QMX Gold Continues To Intersect Strong Mineralization At Bonnefond, Intersecting 39.5 g/t Au Over 2.4 Metres And 31.5 g/t Au...
January 29 2019 - 1:00AM
QMX Gold Corporation (“QMX” or the “Company”)
(TSX:V:QMX) is pleased to report the results from its on-going
Bonnefond drilling program (Figure 1), on the Val d’Or East Zone of
QMX’s extensive land package in Val d’Or, Quebec (Figure 2). These
thirteen (13) holes cover results from the first half of the
on-going definition drilling program on the Bonnefond project. This
program's goal is to support an initial resource estimate schedule
for late Spring 2019.
Highlights include:
In the Tonalitic Plug (lengths
are measured along the holes):
- Drill hole 17315-18-063 returned 1.97 g/t Au over
87.5m, including 3.31 g/t Au over 26.8m and 31.55 g/t Au over
1.6m.
- Drill hole 17315-18-067 returned 1.94 g/t Au over
143.7m, including 12.34 g/t Au over 8.1m.
- Drill hole 17315-18-072 returned 1.92 g/t Au over
147.6, including 5.11 g/t Au over 4.0m.
Shear Zone in Volcanics
(lengths are measured along the holes):
- Drill hole 17315-18-063 returned 9.01 g/t Au over
3.4m
- Drill hole 17315-18-065 returned 11.95 g/t Au over 8.0m
including 39.49 g/t over 2.4m, and 5.54 g/t Au over
1.4m.
- Drill hole 17315-18-069 returned 12.23 g/t Au over 3.2m
and 4.35 g/t over 3.9m.
- Drill hole 17315-18-070 returned 7.20 g/t Au over
2.5m.
- Drill hole 17315-18-072 returned 1.69 g/t Au over 40.9m
including 3.90g/t Au over 6.2m and 3.14 g/t au over
7.9m.
- Drill hole 17315-18-073 returned 6.06 g/t au over
5.0m.
These results are part of a 50m x 50m infill
drilling program on the western side of the Tonalite intrusion
between the surface and 400m depth. This program successfully
confirm and support the grades and the continuity of the
mineralisation in the Bonnefond intrusive with intercepts returning
1.97 g/t Au over 87.5m, including 3.31 g/t Au over 26.8m and 31.55
g/t Au over 1.6m in drill hole 17315-18-063; 1.94 g/t Au over
143.7m, including 12.34 g/t Au over 8.1m in drill hole 17315-18-067
and 1.92 g/t Au over 147.6m in drill hole 17315-18-072. The average
true width of the mineralized envelope is 60m and extends 300m
east-west.
This program also confirmed the continuity and
grade in the shear zones south of the Bonnefond intrusive close to
surface. Results from this environment include 9.01 g/t Au over
3.4m in drill hole 17315-18-063 and 11.95 g/t Au over 8.0m
including 39.49 g/t over 2.4m and 5.54 g/t Au over 1.4m in drill
hole 17315-18-065.
Drill hole 17315-18-072 intercepted 1.69 g/t Au
over 40.9m including 3.90g/t Au over 6.2m and 3.14 g/t au over 7.9m
in one of the shear zones to the north of the Bonnefond intrusion,
increasing the potential in this area for the discovery of
additional mineralized zones close to surface.
Dr. Andreas Rompel, Vice President Exploration,
commented, “We are excited and impressed by these results as they
confirm the high-grade nature of the mineralization in and around
the Bonnefond target. These results will feature well when we
initiate the resource estimation process in this highly prolific
area.”
Table 1: Highlights from the Bonnefond
Target
Hole Number |
Hole Length (metre) |
From(metre) |
To(metre) |
Length*(metre) |
Au**(g/t) |
Remarks |
17315-18-063 |
|
59.5 |
147.0 |
87.5 |
1.97 |
Bonnefond intrusive |
|
Incl. |
93.2 |
120.0 |
26.8 |
3.31 |
|
|
Incl. |
93.2 |
96.0 |
2.8 |
8.00 |
|
|
Incl. |
113.1 |
114.7 |
1.6 |
31.55 |
|
|
|
189.6 |
193.0 |
3.4 |
9.01 |
South Shear zone |
|
17315-18-065 |
|
66.0 |
67.4 |
1.4 |
5.54 |
South Shear zone |
|
|
179.7 |
187.7 |
8.0 |
11.95 |
South Shear zone |
|
Incl. |
182.6 |
185.0 |
2.4 |
39.49 |
|
|
17315-18-067 |
|
125.7 |
269.4 |
143.7 |
1.94 |
Bonnefond intrusive |
|
Incl. |
147.4 |
155.5 |
8.1 |
12.34 |
|
|
17315-18-069 |
|
168.2 |
171.4 |
3.2 |
12.23 |
South Shear zone |
|
|
190.3 |
194.2 |
3.9 |
4.35 |
South Shear zone |
|
17315-18-070 |
|
170.0 |
172.5 |
2.5 |
7.20 |
South Shear zone |
|
17315-18-072 |
|
62.0 |
102.9 |
40.9 |
1.69 |
North Shear zone |
|
Incl. |
68.8 |
75.0 |
6.2 |
3.90 |
|
|
Incl. |
95.0 |
102.9 |
7.9 |
3.14 |
|
|
|
231.9 |
379.5 |
147.6 |
1.92 |
Bonnefond intrusive |
|
Incl. |
287.5 |
291.5 |
4.0 |
5.11 |
|
|
17315-18-073 |
|
290.1 |
295.1 |
5.0 |
6.06 |
South Shear zone |
* Reported length measured along the hole. ** Au uncut
2019 Winter Drilling Program
QMX is currently drilling the last 2,500m of the
definition drilling campaign to support an initial resource
estimate scheduled for late Spring 2019.
Quality Control
During the drilling program, assay samples were
taken from the NQ core and sawed in half. One half is sent to
Swaslab Ltd. or Agat Laboratories. Both are certified commercial
laboratories. The other half of the core is retained for future
reference. A strict quality assurance and quality control program
was applied to all samples; which included insertion of mineralized
standards, blank samples and duplicates inside each batch of 20
samples. The gold analyses were completed by fire-assay with an
atomic absorption finish on 50 grams of material. Repeats were
carried out by fire-assay with a gravimetric finish on each sample
containing 5.0 g/t Au or more. The gold analyses were undertaken by
fire-assay on 50 grams of pulp with an atomic absorption finish.
Repeats were carried out by fire-assay with a gravimetric finish on
each sample containing 5.0 g/t Au or more.
Qualified Persons
The scientific and technical content of this
press release has been reviewed, prepared and approved by Mélanie
Pichon, P.Geo, M.Sc, Exploration Manager, who is a "Qualified
Person" as defined by National Instrument 43-101 - Standards of
Disclosure for Mineral Projects ("NI 43-101").
About QMX Gold Corporation
QMX Gold Corporation is a Canadian based
resource company traded on the TSX Venture Exchange under the
symbol “QMX”. The Company is systematically exploring its extensive
property position in the Val d’Or mining camp in the Abitibi
District of Quebec. QMX is currently drilling in the Val d’Or East
portion of its land package focused on the Bonnefond plug and in
and around the Bevcon Intrusive. In addition to its extensive land
package QMX owns the strategically located Aurbel gold mill and
tailings facility, which is expected to commence custom milling in
2019.
Contact
Information: |
|
|
|
|
|
|
|
|
Brad Humphrey |
|
|
|
|
|
|
|
Louis Baribeau |
President and CEO |
|
|
|
|
|
|
|
Public Relations |
Tel: (416)
861-5887 |
|
|
|
|
|
|
|
Tel: (514)
667-2304 |
Toll
free: +1 877-717-3027 |
|
|
Email:
info@qmxgold.ca |
|
|
|
|
Website: www.qmxgold.ca |
Cautionary Note Regarding
Forward-Looking Information:
This press release contains or may be deemed to
contain “forward-looking information” within the meaning of
applicable Canadian securities legislation. Forward-looking
information includes, but is not limited to, statements regarding
future plans, operations and activities, projected mineralization,
timing of assay results, and the ability of the Company to continue
as a going concern. Generally, forward-looking information can be
identified by the use of forward-looking terminology such as
“plans”, “expects” or “does not expect”, “is expected”, “budget”,
“scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or
“does not anticipate”, or “believes”, or variations of such words
and phrases or state that certain actions, events or results “may”,
“could”, “would”, “might” or “will be taken”, “occur” or “be
achieved”. Forward looking information is subject to known and
unknown risks, uncertainties and other factors that may cause the
actual results, level of activity, performance or achievements of
the Company, its properties and/or its projects to be materially
different from those expressed or implied by such forward-looking
information, including but not limited to those risks described in
the disclosure documents of the Company filed under the Company’s
profile on SEDAR. Although the Company has attempted to identify
important factors that could cause actual results to differ
materially from those contained in forward-looking information,
there may be other factors that cause results not to be as
anticipated, estimated or intended. There can be no assurance that
such information will prove to be accurate, as actual results and
future events could differ materially from those anticipated in
such statements. Accordingly, readers should not place undue
reliance on forward-looking information. The Company does not
undertake to update any forward-looking information, except in
accordance with applicable securities laws.
Neither TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in policies
of the TSX Venture Exchange) accepts responsibility for the
adequacy or accuracy of this release.
Table 2: Results from holes 61 to 73 - Bonnefond South
Target
Hole Number |
Azimuth |
Dip |
Hole |
From |
To |
Length* |
Au** |
Remarks |
|
(°) |
(°) |
Length |
(metre) |
(metre) |
(metre) |
(g/t) |
|
|
|
|
(metre) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
17315-18-061 |
180 |
-85 |
228 |
58.0 |
120.5 |
62.5 |
0.56 |
Bonnefond intrusive |
|
|
|
Incl. |
103.6 |
110.2 |
6.6 |
1.99 |
|
|
|
|
|
|
|
|
|
|
17315-18-062 |
180 |
-85 |
378 |
|
|
|
|
No Significant Results |
|
|
|
|
|
|
|
|
|
17315-18-063 |
180 |
-80 |
232 |
59.5 |
147.0 |
87.5 |
1.97 |
Bonnefond intrusive |
|
|
|
Incl. |
93.2 |
96.0 |
2.8 |
8.00 |
|
|
|
|
Incl. |
113.1 |
114.7 |
1.6 |
31.55 |
|
|
|
|
|
189.6 |
193.0 |
3.4 |
9.01 |
South Shear zone |
|
|
|
|
|
|
|
|
|
17315-18-064 |
180 |
-85 |
342 |
116.9 |
120.3 |
3.4 |
1.99 |
South Shear zone |
|
|
|
Incl. |
118.3 |
119.3 |
1.0 |
6.16 |
|
|
|
|
|
228.0 |
232.9 |
4.9 |
1.48 |
South Shear zone |
|
|
|
Incl. |
230.8 |
232.9 |
2.1 |
3.12 |
|
|
|
|
|
329.3 |
333.7 |
4.4 |
1.00 |
South Shear zone |
|
|
|
Incl. |
330.8 |
332.3 |
1.5 |
2.69 |
|
|
|
|
|
|
|
|
|
|
17315-18-065 |
180 |
-85 |
210 |
66.0 |
67.4 |
1.4 |
5.54 |
South Shear zone |
|
|
|
|
117.8 |
120.3 |
2.5 |
1.84 |
South Shear zone |
|
|
|
|
129.9 |
132.6 |
2.7 |
1.57 |
South Shear zone |
|
|
|
|
179.7 |
187.7 |
8.0 |
11.95 |
South Shear zone |
|
|
|
Incl. |
182.6 |
185.0 |
2.4 |
39.49 |
|
|
|
|
|
|
|
|
|
|
17315-18-066 |
180 |
-85 |
201 |
|
|
|
|
No Significant Results |
|
|
|
|
|
|
|
|
|
17315-18-067 |
180 |
-85 |
300 |
108.0 |
115.5 |
7.5 |
1.14 |
North Shear zone |
|
|
|
|
125.7 |
269.4 |
143.7 |
1.94 |
Bonnefond intrusive |
|
|
|
Incl. |
125.7 |
132.3 |
6.6 |
1.52 |
|
|
|
|
Incl. |
147.4 |
155.5 |
8.1 |
12.34 |
|
|
|
|
Incl. |
261.8 |
267.0 |
5.2 |
4.51 |
|
|
|
|
|
|
|
|
|
|
17315-18-068 |
180 |
-85 |
192 |
|
|
|
|
No Significant Results |
|
|
|
|
|
|
|
|
|
* Reported length are measured along the hole. ** Au uncut
Table 2 continued: Results from holes 61 to 73 -
Bonnefond South Target
Hole Number |
Azimuth |
Dip |
Hole |
From |
To |
Length* |
Au** |
Remarks |
|
(°) |
(°) |
Length |
(metre) |
(metre) |
(metre) |
(g/t) |
|
|
|
|
(metre) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
17315-18-069 |
180 |
-85 |
207 |
168.2 |
171.4 |
3.2 |
12.23 |
South Shear zone |
|
|
|
|
190.3 |
194.2 |
3.9 |
4.35 |
South Shear zone |
|
|
|
|
|
|
|
|
|
17315-18-070 |
180 |
-85 |
201 |
140.5 |
144.2 |
3.7 |
1.17 |
South Shear zone |
|
|
|
|
170.0 |
172.5 |
2.5 |
7.20 |
South Shear zone |
|
|
|
|
|
|
|
|
|
17315-18-071 |
180 |
-85 |
414 |
67.5 |
88.6 |
21.1 |
0.99 |
Bonnefond intrusive |
|
|
|
Incl. |
78.3 |
83.4 |
5.1 |
3.37 |
|
|
|
|
|
171.6 |
175.2 |
3.6 |
1.76 |
South Shear zone |
|
|
|
|
193.7 |
195.7 |
2.0 |
3.93 |
South Shear zone |
|
|
|
|
340.9 |
344.0 |
3.1 |
1.53 |
South Shear zone |
|
|
|
|
399.1 |
404.9 |
5.8 |
1.53 |
South Shear zone |
|
|
|
|
|
|
|
|
|
17315-18-072 |
180 |
-85 |
462 |
62.0 |
102.9 |
40.9 |
1.69 |
North Shear zone |
|
|
|
Incl. |
68.8 |
75.0 |
6.2 |
3.90 |
|
|
|
|
Incl. |
95.0 |
102.9 |
7.9 |
3.14 |
|
|
|
|
|
231.9 |
379.5 |
147.6 |
1.92 |
Bonnefond intrusive |
|
|
|
Incl. |
266.4 |
269.0 |
2.6 |
7.77 |
|
|
|
|
Incl. |
287.5 |
291.5 |
4.0 |
5.11 |
|
|
|
|
|
443.1 |
448.2 |
5.1 |
1.20 |
South Shear zone |
|
|
|
|
|
|
|
|
|
17315-18-073 |
180 |
-60 |
318 |
290.1 |
295.1 |
5.0 |
6.06 |
South Shear zone |
|
|
|
|
|
|
|
|
|
* Reported length are measured along the hole. ** Au uncut
Photos accompanying this announcement are available
at:
http://www.globenewswire.com/NewsRoom/AttachmentNg/90c55673-35d2-4055-b324-bef76841faaa
http://www.globenewswire.com/NewsRoom/AttachmentNg/0e350862-5c52-4320-9af0-a056cb290a0b
QMX Gold (TSXV:QMX)
Historical Stock Chart
From Jan 2025 to Feb 2025
QMX Gold (TSXV:QMX)
Historical Stock Chart
From Feb 2024 to Feb 2025