3.77
|
|
|
|
|
447.40
|
449.00
|
1.60
|
3.71
|
|
|
|
|
465.90
|
467.00
|
1.10
|
3.88
|
|
|
|
Including
|
466.50
|
467.00
|
0.50
|
6.32
|
|
|
|
|
470.35
|
472.00
|
1.65
|
4.42
|
|
|
|
|
473.30
|
474.00
|
0.70
|
5.29
|
|
|
|
|
496.40
|
497.00
|
0.60
|
9.03
|
|
|
|
|
575.00
|
576.00
|
1.00
|
4.33
|
|
|
IM-19-036
|
|
90.00
|
93.00
|
3.00
|
7.39
|
Mosquito
Creek
|
Exploration and
Infill
|
|
Including
|
91.70
|
92.40
|
0.70
|
25.60
|
|
|
|
|
118.15
|
118.65
|
0.50
|
3.49
|
|
|
|
|
129.35
|
131.80
|
2.45
|
14.50
|
|
|
|
Including
|
130.50
|
131.15
|
0.65
|
46.80
|
|
|
|
|
138.10
|
138.85
|
0.75
|
19.85
|
|
|
|
|
175.50
|
176.90
|
1.40
|
7.39
|
|
|
|
|
192.10
|
192.60
|
0.50
|
4.24
|
|
|
IM-19-037
|
No Significant
Assays
|
|
|
|
Willow
|
Exploration
|
IM-19-038
|
|
246.50
|
247.00
|
0.50
|
7.17
|
Mosquito
Creek
|
Exploration and
Infill
|
IM-19-039
|
|
173.00
|
174.00
|
1.00
|
4.61
|
Shaft Zone
|
Exploration and
Infill
|
|
|
251.50
|
253.00
|
1.50
|
3.55
|
|
|
|
|
282.80
|
284.00
|
1.20
|
7.03
|
|
|
|
|
293.20
|
294.10
|
0.90
|
9.13
|
|
|
|
|
374.60
|
375.10
|
0.50
|
13.25
|
|
|
|
|
393.50
|
394.30
|
0.80
|
4.58
|
|
|
|
|
433.00
|
434.00
|
1.00
|
3.71
|
|
|
|
|
468.50
|
470.50
|
2.00
|
3.15
|
|
|
|
Including
|
470.00
|
470.50
|
0.50
|
7.48
|
|
|
|
|
524.20
|
524.70
|
0.50
|
61.80
|
|
|
|
|
586.30
|
587.00
|
0.70
|
14.95
|
|
|
|
|
618.30
|
621.10
|
2.80
|
10.59
|
|
|
|
Including
|
618.30
|
618.80
|
0.50
|
53.30
|
|
|
|
|
630.00
|
630.80
|
0.80
|
29.30
|
|
|
|
|
635.95
|
636.40
|
0.45
|
9.23
|
|
|
|
|
639.90
|
642.05
|
2.15
|
27.23
|
|
|
|
|
647.30
|
648.50
|
1.20
|
16.68
|
|
|
|
Including
|
648.00
|
648.50
|
0.50
|
38.50
|
|
|
|
|
653.90
|
657.40
|
3.50
|
3.30
|
|
|
|
Including
|
653.90
|
654.50
|
0.60
|
5.08
|
|
|
|
and
|
654.50
|
655.00
|
0.50
|
7.90
|
|
|
|
|
659.80
|
660.30
|
0.50
|
13.40
|
|
|
|
|
691.40
|
692.10
|
0.70
|
8.88
|
|
|
IM-19-040
|
|
390.65
|
392.90
|
2.25
|
9.01
|
Shaft Zone
|
Exploration and
Infill
|
|
Including
|
390.65
|
391.15
|
0.50
|
33.20
|
|
|
|
|
399.25
|
405.45
|
6.20
|
8.94
|
|
|
|
Including
|
402.40
|
403.90
|
1.50
|
15.70
|
|
|
|
and
|
403.90
|
404.60
|
0.70
|
37.10
|
|
|
|
|
408.55
|
409.35
|
0.80
|
12.55
|
|
|
|
|
416.35
|
417.65
|
1.30
|
4.89
|
|
|
|
|
490.00
|
493.20
|
3.20
|
21.18
|
|
|
|
Including
|
490.00
|
490.90
|
0.90
|
54.10
|
|
|
|
and
|
492.20
|
493.20
|
1.00
|
19.00
|
|
|
|
|
520.00
|
520.50
|
0.50
|
5.53
|
|
|
|
|
525.00
|
532.85
|
7.85
|
7.31
|
|
|
|
Including
|
525.00
|
525.65
|
0.65
|
19.00
|
|
|
|
and
|
526.15
|
526.65
|
0.50
|
68.50
|
|
|
|
and
|
532.25
|
532.85
|
0.60
|
13.20
|
|
|
|
|
547.70
|
548.80
|
1.10
|
4.21
|
|
|
|
Including
|
547.70
|
548.20
|
0.50
|
7.53
|
|
|
|
|
624.00
|
624.60
|
0.60
|
14.15
|
|
|
|
|
672.80
|
675.30
|
2.50
|
8.91
|
|
|
|
Including
|
672.80
|
673.35
|
0.55
|
6.79
|
|
|
|
and
|
673.95
|
675.30
|
1.35
|
13.60
|
|
|
|
|
728.70
|
729.20
|
0.50
|
7.22
|
|
|
IM-19-041
|
|
338.10
|
340.00
|
1.90
|
4.88
|
Willow
|
Exploration
|
|
Including
|
338.10
|
339.00
|
0.90
|
6.24
|
|
|
IM-19-042
|
|
142.00
|
144.00
|
2.00
|
5.86
|
Mosquito
Creek
|
Exploration and
Infill
|
|
Including
|
142.00
|
142.50
|
0.50
|
19.05
|
|
|
|
|
164.00
|
165.90
|
1.90
|
11.08
|
|
|
|
Including
|
165.10
|
165.90
|
0.80
|
24.80
|
|
|
IM-19-043
|
|
141.65
|
142.80
|
1.15
|
6.56
|
Mosquito
Creek
|
Exploration
|
|
|
183.90
|
189.10
|
5.20
|
45.94
|
|
|
|
Including
|
183.90
|
184.65
|
0.75
|
7.98
|
|
|
|
and
|
187.20
|
187.90
|
0.70
|
15.80
|
|
|
|
and
|
187.90
|
188.40
|
0.50
|
399.00
|
|
|
|
and
|
188.40
|
189.10
|
0.70
|
31.80
|
|
|
|
|
201.15
|
201.65
|
0.50
|
4.51
|
|
|
|
|
246.40
|
247.25
|
0.85
|
13.95
|
|
|
|
|
266.20
|
266.90
|
0.70
|
35.90
|
|
|
|
|
278.65
|
279.35
|
0.70
|
8.56
|
|
|
|
|
389.20
|
389.75
|
0.55
|
5.88
|
|
|
|
|
404.60
|
405.10
|
0.50
|
16.45
|
|
|
|
|
416.00
|
417.70
|
1.70
|
9.34
|
|
|
|
Including
|
417.00
|
417.70
|
0.70
|
15.80
|
|
|
|
|
436.00
|
436.50
|
0.50
|
3.79
|
|
|
|
|
464.10
|
464.60
|
0.50
|
7.80
|
|
|
|
|
560.50
|
561.05
|
0.55
|
4.42
|
|
|
IM-19-044
|
|
184.90
|
186.15
|
1.25
|
6.15
|
Shaft Zone
|
Infill
|
|
|
272.55
|
273.10
|
0.55
|
7.59
|
|
|
|
|
399.00
|
399.60
|
0.60
|
9.02
|
|
|
|
|
420.00
|
422.20
|
2.20
|
3.43
|
|
|
|
Including
|
421.60
|
422.20
|
0.60
|
8.59
|
|
|
|
|
444.00
|
445.00
|
1.00
|
7.82
|
|
|
IM-19-045
|
|
221.00
|
221.70
|
0.70
|
3.78
|
Shaft Zone
|
Exploration and
Infill
|
|
|
378.20
|
379.30
|
1.10
|
3.75
|
|
|
|
|
422.30
|
422.80
|
0.50
|
38.00
|
|
|
|
|
438.55
|
440.55
|
2.00
|
6.38
|
|
|
|
Including
|
439.85
|
440.55
|
0.70
|
9.29
|
|
|
|
|
448.90
|
451.65
|
2.75
|
13.72
|
|
|
|
Including
|
450.50
|
451.65
|
1.15
|
30.00
|
|
|
|
|
462.40
|
463.10
|
0.70
|
6.33
|
|
|
|
|
516.10
|
519.10
|
3.00
|
3.35
|
|
|
|
Including
|
516.10
|
516.60
|
0.50
|
14.60
|
|
|
|
|
577.30
|
581.00
|
3.70
|
4.29
|
|
|
|
Including
|
578.15
|
579.00
|
0.85
|
10.80
|
|
|
|
|
590.60
|
596.30
|
5.70
|
3.23
|
|
|
|
Including
|
594.30
|
594.80
|
0.50
|
25.50
|
|
|
|
|
620.25
|
621.25
|
1.00
|
3.91
|
|
|
|
|
633.30
|
637.70
|
4.40
|
5.99
|
|
|
|
Including
|
633.30
|
633.80
|
0.50
|
16.80
|
|
|
|
and
|
636.95
|
637.70
|
0.75
|
11.15
|
|
|
|
|
656.00
|
657.00
|
1.00
|
10.20
|
|
|
|
|
661.80
|
668.30
|
6.50
|
7.75
|
|
|
|
Including
|
661.80
|
662.50
|
0.70
|
8.16
|
|
|
|
and
|
663.00
|
663.70
|
0.70
|
40.40
|
|
|
|
and
|
666.30
|
667.25
|
0.95
|
13.65
|
|
|
|
|
693.30
|
693.80
|
0.50
|
16.35
|
|
|
IM-19-046
|
|
88.90
|
89.40
|
0.50
|
3.51
|
Mosquito
Creek
|
Exploration
|
|
|
196.85
|
198.20
|
1.35
|
3.20
|
|
|
IM-19-047
|
|
154.90
|
155.40
|
0.50
|
3.61
|
Mosquito
Creek
|
Exploration
|
|
|
158.70
|
159.25
|
0.55
|
21.30
|
|
|
|
|
162.00
|
164.80
|
2.80
|
3.42
|
|
|
|
|
177.20
|
178.25
|
1.05
|
12.75
|
|
|
|
|
212.35
|
217.80
|
5.45
|
7.55
|
|
|
|
Including
|
212.35
|
213.00
|
0.65
|
11.25
|
|
|
|
and
|
216.30
|
217.15
|
0.85
|
9.39
|
|
|
|
and
|
217.15
|
217.80
|
0.65
|
30.70
|
|
|
|
|
220.50
|
224.45
|
3.95
|
8.16
|
|
|
|
Including
|
222.25
|
222.90
|
0.65
|
45.50
|
|
|
|
|
236.50
|
237.10
|
0.60
|
18.35
|
|
|
|
|
239.50
|
242.10
|
2.60
|
6.77
|
|
|
|
Including
|
241.50
|
242.10
|
0.60
|
18.95
|
|
|
|
|
255.00
|
255.70
|
0.70
|
15.05
|
|
|
|
|
487.40
|
491.70
|
4.30
|
6.87
|
|
|
|
Including
|
489.50
|
490.15
|
0.65
|
23.40
|
|
|
|
|
543.00
|
543.50
|
0.50
|
21.60
|
|
|
|
|
560.00
|
562.80
|
2.80
|
7.93
|
|
|
|
Including
|
561.50
|
562.20
|
0.70
|
21.10
|
|
|
Table 2: Drillhole Collar Information:
HOLE
ID
|
UTM
E
|
UTM
N
|
ELEVATION
(M)
|
DIP
|
AZIMUTH
|
LENGTH
(M)
|
IM-19-024
|
593687
|
5885195
|
1396
|
-45
|
319
|
486
|
IM-19-025
|
594221
|
5884638
|
1427
|
-52
|
132
|
231
|
IM-19-026
|
592815
|
5885680
|
1478
|
-45
|
132
|
537
|
IM-19-027
|
593592
|
5885242
|
1410
|
-51
|
304
|
561
|
IM-19-028
|
594223
|
5884599
|
1434
|
-46
|
127
|
201
|
IM-19-029
|
594486
|
5884607
|
1398
|
-48
|
140
|
483
|
IM-19-030
|
594371
|
5884691
|
1398
|
-58
|
133
|
408
|
IM-19-031
|
594234
|
5884621
|
1430
|
-46
|
129
|
201
|
IM-19-032
|
594555
|
5884639
|
1375
|
-49
|
135
|
825
|
IM-19-033
|
593719
|
5885231
|
1391
|
-60
|
313
|
501
|
IM-19-034
|
592756
|
5885601
|
1486
|
-46
|
129
|
327
|
IM-19-035
|
594486
|
5884607
|
1394
|
-51
|
140
|
729
|
IM-19-036
|
593500
|
5885225
|
1434
|
-45
|
315
|
584
|
IM-19-037
|
592669
|
5885653
|
1507
|
-46
|
128
|
387
|
IM-19-038
|
593664
|
5885248
|
1397
|
-46
|
309
|
636
|
IM-19-039
|
594752
|
5884630
|
1353
|
-45
|
133
|
693
|
IM-19-040
|
594554
|
5884638
|
1375
|
-45
|
137
|
822
|
IM-19-041
|
592691
|
5885937
|
1438
|
-44
|
118
|
384
|
IM-19-042
|
593652
|
5885162
|
1401
|
-50
|
323
|
510
|
IM-19-043
|
593965
|
5885038
|
1371
|
-56
|
317
|
600
|
IM-19-044
|
594465
|
5884660
|
1390
|
-52
|
132
|
471
|
IM-19-045
|
594721
|
5884649
|
1360
|
-45
|
130
|
729
|
IM-19-046
|
593593
|
5885322
|
1394
|
-45
|
313
|
576
|
IM-19-047
|
593964
|
5885039
|
1369
|
-53
|
321
|
600
|
SOURCE Barkerville Gold Mines Ltd.