Calibre’s Marathon Pit Ore Control Drilling at the Valentine Gold Mine Yields 44% Additional Gold on 47% Higher Grades Than Modelled in the 2022 Mineral Reserve
September 03 2024 - 5:00AM
UK Regulatory
Calibre’s Marathon Pit Ore Control Drilling at the Valentine Gold
Mine Yields 44% Additional Gold on 47% Higher Grades Than Modelled
in the 2022 Mineral Reserve
VANCOUVER, British Columbia, Sept. 03, 2024 (GLOBE
NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB;
OTCQX: CXBMF) (the "Company" or "Calibre") is pleased to announce
partial ore control reverse circulation (“RC”) infill drill results
from the Marathon Pit (“Marathon”), one of three open pits
comprising the Valentine Gold Mine (“Valentine”) in Newfoundland
& Labrador, Canada. The current 14-year life of mine plan,
which includes the Leprechaun, Berry and Marathon open pits, hosts
2022 Mineral Reserves of 51.6 million tonnes grading 1.62 g/t gold
containing 2.7 million ounces1. At the Marathon pit, the
Company drilled 196 RC holes totaling 4,915 metres in three benches
slated for mining in 2025. When comparing approximately the same
tonnage to the 2022 Mineral Reserve model over three planned mining
benches, the Ore Control Block model yields significantly more gold
than the 2022 Mineral Reserve model due to 47% higher grades. These
results coupled with the Leprechaun ore control results (see news
release dated February 14, 2024) substantiate the 2022 Mineral
Reserve and increase confidence.
Darren Hall, President and Chief
Executive Officer of Calibre, stated: “The results from
the initial Marathon pit ore control drilling are very encouraging
with 47% higher gold grades resulting in
44% additional ounces vs the 2022 Mineral Reserve
in the same area. Given these results, and construction at 77%, our
confidence continues to increase as we responsibly advance towards
first gold at Valentine during Q2, 2025.
Diamond drilling is also underway as part of our
expanded, 100,000 metre program (see news release dated July 15,
2024) with three rigs targeting new gold mineralization along the
Valentine Lake Shear Zone. We look forward to the first results
expected in the coming weeks as we remain excited about the vast
potential to yield further significant gold discoveries within the
Valentine land package.”
Comparison of the Marathon Pit Ore
Control Block Model to 2022 Mineral Reserve
Bench |
Ore Control Block Model |
2022 Mineral Reserve |
Percent Difference |
|
Tonnes |
Grade (g/t Au) |
Ounces |
Tonnes |
Grade (g/t Au) |
Ounces |
Tonnes |
Grade (g/t Au) |
Ounces |
344 |
36,065 |
1.32 |
1,526 |
36,441 |
1.06 |
1,245 |
-1 |
% |
+24 |
% |
+23 |
% |
338 |
81,608 |
2.40 |
6,298 |
82,789 |
1.76 |
4,675 |
-1 |
% |
+37 |
% |
+35 |
% |
332 |
73,237 |
2.37 |
5,591 |
75,718 |
1.40 |
3,410 |
-3 |
% |
+69 |
% |
+64 |
% |
Total |
190,901 |
2.19 |
13,415 |
194,948 |
1.49 |
9,330 |
-2 |
% |
+47 |
% |
+44 |
% |
Quality Assurance/Quality
Control
QA/QC protocols followed at the Valentine Gold
Project for the RC ore control drilling include the insertion of
blanks and standards at regular intervals in each sample batch. RC
drillhole cuttings are cone split at the rig to nominally 2.5 kg
samples, shipped to the SGS facility in Grand Falls-Windsor for
preparation, split to 1 kg, and then shipped to SGS Burnaby, BC.
for gold analysis by the LeachWELL method.
Qualified Person
The scientific and technical information
contained in this news release was approved by David Schonfeldt
P.GEO, Calibre Mining’s Corporate Chief Geologist and a "Qualified
Person" under National Instrument 43-101.
About Calibre
Calibre (TSX:CXB) is a Canadian-listed, Americas
focused, growing mid-tier gold producer with a strong pipeline of
development and exploration opportunities across Newfoundland &
Labrador in Canada, Nevada and Washington in the USA, and
Nicaragua. Calibre is focused on delivering sustainable value for
shareholders, local communities and all stakeholders through
responsible operations and a disciplined approach to growth. With a
strong balance sheet, a proven management team, strong operating
cash flow, accretive development projects and district-scale
exploration opportunities Calibre will unlock significant
value.
For further information, please contact:
Ryan King
SVP Corporate Development & IR
T: 604.628.1012
E: calibre@calibremining.com
W: www.calibremining.com
Calibre’s head office is located at Suite 1560, 200 Burrard St.,
Vancouver, British Columbia, V6C 3L6.
X / Facebook / LinkedIn / YouTube
The Toronto Stock Exchange has neither
reviewed nor accepts responsibility for the adequacy or accuracy of
this news release.
Cautionary Note Regarding Forward
Looking Information
This news release includes certain
"forward-looking information" and "forward-looking statements"
(collectively "forward-looking statements") within the meaning of
applicable Canadian securities legislation. All statements in this
news release that address events or developments that we expect to
occur in the future are forward-looking statements. Forward-looking
statements are statements that are not historical facts and are
identified by words such as "expect", "plan", "anticipate",
"project", "target", "potential", "schedule", "forecast", "budget",
"estimate", “assume”, "intend", “strategy”, “goal”, “objective”,
“possible” or "believe" and similar expressions or their negative
connotations, or that events or conditions "will", "would", "may",
"could", "should" or "might" occur. Forward-looking statements
necessarily involve assumptions, risks and uncertainties, certain
of which are beyond Calibre's control. For a listing of risk
factors applicable to the Company, please refer to Calibre's annual
information form (“AIF”) for the year ended December 31, 2023, its
management discussion and analysis for the year ended December 31,
2023 and other disclosure documents of the Company filed on the
Company’s SEDAR+ profile at www.sedarplus.com.
Calibre's forward-looking statements are
based on the applicable assumptions and factors management
considers reasonable as of the date hereof, based on the
information available to management at such time. Calibre does not
assume any obligation to update forward-looking statements if
circumstances or management's beliefs, expectations or opinions
should change other than as required by applicable securities laws.
There can be no assurance that forward-looking statements will
prove to be accurate, and actual results, performance or
achievements could differ materially from those expressed in, or
implied by, these forward-looking statements. Accordingly, undue
reliance should not be placed on forward-looking
statements.
Footnotes:
- Refer to the Valentine Gold Project NI 43-101 Technical
Report and Feasibility Study, Newfoundland & Labrador, Canada
dated November 30, 2022 and found on the Calibre website
at www.calibremining.com and on SEDAR+
at www.sedarplus.ca .
Calibre Mining (TG:WCLA)
Historical Stock Chart
From Nov 2024 to Dec 2024
Calibre Mining (TG:WCLA)
Historical Stock Chart
From Dec 2023 to Dec 2024