Prime Mining Corp. (“Prime”, or the “Company”) (
TSV:
PRYM) (
OTCQX: PRMNF) (
Frankfurt:
O4V3) is pleased to report its operating and financial
results for the quarter ended March 31, 2023. Prime is focused on
the exploration and development of its wholly owned high-grade Los
Reyes Gold-Silver Project in Sinaloa State, Mexico (“Los Reyes” or
the “Project”).
Prime Chief Executive Officer Scott Hicks
commented, “2024 is off to a great start for Prime as our high
grade, gold-silver Los Reyes Project in Mexico continues to deliver
excellent results. We released exciting expansion drill results
from Guadalupe East and generative drill results from Las Primas,
which demonstrate similarities in mineralization and potential for
underground resource expansion, while expansion drilling at Z-T
continues to extend mineralization along strike and at depth.”
Corporate Highlights During the
Quarter (Unless otherwise stated, all amounts are
presented in Canadian dollars.)
- On January 16th, the Company
announced that CEO Daniel Kunz would retire effective February 1,
2024, and that EVP Mr. Scott Hicks would succeed him as Chief
Executive Officer with concurrent appointment to the Board of
Directors.
- On January 24th, the Company
announced its 2024 Outlook for the Los Reyes Project including a
planned 40,000m drill program.
- On January 24th, the Company
announced it had granted a total of 991,626 incentive stock
options, 455,846 restricted share units and 661,202 deferred share
units in accordance with the long-term incentive plan adopted by
the Company.
- On March 25th, the Company
released its 2023 Financial and Operating Results.
Exploration Highlights During the
Quarter
Prime Intercepts High Grades at Las
Primas and Record High Grades at Guadalupe East
January 10, 2024Drill Highlights – Generative: Las
Primas AreaThe Company reported five core holes at Las Primas.
Highlights are listed below:
- 15.63 gpt AuEq (11.60 gpt Au and
311.1 gpt Ag) over 4.5 m etw in hole 23LP-18, including:
- 27.52 gpt AuEq (20.39 gpt Au and
550.8 gpt Ag) over 2.5 m etw, and including,
- 56.28 gpt AuEq (41.90 gpt Au and
1,111.0 gpt Ag) over 1.1 m etw;
- 1.91 gpt AuEq (1.29 gpt Au and 47.7
gpt Ag) over 10.20 m etw in 23LP-20, including:
- 6.43 gpt AuEq (2.2 gpt Au and 327
gpt Ag) over 1.3 m etw;
- 1.89 gpt AuEq (0.73 gpt Au and
89.61 gpt Ag) over 2.6 m etw in hole 23LP-17, including:
- 5.61 gpt AuEq (1.97 gpt Au and 281
gpt Ag) over 1.0 m etw.
Drill Highlights – Expansion: Guadalupe Zone,
Guadalupe East AreaThe Company reported one core hole at Guadalupe
East. Highlights are listed below:
- 17.95 gpt AuEq (9.69 gpt Au and
638.6 gpt Ag) over 31.25 m etw in hole 23GE-147, including:
- 52.67 gpt AuEq (29.41 gpt Au and
1,797.3 gpt Ag) over 6.45 m etw, and including,
- 80.57 gpt AuEq (45.34 gpt Au and
2,722.6 gpt Ag) over 3.90 m etw.
Prime Intersects 3.74 gpt AuEq Over 5.7m
at Z-T in New High-Grade Mineralized Zone 350m Beyond Current
Resource Pit While Extending High-Grade Shoots at Depth
February 6, 2024Expansion Drilling Highlights in
the Z-T AreaThe Company reported 21 core holes at Tahonitas with
the following highlights:
- 3.59 gpt AuEq (3.54 gpt Au and 4.1
gpt Ag) over 6.6 m etw in hole 23TA-85, including:
- 6.21 gpt AuEq (6.17 gpt Au and 2.9
gpt Ag) over 1.4 m etw, and including,
- 12.35 gpt AuEq (12.10 gpt Au and
19.1 gpt Ag) over 1.0 m etw.
- 2.09 gpt AuEq (1.26 gpt Au and 63.9
gpt Ag) over 11.6 m etw in hole 23TA-90, including:
- 3.83 gpt AuEq (2.61 gpt Au and 94.5
gpt Ag) over 2.2 m etw.
- 3.74 gpt AuEq (0.99 gpt Au and
212.5 gpt Ag) over 5.7 m etw in hole 23TA-100, including:
- 10.94 gpt AuEq (2.97 gpt Au and
616.0 gpt Ag) over 1.3 m etw.
- 2.33 gpt AuEq (0.83 gpt Au and
115.9 gpt Ag) over 7.1 m etw in hole 23TA-91, including:
- 8.14 gpt AuEq (2.85 gpt Au and
409.0 gpt Ag) over 0.9 m etw.
- 2.21 gpt AuEq (0.69 gpt Au and
117.8 gpt Ag) over 5.0 m etw in hole 23TA-94.
- 6.39 gpt AuEq (4.51 gpt Au and
145.3 gpt Ag) over 1.2 m etw in hole 23TA-99.
Prime Releases Final 2023 Drilling
Results and Recap From Los Reyes; 60,000m Post Resource Drilling
Contributes to Significant Mineralization Expansion
Feb 21, 2024Drilling Highlights from 2023 included
the following holes, which were newly released:At Mariposa, a
generative target northwest of Z-T, returned strong gold
grades:
- 3.3 gpt AuEq (3.11 gpt Au and 14.8
gpt Ag) over 2.2 m etw downhole in new hole 23MA11Guadalupe East –
High Grade Gold and Silver:
- 27.56 gpt AuEq (8.17 gpt Au and
1,498.0 gpt Ag) over 0.6 m etw in new hole 23GE-144 Orito Sur, a
generative target north of Guadalupe East, returned strong gold and
silver grades:
- 5.3 gpt AuEq (2.70 gpt Au and 200.5
gpt Ag) over 2.4 m etw in new hole 23OS-01 Mina, a generative
target northeast of Guadalupe East, also returned strong
grades:
- 4.24 gpt AuEq (2.54 gpt Au and
131.3 gpt Ag) over 4.9 m downhole in new hole 23MINA13 Central –
High Grade, Near-Surface Material at Noche Buena:
- 2.43 gpt AuEq (0.91 gpt Au and
117.3 gpt Ag) over 6.5 m etw in new hole 23NB-59
Subsequent to the Quarter, the Company
issued the following exploration news releases:
- Prime Discovers New High-Grade
Shoot Containing 7.68 g/t gold-equivalent over 7.7 m - High gold
grade area remains open, and continues at depth and along trend at
Z-T - April 10, 2024
- Prime Reports 11.8 gpt
gold-equivalent over 3.0 metres at Las Primas And Continues to
Discover High Grades at Shallow Depths - April 17, 2024
Maintaining Health and Safety
Protocols
Prime remains engaged with local stakeholders
and is proactive in monitoring employees and contractors concerning
general health conditions. The Company continues to closely adhere
to the directives of all levels of government and relevant health
authorities in Mexico and Canada.
Community Engagement and Environmental
Stewardship Strategy
We continued to gather environmental and
community data in the quarter in support of our ESG programs,
including completion of a materiality assessment, strategic plan,
and disclosure matrix. We strive to minimize the environmental
footprint of our activities and ensure that Los Reyes has a
positive impact on our host communities.
The Company released its initial sustainability
report during April 2023 which establishes a baseline and a new
yardstick to measure our progress in meeting our commitments
regarding sustainability and stewardship of the environment,
relevant social issues, and corporate governance. The Company
expects to release its 2024 Sustainability Report in the coming
weeks.
Selected Financial Data
The following selected financial data is
summarized from the Company’s consolidated financial statements and
related notes thereto (the “Financial Statements”) for the three
months ended March 31, 2024 and 2023. A copy of the Financial
Statements and MD&A is available at www.primeminingcorp.ca
or on SEDAR at www.sedar.com.
|
Three Months endedMarch 31, 2024 |
|
Three Months endedMarch 31, 2023 |
|
Loss and comprehensive loss |
$(6,450,142) |
|
$(5,995,467) |
|
Loss per share – basic and diluted |
$(0.04) |
|
$(0.05) |
|
|
March 31, 2024 |
|
December 31, 2023 |
|
Cash |
$27,897,697 |
|
$33,811,215 |
|
Total assets |
$41,969,945 |
|
$47,908,403 |
|
Total current liabilities |
$1,355,464 |
|
$2,470,659 |
|
Total liabilities |
$2,188,048 |
|
$3,295,811 |
|
Total shareholders’ equity |
$39,781,897 |
|
$44,612,592 |
|
2024 OutlookPrime is targeting
40,000 metres in its 2024 drill program and will continue to
evaluate drilling plans using its success-based approach. This
evaluation will also include prioritization of targets based on
probability of resource development and generative area discovery
potential.
Four drill rigs are currently active on site at Los Reyes, with
2024 exploration focused on:
- Extending the high-grade Z-T Area shoots that
remain open at depth, as well as along strike, both north and
south.
- Expanding the known high-grade mineralization at
Guadalupe East.
- Increasing the Central Area resource through
additions at Noche Buena and its connection to San Miguel
East.
- Generative target drilling of high-grade
intercepts at Las Primas, Mariposa, Fresnillo, Mina and
others to further develop the resource potential at Los Reyes.
About the Los Reyes Gold and Silver
Project
Los Reyes is a rapidly evolving high-grade, low
sulphidation epithermal gold-silver project located in Sinaloa
State, Mexico. Since acquiring Los Reyes in 2019, Prime has spent
approximately CAD$52 million on direct exploration activities and
has completed over 185,000 metres of drilling. On May 2, 2023,
Prime announced an updated multi-million-ounce high-grade open pit
constrained resource (see the May 2, 2023 press release for more
details).
May 2, 2023
Resource Statement |
|
AssuranceCategory |
OreTonnesMt |
AverageGold Grade(g/t) |
ContainedGold(k ozs) |
AverageSilver Grade(g/t) |
ContainedSilver(k ozs) |
AverageAuEq Grade(g/t)(1) |
ContainedAuEq(k ozs) |
Measured (M) |
- |
- |
- |
- |
- |
- |
- |
Indicated (I) |
27.2 |
1.16 |
1, 013 |
40.40 |
35,263 |
1.68 |
1,470 |
M+I |
27.2 |
1.16 |
1, 013 |
40.40 |
35,263 |
1.68 |
1,470 |
Inferred |
18.1 |
0.85 |
497 |
31.52 |
18,334 |
1.26 |
734 |
|
|
|
|
|
|
|
|
(1) Refer to the Additional Technical Notes
section for the gold equivalent grade (“AuEq”) calculation
method.
Drilling is on-going and suggests that the three
known main deposit areas (Guadalupe, Central and Z-T) are larger
than previously reported. Potential also exists for new discoveries
where mineralized trends have been identified outside of the
currently defined resource areas.
Historic operating results indicate that an
estimated 1 million ounces of gold and 60 million ounces of silver
were recovered from five separate operations at Los Reyes between
1770 and 1990. Prior to Prime’s acquisition, recent operators of
Los Reyes had spent approximately US$20 million on exploration,
engineering, and prefeasibility studies.
QA/QC Protocols and Sampling Procedures
Drill core at the Los Reyes project is drilled
in predominately HQ size (63.5 millimetre “mm”), reducing to NQ
(47.6 mm) when required. Drill core samples are generally 1.50 m
long along the core axis with allowance for shorter or longer
intervals if required to suit geological constraints. After logging
intervals are identified to be sampled, the core is cut and one
half is submitted for assay. RC drilling returns rock chips and
fines from a 133.35 mm diameter tricone bit. The returns are
homogenized and split into 2 halves, with one half submitted for
analysis and the other half stored.
Sample QA/QC measures include unmarked certified
reference materials, blanks, and field duplicates as well as
preparation duplicates are inserted into the sample sequence and
make up approximately 8% of the samples submitted to the laboratory
for each drill hole.
Samples are picked up from the Project by the
laboratory personnel and transported to their facilities in Durango
or Hermosillo Mexico, for sample preparation. Sample analysis is
carried out by Bureau Veritas and ALS Labs, with fire assay,
including over limits fire assay re-analysis, completed at their
respective Hermosillo, Mexico laboratories and multi-element
analysis completed in North Vancouver, Canada. Drill core sample
preparation includes fine crushing of the sample to at least 70%
passing less than 2 mm, sample splitting using a riffle splitter,
and pulverizing a 250-gram split to at least 85% passing 75
microns.
Gold in diamond drill core is analyzed by fire
assay and atomic absorption spectroscopy of a 30 g sample (code
FA430 or Au-AA23). Multi-element chemistry is analyzed by 4-Acid
digestion of a 0.25-gram sample split (code MA300 or ME-ICP61) with
detection by inductively coupled plasma emission spectrometer for a
full suite of elements.
Gold assay techniques FA430 and Au-AA23 have an
upper detection limit of 10 ppm. Any sample that produces an
over-limit gold value via the initial assay technique is sent for
gravimetric finish via method FA-530 or Au-GRA21. Silver analyses
by MA300 and ME-ICP61 have an upper limit of 200 ppm and 100 ppm,
respectively. Samples with over-limit silver values are re-analyzed
by fire assay with gravimetric finish FA530 or Au-GRA21.
Both Bureau Veritas and ALS Labs are ISO/IEC
accredited assay laboratories.
Additional Technical Notes
Metres is represented by “m”; “etw” is
Estimated True Width and is based on drill hole geometry or
comparisons with other on-section drill holes; “Au” refers to gold,
and “Ag” refers to silver; “gpt” is grams per metric tonne; some
figures may not sum due to rounding; Composite assay grades
presented in summary tables are calculated using a Au grade minimum
average of 0.20 gpt or 1.0 gpt as indicated in “Au Cut-off” column
of Summary Tables. Maximum internal waste included in any reported
composite interval is 3.00 m. The 1.00 gpt Au cut-off is used to
define higher-grade “cores” within the lower-grade halo.
Gold equivalent grades are calculated based on
an assumed gold price of US$1,700 per ounce and silver price of $22
per ounce, based on the formula AuEq grade (gpt) = Au grade + (Ag
grade x ($22 / $1,700)). Metallurgical recoveries are not
considered in the in-situ grade estimate but are estimated to be
93% and 83% for gold and silver, respectively, when processed in a
mill, and 72% and 25% respectively when heap-leached. See the June
12, 2023 Los Reyes Technical Report for additional details.
Qualified Person
Scott Smith, P.Geo., Executive Vice President of
Exploration, is a qualified person for the purposes of National
Instrument 43-101 and has reviewed and approved the technical
content in this news release.
About Prime Mining
Prime is managed by an ideal mix of successful
mining executives, strong capital markets personnel and experienced
local operators all focused on unlocking the full potential of the
Los Reyes Project. The Company has a well-planned capital structure
with a strong management team and insider ownership. Prime is
targeting a material resource expansion at Los Reyes through a
combination of new generative area discoveries and growth, while
also building on technical de-risking activities to support
eventual project development.
For further information, please visit
https://primeminingcorp.ca/ or direct enquiries to:
Scott HicksCEO &
Director
Indi GopinathanVP Capital
Markets & Business Development
Prime Mining Corp.710 – 1030 West Georgia
St.Vancouver, BC V6E 2Y3 Canada+1(604)
238-1659info@primeminingcorp.ca
Cautionary Notes to U.S. Investors
Concerning Resource EstimatesThis news release has been
prepared in accordance with the requirements of the securities laws
in effect in Canada, which differ from the requirements of the U.S.
securities laws. In particular, and without limiting the generality
of the foregoing, the terms “mineral reserve”, “proven mineral
reserve”, “probable mineral reserve”, “inferred mineral resources,”
“indicated mineral resources,” “measured mineral resources” and
“mineral resources” used or referenced in this presentation are
Canadian mineral disclosure terms as defined in accordance with
National Instrument 43-101 – Standards of Disclosure for Mineral
Projects (“NI 43-101”) under the guidelines set out in the 2014
Canadian Institute of Mining, Metallurgy and Petroleum Standards
for Mineral Resources and Mineral Reserves, Definitions and
Guidelines, May 2014 (the “CIM Standards”). The CIM Standards
differ from the mineral property disclosure requirements of the
U.S. Securities and Exchange Commission (the “SEC”) in Regulation
S-K Subpart 1300 (the “SEC Modernization Rules”) under the U.S.
Securities Act of 1933, as amended (the “Securities Act”). As a
foreign private issuer that is eligible to file reports with the
SEC pursuant to the multijurisdictional disclosure system, the
Company is not required to provide disclosure on its mineral
properties under the SEC Modernization Rules and will continue to
provide disclosure under NI 43-101 and the CIM Standards.
Accordingly, the Company’s disclosure of mineralization and other
technical information may differ significantly from the information
that would be disclosed had the Company prepared the information
under the standards adopted under the SEC Modernization Rules.
Forward Looking InformationThis
news release contains certain “forward-looking information” and
“forward-looking statements” within the meaning of Canadian
securities legislation as may be amended from time to time,
including, without limitation, statements regarding the perceived
merit of the Company’s properties, including additional exploration
potential of Los Reyes, potential quantity and/or grade of
minerals, the potential size of the mineralized zone, metallurgical
recoveries, and the Company’s exploration and development plans in
Mexico. Forward-looking statements are statements that are not
historical facts which address events, results, outcomes, or
developments that the Company expects to occur. Forward-looking
statements are based on the beliefs, estimates and opinions of the
Company’s management on the date the statements are made, and they
involve several risks and uncertainties. Certain material
assumptions regarding such forward-looking statements were made,
including without limitation, assumptions regarding the price of
gold, silver and copper; the accuracy of mineral resource
estimations; that there will be no material adverse change
affecting the Company or its properties; that all required
approvals will be obtained, including concession renewals and
permitting; that political and legal developments will be
consistent with current expectations; that currency and exchange
rates will be consistent with current levels; and that there will
be no significant disruptions affecting the Company or its
properties. Consequently, there can be no assurances that such
statements will prove to be accurate and actual results and future
events could differ materially from those anticipated in such
statements. Forward-looking statements involve significant known
and unknown risks and uncertainties, which could cause actual
results to differ materially from those anticipated. These risks
include, but are not limited to: risks related to uncertainties
inherent in the preparation of mineral resource estimates,
including but not limited to changes to the cost assumptions,
variations in quantity of mineralized material, grade or recovery
rates, changes to geotechnical or hydrogeological considerations,
failure of plant, equipment or processes, changes to availability
of power or the power rates, ability to maintain social license,
changes to interest or tax rates, changes in project parameters,
delays and costs inherent to consulting and accommodating rights of
local communities, environmental risks, title risks, including
concession renewal, commodity price and exchange rate fluctuations,
risks relating to COVID-19, delays in or failure to receive access
agreements or amended permits, risks inherent in the estimation of
mineral resources; and risks associated with executing the
Company’s objectives and strategies, including costs and expenses,
as well as those risk factors discussed in the Company's most
recently filed management's discussion and analysis, as well as its
annual information form dated August 21, 2023, available on
www.sedarplus.ca. Except as required by the securities disclosure
laws and regulations applicable to the Company, the Company
undertakes no obligation to update these forward-looking statements
if management’s beliefs, estimates or opinions, or other factors,
should change.
Prime Mining (TSX:PRYM)
Historical Stock Chart
From Oct 2024 to Nov 2024
Prime Mining (TSX:PRYM)
Historical Stock Chart
From Nov 2023 to Nov 2024