UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934

 

For March 24, 2015 Commission File Number: 0-28792
   

 

CANALASKA URANIUM LTD.

(Translation of registrant’s name into English)

 

#1020 – 625 Howe Street, Vancouver, B.C. V6C 2T6

(Address of principal executive office)

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F

 

Form 20-F __X___ Form 40-F_____

 

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): _____

 

Note: Regulation S-T Rule 101(b)(1) only permits the submission in paper of a Form 6-K if submitted solely to provide an attached annual report to security holders.

 

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): _____

 

Note: Regulation S-T Rule 101(b)(7) only permits the submission in paper of a Form 6-K if submitted to furnish a report or other document that the registrant foreign private issuer must furnish and make public under the laws of the jurisdiction in which the registrant is incorporated, domiciled or legally organized (the registrant’s “home country”), or under the rules of the home country exchange on which the registrant’s securities are traded, as long as the report or other document is not a press release, is not required to be and has not been distributed to the registrant’s security holders, and, if discussing a material event, has already been the subject of a Form 6-K submission or other Commission filing on EDGAR.

 

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934. Yes: _____ No: __X___

 

If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): 82- ___________.

 

Signatures

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

CanAlaska Uranium Ltd.

Registrant

 

“Dianne Szigety”

Dianne Szigety (Corporate Secretary)

 

March 24, 2015

Date

 

EX-99,1 Condensed Interim Consolidated Financial Statements Third Quarter - January 31, 2015
EX-99.2  Management Discussion and Analysis For the Third Quarter and Nine Months Ended January 31, 2015
EX-99.3  Certification of Interim Filings - CEO
EX-99.4  Certification of Interim Filings - CFO

 

 

 

 

 

 



 




CanAlaska Uranium Ltd.

Condensed Interim Consolidated Financial Statements
Third Quarter - January 31, 2015
(Unaudited)
(Expressed in Canadian dollars, except where indicated)

 
 
 

 
 
1

 

NOTICE OF NO AUDITOR REVIEW OF
 
CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS


Under National Instrument 51-102, if an auditor has not performed a review of the condensed interim consolidated financial statements required to be filed, they must be accompanied by a notice indicating that the condensed interim consolidated financial statements have not been reviewed by an auditor.

The accompanying condensed interim consolidated financial statements have been prepared by and are the responsibility of the Company’s management.

The Company’s independent auditor has not performed a review of these condensed interim consolidated financial statements in accordance with standards established by the Canadian Institute of Chartered Accountants for a review of condensed interim consolidated financial statements by an entity’s auditor.

 
 
2

 
 
CanAlaska Uranium Ltd.
Condensed Interim Consolidated Statements of Financial Position
(Unaudited)
(Expressed in Canadian dollars except where indicated)

 
   
January 31
2015
$000’s
   
April 30
2014
$000’s
 
Assets
           
Current assets
           
Cash and cash equivalents (note 4)
    1,710       1,044  
Trade and other receivables
    85       52  
Available-for-sale securities (note 5)
    541       414  
Total current assets
    2,336       1,510  
                 
Non-current assets
               
Reclamation bonds
    132       189  
Property and equipment (note 6)
    243       294  
Mineral property interests (note 7)
    731       813  
Total assets
    3,442       2,806  
                 
Liabilities
               
Current liabilities
               
Trade and other payables
    136       382  
                 
Equity
               
Common shares (note 8)
    73,205       73,205  
Equity reserve  (note 8)
    10,947       10,807  
Investment revaluation reserve
    (297 )     (24 )
Deficit
    (80,549 )     (80,564 )
      3,306       2,424  
      3,442       2,806  
Going Concern (note 2)
               
Commitments (note 11)
               
Subsequent Events (note 14)
               
 
Approved by the Audit Committee of the Board of Directors
 
“Peter Dasler”     “Jean Luc Roy”
       
Director     Director
       
The accompanying notes are an integral part of these unaudited condensed interim consolidated financial statements.
 
 
3

 
 
CanAlaska Uranium Ltd.
Condensed Interim Consolidated Statements of Comprehensive Earnings (Loss)
(Unaudited)
(Expressed in Canadian dollars except where indicated)


   
Three months
 ended
January 31
 2015
   
Three months
 ended
January 31
 2014
   
Nine months
 ended
January 31
 2015
   
Nine months
ended
January 31
2014
 
   
($000's)
   
($000's)
   
($000's)
   
($000's)
 
                         
EXPLORATION COSTS
                       
Mineral property expenditures net of reimbursements
    (59 )     15       109       131  
Write-down on reclamation bonds
    -       -       -       3  
Mineral property write-offs
    17       141       82       317  
Net option payments
    (150 )     (25 )     (2,031 )     (265 )
Equipment rental income
    (4 )     (11 )     (8 )     (11 )
      (196 )     120       (1,848 )     175  
OTHER EXPENSES (INCOME)
                               
Consulting, labour and professional fees
    118       110       504       297  
Depreciation and amortization (note 6)
    16       20       47       60  
(Gain) loss on disposal of property and equipment
    (35 )     -       (35 )     1  
Foreign exchange gain
    -       (1 )     -       (1 )
Insurance, licenses and filing fees
    5       37       53       85  
Interest income
    (4 )     (2 )     (12 )     (8 )
Other corporate costs
    4       10       27       28  
Investor relations and presentations
    18       9       80       12  
Rent
    4       7       17       18  
Share-based payments (note 9)
    80       105       140       125  
Travel and accommodation
    3       1       6       5  
Impairment of available-for-sale securities (note 5)
    2       12       17       36  
Management fees
    5       -       (11 )     (6 )
      216       308       833       652  
                                 
Net earning (loss) for the period
    (20 )     (428 )     1,015       (827 )
                                 
Other comprehensive income (loss)
                               
Unrealized (gain) loss on available-for-sale securities
    (55 )     86       273       69  
Total comprehensive earnings (loss) for the period
    35       (514 )     742       (896 )
                                 
Basic and diluted earnings (loss) per share ($ per share)
    (0.00 )     (0.02 )     0.05       (0.04 )
                                 
Basic and diluted weighted average common shares
outstanding (000's)
    22,068       22,068       22,068       22,066  
 
The accompanying notes are an integral part of these unaudited condensed interim consolidated financial statements.
 
 
4

 
 
CanAlaska Uranium Ltd.
Condensed Interim Consolidated Statements of Changes in Equity
For the nine months ended January 31, 2015 and 2014
(Unaudited)
(Expressed in Canadian dollars except where indicated)

 
       
Common Shares
     Equity Reserve      Investment Revaluation      Accumulated Deficit      Total Equity  
     
Shares 000’s
   
Amount $000’s
   
$000’s
   
Reserve $000’s
   
 $000’s
   
$000’s
 
Balance-May 1, 2013
   
22,058
     
73,205
     
10,682
     
(1
)
   
(80,856
)
   
3,030
 
Issued to acquire mineral property interest (note 8)
   
10
     
1
     
-
     
-
     
-
     
1
 
Share issuance costs
   
-
     
(1
)
   
-
     
-
     
-
     
(1
)
Share-based payments
   
-
     
-
     
125
     
-
     
-
     
125
 
Unrealized gain on available-for-sale securities
   
-
     
-
     
-
     
(69
)
   
-
     
(69
)
Loss for the period
   
-
     
-
     
-
     
-
     
(827
)
   
(827
)
Balance-January 31, 2014
   
22,068
     
73,205
     
10,807
     
(70
)
   
(81,683
)
   
2,259
 
                                                 
                                                 
                                                 
Balance-May 1, 2014
   
22,068
     
73,205
     
10,807
     
(24
)
   
(81,564
)
   
2,424
 
Share-based payments
   
-
     
-
     
140
     
-
     
-
     
140
 
Unrealized gain (loss) on available-for-sale securities
   
-
     
-
     
-
     
(273
)
   
-
     
(273
)
Income for the period
   
-
     
-
     
-
     
-
     
1,015
     
1,015
 
Balance-January 31, 2015
   
22,068
     
73,205
     
10,947
     
(297
)
   
(80,549
)
   
3,306
 
 
The accompanying notes are an integral part of these unaudited condensed interim consolidated financial statements.
 
 
5

 
 
CanAlaska Uranium Ltd.
Condensed Interim Consolidated Statements of Cash Flows
(Unaudited)
(Expressed in Canadian dollars except where indicated)

 
   
Nine months
 ended January 31
2015
   
Nine months
 ended January 31
2014
 
    $ 000’s     $ 000’s  
Cash flows from operating activities
               
Income (loss) for the period
    1,015       (827 )
Items not affecting cash
               
Loss (gain) on disposal of property and equipment
    (35 )     1  
Depreciation and amortization (note 6)
    47       60  
Mineral property write-offs
    82       317  
Write-down on reclamation bonds
    -       3  
Other
    -       1  
Impairment of available-for-sale securities (note 5)
    17       36  
Net option payments and receipts
    (2,031 )     (180 )
Share-based payments (note 9)
    140       125  
      (765 )     (464 )
Change in non-cash operating working capital
               
Increase in trade and other receivables
    (20 )     (1 )
Decrease in trade and other payables
    (246 )     (37 )
      (1,031 )     (502 )
Cash flows used in financing activities
               
Issuance of common shares (net of share issue costs)
    -       (1 )
      -       (1 )
Cash flows from/used in investing activities
               
Additions to mineral property interests
    (11 )     (17 )
Acquisition of property and equipment
    -       -  
Proceeds from sale of property and equipment
    25       -  
Reclamation bond
    58       10  
Option payments received
    1,625       -  
      1,697       (7 )
                 
Increase (decrease) in cash and cash equivalents
    666       (510 )
                 
Cash and cash equivalents - beginning of period (note 4)
    1,044       1,265  
                 
Cash and cash equivalents - end of period (note 4)
    1,710       755  
 
The accompanying notes are an integral part of these unaudited condensed interim consolidated financial statements.
 
 
6

 
 
CanAlaska Uranium Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the nine month period ended January 31, 2015
(Unaudited)
(Expressed in Canadian dollars except where indicated)

 
1
Nature of Operations

CanAlaska Uranium Ltd. (the “Company” or “CanAlaska”) and its subsidiaries for the past 9 years have been principally engaged in the exploration of uranium properties. The Company will attempt to bring the properties to production, structure joint ventures with others, option or lease properties to third parties or sell the properties outright. The Company has not determined whether these properties contain ore reserves that are economically recoverable and the Company is considered to be in the exploration stage. From time to time, the Company evaluates new properties and directs exploration on these properties based on the Board of Director’s evaluation of financial and market considerations at the time. On December 30, 2013, the Company’s shares commenced trading on the TSX Venture Exchange under the symbol “CVV” and ceased trading on the Toronto Stock Exchange. The Company’s shares are also quoted on the OTCQB in the United States under the symbol “CVVUF” and the Frankfurt Stock Exchange under the symbol “DH7N”. The Company’s registered office is located at 625 Howe Street, Suite 1020, Vancouver, British Columbia, V6C 2T6, Canada.

2
Going Concern

These condensed interim consolidated financial statements have been prepared on a going concern basis. The going concern basis of presentation assumes that the Company will continue in operation for the foreseeable future and be able to realize its assets and discharge its liabilities and commitments in the normal course of business. These condensed interim consolidated financial statements do not include any adjustments to the carrying values of assets and liabilities and the reported expenses and statement of financial position classification that would be necessary should the Company be unable to continue as a going concern. These adjustments could be material.

The recoverability of the amounts shown for mineral properties and related deferred costs is dependent upon the existence of economically recoverable mineral reserves, the ability of the Company to obtain the necessary financing to complete the development, and upon future profitable production or proceeds from disposition of the mineral properties. Due to increasingly difficult market conditions facing junior uranium exploration companies there is no assurance that the Company will be successful in raising additional financing. The amounts shown as mineral property costs represent acquisition costs incurred to date, net of recoveries.

At January 31, 2015, the Company had cash and cash equivalents of $1.7 million (April 30, 2014: $ 1.0 million) (note 4) and working capital of $2.2 million (April 30, 2014: $1.1 million). The Company has a deficit of $80.5 million at January 31, 2015. Management believes that the cash on hand is sufficient to meet corporate, administrative and selected exploration activities for at least the next twelve months. Management is working to option, joint venture or sell its individual exploration projects. The above factors cast substantial doubt regarding the Company’s ability to continue as a going concern.
 
 
7

 
 
CanAlaska Uranium Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the nine month period ended January 31, 2015
(Unaudited)
(Expressed in Canadian dollars except where indicated)

 
3          Basis of Consolidation and Presentation

a)         Statement of Compliance

These condensed interim consolidated financial statements of the Company, including comparatives, have been prepared in accordance with International Financial Reporting Standards 34 Interim Financial Reporting (“IAS 34”) using the accounting policies consistent with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Boards (“IASB”). These condensed interim consolidated financial statements have been prepared on the basis of and using accounting policies, methods of computation and presentation consistent with those applied in the Company’s April 30, 2014 consolidated annual financial statements.

These condensed interim consolidated financial statements were authorized for issuance by the Board of Directors of the Company on March 24, 2015.

b)         Basis consolidation and preparation

These condensed interim consolidated financial statements are presented in Canadian dollars.  The consolidated financial statements are prepared on the historical cost basis except for certain financial instruments that are measured on the fair value basis.

These condensed interim consolidated financial statements include the accounts of CanAlaska and its wholly-owned subsidiaries including:
 
·  
CanAlaska Resources Ltd. U.S.A., a Nevada company
·  
CanAlaska West McArthur Uranium Ltd., a B.C. company
·  
Golden Fern Resources Limited, a New Zealand company
·  
Poplar Uranium Limited., a B.C. company

Subsidiaries are entities over which the Company has the power, directly or indirectly, to govern the financial and operating policies of the entity so as to obtain benefits from its activities. In assessing control, potential voting rights that are presently exercisable or convertible, are taken into account in the assessment of whether control exists. Subsidiaries are fully consolidated from the date on which control is transferred to the Company.  They are deconsolidated from the date on which control ceases. All inter-company transactions, balances, income and expenses have been eliminated on consolidation.

These condensed interim consolidated financial statements also include the Company's share of the jointly held assets, its jointly incurred liabilities, its share of the revenues and expenses of CanAlaska Korean Uranium Limited Partnership (“CKULP” or the “Partnership” or the “CKU Partnership”) and CanAlaska Korean Uranium Limited.
 
 
8

 
 
CanAlaska Uranium Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the nine month period ended January 31, 2015
(Unaudited)
(Expressed in Canadian dollars except where indicated)

 
4         Cash and Cash Equivalents

   
January 31, 2015
$000’s
   
April 30, 2014
000’s
 
CKU Partnership funds
    130       176  
Option-in advances
    68       93  
Cash in bank and other short term deposits
    1,512       775  
Total
    1,710       1,044  

CKU Partnership funds are held by the Company for expenditure on the properties held by the CKULP.

Option-in advances are advance cash funding by joint venture partners on various exploration properties.

Cash and cash equivalents of the Company are comprised of bank balances and short-term investments, which are convertible to cash, with an original maturity of 90 days or less as follows:

   
January 31, 2015
$000’s
   
April 30, 2014
000’s
 
Cash
    535       319  
Cash equivalents
    1,175       725  
Total
    1,710       1,044  
 
5         Available-for-Sale Securities

   
January 31, 2015
   
April 30, 2014
 
   
Cost
 $000’s
   
Market Value
$000’s
   
Cost
$000’s
   
Market Value
$000’s
 
Pacific North West Capital Corp.
    8       8       17       17  
Mega Uranium Ltd.
    3       6       3       11  
Makena Resources Inc.
    196       70       155       80  
Copper Reef Mining Corp.
    20       10       20       10  
Northern Uranium Corp.
    600       420       225       259  
Other available-for-sale securities
    10       27       18       37  
Total
    837       541       438       414  

The Company reviews the carrying values of its available-for-sale securities, and after considering where the decreases on fair value were significant or prolonged, the Company recognized an impairment on available-for-sale securities of $1,596 for the three ended January 31, 2015 and $16,839 for the nine months ended January 31, 2015 (three months ended January 31, 2014: $11,919; nine months ended January 31, 2014: $36,272).
 
 
9

 
 
CanAlaska Uranium Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the nine month period ended January 31, 2015
(Unaudited)
(Expressed in Canadian dollars except where indicated)

 
6
Property and Equipment

   
Automotive
$000’s
   
Leasehold improvements
$000’s
   
Mining equipment
$000’s
   
Office equipment
$000’s
   
Total
$000’s
 
Cost
                             
At May 1, 2013
    25       270       1,022       456       1,773  
Disposals
    -       -       -       (1 )     (1 )
At April 30, 2014
    25       270       1,022       455       1,772  
Disposals
    -       -       (70 )     (5 )     (75 )
At January 31, 2015
    25       270       952       450       1,697  
 
Accumulated Depreciation and Amortization
                             
At May 1, 2013
   
(17
)
   
(125
)
   
(880
)
   
(376
)
   
(1,398
)
Depreciation and amortization
   
(3
)
   
(20
)
   
(42
)
   
(15
)
   
(80
)
Disposals
   
-
     
-
     
-
     
-
     
-
 
At April 30, 2014
   
(20
)
   
(145
)
   
(922
)
   
(391
)
   
(1,478
)
Depreciation and amortization
   
(1
)
   
(15
)
   
(22
)
   
(9
)
   
(47
)
Disposals
   
-
     
-
     
68
     
3
     
71
 
At January 31, 2015
   
(21
)
   
(160
)
   
(876
)
   
(397
)
   
(1,454
)
                                         
Carrying Value
                                       
At April 30, 2014
   
5
     
125
     
100
     
64
     
294
 
At January 31, 2015
   
4
     
110
     
76
     
53
     
243
 
 
 
10

 
 
CanAlaska Uranium Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the nine month period ended January 31, 2015
(Unaudited)
(Expressed in Canadian dollars except where indicated)

 
7          Mineral Property Interests

The Company holds approximately 695,000 hectares of mining claims in the Athabasca Basin located across the provinces of Saskatchewan and Manitoba in Canada. The holdings are comprised of 19 projects which are in various stages of exploration and discovery.

The Company also holds mining claims in Alaska, and British Columbia.

Details of acquisition costs and property impairments for the twelve and nine months ended April 30, 2014 and January 31, 2015 are as follows:

Project ($000’s)
 
May 1, 2013
   
Additions/
write-offs/ recoveries
   
April 30, 2014
   
Additions/
write-offs/
recoveries
   
January 31, 2015
 
Athabasca Basin
                             
Cree East (a)
    -       -       -       -       -  
West McArthur (b)
    65       -       65       -       65  
Fond du Lac
    120       -       120       -       120  
Grease River (c)
    133       (57 )     76       (29 )     47  
Key Lake
    24       -       24       -       24  
NW Manitoba (d)
    16       (8 )     8       (8 )     -  
Poplar (e)
    166       (35 )     131       (11 )     120  
Helmer (f)
    107       -       107       (9 )     98  
Lake Athabasca (g)
    118       (20 )     98       (7 )     91  
Hodgson
    109       (102 )     7       -       7  
Collins Bay (h)
    -       -       -       -       -  
McTavish
    74       -       74       -       74  
Carswell (i)
    136       (136 )     -       2       2  
Ruttan (j)
    15       -       15       (10 )     5  
Patterson (k)
    4       (2 )     2       (2 )     -  
Cable Bay (l)
    -       -       -       2       2  
Other (m)
    53       -       53       (8 )     45  
New Zealand
                                       
Reefton, NZ (n)
    24       (24 )     -       -       -  
Other
                                       
Other Projects, Various (o)
    74       (41 )     33       (2 )     31  
Total
    1,238       (425)       813       (82)       731  

 
11

 
 
CanAlaska Uranium Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the nine month period ended January 31, 2015
(Unaudited)
(Expressed in Canadian dollars except where indicated)

 
7          Mineral Property Interests (continued)

   
Total
 
Summary of option payments remaining due in the
years ending April 30
 
Cash
$000’s
   
Spend1
$000’s
   
Shares
 
2015
    -       -       -  
2016
    -       600       30,000  
2017
    -       1,800       -  
Thereafter
    -       3,000       80,000  

 
1 Represents cumulative spend required not the spend per fiscal year to maintain certain interest in the Company’s properties.  The cumulative spend is at the Company’s discretion under an option. It may not be the Company’s intention to pay the option, in which case the expenditure will not be incurred.

   
Total2
 
Summary of option payments receivable  in the years ending April 301
 
Cash
$000’s
   
Spend1
$000s
   
Shares
 
2015
    25       3,475       6,000,000  
2016
    25       3,925       750,000  
2017
    -       7,425       -  
Thereafter
    -       13,025       5,000,000  

 
1 Represents cumulative spend required not the spend per fiscal year to maintain certain interest in the Company’s properties.
 
2 Represents optionees' commitments to maintain certain interest in the Company's properties.

a)         Cree East, Saskatchewan – Korean Consortium

Cree East consists of approximately 58,000 hectares of mineral claims in the Athabasca. In December 2007, the Company formed the CKU Partnership with the Korean Consortium ("Consortium") to develop Cree East. Under the terms of agreements, the Korean Consortium invested $19.0 million towards the earn-in of a 50% ownership interest in the CKU Partnership over a four year period (April 30, 2014: 50%). The Company acts as the operator for the exploration project and earns a management fee of 10% of the exploration expenditures incurred. The total expenditures on the property for the nine months ended January 31, 2015 and 2014 was approximately $76,000 and $39,000 respectively.
 
 
12

 
 
CanAlaska Uranium Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the nine month period ended January 31, 2015
(Unaudited)
(Expressed in Canadian dollars except where indicated)

  
7          Mineral Property Interests (continued)

b)         West McArthur, Saskatchewan - Mitsubishi

West McArthur consists of approximately 36,000 hectares of mineral claims in the Athabasca. In April 2007, the Company optioned the claims to Mitsubishi Development Pty Ltd. (“Mitsubishi”) whereby Mitsubishi could exercise an option to earn a 50% interest in the property by funding expenditures of $10.0 million and by making a $1.0 million payment upon completion of the $10.0 million funding requirement. In February 2010, Mitsubishi exercised their option with a payment to the Company of $1.0 million and an unincorporated 50/50 joint venture was formed between the parties to pursue further exploration and development of the property. The Company acts as project operator and earns a fee (between 5% and 10%) based on the expenditures incurred. The total expenditures on the property for the nine months ended January 31, 2015 and 2014 was approximately $22,000 and $12,000 respectively.

c)         Grease River, Saskatchewan

In the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Grease River claims of approximately $29,000 as it did not renew its permits on these claims.

d)         NW Manitoba, Manitoba

In September 2013, the Company entered into an option agreement with Northern Uranium Corp ("Northern") previously MPVC Inc. for an interest in the NW Manitoba project. The project covers 143,603 hectares along the Saskatchewan/Manitoba border. Northern may earn an 80% interest in the project by carrying out a three stage $11.6 million exploration program, make a cash payment of $35,000 (paid), issue 12 million common shares and issue 6 million common share purchase warrants.

On December15, 2014, the Company received notification from Northern Uranium of the expenditure threshold for the 50% earned interest in the NW Manitoba property.

e)         Poplar, Saskatchewan

In the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Poplar claims of approximately $11,000 as it did not renew its permits on these claims.

f)          Helmer, Saskatchewan

In August and September 2014, the Company acquired 11 claim blocks totalling 4,862 hectares located near the southern shore of Lake Athabasca, 12 kilometres west of Fond Du Lac on the central northern edge of the Athabasca basin for $5,005.

In the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Helmer claims of approximately $14,000 as it did not renew its permits on these claims.
 
 
13

 
 
CanAlaska Uranium Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the nine month period ended January 31, 2015
(Unaudited)
(Expressed in Canadian dollars except where indicated)

  
7          Athabasca Mineral Property Interests (continued)

g)         Lake Athabasca, Saskatchewan

In the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Lake Athabasca claims of approximately $7,000 as it did not renew its permits on these claims.

h)         Collins Bay, Saskatchewan

In June 2013, the Collins Bay Extension option agreement dated July 4, 2009 and subsequently amended on March 29, 2011 with Bayswater Uranium Corporation ("Bayswater") was amended whereby the option period was extended from six years to eight years. In consideration for the extension, the Company accelerated its staged common share issuances and issued 10,000 common share on July 12, 2013 (note 8). As a result, in July 2013, the Company issued an aggregate of 20,000 common shares under the amended option agreement for the Collins Bay Extension project.

i)          Carswell, Saskatchewan

In August 2014, the Company acquired 8 claim blocks totalling 1,723 hectares located in the western portion of the Athabasca basin, within the roughly circular Carswell geologic structure at Cluff Lake for $2,400.

j)          Ruttan, Saskatchewan

During the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Ruttan claims of approximately $10,000 as it did not renew its permits on this property.

k)         Patterson – Saskatchewan

In January 2013, the Company acquired three block of claims, totalling 6,687 hectares located in the Patterson Lake area of the western Athabasca basin. In August 2013, the Company optioned the claims to Makena Resources Inc ("Makena"). Makena may earn a 50% interest in the property by making cash payments totalling $100,000 by June 1, 2015, issuing 2,500,000 common share by June 1, 2015 and incurring exploration expenditures totalling $1.4 million by September 30, 2016.

On June 30, 2014, the option agreement with Makena Resources Inc. for the Patterson project was amended whereby in exchange for a six month extension on the work program, Makena agreed to return the Patterson Lake North project and the Patterson Lake East project to the Company.

On March 6, 2015, the option agreement with Makena Resources Inc. for the Patterson project was amended whereby in exchange for an extension on the work program and remaining cash payment and share issuance, Makena agreed to issue an addition 750,000 common shares to the Company subject to TSX Venture Exchange approval.
 
 
14

 
 
CanAlaska Uranium Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the nine month period ended January 31, 2015
(Unaudited)
(Expressed in Canadian dollars except where indicated)

  
7          Athabasca Mineral Property Interests (continued)

l)          Cable Bay, Saskatchewan

In July 2014, the Company acquired four claim blocks totalling 2,411 hectares located partly on land and partlover Cree Lake for $2,004. The property straddles the edge of the Athabasca basin, along the Cable Bay Shear Zone.

m)        Other - Moon, Saskatchewan

During the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Moon claims of approximately $8,000 as it did not renew its permits on these claims.

n)         Reefton – New Zealand

In March 2014, the Company entered into a purchase agreement to sell the exploration permit for the Reefton project to Stevenson Mining Ltd. ("Stevenson") for aggregate purchase consideration of $20,000. The Company recognized a loss on disposal of the Reefton project of approximately $4,000.

On May 20, 3014, Golden Fern Resources Limited, the Company's wholly owned subsidiary in New Zealand, began liquidation proceedings which was completed on August 29, 2014. The New Zealand subsidiary was liquidated after the sale of the Reefton project to Stevenson. There were no significant assets or liabilities remaining in the entity.

o)         Other Projects

             Kasmere, Manitoba

In March 2014, the Company entered into a binding agreement to sell its interest in its Kasmere South project in northwestern Manitoba to private company East Resources Ltd. for an aggregate cash payment totalling $1.8 million. The Company retains a 2.5% net smelter royalty on any future production. On March 28, 2014, the Company received a non-refundable cash payment of $200,000 from East Resources Ltd. Subsequent to year end, the Company also received the remaining cash instalments of $100,000 and $1.5 million on May 30, 2014 and June 26, 2014 respectively.

            Big Creek, British Columbia

In December 2014, the Company acquired two claim blocks totalling 481 hectares located in south central British Columbia for $842.

In the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Big Creek claims of approximately $3,000 as it did not renew its permits on these claims.
 
 
15

 
 
CanAlaska Uranium Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the nine month period ended January 31, 2015
(Unaudited)
(Expressed in Canadian dollars except where indicated)

 
8          Share Capital

The Company has authorized capital consisting of an unlimited amount of common shares without par value.

            Share Issuances

In July 2013, the Company issued 10,000 common shares under the option agreement for the Collins Bay Extension project (see note 7(h)).

9          Stock Options and Warrants

The Company has a stock option plan that permits the granting of stock options to directors, officers, key employees and consultants. Terms and pricing of options are determined by management at the date of grant. A total of 4,400,000 common shares of the Company may be allotted and reserved for issuance under the stock option plan.

   
Number of options
000’s
   
Weighted average
exercise price $
 
Outstanding - May 1, 2013
    3,598       0.55  
Granted
    1,592       0.12  
Expired
    (753 )     0.69  
Forfeited
    (586 )     0.34  
Outstanding – April 30, 2014
    3,851       0.20  
Granted
    1,336       0.14  
Expired
    (862 )     0.25  
Forfeited
    (249 )     0.25  
Outstanding – January 31, 2015
    4,076       0.16  

As at January 31, 2015, the following stock options were outstanding:

   
Number of options outstanding 000’s
   
Number of options exercisable 000’s
   
Exercise
 price
   
Expiry date
(Fiscal Year)
 
      55       55     $ 0.25       2015  
      574       574     $ 0.18       2017  
      1,092       1,092     $ 0.25       2018  
      1,592       1,592     $ 0.12       2019  
      763       763     $ 0.12 - $0.14       2020  
Total
    4,076       4,076                  

For the three months ended January 31, 2015, total share-based compensation expense was $79,086 (January 31, 2014: $104,529). For the nine months ended January 31, 2015, total share-based compensation expense was $140,554 (January 31, 2014: $124,363).
 
 
16

 
 
CanAlaska Uranium Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the nine month period ended January 31, 2015
(Unaudited)
(Expressed in Canadian dollars except where indicated)

 
9
Stock Options and Warrants (continued)

Warrants

   
Number of warrants
000’s
   
Weighted average
exercise price $
 
Outstanding - May 1, 2013
    72       0.55  
Expired
    (72 )     0.55  
Outstanding – April 30, 2014
    -       -  
Outstanding – January 31, 2015
    -       -  

Option and warrant pricing models require the input of highly subjective assumptions including the expected volatility. Changes in the assumptions can materially affect the fair value estimate, and therefore, the existing models do not necessarily provide a reliable measure of the fair value of the Company’s stock options and warrants. The Company’s expected volatility is based on the historical volatility of the Company’s share price on the Toronto Stock Exchange or the TSX Venture Exchange. The following assumptions were used in the Black-Scholes option pricing model to calculate the compensation expense for the nine months ended January 31, 2015:

   
Warrants
   
Options
 
Weighted average fair value
    -     $ 0.11  
Forfeiture rate
    -       15.4 %
Risk-free interest rate
    -       1.0% – 1.1 %
Expected life
    -    
2.0 – 2.4 years
 
Expected volatility
    -       126.2% - 128.6 %
Expected dividend
    -       0 %
 
 
17

 
 
CanAlaska Uranium Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the nine month period ended January 31, 2015
(Unaudited)
(Expressed in Canadian dollars except where indicated)


10       Related Party Transactions

Related parties include the Board of Directors and Officers of the Company and enterprises which are controlled by these individuals.

The remuneration of directors and key management of the Company for the three and nine months ended January 31, 2015 and 2014 were as follows. Certain compensation is paid to Schimann Consultants, a company controlled by a director and VP of Exploration.

   
Three months ended January 31
   
Nine months ended January 31
 
($000’s)
    2015
$
     
2014
$
      2015
$
      2014
$
 
Employment benefits
    71       55       260       165  
Schimann Consultants
    34       19       152       56  
Directors fees
    -       -       100       -  
Share-based compensation
    71       100       125       118  

The directors and key management were awarded the following share options under the employee share option plan during the nine months ended January 31, 2015:

Date of grant
Number of options
Exercise price
Expiry
June 30, 2014
503,750
$0.18
June 30, 2016
November 7, 2014
597,500
$0.12
November 7, 2019
December 15, 2014
90,000
$0.14
December 15, 2019

11       Commitments

The Company has the following commitments in respect of operating leases for office space, land, or computer equipment:

Fiscal Year Ending
       
Total
$000’s
2015
       
39
2016
       
133
Thereafter
       
7
Total
       
179

The Company has outstanding and future commitments under mineral properties option agreements to pay cash and/or issue common shares of the Company (note 7).

The Company has sub leased its Vancouver office space to reduce its operating costs. However, the Company is committed for the full office lease amount.
 
 
18

 
 
CanAlaska Uranium Ltd.
Notes to the Condensed Interim Consolidated Financial Statements
For the nine month period ended January 31, 2015
(Unaudited)
(Expressed in Canadian dollars except where indicated)

 
12        Management of Capital
 
The Company considers its capital to consist of common shares, stock options and warrants. The Company’s objectives when managing capital are to safeguard the Company’s ability to continue as a going concern in order to pursue the exploration of its mineral properties and to maintain a flexible capital structure which optimizes the costs of capital at an acceptable risk.

The Company manages the capital structure and makes adjustments to it in light of changes in economic conditions and the risk characteristics of the underlying assets. To maintain or adjust the capital structure, the Company may attempt to issue new shares and, acquire or dispose of assets.

In order to maximize ongoing exploration efforts, the Company does not pay out dividends. The Company’s investment policy is to invest its short-term excess cash in highly liquid short-term interest bearing investments with short term maturities, selected with regards to the expected timing of expenditures from continuing operations.

13       Geographic Segmented Information

The Company operates in one segment, the exploration of mineral property interests.

January 31, 2015 ($000’s)
 
Canada
   
U.S.A.
   
New Zealand
   
Total
 
Non-current Assets
    1,100       6       -       1,106  
Total Assets
    3,436       6       -       3,442  
Total Liabilities
    136       -       -       136  
Income (Loss) for the Period
    1,036       (9)       (10)       1,015  
 
April 30, 2014 ($000’s)
 
Canada
   
U.S.A.
   
New Zealand
   
Total
 
Non-current Assets
    1,290       6       -       1,296  
Total Assets
    2,771       6       29       2,806  
Total Liabilities
    380       -       2       382  
Loss for the Year
    (669)       (2)       (37)       (708)  
 
14       Subsequent Event

On March 6, 2015, the option agreement with Makena Resources Inc. for the Patterson project was amended whereby in exchange for an extension on the work program and remaining cash payment and share issuance, Makena agreed to issue an addition 750,000 common shares to the Company subject to TSX Venture Exchange approval.
 
 
19

 


 

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 1 of 20

 

 

 

 

 

 

 

 

CanAlaska Uranium Ltd.

CVV - TSX-V CVVUF - OTCBB DH7N – Frankfurt

 

Management Discussion and Analysis

For the Third Quarter and Nine Months Ended

January 31, 2015

 

 

 

Dated March 24, 2015

 

For further information on the Company reference should be made to the Company’s public filings which are available on SEDAR. Information is also available at the Company’s website www.canalaska.com. In addition, reference should be made to the risk factors section of the most recently filed Annual Information Form (“AIF”) or the Company’s audited consolidated financial statements for the year ended April 30, 2014. The following information is prepared in accordance with International Financial Reporting Standards (IFRS) as issued by the IASB and denominated in Canadian dollars, unless otherwise noted. This MD&A should be read in conjunction with the Company’s unaudited condensed interim consolidated financial statements for the nine months ended January 31, 2015.

 

 

 

Table of Contents:

 

1. OVERVIEW OF THE COMPANY AND STRATEGY 2
2. MILESTONES AND PROJECT UPDATES 4
3. FINANCIAL POSITION 12
4. Expenditures Review 14
5. CASHFLOW REVIEW 15
6. Other matters 16
7. Quarterly Financial information 20

 

 

 

This MD&A contains forward-looking information. Refer to Section 6 “Forward-Looking Statements” and “Risks Factors” for a discussion of the risks, uncertainties and assumptions relating to such information.

 

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 2 of 20
1.OVERVIEW OF THE COMPANY

 

üOver 19 projects covering 695,000 hectares focused on Uranium (section 1.1)
üCash resources of $1.7 million (as at January 31, 2015)
ü22,068,136 common shares issued and outstanding (March 24, 2015)

 

The Company has responded to the drop in market activity and values since the Fukushima nuclear incident by actively marketing its expertise and uranium exploration projects to industry and end users for project financings or sales. There has been a slow resurgence in interest, and at the end of the third quarter of our 2015 fiscal year, some renewed interest from North American and Chinese industry groups in response to the Canada-China nuclear accord. Management has continued with evaluating its priorities, taken steps to streamline non-discretionary expenditures, continued it efforts to raise funds and continues to explore all opportunities to sell and/or joint venture its properties. The recoverability of the amounts shown for mineral properties and related deferred costs is dependent upon the existence of economically recoverable mineral reserves, the ability of the Company to obtain the necessary financing to complete the development, and upon future profitable production or proceeds from disposition of the mineral properties. Due to the difficult market conditions facing junior uranium exploration companies there is no assurance that the Company will be successful in raising additional financing. From time to time, the Company will evaluate new properties and direct activities to these based on the Board of Director’s evaluation of financial and market considerations at the time.

 

1.1Profile and Strategy

The Company is an exploration stage company engaged in the acquisition and exploration of mineral properties, principally in Canada. The Company aims to acquire and advance its projects to a stage where they can be exploited at a profit or it can arrange joint ventures, whereby other companies provide funding for development and exploitation. The Company’s principal focus for the past nine years has been the exploration for high-grade uranium deposits in the Athabasca Basin area of Saskatchewan. There are four projects on which the Company has expended most of its recent efforts. Three of these projects, West McArthur, Cree East and Fond Du Lac are 50% joint ventures, and the fourth, NW Manitoba, is currently under option to Northern Uranium Corp. ("Northern Uranium"). Going forward it is expected that the Company will focus its effort on two of the project, West McArthur and Cree East. The Company is actively marketing the remainder of its projects for option, joint venture or sale.

 

Table 1: Canadian Strategic Property Summary    
Property / Project Name Notes Hectares LTD Expenditures
West McArthur Ventured with Mitsubishi 36,000 $19,687,000
Cree East Ventured with Korean Consortium 58,000 $19,226,000
NW Manitoba Option with Northern Uranium Corp. 144,000 $7,260,000
Fond Du Lac         Option with Fond Du Lac Denesuline 10,000 $4,547,000
TOTAL     $50,720,000

 

In the Athabasca Basin, the Company’s most advanced projects are those which the Company has under joint venture with Japanese and Korean entities. The Company has a strong in-house exploration team along with outside consultants which it can access and has established strategic exploration funding relationships with MC Resources Canada, a wholly owned subsidiary of Japan’s Mitsubishi Corporation Ltd. (“Mitsubishi”) on the West McArthur project. On the Cree East project, the Company is the Operator of a 50% Joint Venture with a Korean Consortium comprised of Hanwha Corp., Korea Resources Corp. (“KORES”), Korea Electric Power Corporation (“KEPCO”), and SK Networks Co. Ltd.

Throughout the region, the Company controls an exploration portfolio of 19 projects totalling over 2,610 square miles (695,000 hectares) and has a land position that rivals the combined holdings of established uranium producing giants Cameco Corporation and Areva. The largest of these projects is the NW Manitoba Project, located just east of the Saskatchewan-Manitoba provincial border. In 2012, the Company re-started exploration at the NW Manitoba project, after waiting since 2007 for the Manitoba government approvals related to community consultation. In early 2012, the Company completed an operating MOU with the local community and geophysics work and target definition started in March 2012. At the current time, the Company has optioned the project to Northern Uranium. Northern Uranium may earn an 80% interest in the project by carrying out a three stage $11.6 million exploration program (see section 2.2.3).

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 3 of 20

In addition, CanAlaska is the operator of a Joint Venture with the Fond Du Lac Denesuline community over an area which covers the historic Fond Du Lac uranium deposit, and where the Company has extended the target area to the east, with a drill intercept of 40.4 metres grading 0.32% uranium.

The Company’s exploration activities are managed through CanAlaska offices maintained in Vancouver, BC (Head Office) and La Ronge, Saskatchewan (Field support and Equipment Warehouse).

The Company believes that the fundamentals of the nuclear power industry and the economic superiority of uranium over other energy fuels will ensure the long-term future of global uranium markets and prices. Since 2004, CanAlaska has expended over $78 million on exploration and research towards the advancement of uranium discovery on our current project areas. The information gained from this work has provided the Company with significant evidence about the nature and location of mineral rich hydrothermal systems in areas of the Athabasca where previous information was lacking. The increase in understanding of the geology of the target areas, and the integration of modern geophysical methods with data processing to get more precise target definition at depth gives management the confidence to continue exploration for large scale uranium deposits on our projects.

 

As of March 23, 2015, the Company had 22,068,136 shares outstanding with a total market capitalization of $3.3 million. The Company’s shares trade on the TSX Venture Exchange (“CVV”) and are quoted on the OTCQB in the United States (“CVVUF”) and the Frankfurt Stock Exchange (“DH7N”). On December 30, 2013, the Company's shares commenced trading on the TSX Venture Exchange and ceased trading on the Toronto Stock Exchange. On September 2, 2014, the Company's shares were approved for trading in the United States on the OTCQB Marketplace.

 

The financial statements and the Management Discussion and Analysis have been prepared under IFRS applicable to a going concern, which contemplates the realization of assets and settlement of liabilities in the normal course of business. For the nine months ended January 31, 2015, the Company reported income of $1.0 million and as at that date had cash and cash equivalents of $1.7 million, net working capital balance of $2.2 million and an accumulated deficit of $80.5 million. The Company is continuing to pursue a number of financing alternatives including selling and/or joint venturing some of its properties.

 

The Company's ability to continue as a going concern is dependent upon its ability to obtain additional funding from debt, equity or through other arrangements. Management believes that the cash on hand is sufficient to meet corporate, administrative and selected exploration activities for at least the next twelve months. Management may either need to dilute its ownership in its properties or secure additional financing to continue to advance the development of its exploration projects. Management has taken steps to streamline non-discretionary expenditures and financial overheads and is working to option, joint venture or sell its individual exploration projects. The above factors cast doubt regarding the Company’s ability to continue as a going concern.

 

1.2Strategic and Operating Intent

·         Targeted marketing of uranium projects for financing

·         Restriction of uranium exploration activity until financial markets recover in this sector

·         Strong commitment to option, project joint venture or sale of individual exploration projects

·         Evaluate alternate commodities and projects suitable for market financing, or acquisition and sale

·         Company believes that it has the projects, strategic partners, people and knowledge base, corporate treasury and fund raising ability to maintain a position in the uranium exploration sector, but, due to increasingly difficult market conditions facing junior mining and junior uranium exploration companies, management has taken steps to streamline non-discretionary expenditures and financial overheads

·         The Company has tax loss carry-forwards of approximately $9 million and cumulative Canadian exploration expenses of approximately $18 million

·         Our Korean partners have contributed all of their $19.0 million funding commitment towards the Cree East project, but have requested a slow-down in expenditures, or introduction of an incoming partner

·         At the West McArthur project, exploration is being carried out under a 50/50 joint venture with MC Resources Canada (“MCRC”), a wholly owned subsidiary of Mitsubishi Corporation, and CanAlaska which maybe deferred in 2014/2015 to await better market conditions

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 4 of 20
2.MILESTONES AND PROJECT UPDATES

 

2.1Overview– May 1, 2014 to March 24, 2015
·Exploration underway at Patterson Lake and NW Manitoba (February 2015)
·Northern Uranium earns 50% interest in NW Manitoba (December 2014)
·Common shares trade in the United States on the OTCQB (September 2014)
·Carpenter project - staked four claim blocks (July 2014)
·Kasmere south uranium project sale completed (June 2014)
·Cree East project target extended (June 2014)

 

At the Patterson Lake property, Makena Resources has resumed geophysics work on the property. The Patterson Lake project is located adjacent to the PLS project of Fission Uranium and the Patterson Lake North project of Fission 3.0. At the NW Manitoba property, core drilling has commenced to evaluate a number of gravity and resistivity targets.

 

In December 2014, the Company received notification from Northern Uranium of the expenditure threshold for the 50% earned interest in the NW Manitoba property, as well as continued work on the project.

 

In September 2014, the Company announced that its common shares have been approved for trading in the United States on the OTCQB Marketplace under the symbol, CVVUF.

 

In July 2014, the Company staked the Cable Bay project (previously Carpenter project) which consists of four block of claims with a total area of 2,411 hectares. The project is partly on land and partly over Cree Lake. The Cable Bayr project straddles the edge of the Athabasca basin, along a major Basin structure, the Cable Bay Shear Zone which hosts uranium mineralization in Nuinsco Resources Corp's Diabase Peninsula project. The Nuinsco Resources Corp's claims are adjacent immediately to the northeast. The depth to unconformity is less than 90 metres.

 

In June 2014, the sale of the Kasmere South uranium project in Northern Manitoba to East Resource was completed for a total cash payment of $1.8 million and a 2.5% net smelter royalty was completed.

 

In June 2014, the Company announced that the winter geophysics program at the Cree East project has defined a 1.8 kilometre long graphitic basement EM conductor adjacent to Zone B quartz ridge uplift and its surrounding large hydrothermal alteration halo.

 

2.2Project Updates

Overview

The Company currently has 19 projects within the Athabasca basin area and has carried out exploration programs on 3 of these in the past year. In the first nine months of fiscal 2015, the Company spent approximately $109,000 ($168,000 net of $59,000 from reimbursements from partners) on exploration costs in the Athabasca Basin area. The two largest exploration projects were at West McArthur and at Cree East.

 

Exploration spending in the first three quarter of 2015 is down from the same comparative quarters of 2014. In the third quarter, the Company historically spent time preparing and interpreting data in preparation for its winter programs.

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 5 of 20

The following table summarizes the Company’s expenditures for the nine months ended January 31, 2015.

 

Table 2: ($000's)

Total Exploration

Cree East West McArthur Fond du Lac NW Manitoba Other Athabasca Basin Projects Other and Generative Projects Total
Camp Cost & Operations - - - - - - -
Drilling - - - - - - -
General & Admin 47 41 - 7 24 11 130
Geochemistry 64 - - - - - 64
Geology - - - - - - -
Geophysics (55) - - - 1 - (54)
Other 20 2 - 1 5 - 28
Gross Expenditures 76 43 - 8 30 11 168
Reimbursement (38) (21) - - - - (59)
Net Expenditures 38 22 - 8 30 11 109

 

The following section contains a comparative breakdown of project expenditures for the Company’s significant projects. Reimbursements represents the amounts received from our joint venture partners and option partners to be applied against the expenditures for the project.

 

2.2.1West McArthur Project, Saskatchewan – Mitsubishi

The West McArthur project in the Athabasca Basin, Saskatchewan, was optioned in April 2007 to Mitsubishi Development Pty Ltd., a subsidiary of Mitsubishi Corporation of Japan. Under the option agreement, Mitsubishi could exercise an option to earn a 50% interest in the property by investing $11.0 million. In February 2010, Mitsubishi exercised their option with a payment to the Company and an unincorporated 50/50 joint venture was formed between the parties to pursue further exploration and development of the property. As at January 31, 2015, the Company holds a 50% interest in the West McArthur project. Mitsubishi holds the remaining 50% interest in the property. The Company acts as project operator under the supervision and guidance of Dr. Karl Schimann, P. Geo. and Mr. Peter Dasler, P. Geo. and earns a fee between 5% and 10%, based on expenditures incurred. Included within Other expenses are management fees charged to and reimbursed by Mitsubishi for CanAlaska acting as the project operator.

 

Table 3: ($000's) Quarterly  
West McArthur Project Q413 Q114 Q214 Q314 Q414 Q115 Q215 Q315 LTD
Camp Cost & Operations (8) - - - - - - - 2,976
Drilling - - - - - - - - 6,745
General & Admin 8 6 8 10 11 8 26 7 2,173
Geochemistry - - - - - - - - 339
Geology - - - - - - - - 1,000
Geophysics - - - - - - - - 5,775
Other - 1 2 - - 1 1 - 679
Gross Expenditures - 7 10 10 11 9 27 7 19,687
Reimbursement - (4) (5) (5) (6) (5) (14) (2) (14,248)
Net Expenditures - 3 5 5 5 4 13 5 5,439

 

The West McArthur project is located between 6 and 30 kilometres west of the producing McArthur River uranium mine operated by Cameco Corp, and covers approximately 36,000 hectares. On the property there is evidence of hydrothermal alteration extending well into the sandstone, matching the typical alteration model of Athabasca unconformity style uranium deposits. There is evidence of uranium mineralization from drill testing in multiple areas, either as enrichment at the unconformity or in basement stringers. The most compelling features for further exploration are the uranium values in sandstone higher in the stratigraphy, the hematized and broken rock in the sandstone, and the pattern of basement offsets and geophysical conductivity.

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 6 of 20

The project is accessible during the winter drill season by seasonal winter ice roads and winter trails and during the summer exploration season by air and water. There is no physical plant or permanent infrastructure on the property and no source of power. There are multiple extensive lakes which can provide a source of water for the project.

 

The mineral rights for West McArthur were acquired between October 2004 and February 2009 from the Ministry of Energy and Resources in the province of Saskatchewan, Canada. The claim numbers are as follows, S-107561, S-107562, S-107563, S-107565, S-107773, S-108010, S-108011, S-108012, S-111412 S-111413, S-111511 and S-111512. The mineral rights to West McArthur are valid and in good standing with the earliest claim requiring renewal in October 2029 with no further exploration expenditures required. An annual assessment report is required to be filed by the Company with the Ministry of Energy and Resources to disclose the exploration activities on this claim. There is no fee for filing the annual assessment report.

 

In April 2012, the Company announced a preliminary summary of drilling at its West McArthur project. Seven diamond drill holes were completed in February and March 2012, to test a series of individual zones where the resistivity lows were coincident with the EM conductors within the Grid 5 area. Total meterage drilled in the season was 6,422 metres, including one abandoned drill hole. The winter 2012 drill programme has demonstrated on Grid 5 the presence of requisite geological environment for unconformity uranium deposits. Significant faulting and fracturing are present in a number of drill holes, with individual radioactive spikes or elevated radioactivity in zones of hydrothermal alteration.

 

In June 2012, the Company reported the results of drill core geochemistry on the West McArthur property. Drill holes WMA028 and WMA034 produced very positive results for uranium. Both intersected parts of a highly-altered graphitic pelite unit and are thought to be within 50 metres of the targeted conductor, which was identified from the down-hole geophysical surveys. The targets generated at the eastern end of Grid 5 matched and extended a historical conductor, which was drill-tested by Uranerz in 1989. Neither of the two historical drill holes intersected their targeted basement conductor, but, significantly, contained dravite clay and pyrite along with narrow, steep, clay rich fault gouges/breccia in the top 350-400 metres of the sandstone column. In one historical hole, the upper 400 metres of sandstone showed anomalous uranium and trace elements. Drill holes WMA028 and WMA034 are located in this area. Both show deep alteration into the basement rocks, indicating and confirming a substantial hydrothermal alteration system.

 

The potential of this project is for unconformity style uranium mineralization of both the Simple (Low REE, basement hosted) and the Complex (High REE, Sandstone hosted) types of uranium. Previous exploration was hampered by the depths to the basement, however, recent advances with airborne geophysical survey technology has enabled penetration to those depths. Multiple exploration programs since 2005 have identified targets with strong geophysical feature, similar to those near existing uranium mines. Limited drill testing in several of these areas have shown the basement offsets, hydrothermal clay alteration, and elevated uranium geochemistry consistent with the Athabasca unconformity deposit model. The project has four target areas which are being evaluated for further drill testing.

 

The property has undergone a series of exploration programs, including extensive geophysics and drilling of over 35 drill holes since 2005. Approximately $19.7 million has been spent by the joint venture.

 

The next drill programs are dependent on financing. The project does not have a drill program planned for 2015. Active full season programs of 6-9 drill holes are generally budgeted at $3 to $4 million, including drill geophysics, camp and logistics. The project currently has a maintenance budget of approximately $100,000 for 2015 which will be funded 50% by CanAlaska and 50% by Mitsubishi.

 

As at January 31, 2015, the total exploration costs incurred for the West McArthur project was $19.7 million. Further exploration expenditures for this project has been deferred in 2014/2015 to await better capital market conditions in order to raise exploration funds. The West McArthur property is without known reserves and any proposed program is exploratory in nature.

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 7 of 20

 

2.2.2Cree East Project, Saskatchewan – Korean Consortium

The Cree East project is located in the south-eastern portion of the Athabasca Basin, 35 kilometres west of the formerly producing Key Lake mine and 5 to 22 kilometres north of the south rim of the Athabasca Basin. The project is comprised of 17 contiguous mineral claims totalling approximately 58,000 hectares. In December 2007 a Korean Consortium (Hanwha Corp., Korea Electric Power Corp., Korea Resources Corp. and SK Networks Co. Ltd.), agreed to spend $19.0 million on the properties to earn into a 50% interest in the Cree East project.

 

As of January 31, 2015, the Korean Consortium has contributed its $19.0 million towards exploration of the project and holds a 50% ownership interest in both CanAlaska Korea Uranium Ltd. and the Canada-Korea Uranium Limited Partnership. The remaining 50% interest is held by CanAlaska. The following table summarizes the Korean Consortium expenditures and advances by quarter and life to date (“LTD”) on the project. The table does not include a $1.0 million payment made directly to CanAlaska in 2007 ($0.6 million) and 2010 ($0.4 million) for intellectual property associated with the project. As at January 31, 2015, the Company is holding approximately $130,000 of joint venture funds.

 

Table 4: ($000's) Quarterly  
Cree East Project Q413 Q114 Q214 Q314 Q414 Q115 Q215 Q315 LTD
Camp Cost & Operations - - 1 (13) - (6) 7 (1) 3,332
Drilling - - 27 - - - - - 6,740
General & Admin 18 - 13 5 9 15 25 7 550
Geochemistry - - - - - 11 52 1 601
Geology 20 - 1 - - - - - 1,583
Geophysics - - - - 151 4 - (59) 3,355
Management Fees 6 1 4 - 17 6 8 (5) 1,583
Other 3 - - - 7 10 1 - 1,482
Net Expenditures 47 1 46 (8) 184 40 93 (57) 19,226

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 8 of 20

The project is accessible during the winter drill season by seasonal winter ice roads and winter trails and during the summer exploration season by air and water. There is no physical plant or permanent infrastructure on the property and no source of power. There are multiple extensive lakes which can provide a source of water for the project.

 

The mineral rights for Cree East were acquired between November 2004 and June 2010 from the Ministry of Energy and Resources in the province of Saskatchewan, Canada. The claim numbers are as follows, S-107757, S-107774, S-107775, S-107776, S-107777, S-107778, S-107779, S-107780, S-108357, S-108358, S-108382, S-108383, S-108384, S-108385, S-108386, S-108387 and S-111809. The mineral rights to Cree East are valid and in good standing with the earliest claim requiring renewal in September 2025 with no further exploration expenditures required. An annual assessment report is required to be filed by the Company with the Ministry of Energy and Resources to disclose the exploration activities on this claim. There is no fee for filing the annual assessment report.

 

The project area covers Athabasca group conglomerates and sandstones. Sandstone unconformity overlies basement at depths in the order of 200 to 300 metres in the south. Structural breaks which trend across the across the property further drop the basement to estimated depths of 800 to 900 metres across the northern edge of the property The basement is composed of the Lower Proterozoic, (Trans Hudson) Mudjatik domain, granitoids and associated minor supercrustals (psammites, pelites and metavolcanics) A significant portion of the property is considered to be underlain by rocks of the highly prospective Wollaston Domain.

 

In May 2012, the Company reported receipt of uranium assay results and trace element geochemistry for the winter drill program on the Cree East project. The results confirm the anomalous multi-element enrichments in the large alteration zone identified at Zone B and additional gold and uranium mineralization in drill hole CRE080, which intersected mineralized iron formation at Zone J.

 

The property has undergone extensive exploration since 2005 with $19.2 million expended on surveys, extensive geophysical testing and over 70 drill holes testing targets.

 

The potential of this project is for unconformity style uranium mineralization of both the Simple (Low REE, basement hosted) and the Complex (High REE, Sandstone hosted) types of uranium. The area has numerous conductors and faults which act as both the conduit and the trap for potential uranium mineralization. A number of structures and conductive targets have been identified from the Company's exploration efforts.

 

The next substantial work programs on the property will consist mainly of drill testing the current targets. Active full season programs of 15-18 drill holes are generally budgeted at $3 to $4 million, including drill geophysics, camp and logistics. The project currently has a maintenance budget of approximately $100,000 for 2015.

 

Under the Cree East agreement, CanAlaska is entitled to charge an operator fee of 10% to recoup its indirect costs associated with the project, which the Company recognizes as management fees. CanAlaska acts as project operator under the supervision and guidance of Dr. Karl Schimann, P. Geo. and Mr. Peter Dasler, P. Geo.

 

As at January 31, 2015, the total exploration costs incurred for the Cree East project was $19.2 million. In March 2014 the Joint Venture carried out geophysical surveys over the Zone B target area. This surveying was in preparation for a proposed summer drill program. The summer drill program was dependant upon financing by CanAlaska or others. The Korean Consortium and CanAlaska are actively marketing the Cree East project for option or joint venture to allow for the continuation of the drill exploration. The Cree East property is without known reserves and any proposed program is exploratory in nature.

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 9 of 20

 

2.2.3NW Manitoba, Manitoba

This property consists of approximately 144,000 hectares and lies between 90 and 170 kilometres northeast along the Wollaston trend of basement formations hosting uranium deposits, which include Rabbit Lake, Collins Bay and Eagle Point Uranium mines. In May 2012, the Company reported strong geophysical responses matching geology and uranium mineralized boulders from the recent surveys within the target areas at its NW Manitoba uranium project. The project was re-started in March 2012 following a four and a half year permitting delay due to consultations between the government of Manitoba and the local community. The Company has now concluded an operating MOU with the local community and recommenced ground survey work. The ground resistivity gravity geophysical surveys carried out in March 2012 localized anomalous features typical of sulphide-bearing mineralization, and zones of clay alteration within areas of shallow overburden. There is a striking correspondence between the location of gravity anomalies and the low resistivity zones from the survey. These targets are similar in style to the Andrew Lake uranium project in Nunavut, which has similar resistivity and gravity geophysical responses related to uranium mineralization hosted in regional fault structures.

 

In September 2013, the Company entered into an option agreement Northern Uranium Corp. (previously MPVC Inc.) for an interest in the NW Manitoba project. Northern Uranium may earn an 80% interest in the project by carrying out a three stage $11.6 million exploration program, make a cash payment of $35,000, issue 12 million common shares and issue 6 million common share purchase warrants.

 

On February 28, 2014, the option agreement with Northern Uranium for the NW Manitoba project was amended to extend the date of certain provisions of the agreement from February 28, 2014 to March 14, 2014. In consideration for amending the option agreement, Northern Uranium paid a further non-refundable cash deposit in the amount of $50,000 on March 14, 2014.

 

In April 2014, the Company announced that Northern Uranium had received highly anomalous radon results of a recently completed, land-based survey over the Maguire Lake area. Northern Uranium reports that its geologic team is most encouraged by the distribution of radon, resistivity, magnetic and gravity anomalies which are prime drill targets for uranium mineralization.

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 10 of 20

In December 2014, the Company received notification from Northern Uranium of the expenditure threshold for the 50% earned interest in the NW Manitoba property, as well as continued work on the project.

 

2.2.4Grease River

During the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Grease River claims of approximately $29,000 as it did not renew its permits on these claims.

 

2.2.5Poplar

During the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Poplar claims of approximately $11,000 as it did not renew its permits on these claims.

 

2.2.6Helmer

In August and September 2014, the Company acquired 11 block of claims, totalling 4,862 hectares located near the southern shore of Lake Athabasca, 12 kilometres west of Fond Du Lac on central northern edge of the Athabasca basin for $5,005.

 

During the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Helmer claims of approximately $14,000 as it did not renew its permits on these claims.

 

2.2.7Lake Athabasca

During the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Lake Athabasca claims of approximately $7,000 as it did not renew its permits on these claims.

 

2.2.8Carswell

In August 2014, the Company acquired 8 block of claims, totalling 1,723 hectares located in the western portion of the Athabasca basin, within the roughly circular Carswell geologic structure at Cluff Lake for $2,400.

 

2.2.9Ruttan

During the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Ruttan claims of approximately $10,000 as it did not renew its permits on these claims.

 

2.2.10Patterson

In January 2013, the Company acquired three block of claims, totalling 6,687 hectares located in the Patterson Lake area of the western Athabasca basin. In August 2013, the Company optioned the claims to Makena Resources Inc ("Makena"). Makena may earn a 50% interest in the property by making cash payments totalling $100,000 by June 1, 2015, issuing 2,500,000 common share by June 1, 2015 and incurring exploration expenditures totalling $1.4 million by September 30, 2016.

 

On June 30, 2014, the option agreement with Makena Resources Inc. for the Patterson project was amended whereby in exchange for a six month extension on the work program, Makena agreed to return the Patterson Lake North project and the Patterson Lake East project to the Company.

 

On March 6, 2015, the option agreement with Makena Resources Inc. for the Patterson project was amended whereby in exchange for an extension on the work program and remaining cash payment and share issuance, Makena agreed to issue an addition 750,000 common shares to the Company subject to TSX Venture Exchange approval.

 

2.2.11Cable Bay

In July 2014, the Company acquired four block of claims, totalling 2,411 hectares located partly on land and partly over Cree Lake for $2,004. The property straddles the edge of the Athabasca basin, along the Cable Bay Shear Zone.

 

2.2.12Moon

During the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Moon claims of approximately $8,000 as it did not renew its permits on these claims.

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 11 of 20
2.2.13Reefton

In March 2014, the Company entered into a purchase agreement to sell the exploration permit for the Reefton project to Stevenson Mining Ltd. ("Stevenson") for aggregate purchase consideration of $20,000. The Company recognized a loss on disposal of the Reefton project of approximately $4,000.

 

On May 20, 3014, Golden Fern Resources Limited, the Company's wholly owned subsidiary in New Zealand, began liquidation proceedings which was completed on August 29, 2014. The New Zealand subsidiary was liquidated after the sale of the Reefton project to Stevenson. There were no significant assets or liabilities remaining in the entity.

 

2.2.14Kasmere

In March 2014, the Company entered into a binding agreement to sell its interest in its Kasmere South project in northwestern Manitoba to private company East Resources Ltd. for an aggregate cash payment totalling $1.8 million. The Company retains a 2.5% net smelter royalty on any future production. On March 28, 2014, the Company received a non-refundable cash payment of $200,000 from East Resources Ltd. Subsequent to April 30, 2014, the Company also received the remaining cash instalments of $100,000 and $1.5 million on May 30, 2014 and June 26, 2014 respectively.

 

2.2.15Big Creek

In December 2014, the Company acquired two claim blocks totalling 481 hectares located in south central British Columbia for $842.

 

During the nine months ended January 31, 2015, the Company recognized an impairment on certain of its Big Creek claims of approximately $3,000 as it did not renew its permits on these claims.

 

2.2.16Other Projects

The Company uses its technical staff between field seasons to evaluate other mineral projects for acquisition, either by staking or by option, with the purpose of sale to third parties. For a full description of the geology and setting of the current projects and of the Company’s other projects, reference should be made to the “Projects” section, and accompanying news releases of work on the Company’s website at www.canalaska.com.

 

Table 5:

Other projects update

Status Recent work undertaken
Big Creek Seeking Venture Partner No significant work undertaken
Cable Bay Seeking Venture Partner No significant work undertaken
Carswell Seeking Venture Partner No significant work undertaken
Collins Bay Extension Option with Bayswater Uranium No significant work undertaken
Grease River Seeking Venture Partner No significant work undertaken
Hanson Seeking Venture Partner No significant work undertaken
Helmer Seeking Venture Partner No significant work undertaken
Hodgson Seeking Venture Partner No significant work undertaken
Kasmere South Sale to East Resources  
Kasmere Under application Exploration permits pending
Key Seeking Venture Partner No significant work undertaken
Lake Athabasca Seeking Venture Partner No significant work undertaken
McTavish Seeking Venture Partner No significant work undertaken
Moon Seeking Venture Partner No significant work undertaken
Patterson Option with Makena Resources Inc. Airborne surveys have been contracted
Poplar Seeking Venture Partner No significant work undertaken
Waterbury Seeking Venture Partner No significant work undertaken
Rainbow Hill AK Seeking Venture partner or sale No significant work undertaken
Zeballos Seeking Venture Partner Consolidating ownership
Glitter Lake Disposed, NSR retained  

 

The Company is restricting its exploration activities on these Other projects until financial markets recover. The Company intents to continue its efforts to seek a venture partner either through a joint venture or sales of its other projects.

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 12 of 20

In the first three quarters of fiscal 2015, the Company recognized an impairment on its Grease River, Poplar, Ruttan, s Lake Athabasca, Moon, Big Creek and Helmer claims of approximately $82,000 as it did not renew certain of its permit on these properties.

 

CanAlaska maintains 17 other projects in the Athabasca basin; 1 project in Alaska and 3 projects in British Columbia. These other projects have value to the Company but are not being actively explored, other than reviews and reporting. A number of these projects are being marketed for sale or joint venture, and the company hopes to realize increased value in the future.

 

All of the samples from the CanAlaska exploration programs have been submitted to one of two qualified Canadian Laboratories for analysis. Samples submitted to Saskatchewan Research Laboratories were analyzed for multi-element geochemistry and including uranium by tri-acid digestion and ICP. Samples submitted for assay for trace element geochemistry to Acme Laboratories in Vancouver BC, were analyzed by aqua regia digestion and ICP analysis. The samples were collected by CanAlaska field geologists under the supervision of Dr. Karl Schimann, and were shipped in secure containment to the laboratories noted above.

 

Our exploration activities requires permitting in the Province of Saskatchewan. For our projects in Saskatchewan, the Company applies for surface exploration permits from the Ministry of Environment, a letter of advice from the Heritage Resources Branch of the Ministry of Tourism, Parks, Culture and Sport, and a Right to Use Water from the Saskatchewan Water Authority. For our exploration projects in the Province of Manitoba, the Company applies for a Prospecting License, a Work Permit from the Manitoba Department of Conservation, and a notification to the Director of Mines for airborne surveys. In addition, all exploration activities have to conform to the Fisheries Act in terms of protection of fish habitat.

 

3.FINANCIAL POSITION and CAPITAL resources

 

3.1Cash and Working Capital

 

Table 6: ($000’s)

Cash and Working Capital

      Jan-15 Apr-14
Cash and cash equivalents         1,710 1,044
Trade and other receivables         85 52
Available-for-sale securities         541 414
Trade and other payables         (136) (382)
Working capital         2,200 1,128

 

For analysis and discussion of the movement in cash and cash equivalents reference should be made to Section 5 of this MD&A. Included within cash and cash equivalents is approximately $130,000 in funds from the CKU Partnership which are dedicated to the Cree East project. Reference should be made to note 4 of the condensed interim consolidated financial statements for further details.

 

As at January 31, 2015, included within trade and other receivables is approximately $1,000 in Goods and Services Tax ("GST") refunds. The increase in available-for-sale securities is primarily a result of a combination of the receipt of 4,750,000 shares from Northern Uranium Corp. (previously MPVC Inc.) for our NW Manitoba project and 750,000 shares from Makena for our Patterson Lake project in the nine months ended January 31, 2015 along with the changein the market value of the Company's portfolio of available-for-sale securities at period end. The decrease in trade and other payables is consistent with the corporate activities compared with the fourth quarter of 2014. In Q414, the Company was operating an extensive geophysics program at our Cree East project.

 

3.2Other Assets and Liabilities

 

Table 7: ($000’s)

Other Assets and Liabilities

 

 

  Jan-15 Apr-14
Reclamation bonds       132 189
Property and equipment       243 294
Mineral property interests (Section 2.2)       731 813

 

During the nine months ended January 31, 2015, the Company recognized an impairment on its Grease River, Poplar, Ruttan, Lake Athabasca, Moon, Big Creek and Helmer projects for approximately $82,000 as it did not renew certain of its permits for these

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 13 of 20

properties. Also during the period, the Company acquired the Cable Bay, Helmer, Carswell, and Big Creek properties by staking claims totalling 9,477 hectares for approximately $11,000.

 

During the nine months ended January 31, 2015, the Company received proceeds of approximately $25,000 for the sale of property and equipment.

 

3.3Equity and Financings

 

Table 8: ($000’s)

Equity

    Jan-15 Apr-14
Common shares       73,205 73,205
Equity reserve       10,947 10,807
Investment revaluation reserve       (297) (24)
Deficit       (80,549) (81,564)
Total equity       3,306 2,424

 

Table 9: (000’s)

Equity Instruments

    Jan-15 Apr-14
Common shares outstanding       22,068 22,068
Options outstanding                        
Number       4,076 3,851
Weighted average price       $0.16 $0.20
Warrants outstanding          
Number       - -
Weighted average price       - -

 

Equity instruments

 

As of March 24, 2015, the Company had the following securities outstanding. Common shares - 22,068,136; stock options – 4,075,500; and warrants – nil.

 

In July 2013, the Company issued 10,000 common shares under the option agreement for the Collins Bay project.

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 14 of 20

4. Expenditures Review

 

Table 10: ($000’s) Quarterly  
Quarterly Earnings (Loss) & Comprehensive Earnings (Loss) Summary Q413 Q114 Q214 Q314 Q414 Q115 Q215 Q315  
Revenue - - - - - - - -  
Exploration Cost                  
  Mineral property expenditures net of reimbursements 30 29 87 15 140 54 114 (59)  
  Write-down on reclamation bonds - 3 - - - - - -  
  Mineral property write-offs 54 143 33 141 40 50 15 17  
  Recoveries on option payments received - - (240) (25) (481) (1.881) - (150)  
  Equipment rental income - - - (11) (1) (4) - (4)  
    84 175 (120) 120 (302) (1,781) 129 (196)  
Other Expenses (Income)                  
 

Consulting, labour and

professional fees

121 100 87 110 105 288 98 118  
  Depreciation 26 20 20 20 20 16 16 16  
  (Gain) loss on disposal of properties and equipments 14 1 - - 4 - - (35)  
  Foreign exchange (gain) loss - - - (1) 2 - - -  
  Insurance, licenses and filing fees 24 19 29 37 13 10 38 5  
  Interest income (4) (4) (2) (2) (2) (3) (5) (4)  
  Other corporate costs 19 9 9 10 5 10 12 4  
  Investor relations and  presentations 15 1 2 9 10 6 56 18  
  Rent 20 4 7 7 8 6 7 4  
  Stock-based payments 137 - 20 105 - 61 - 80  
  Travel and accommodation 4 2 2 1 4 1 2 3  
 

Impairment and loss (gain) on

disposal of available-for-sale

securities

83 8 16 12 38 6 9 2  
  Management fees (6) (1) (5) - (24) (6) (10) 5  
    453 159 185 308 183 395 223 216  
Net (loss) earnings for the period (537) (334) (65) (428) 119 1,386 (352) (20)  
                   
Other comprehensive loss                  
Items that may be subsequently reclassified to profit or loss:                  
 

Unrealized loss (gain) on available-

for-sale securities

(45) 23 (40) 86 (46) 130 198 (55)  
Comprehensive (loss) earnings (492) (357) (25) (514) 165 1,256 (550) 35  
Basic and diluted (loss) earnings per share (0.02) (0.02) (0.00) (0.02) 0.01 0.06 (0.02) (0.00)  

 

In the nine months ended January 31, 2015, the Company spent approximately $168,000 on exploration costs and recovered $59,000 from our exploration partners for a net mineral property expenditure of $109,000. In Q315, the Company received a credit note for a geophysics program on our Cree East property of approximately $59,000.

 

For the nine months ended January 31, 2015, the Company recognized mineral property impairments on the Grease River, Poplar, Ruttan, Lake Athabasca, Moon, Big Creek and Helmer projects for approximately $82,000 as the Company did not renew certain of its permits for these projects.

 

In Q115, the Company completed the sale of the Kasmere South project to East Resources Ltd. During Q115, the Company received proceeds of $1.6 million for the sale of the property. The Company also received 2,250,000 shares from MPVC Inc. related to the option agreement of our NW Manitoba project and 750,000 shares from Makena Resources related to the option agreement of our Patterson project. During Q315, the Company received 2,500,000 shares from Northern Uranium (previously MPVC Inc.) related to the option agreement of our NW Manitoba project.

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 15 of 20

Camp and other miscellaneous exploration equipment owned by the Company is maintained at our La Ronge warehouse. Equipment rental income is comprised of income from charging exploration projects for the rental of this equipment. In Q314, Q414 and Q115, the rental income is related to the rental of tents and camp supplies to a 3rd party.

 

Consulting, labour, and professional fees are higher than the same comparative prior period. The increase is primarily attributed to an increase in the salaries expense from the employment for senior staff and management. In Q315, the Company's use of professionals and consulting expenses were consistent with the prior comparative period. In July 2014, the Company paid each director of the Company a $25,000 directors’ fee. The directors of the Company suspended their cash compensation from January 1, 2013 to June 2014 in order to assist the Company in its plans to control its operating costs.

 

In Q315, insurance, licenses and filing fees were lower compared to Q314. The decrease is primarily attributed to the lising fees related to the application for the Company's common shares to trade on the TSX Venture Exchange. On December 30, 2014, the Company's common shares were approved for trading on the TSX Venture Exchange under the symbol, CVV.

 

Investor relations expenses were higher in Q315 compared to Q314. The increase is primarily attributed to use of an investor relations consultant in the Q315. During the three months ended January 31, 2014, the Company reduced its discretionary expenditures and financial overheads in order to control its operating costs.

 

Rent expense was lower in Q315 compared with the same comparative prior period, Q314. The Company sublet its office space in March 2013 in its effort to reduce it cash burn and operating costs going forward. The Company is however committed to the full lease amount, not the net for the head lease on the Vancouver office space.

 

Share-based payments decreased in Q315 compared to Q314. The decrease was attributed to the decrease in the number of options granted relative to Q314. During Q315, there were 762,500 options granted compared to 1,591,750 options granted in Q314.

 

Management fees were higher in Q315 compared to Q314. This was primarily due to the increase in our exploration activities relative to last year. During same period last year, the Company spent $164,000 on exploration, of which $64,000 were related to our joint venture projects where management fees were generated. During Q315, the Company spent $168,000 on exploration, of which only $119,000 were related to joint venture projects.

 

5.CASHFLOW and liquidity REVIEW

 

As of January 31, 2015, the Company had $1.7 million in cash and cash equivalents and working capital of $2.2 million and as of April 30, 2014, the Company had $1.0 million in cash and cash equivalents and working capital of $1.1 million.

 

5.1Operating Activities

The Company’s operating activities resulted in net cash outflows of $1.0 million and $0.5 million for the nine months ended January 31, 2015 and 2014 respectively. Operating activities and costs for the nine months ended January 31, 2015 are higher than the nine months ended January 31, 2014 as the Company had a greater amount of exploration activities relative to the prior year. The Company is however continuing its efforts to minimize it operating costs in order to conserve its cash reserves.

 

5.2Financing Activities

Financing activities resulted in net cash outflows of approximately $nil and $1,000 for the nine months ended January 31, 2015 and 2014 respectively. During the nine months ended January 31, 2014, the Company incurred TSX listing fees related to the Company's share compensation plan. During the nine months end January 31, 2015, the Company had no financing activities. Currently, junior uranium exploration companies are finding it difficult to seek financing. The Company is working to sell option or joint venture non core assets.

 

5.3Investing Activities

Investing activities resulted in net cash inflows of $1.7 million and net cash outflows of $7,000 for the nine months ended January 31, 2015 and 2014 respectively. During the nine months ended January 31, 2015, the Company received $1.6 million from East Resources for the sale of the Kasmere South project and $25,000 from Makena for their option on the Patterson project. The Company also staked our Cable Bay, Helmer, Carswell, Big Creek projects for approximately $11,000 and recovered $58,000 of reclamation bonds deposited with the Manitoba Mines Branch during the period. The Company also received $25,000 in proceeds from the sale of property and equipment. During the nine months ended January 31, 2014, the Company staked the Hansen for approximately $10,000

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 16 of 20

and the Hodgson project for approximately $7,000. The Company also recovered approximately $10,000 of reclamation bonds deposited with the Manitoba Mines Branch.

 

6.Other matters

 

For a full version of the risks and critical accounting estimates and policies reference should be made to the Company’s audited consolidated financial statements for the year ended April 30, 2014, which are available on the Company’s website at www.canalaska.com and the risk factor section of the most recently filed Form 20-F on EDGAR.

 

6.1Related Party Transactions

Related parties include the Board of Directors and Officers of the Company and enterprises which are controlled by these individuals.

 

The remuneration of directors and key management of the Company for the three and nine months ended January 31, 2015 and 2014 were as follows. Certain compensation is paid to Schimann Consultants, a company controlled by Dr. Karl Schimann, the VP of Exploration.

 

Table 11: Compensation to Related Parties Three months ended January 31 Nine months ended January 31
($000’s)

2015

$

2014

$

2015

$

2014

$

Employment benefits 71 55 260 165
Schimann Consultants 34 19 152 56
Directors fees - - 100 -
Share-based compensation 71 100 125 118

 

The directors and key management were awarded the following share options under the employee share option plan during the nine months ended January 31, 2015:

 

Table 12: Share Option Issuance
Date of grant Number of options Exercise price Expiry
June 30, 2014 503,750 $0.18 June 30, 2016
November 7, 2014 597,500 $0.12 November 7, 2019
December 15, 2014 90,000 $0.14 December 15, 2019

 

6.2Financing

Due to increasingly difficult market conditions facing junior uranium exploration companies management is currently in the process of evaluating its priorities and taking steps to streamline non-discretionary expenditures. Should management be successful in its coming exploration programs it may either need to dilute its ownership in its properties and/or secure additional financing to continue to advance the development of its projects.

 

6.3Critical Accounting Estimates and Judgments

 

6.3.1Share-Based Payment Plan

The Company operates an equity-settled, share-based compensation plan, under which the entity receives services from employees and non-employees as consideration for equity instruments (options) of the Company. The total amount to be expensed is determined by reference to the fair value of the options granted.

 

The fair value of share-based compensation is determined using the Black-Scholes option-pricing model and management’s assumptions as disclosed in note 9 to the interim consolidated financial statement of the Company. When a stock option is exercised, the Company recognizes an increase in its share capital equivalent to the consideration paid by the option holder and the fair value amount previously recognized in equity reserve. The fair value of any stock options granted to directors, officers and employees of the Company is recorded as an expense over the vesting period of the options with a corresponding increase in equity reserve.

 

6.3.2Mineral Property Interest

The recoverability of the amounts shown for mineral properties and related deferred costs is dependent upon the existence of economically recoverable mineral reserves, the ability of the Company to obtain the necessary financing to complete the development, and upon future profitable production or proceeds from disposition of the mineral properties. Due to increasingly difficult market conditions facing junior uranium exploration companies there is no assurance that the Company will be successful in raising additional financing. The amounts shown as mineral property costs represent net acquisition costs incurred to date and do not necessarily represent current or future values of the mineral properties.

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 17 of 20

 

6.3.3Going Concern

The consolidated financial statements have been prepared on a going concern basis. The going concern basis of presentation assumes that the Company will continue in operation for the foreseeable future and be able to realize its assets and discharge its liabilities and commitments in the normal course of business. The financial statements do not include any adjustments to the carrying values of assets and liabilities and the reported expenses and statement of financial position classification that would be necessary should the Company be unable to continue as a going concern. These adjustments could be material. Refer to section 1.1.

 

6.4Disclosure Controls and Internal Control over Financial Reporting

Disclosure controls and procedures ("DC&P") are designed to provide reasonable assurance that all relevant information is gathered and reported to senior management, including the Company's Chief Executive Officer and Chief Financial Officer, on a timely basis so that appropriate decisions can be made regarding public disclosure. Internal control over financial reporting ("ICFR") is designed to provide reasonable assurance that such financial information is reliable and complete. As at the end of the period covered by this management's discussion and analysis, management of the Company, with the participation of the Chief Executive Officer and the Chief Financial Officer, evaluated the effectiveness of the Company's DC&P and ICFR as required by Canadian securities laws. Based on that evaluation, the Chief Executive Officer and the Chief Financial Officer have concluded that, as of the end of the period covered by this management's discussion and analysis, the DC&P were effective to provide reasonable assurance that material information relating to the Company was made known to senior management by others and information required to be disclosed by the Company in its annual filings, interim filings (as such terms are defined under National Instrument 52-109 – Certification of Disclosure in Issuers' Annual and Interim Filings) or other reports filed or submitted by it under securities legislation were recorded, processed, summarized and reported within the time periods specified in securities legislation. The Chief Executive Officer and the Chief Financial Officer have also concluded that, as of the end of the period covered by this management's discussion and analysis, the Company's ICFR is effective and the ICFR provides reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with IFRS. To design its ICFR, the Company used the Internal Control – Integrated Framework (1992) (COSO Framework) published by the Committee of Sponsoring Organizations of the Treadway Commission. There are no material weaknesses in the Company's ICFR. During the nine months ended January 31, 2015 there were no changes to the Company's ICFR that materially affected, or are reasonably likely to materially affect, the Company's ICFR.

 

6.5Forward Looking Statements

Certain statements included in this “MD&A” constitute forward-looking statements, including those identified by the expressions “anticipate”, “believe”, “plan”, “estimate”, “expect”, “intend”, “may”, “should” and similar expressions to the extent they relate to the Company or its management. The forward-looking statements are not historical facts but reflect current expectations regarding future results or events. This MD&A contains forward-looking statements. These forward-looking statements are based on current expectations and various estimates, factors and assumptions and involve known and unknown risks, uncertainties and other factors.

 

Information concerning the interpretation of drill results also may be considered forward-looking statements; as such information constitutes a prediction of what mineralization might be found to be present if and when a project is actually developed. The estimates, risks and uncertainties described in this MD&A are not necessarily all of the important factors that could cause actual results to differ materially from those expressed in the Company’s forward-looking statements. In addition, any forward-looking statements represent the Company’s estimates only as of the date of this MD&A and should not be relied upon as representing the Company’s estimates as of any subsequent date. The material factors and assumptions that were applied in making the forward-looking statements in this MD&A include: (a) execution of the Company’s existing plans or exploration programs for each of its properties, either of which may change due to changes in the views of the Company, or if new information arises which makes it prudent to change such plans or programs; and (b) the accuracy of current interpretation of drill and other exploration results, since new information or new interpretation of existing information may result in changes in the Company’s expectations. Readers should not place undue reliance on the Company’s forward-looking statements, as the Company’s actual results, performance or achievements may differ materially from any future results, performance or achievements expressed or implied by such forward-looking statements if known or unknown risks, uncertainties or other factors affect the Company’s business, or if the Company’s estimates or assumptions prove inaccurate. Therefore, the Company cannot provide any assurance that forward-looking statements will materialize.

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 18 of 20
6.6New Accounting Standards Adopted

The following standards were adopted effective May 1, 2014.

 

(i) IFRIC 21, Accounting for Levies imposed by Governments, clarifies that the obligating event giving rise to a liability to pay a levy is the activity described in the relevant legislation that triggers payment of the levy. IFRIC 21 is effective for the Company beginning on May 1, 2014. The adoption of this standard had no effect on the Company's consolidated financial statements.

 

6.7Future Accounting Pronouncements

Unless otherwise noted, the following new or revised standards will be effective for the Company in future periods.

 

(i) IFRS 9 Financial Instruments, was issued in November 2009 and addresses classification and measurement of financial assets. It replaces the multiple category and measurement models in IAS 39 for debt instruments with a new mixed measurement model having only two categories: amortized cost and fair value through profit or loss. IFRS 9 also replaces the models for measuring equity instruments. Such instruments are either recognized at fair value through profit or loss or at fair value through other comprehensive income. Where equity instruments are measured at fair value through other comprehensive income, dividends are recognized in profit or loss to the extent that they do not clearly represent a return of investment; however, other gains and losses (including impairments) associated with such instruments remain in accumulated comprehensive income indefinitely.

 

Requirements for financial liabilities were added to IFRS 9 in October 2010 and they largely carried forward existing requirements in IAS 39, Financial Instruments - Recognition and Measurement, except that fair value changes due to credit risk for liabilities designated at fair value through profit and loss are generally recorded in other comprehensive income. In February 2014, the IASB tentatively determined that the revised effective date for IFRS 9 would be January 1, 2018. The Company has not yet completed an assessment of the impact of adopting IFRS 9.

 

(ii) IFRS 15, Revenue from Contracts with Customers (“IFRS 15”) In May 2014, the IASB and the Financial Accounting Standards Board (“FASB”) completed its joint project to clarify the principles for recognizing revenue and to develop a common revenue standard for IFRS and US GAAP. As a result of the joint project, the IASB issued IFRS 15, Revenue from Contracts with Customers, and will replace IAS 18, Revenue, IAS 11, Construction Contracts, and related interpretations on revenue. IFRS 15 establishes principles to address the nature, amount, timing and uncertainty of revenue and cash flows arising from an entity’s contracts with customers. Entities can elect to use either a full or modified retrospective approach when adopting this standard and it is effective for annual periods beginning on or after January 1, 1017. The Company has not yet completed an assessment of the impact of adopting IFRS 15.

 

6.8Risk Factors

The Company is engaged in the exploration of mineral properties, an inherently risky business. There is no assurance that funds spent on the exploration and development of a mineral deposit will result in the discovery of an economic ore body. Most exploration projects do not result in the discovery of commercially mineable ore deposits. In addition, reference should be made to the most recently filed AIF available on SEDAR at www.sedar.com.

 

6.8.1Cash Flows and Additional Funding Requirements

The Company has limited financial resources, no sources of operating cash flows and no assurances that sufficient funding, including adequate financing, will be available. If the Company’s exploration programs are successful, additional funds will be required in order to complete the development of its projects. The sources of funds currently available to the Company are the sale of marketable securities, the raising of equity capital or the offering of an ownership interest in its projects to a third party. There is no assurance that the Company will be successful in raising sufficient funds to conduct further exploration and development of its projects or to fulfill its obligations under the terms of any option or joint venture agreements, in which case the Company may have to delay or indefinitely postpone further exploration and development, or forfeit its interest in its projects or prospects. Without further financing and exploration work on its properties the Company expects its current 697,324 hectares of property to reduce to 502,218 hectares by December 31 2015, and 401,431 hectares by December 31 2016. The Company’s Fond Du Lac property reached its last anniversary on February 25 2015, after February 2016 a new lease or a special lease extension will be required by the Fond Du Lac community from Aboriginal and Northern Affairs Canada. The Cree East and West McArthur projects, with current work filings are in good standing for a minimum 15 years from the current date. Refer to section 1.1.

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 19 of 20
6.8.2Commodity Prices

The profitability of the Company’s operations will be dependent upon the market price of mineral commodities. Mineral prices fluctuate widely and are affected by numerous factors beyond the control of the Company. The prices of mineral commodities have fluctuated widely in recent years. Current and future price declines could cause commercial production to be impracticable. The Company’s future revenues and earnings also could be affected by the prices of other commodities such as fuel and other consumable items, although to a lesser extent than by the price of mineral commodities.

 

6.8.3Competition

The mining industry is intensely competitive in all of its phases, and the Company competes with many companies possessing greater financial resources and technical facilities than itself with respect to the discovery and acquisition of interests in mineral properties, the recruitment and retention of qualified employees and other persons to carry out its mineral exploration activities. The Company has a large land position in the Athabasca Basin, and has carried out extensive exploration, but has not defined an economic deposit. Other exploration companies have been successful with the discovery of deposits in the Athabasca, and these companies tend to attract investors away from CanAlaska. CanAlaska relies on the ongoing support of its JV partners to fund their portion of exploration, however additional funding from the current partners is uncertain. Competition in the mining industry could adversely affect the Company’s prospects for mineral exploration in the future.

 

6.8.4Foreign Political Risk

The Company’s material property interests are currently located in Canada. Some of the Company’s interests are exposed to various degrees of political, economic and other risks and uncertainties. The Company’s operations and investments may be affected by local political and economic developments, including expropriation, nationalization, invalidation of government orders, permits or agreements pertaining to property rights, political unrest, labour disputes, limitations on repatriation of earnings, limitations on mineral exports, limitations on foreign ownership, inability to obtain or delays in obtaining necessary mining permits, opposition to mining from local, environmental or other non-governmental organizations, government participation, royalties, duties, rates of exchange, high rates of inflation, price controls, exchange controls, currency fluctuations, taxation and changes in laws, regulations or policies as well as by laws and policies of Canada affecting foreign trade, investment and taxation.

 

6.8.5Government Laws, Regulation and Permitting

Mining and exploration activities of the Company are subject to both domestic and foreign laws and regulations governing prospecting, development, production, taxes, labour standards, occupational health, mine safety, waste disposal, toxic substances, the environment and other matters. Although the Company believes that all exploration activities are currently carried out in accordance with all applicable rules and regulations, no assurance can be given that new rules and regulations will not be enacted or that existing rules and regulations will not be applied in a manner which could limit or curtail production or development. Amendments to current laws and regulations governing the operations and activities of the Company or more stringent implementation thereof could have a substantial adverse impact on the Company.

 

The operations of the Company will require licenses and permits from various governmental authorities to carry out exploration and development at its projects. In Canada, the issuance of governmental licenses and permits are increasingly being influenced by land use consultations between the government and local First Nations communities. There can be no assurance that the Company will be able to obtain the necessary licences and permits on acceptable terms, in a timely manner or at all. Any failure to comply with permits and applicable laws and regulations, even if inadvertent, could result in the interruption or closure of operations or material fines, penalties or other liabilities.

 

6.8.6Title to Properties

Acquisition of rights to the mineral properties is a very detailed and time-consuming process. Title to, and the area of, mineral properties may be disputed. Although the Company has investigated the title to all of the properties for which it holds concessions or other mineral leases or licenses or in respect of which it has a right to earn an interest, the Company cannot give an assurance that title to such properties will not be challenged or impugned.

 

The Company has the right to earn an increased economic interest in certain of its properties. To earn this increased interest, the Company is required to make certain exploration expenditures and payments of cash and/or Company shares. If the Company fails to make these expenditures and payments, the Company may lose its right to such properties and forfeit any funds expended up to such time.

 

 www.canalaska.com 
CanAlaska Uranium Ltd. - MD&A January 31, 2015Page 20 of 20
6.8.7Estimates of Mineral Resources

The mineral resource estimates used by the Company are estimates only and no assurance can be given that any particular level of recovery of minerals will in fact be realized or that an identified resource will ever qualify as a commercially mineable (or viable) deposit which can be legally or commercially exploited. In addition, the grade of mineralization ultimately mined may differ from that indicated by drilling results and such differences could be material.

 

6.8.8Key Management

The success of the Company will be largely dependent upon the performance of its key officers, consultants and employees. Locating mineral deposits depends on a number of factors, not the least of which is the technical skill of the exploration personnel involved. The success of the Company is largely dependent on the performance of its key individuals. Failure to retain key individuals or to attract or retain additional key individuals with necessary skills could have a materially adverse impact upon the Company’s success. The Company on July 31, 2012, has terminated all long term employment contracts with senior management and has completed the negotiation of reduced contracts with the CEO, former CFO and VP Exploration. The VP Corporate Development position was terminated and the responsibilities have been assumed by the CEO. Remaining technical staff are working on part time contracts. In January 2013, Mr. Chan, the Corporate Controller took over the position of CFO replacing Mr. Ramachandran. In June 2013, the Company received the resignation of board member, Hubert Marleau. On September 26, 2013, the Company accepted the resignation of board member, Michael Riley. Dr. Karl Schimann, VP Exploration, was appointed to the board of directors on September 26, 2013 in Mr. Riley's place. On January 7, 2014, Kathleen Kennedy Townsend was appointed to the Company's board of directors.

 

6.8.9Volatility of Share Price

Market prices for shares of early stage companies are often volatile. Factors such as announcements of mineral discoveries, financial results, and other factors could have a significant effect on the price of the Company’s shares and the amount of financing that can be raised by the Company.

 

6.8.10Foreign Currency Exchange

A small portion of the Company’s expenses are now, and are expected to continue to be incurred in foreign currencies. The Company’s business will be subject to risks typical of an international business including, but not limited to, differing tax structures, regulations and restrictions and general foreign exchange rate volatility. Fluctuations in the exchange rate between the Canadian dollar and such other currencies may have a material effect on the Company’s business, financial condition and results of operations and could result in downward price pressure for the Company’s products or losses from currency exchange rate fluctuations. The Company does not actively hedge against foreign currency fluctuations.

 

6.8.11Conflict of Interest

Some of the Company’s directors and officers are directors and officers of other natural resource or mining-related companies. These associations may give rise from time to time to conflicts of interest. As a result of such conflict, the Company may miss the opportunity to participate in certain transactions.

 

7.QUARTERLY FINANCIAL INFORMATION

 

The following tables sets out a summary of the Company’s results:

 

Table 13: ($000’s) Quarterly
Loss & Comprehensive Loss Summary Q413 Q114 Q214 Q314 Q414 Q115 Q215 Q315
Revenue - - - - - - - -
(Loss) earnings for the period (537) (334) (65) (428) 119 1,386 (352) (20)
(Loss) earnings per share (0.02) (0.02) (0.00) (0.02) 0.01 0.06 (0.02) (0.00)

 

Table 14: ($000’s) Financial Position summary As at
Apr 30, 2013 Jul 31, 2013 Oct 31, 2013 Jan 31, 2014 Apr 30, 2014 Jul 31, 2014 Oct 31, 2014 Jan 31, 2015
Total Assets 3,225 2,878 2,826 2,416 2,806 3,974 3,406 3,442
Total Liabilities 195 204 158 157 382 233 215 136
Total Equity 3,030 2,674 2,668 2,259 2,424 3,741 3,191 3,306

 

 



Form 52-109F2

Certification of Interim Filings

Full Certificate

 

I, Peter Dasler, Chief Executive Officer of CanAlaska Uranium Ltd., certify the following:

 

1.Review: I have reviewed the interim financial report and interim M&DA (together the “interim filings”) of CanAlaska Uranium Ltd. (the “issuer”) for the interim period ended January 31, 2015.

 

2.No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, for the period covered by the interim filings.

 

3.Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date and for the period presented in the interim filings.

 

4.Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuer’s Annual and Interim Filings, for the issuer.

 

5.Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the end of the period covered by the interim filings

 

(a)designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

 

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and

 

(ii)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

 

(b)designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

 

5.1Control framework: The control framework the issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is the Internal Control – Integrated Framework (COSO Framework) published by The Committee of Sponsoring Organizations of the Treadway Commission (COSO).

 

   
   
5.2N/A

 

5.3N/A

 

6.Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on May 1, 2014 and ended on January 31, 2015 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.

 

Dated:March 24, 2015

 

“P. Dasler”

____________________________

Peter Dasler

Chief Executive Officer

 



Form 52-109F2

Certification of Interim Filings

Full Certificate

 

I, Harry Chan, Chief Financial Officer of CanAlaska Uranium Ltd., certify the following:

 

1.Review: I have reviewed the interim financial report and interim M&DA (together the “interim filings”) of CanAlaska Uranium Ltd. (the “issuer”) for the interim period ended January 31, 2015.

 

2.No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, for the period covered by the interim filings.

 

3.Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date and for the period presented in the interim filings.

 

4.Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuer’s Annual and Interim Filings, for the issuer.

 

5.Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the end of the period covered by the interim filings

 

(a)designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

 

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and

 

(ii)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

 

(b)designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

 

5.1Control framework: The control framework the issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is the Internal Control – Integrated Framework (COSO Framework) published by The Committee of Sponsoring Organizations of the Treadway Commission (COSO).

 

5.2N/A
   
   

 

5.3N/A

 

6.Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on May 1, 2014 and ended on January 31, 2015 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.

 

Dated:March 24, 2015

 

“H. Chan”

____________________________

Harry Chan

Chief Financial Officer

 

CanAlaska Uranium (QX) (USOTC:CVVUF)
Historical Stock Chart
From Oct 2024 to Nov 2024 Click Here for more CanAlaska Uranium (QX) Charts.
CanAlaska Uranium (QX) (USOTC:CVVUF)
Historical Stock Chart
From Nov 2023 to Nov 2024 Click Here for more CanAlaska Uranium (QX) Charts.