Everton Resources Inc., (TSX VENTURE:EVR)(Frankfurt:ERV) and its partner Brigus
Gold Corp. (TSX and NYSE Amex: BRD) are pleased to announce the advances made on
the core drilling program currently underway at the La Lechoza Prospect on the
Ampliacion Pueblo Viejo property, located adjacent to the Pueblo Viejo gold
deposit, in Central Dominican Republic. 


Highlights are:



--  Hole APV10-30: 4.76 g/t Au and 23.07 g/t Ag over 23.37 m. 
    
--  Hole APV10-33: 1.81 g/t Au and 99.0 g/t Ag over 26.0 m and 0.58% Cu over
    40.5 m. 
    
--  Hole APV10-19: 0.49 g/t Au, 5.34 g/t Ag, 0.14% Cu and 1.14% Zn over
    10.50 m. 
    
--  Hole APV10-20: 0.23 g/t Au, 8.34 g/t Ag, 0.20% Cu, 0.73% Zn over 129.00
    m. 
    
--  Hole APV10-26: 5.11 g/t Ag, 0.43% Cu and 0.18% Zn over 9.00 m. 
    
--  Hole APV10-27: 0.27% Cu over 27.00 m. 
    



(see map at www.evertonresources.com)

Commenting on these developments, Everton's CEO and President, Andre Audet,
said: "We continue to be very encouraged by the drill results at La Lechoza. We
are now achieving some of our best gold, silver and copper drill results on this
developing VMS target. We plan to continue drilling this prospect and test at
least eight new targets in the next four months."


Table of assay intercepts:



Hole APV10-19 - La Lechoza Pon Hill                                       
                                                                          
From           To   Length       Au       Ag   Cu   Zn                    
(m)            (m)      (m)    (g/t)    (g/t)  (%)  (%)           Comments
--------------------------------------------------------------------------
                                                           Disseminated to
                                                              semi-massive
116.00      126.50    10.50     0.49     5.34 0.14 1.14         sulphides.
129.25      153.00    23.75        -     2.85    -    -                   
160.00      181.00    21.00        -     2.87    -    -                   
Including                                                                 
173.00      176.00     3.00     0.11     3.63    -    -                   
                                                                          
190.22      197.00     6.78        -     2.51    - 0.27                   
Including                                                                 
193.00      194.00     1.00     0.18     5.00    - 0.11                   
--------------------------------------------------------------------------
                                                                          
Hole APV10-20 - La Lechoza Pon Hill                                       
                                                                          
From            To    Length       Au       Ag    Cu    Zn                
(m)             (m)       (m)    (g/t)    (g/t)   (%)   (%)       Comments
--------------------------------------------------------------------------
18.00        147.00    129.00     0.23     8.34  0.20  0.73               
Including                                                                 
18.00         40.00     22.00     0.53    20.73  0.50  2.52               
      And including                                                       
                                                                Secondary 
24.00         26.00      2.00     1.76    85.85  0.73 10.54    enrichment.
                                                                Secondary 
33.00         40.00      7.00     0.50    16.54  0.68  2.46    enrichment.
                                                                          
                                                             Semi-massive 
62.00         69.00      7.00     0.10     2.01     -  0.73     sulphides.
                                                                          
                                                             Semi-massive 
84.00         90.00      6.00     0.20    14.93     -  0.81     sulphides.
                                                                          
                                                             Disseminated 
112.00       132.00     20.00     0.32     8.17  0.31  1.04     sulphides.
--------------------------------------------------------------------------
                                                                          
Hole APV10-22 - La Lechoza Pon Hill                                       
                                                      Cu   Zn             
From (m)      To (m) Length (m)  Au (g/t)  Ag (g/t)  (%)  (%)     Comments
--------------------------------------------------------------------------
                                                              Disseminated
55.65          58.50       2.85      0.29     10.22    -    -   sulphides.
--------------------------------------------------------------------------
                                                                          
Hole APV10-23 - La Lechoza Pon Hill                                       
                                                                          
From            To     Length        Au        Ag     Cu     Zn           
(m)             (m)        (m)     (g/t)     (g/t)    (%)    (%)  Comments
--------------------------------------------------------------------------
Low values                                                                
--------------------------------------------------------------------------
                                                                          
Hole APV10-25 - La Lechoza Spanish Pit                                    
                                                                          
From          To     Length       Au        Ag  Cu    Zn                  
(m)           (m)        (m)    (g/t)    (g/t)  (%)   (%)         Comments
--------------------------------------------------------------------------
                                                               Saprolite, 
-            4.50       4.50     0.59        -    -     -  clay rich soil.
                                                               Saprolite, 
9.00        24.00      15.00     0.40        -    -     -  clay rich soil.
--------------------------------------------------------------------------
                                                                          
Hole APV10-26 - Spanish Pit                                               
                                                                          
From              To    Length       Au       Ag   Cu   Zn                
(m)               (m)       (m)    (g/t)    (g/t)  (%)  (%)       Comments
--------------------------------------------------------------------------
                                                                Weathering
                                                                    zone, 
8.00            17.00      9.00        -     5.11 0.43 0.18      saprolite
Including                                                                 
8.00            11.00      3.00        -    10.30 0.45 0.13               
                                                                          
                                                                 Secondary
                                                                 enriched 
                                                              semi-massive
41.00           53.00     12.00        -        -    - 1.48      sulphides
--------------------------------------------------------------------------
                                                                          
Hole APV10-27 - La Lechoza Spanish Pit                                    
                                                                          
From          To     Length       Au      Ag    Cu   Zn                   
(m)           (m)        (m)    (g/t)   (g/t)   (%)  (%)          Comments
--------------------------------------------------------------------------
                                                                Weathered,
                                                                brecciated
                                                           basaltic flows 
                                                          and semi-massive
5.00        32.00      27.00        -       -  0.27    -         sulphides
Including                                                                 
26.00       31.00       5.00     0.50       -  0.23 0.57                  
                                                                          
                                                                Brecciated
                                                           basaltic flows 
                                                          and semi-massive
53.80       58.80       5.00     0.12    4.30     - 0.39        sulphides.
                                                                Brecciated
                                                           basaltic flows 
                                                          and semi-massive
65.80       67.80       2.00     0.48    2.60     - 1.05        sulphides.
--------------------------------------------------------------------------





Hole APV10-28 - La Lechoza SE of Spanish Pit                              
                                                                          
From            To     Length        Au       Ag   Cu    Zn               
(m)             (m)        (m)     (g/t)    (g/t)  (%)   (%)      Comments
--------------------------------------------------------------------------
                                                                  Oxidized
                                                              veinlets and
3.00          23.00      20.00         -        -    -  0.22   stockworks.
--------------------------------------------------------------------------
                                                                          
APV10-30 - La Lechoza North Hill                                          
                                                                          
From              To    Length       Au      Ag    Cu   Zn                
(m)               (m)       (m)    (g/t)   (g/t)     %    %       Comments
--------------------------------------------------------------------------
                                                             Oxidation and
5.55            28.92     23.37     4.76   23.07     -    -   gossan zone.
Including                                                                 
5.55            14.00      8.45    12.86   22.80     -    -               
15.50           28.92     13.42        -   25.00     -    -               
                                                                          
39.00           70.50     31.50        -       -  0.33    -               
Including                                                                 
40.00           42.00      2.00        -       -  1.23    -               
--------------------------------------------------------------------------
                                                                          
APV10-31 - La Lechoza North Hill                                          
                                                                          
From            To     Length        Au        Ag   Cu    Zn              
(m)             (m)        (m)     (g/t)     (g/t)    %     %     Comments
--------------------------------------------------------------------------
18.50         21.50       3.00      0.39         -    -     -       Gossan
20.00         23.00       3.00         -      7.90    -     -             
--------------------------------------------------------------------------
APV10-32 - La Lechoza North Hill                                          
                                                                          
From            To     Length       Au       Ag   Cu    Zn                
(m)             (m)        (m)    (g/t)    (g/t)    %     %       Comments
--------------------------------------------------------------------------
                                                                Jasper and
                                                               basalt with
                                                                    traces
18.50         23.00       4.50        -     3.70    -     -     sulphides.
Including                                                                 
18.50         20.00       1.50     2.05     5.40    -     -               
--------------------------------------------------------------------------
                                                                          
APV10-33 - La Lechoza North Hill                                          
                                                                          
                                                                          
From             To     Length        Au        Ag  Cu    Zn              
(m)              (m)        (m)     (g/t)     (g/t)   %     %     Comments
--------------------------------------------------------------------------
                                                               Mineralized
0.00           26.00      26.00      1.81     99.00   -     -    breccias.
Including                                                                 
0.00           17.00      17.00      2.56    148.00   -     -             
And                                                                       
including                                                                 
0.00            6.50       6.50      4.55     14.70   -     -             
9.50           14.00       4.50      1.57    535.00   -     -             
                                                                          
36.50          77.00      40.50         -          0.58%    -             
Including                                                                 
36.50          44.00       7.50         -          1.22%    -             
--------------------------------------------------------------------------



Everton also announces the results of five previously unreported holes from the
2010 campaign (APV10-08 to APV10-12): 




APV10-08 - Pon Hill                                                       
                                                                          
From (m)   To (m) Length (m) Au (g/t)  Ag (g/t) Cu %  Zn %        Comments
--------------------------------------------------------------------------
                                                                Brecciated
                                                            basaltic flows
                                                                 and semi-
                                                                   massive
1.80         9.50       7.70     0.52         -    -     -      sulphides.
12.50       15.50       3.00     0.18         -    -     -                
2.30         7.50       5.20        -     13.93    -     -                
12.50       14.50       2.00        -      9.06    -     -                
1.80         7.50       5.70        -         - 0.21%    -                
30.50       39.50       9.00        -         - 0.21%    -                
0.00        63.85      63.85        -         -    -  0.18%               
--------------------------------------------------------------------------
                                                                          
APV10-09 - SE of Spanish Pit                                              
                                                                          
From (m)   To (m) Length (m) Au (g/t)  Ag (g/t) Cu %  Zn %        Comments
---------------------------------------------------- ---------------------
0.00         5.00       5.00     0.10         -    -     -                
12.50       29.00      16.50     0.29         -    -     -                
Including                                                                 
15.00       20.00       5.00        -     10.49    -     -                
                                                                          
0.00        45.50      45.50        -         - 0.41%    -                
Including                                                                 
26.00       33.50       7.50        -         - 1.44% 0.19%               
--------------------------------------------------------------------------
                                                                          
APV10-10 - Pon Hill : Low values                                          
                                                                          
APV10-11 - Pon Hill                                                       
                                                                          
From (m)   To (m) Length (m) Au (g/t)  Ag (g/t) Cu %  Zn %        Comments
--------------------------------------------------------------------------
28.30       32.00       3.70     0.21         -    -     -                
24.50       32.00       7.50        -      6.11    -     -                
24.50       38.00      13.50        -         -    -  0.44%               
Including                                                                 
30.50       32.00       1.50        -         -    -  1.52%               
--------------------------------------------------------------------------
                                                                          
                                                                          
APV10-12 - Central Gossan                                                 
                                                                          
From (m)   To (m) Length (m) Au (g/t)  Ag (g/t) Cu %  Zn %        Comments
--------------------------------------------------------------------------
0.00         2.00       2.00     0.22      4.40    -     -                
5.00        11.00       6.00     0.21         -    -     -                
32.00       36.75       4.75     0.27         -    -  0.70%               
38.00       48.50      10.50        -         -    -  0.33%               
--------------------------------------------------------------------------



Holes APV10-21, Holes APV10-24, and Holes APV10-29 at the Noth Manuel target
returned low values.


Assays for APV11-01 to APV11-05 pending. Holes APV11-06 and APV11-09 currently
underway.


The mineralization at La Lechoza has the characteristics of exhalative
polymetallic volcanogenic massive sulphides (VMS) and is zoned laterally and
possibly vertically. Hole APV10-20 was drilled parallel to the interpreted
structure and confirmed the lateral zonation of the metal distribution and the
dip angle of the structure. The stratigraphy in these holes is dominated by
basaltic andesites, breccias and tuffs, and banded cherts which directly overlay
the mineralized structure at Pon Hill. 


Diamond Drilling Program

This program to date has completed 3,400 metres and another 12 holes are planned
during the next two months. This program is designed to follow-up on targets
identified during the 2009 and 2010 drilling phases.


A second phase of the program that consists of deep drilling is slated to
commence in early 2011, as soon as the adequate equipment is ready. This program
will include 10,000 meters in 8 to 12 holes between 800 and 1200 meters. The
purpose of this program is to test the deep portions of the mineralization
system inferred to occur beneath a barren silica lithocap covering the area in
the southwestern sector of the Ampliacion Pueblo Viejo concession.


This press release was reviewed by Robert Wheatley, P. Geo. and VP Exploration
of Everton, who acts as Everton's Qualified Person as defined by NI 43-101.
Personnel, at the project, photograph each individual core box from each core
hole prior to measuring core recovery and geologically logging the hole. The
core is then sawn in half with one half going to the lab and the other half kept
for reference. All sample shipments are sealed and shipped to Acme Analytical
Laboratories (R.D.) S.A. at Maimon for preparation. Prepared samples are then
sent to the Acme Analytical Laboratories Ltd. in Vancouver for analysis. Acme's
quality control system complies with the requirements for the International
Standard ISO 9001:2000 by monitoring analytical accuracy and precision with the
insertion and analysis of blanks, reference standards and duplicate samples.
Everton's Quality Control is further assured by the use of in-house blanks. The
use of certified standards and independent analysis of duplicate samples is
being initiated.


Everton 

Everton is partnered with Brigus Gold on actively exploring in the Dominican
Republic adjacent to the US$3 billion Pueblo Viejo project, currently being
developed by the world's largest gold mining company, Barrick Gold Corporation
(60%) (NYSE/TSX: ABX) in partnership with Goldcorp (40%) ("Goldcorp") (NYSE: GG,
TSX: G). Planned divestiture of its 100%-owned subsidiary Hays Lake Gold
containing the Shoal Lake Gold Project in Kenora, Ontario is expected to provide
internal funding to advance the Ampliacion Pueblo Viejo project. Everton also
holds an interest in the Opinaca region of James Bay, Quebec where the Company
has partnered with Aurizon Mines Ltd. who is advancing Everton's interest by
funding 100% of all exploration work on one of the largest land packages
adjacent to Goldcorp's Eleonore gold deposit.


This news release contains certain forward-looking statements that involve risks
and uncertainties, such as statements of Everton's plans, objectives,
strategies, expectations and intentions. The words "may", "would", "could",
"will", "intend", "plan", "anticipate", "believe", "estimate", "expect" and
similar expressions, as they relate to Everton, or its management, are intended
to identify such forward-looking statements. Many factors could cause Everton's
actual results, performance or achievements to be materially different any
future results, performance or achievements that may be expressed or implied by
such forward-looking statements. The forward-looking statements included in this
press release represent Everton's views as of the date of the release. While
Everton anticipates that subsequent events and developments may cause its views
to change, it specifically disclaims any obligation to update these
forward-looking statements, except in accordance with applicable securities
laws. Accordingly, readers are advised not to place undue reliance on
forward-looking information. All subsequent written and oral forward-looking
statements attributable to Everton or persons acting on its behalf are expressly
qualified in their entirety by this notice.  Neither TSX Venture Exchange nor
its Regulation Services Provider (as that term is defined in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of
this release.


Everton Resources (TSXV:EVR)
Historical Stock Chart
From Nov 2024 to Dec 2024 Click Here for more Everton Resources Charts.
Everton Resources (TSXV:EVR)
Historical Stock Chart
From Dec 2023 to Dec 2024 Click Here for more Everton Resources Charts.