Petrichor Energy Spuds Hinson #1 Well

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Dec 3, 2013) - Petrichor Energy Inc. (TSX-VENTURE:PTP)(FRANKFURT:YQN) (the "Company") announces that a drilling rig has been moved on site and the Hinson #1 well was spud this morning and will be drilled to a depth of approximately 5,200 feet to test the Caddo Lime, Marble Falls, and Mississippi Lime formations.

The Hinson #1 is the first of three wells to be drilled on the Marble Falls Prospect (the "Prospect"), and is located in Young County, Texas, within the approximate surface coordinates of -98.6644182 Longitude and 33.3508939 Latitude.

The Company owns a 66.67% working interest in the Prospect, which covers 11,695.33 acres to date, located within Young County, Jack County, Archer County and Clay County, Texas.

The Mississippi Lime is a Mississippian age porous limestone formation that is deposited beneath the Barnett Shale, which is analogous to the Mississippi Lime play in Kansas and Oklahoma. The Marble Falls formation is a Pennsylvanian age limestone, analogous to the Strawn Lime play in West Texas. To date, independent operators have drilled over 50 vertical and horizontal multi-stage fraced wells in the Marble Falls and Mississippi limestone with positive results.

ON BEHALF OF THE BOARD

Richard Barnett, Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release includes certain forward-looking statements or information. All statements other than statements of historical fact included in this release, including, without limitation, statements relating other future plans, objectives or expectations of the Company are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's plans or expectations include risks relating to: availability of capital and financing required to continue the Company's exploration programs and operations; general economic, market or business conditions; the actual results of current and planned exploration activities; fluctuating commodity prices; risks associated with participation agreements, leases, joint ventures and the ability to conclude such agreements on favourable terms; possibility of accidents, equipment breakdowns and delays during exploration and production; cost overruns or unanticipated costs and expenses; regulatory changes and restrictions including in relation to environmental liability; timeliness of government or regulatory approvals and other risks detailed herein and from time to time in the filings made by the Company with securities regulators. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.

Petrichor Energy Inc.Richard BarnettDirector(604) 336-8615(604) 718-2808www.petrichorenergy.com

Petrichor Energy (TSXV:PTP)
Historical Stock Chart
From Oct 2024 to Nov 2024 Click Here for more Petrichor Energy Charts.
Petrichor Energy (TSXV:PTP)
Historical Stock Chart
From Nov 2023 to Nov 2024 Click Here for more Petrichor Energy Charts.