El Tigre Silver Corp. (the "Company" or "El Tigre") (TSX
VENTURE:ELS)(OTCQX:EGRTF)(FRANKFURT:5RT) is pleased to report that the drilling
program started on January 18, 2013 continues to perform well with 31 holes
completed and 3,714 meters drilled. El Tigre is drilling on concessions that are
part of the Company's 431 square kilometer ownership in Sonora, Mexico.


Stuart Ross, President and CEO stated, "We are very encouraged to receive these
excellent assay results from our drilling program. They continue to confirm the
strong mineralization in the 1.2 kilometer area of focus that is part of El
Tigre's 5.3 kilometer strike zone. We have approximately nine more holes to be
drilled and core from eighteen holes on site or in the assay lab, I am confident
we will continue to deliver strong results to our shareholders as the drill
program moves forward."


El Tigre believes that the property hosts a classic Mexican caldera-related,
epithermal low sulphide vein system that extends 5.3 kilometers along strike.
The drilling program is focusing on the southern 1.2 kilometer zone that has
potential for bulk mineable gold associated with the historic high grade
silver-gold veins. All the gold and silver intercepts are oxidized from pyrite
and base metal minerals to a reddish brown color.


This is the third drilling campaign that the Company has conducted in three
years. The seven holes that the Company is reporting are from the old Brown's
Shaft area of Mula Mountain where the El Tigre vein and Seitz-Kelly vein split. 


The following table highlights the best intervals in each hole while the assay
summary table lists all intervals for these holes. The highest gold and silver
assay that was reported from these 7 holes was in Hole ET13-51 with 1.0 meter of
995 g/t Ag and another 1.0 meter 11.0 g/t Au.


Assay Interval Highlights:



--  ET13-51 with 21.95 meters of 1.02 g/t Au equivalent- 6.38 g/t Ag and
    0.89 g/t Au 
    
    --  And with 25.5 meters of 3.34 g/t Au equivalent- 20.9 g/t Ag and 2.93
        g/t Au 
        
    --  And with 25.1 meters of 2.23 g/t Au equivalent- 43.93 g/t Ag and
        1.35 g/t Au 
        
--  ET13-52 with 32.9 meters of 0.93 g/t Au equivalent- 17.0 g/t Ag and 0.59
    g/t Au 
    
--  ET13-53 with 46 meters of 1.03 g/t Au equivalent- 14.37 g/t Ag and 0.74
    g/t Au 
    
--  ET13-54 with 31.6 meters of 1.44 g/t Au equivalent- 44.71 g/t Ag and
    0.54 g/t Au 
    
--  ET13-55 with 47.5 meters of 1.22 g/t Au equivalent- 34.71 g/t Ag and
    0.53 g/t Au 
    
--  ET13-56 with 70.4 meters of 2.16 g/t Au equivalent- 55.8 g/t Ag and 1.04
    g/t Au 
    
--  ET13-57 with 12.8 meters of 1.40 g/t Au equivalent- 16.22 g/t Ag and
    1.08 g/t Au 



Summary of mineralized intervals for these seven holes:



----------------------------------------------------------------------------
                                   Interval                         Au Equiv
Hole Num.    From (m)     To (m)        (m)     Ag g/t     Au g/t       50:1
----------------------------------------------------------------------------
ET13-51           4.0        5.5        1.5       1.40       0.35       0.38
----------------------------------------------------------------------------
                  7.0        8.5        1.5        (i)       0.27       0.27
----------------------------------------------------------------------------
                 12.0       15.0        3.0        (i)       0.12       0.12
----------------------------------------------------------------------------
                 15.0      18.15       3.15      33.00       0.92       1.58
----------------------------------------------------------------------------
                22.25       44.2      21.95       6.38       0.89       1.02
----------------------------------------------------------------------------
Includes         39.0       41.0        2.0      41.95       2.97       3.80
----------------------------------------------------------------------------
                 48.5       73.0       25.5      20.90       2.93       3.34
----------------------------------------------------------------------------
Includes         55.5       60.5        5.0      38.10       5.58       6.35
----------------------------------------------------------------------------
Includes         57.5       58.5        1.0      82.10      11.00      12.64
----------------------------------------------------------------------------
                105.1      134.2       25.1      43.93       1.35       2.23
----------------------------------------------------------------------------
Includes       117.45      120.5       3.05     373.00       1.27       8.73
----------------------------------------------------------------------------
Includes       117.45     118.45        1.0     995.00       2.66      22.56
----------------------------------------------------------------------------
                142.5      144.6        2.1      42.56       0.21       1.06
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
ET13-52         115.2      146.1       32.9      17.00       0.59       0.93
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
ET13-53             0       46.0       46.0      14.37       0.74       1.03
----------------------------------------------------------------------------
Includes         43.0       43.8        0.8     153.00       0.65       3.71
----------------------------------------------------------------------------
                64.05       66.7       2.65       9.54       1.79       1.98
----------------------------------------------------------------------------
                 71.6       81.6       10.0     109.55       1.26       3.45
----------------------------------------------------------------------------
Includes         75.5      80.15   4.65(ii)     427.00       2.42      10.96
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
ET13-54          10.0      41.65      31.65      44.71       0.54       1.44
----------------------------------------------------------------------------
Includes         33.0      41.65       8.65     129.72       0.96       3.55
----------------------------------------------------------------------------
Includes        35.75      37.35        1.6     548.80       0.91      11.89
----------------------------------------------------------------------------
                 60.0       62.0        2.0        (i)       0.35       0.35
----------------------------------------------------------------------------
                64.75       65.8   1.05(ii)     297.00       0.63       6.57
----------------------------------------------------------------------------
                 75.7       76.8        1.1        (i)       0.48       0.48
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
ET13-55           2.4        6.2        3.8       7.53       0.28       0.43
----------------------------------------------------------------------------
                 12.5       60.0       47.5      34.71       0.53       1.22
----------------------------------------------------------------------------
Includes         41.5      46.35       4.85     201.82       0.76       4.79
----------------------------------------------------------------------------
Includes         43.0       44.5        1.5     372.00       1.20       8.64
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
ET13-56             0       70.4       70.4      55.80       1.04       2.16
----------------------------------------------------------------------------
Includes         35.0       51.3       16.3     129.79       0.61        3.2
----------------------------------------------------------------------------
Includes        41.45       43.0       1.55     370.00       1.17       8.56
----------------------------------------------------------------------------
Includes         55.0       60.0        5.0      17.04       3.50       3.84
----------------------------------------------------------------------------
Includes         63.0       69.4        6.4     231.20       0.54       5.16
----------------------------------------------------------------------------
Includes         63.0       64.5        1.5     651.00       0.58       13.6
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
ET13-57          52.0       64.8       12.8      16.22       1.08       1.40
----------------------------------------------------------------------------
Includes         54.5       55.7        1.2       81.8       4.70       6.34
----------------------------------------------------------------------------
                 87.4       88.5        1.1       5.90       0.48       0.59
----------------------------------------------------------------------------
Note 1: Assay cutoffs are 0.2 g/t Au and 10 g/t Ag with g/t as gram per     
tonne.                                                                      
Note 2: Drill hole direction, angle and depth.                              
                                                                            
                                                                            
----------------------------------------------------------------------------
Drill Hole                       Azimuth             Angle             Depth
----------------------------------------------------------------------------
ET13-51                           90 deg           -65 deg             149.1
----------------------------------------------------------------------------
ET13-52                          110 deg           -46 deg             173.1
----------------------------------------------------------------------------
ET13-53                           90 deg           -60 deg            102.95
----------------------------------------------------------------------------
ET13-54                           90 deg           -46 deg             84.35
----------------------------------------------------------------------------
ET13-55                           90 deg           -65 deg             106.1
----------------------------------------------------------------------------
ET13-56                           90 deg           -52 deg              87.7
----------------------------------------------------------------------------
ET13-57                           95 deg           -47 deg              93.7
----------------------------------------------------------------------------
Note 3: (i) Did not meet cut-off grade. (ii) El Tigre Vein              
Note 4: All intervals reported as core length in meters and does not reflect
true width.                                                                 



El Tigre's objective for this drilling program is 5,000 meters of diamond core
for approximately 40 holes. As of the end of March, 31 holes have been completed
with 3,714 meters drilled. At current advancement rates, the program is
anticipated to be completed around mid-April with all assays returned by the end
of April. 


The remaining 1,286 meters of the 2013 program will fill-in around earlier holes
as needed for the planned resource block model, and test other targets northward
to the Camp area. The Company currently has core from twelve holes (ET13-58 to
69) in the assay laboratory and another six in camp waiting for transport to
assay laboratory.


The technical content of this news release has been approved by Steven D. Craig,
CPG and Vice President of Exploration for El Tigre, a Qualified Person as
defined in NI 43-101.


About El Tigre Silver Corp.:

The Company, through its subsidiaries, holds the rights to 100% of nine mineral
concessions, eight comprising of 431 square kilometers located in north-eastern
Sonora, Mexico (the "El Tigre Property"). El Tigre also holds one additional 32
hectare claim separate from the El Tigre Property. A technical report has been
prepared for the El Tigre Property and can be found on the Company's profile on
SEDAR at www.sedar.com and on the Company's website at
www.eltigresilvercorp.com.


Cautionary Statements:

This news release contains forward-looking statements and forward-looking
information (together, "forward-looking statements") within the meaning of
applicable securities laws and the United States Private Securities Litigation
Reform Act of 1995. Forward-looking statements include assay results, expected
drilling programs and future plans. Forward-looking statements involve risks,
uncertainties and other factors that could cause actual results, performance,
prospects and opportunities to differ materially from those expressed or implied
by such forward-looking statements. Factors that could cause actual results to
differ materially from these forward-looking statements include those risks set
out in the Company's public documents filed on SEDAR at www.sedar.com. Although
the Company believes that the assumptions and factors used in preparing the
forward-looking statements are reasonable, undue reliance should not be placed
on these statements, which only apply as of the date of this news release, and
no assurance can be given that such events will occur in the disclosed times
frames or at all. Except where required by law, the Company disclaims any
intention or obligation to update or revise any forward-looking statement,
whether as a result of new information, future events or otherwise.



FOR FURTHER INFORMATION PLEASE CONTACT: 
El Tigre Silver Corp.
Stuart Ross
President and CEO
(778) 980-7187
srross@eltigresilvercorp.com


El Tigre Silver Corp.
Steven Craig
VP Exploration
(775) 815-8456
scraig@eltigresilvercorp.com


El Tigre Silver Corp.
Rob Grace
Corporate Communications
(604) 639-0044
(604) 608-6163 (FAX)
rgrace@eltigresilvercorp.com
www.eltigresilvercorp.com

El Tigre Silver Corp. (TSXV:ELS)
Historical Stock Chart
From May 2024 to Jun 2024 Click Here for more El Tigre Silver Corp. Charts.
El Tigre Silver Corp. (TSXV:ELS)
Historical Stock Chart
From Jun 2023 to Jun 2024 Click Here for more El Tigre Silver Corp. Charts.