- Metal Energy releases never published results of high-grade
nickel historic drill intersections
- New detailed webinar on Metal Energy's Plan for
Manibridge
- Drilling has started
TORONTO, March 7, 2022 /CNW/ - Metal Energy Corp. ("the
"Company" or "Metal Energy") (TSXV: MERG) is pleased
to announce that a 3,000 metre drill program has started on the
high-grade nickel Manibridge project (the "Project" or
"Manibridge") in the Thompson Nickel Belt, Manitoba. Drilling will focus within the
shadow of the past-producing mine that produced 1.3 million tonnes
at 2.55% nickel and 0.27% copper from 1971 to 1977.
The Company has prepared an in-depth video presentation for
Manibridge that details Metal Energy's growth potential on the
Project.
VIEW METAL ENERGY'S WEBINAR: MANIBRIDGE –
HIGH-GRADE NICKEL
"We're excited to launch the first drill program on our flagship
Manibridge project. Historic drilling within one kilometre of the
old mine workings intersected broad zones of high-grade nickel
mineralization. However, we've identified numerous target areas
with the potential to extend known high-grade nickel occurrences
and increase the overall size of the mineralization shell. Some of
the targets follow historic intersections of 15 to 30 metres
grading between 0.80 to 2.00% Ni. The program is designed to test a
broad array of target areas that will provide us with new
geological information to help us plan for our larger summer
program," said James Sykes, CEO of
Metal Energy.
Selected Historic Drill Intersections on Manibridge: Table
1
Hole
Number
|
Location
|
From
(m)
|
To
(m)
|
Interval
(m)
|
%Ni
|
%Ni*m
|
6-60
|
Underground
|
33.83
|
75.59
|
41.76
|
1.80
|
75.02
|
W50-39
|
Mined
|
98.45
|
163.98
|
65.53
|
1.10
|
72.14
|
W50-27
|
Mined
|
185.93
|
210.01
|
24.08
|
2.93
|
70.61
|
W50-34
|
Mined
|
86.26
|
110.64
|
24.38
|
1.88
|
45.76
|
W50-31
|
Mined
|
244.75
|
261.52
|
16.77
|
2.67
|
44.84
|
W50-05
|
Mined
|
311.51
|
336.80
|
25.29
|
1.57
|
39.64
|
MN08-01
|
Surface
|
156.50
|
195.75
|
39.25
|
0.98
|
38.47
|
W50-28
|
Mined
|
203.30
|
211.99
|
8.69
|
4.15
|
36.07
|
W50-09
|
Mined
|
178.92
|
198.73
|
19.81
|
1.80
|
35.62
|
6-42A
|
Underground
|
270.51
|
287.43
|
16.92
|
1.98
|
33.44
|
W50-33
|
Mined
|
274.93
|
289.56
|
14.63
|
2.15
|
31.50
|
W50-50
|
Surface
|
184.40
|
196.60
|
12.20
|
1.24
|
15.13
|
Notes to Table 1:
- Cut-off grade = 0.3% Ni
- Maximum consecutive internal dilution = 3.0 m downhole
- Historic drill holes have not been verified or confirmed with
twinned drill holes
- Metal Energy considers "high-grade" to be nickel mineralization
with a concentration greater than 0.8% Ni.
- All reported depths and intervals are drill hole depths and
intervals, unless otherwise noted, and do not represent true
thicknesses, which have yet to be determined.
Manibridge's drill program is planned for 3,000 metres with 9
drill holes all within a kilometre strike of the past-producing
mine. Table 1 provides a summary of selected historic high-grade
nickel drill hole intercepts on Manibridge. Figure 1 is a
location map of the Manibridge project and the old mine workings,
and Figure 2 shows the Manibridge mineralization shell with
the planned drill holes and pierce points.
Initial drill program results will be released upon completion
of the program, and geochemical assays will be released later once
received from the lab and reviewed for QAQC. CanAlaska Uranium Ltd.
Is the operator for this inaugural exploration program.
About the Manibridge Project
Manibridge encompasses
4,368 hectares and is within the world-class Thompson Nickel Belt.
The Project is 20 kilometers southwest of Wabowden, which has significant infrastructure
and capacity that has supported previous exploration programs,
including year-round highway access via Highway 6.
About Metal Energy Corp.
Metal Energy is a
well-funded nickel and battery metal exploration company with two
projects, Manibridge and Strange, in the politically stable
jurisdictions of Manitoba and
Ontario, Canada, respectively.
Both projects are subject to earn-in agreements where the Company
can acquire 100% exploration rights to approximately 16,200
hectares.
QP Statement
The technical information contained in
this news release has been reviewed and approved by Mike Sweeny, P.Geo., Vice-President, Exploration
& Development for Metal Energy, and a Qualified Person as
defined in "National Instrument 43-101, Standards of Disclosure for
Mineral Projects."
Reader Advisory
Certain information set forth in
this news release contains forward-looking statements or
information ("forward-looking statements"), including
details about the business of the Company. By their nature,
forward-looking statements are subject to numerous risks and
uncertainties, some of which are beyond the Company's control,
including the impact of general economic conditions, industry
conditions, volatility of commodity prices, currency fluctuations,
environmental risks, operational risks, competition from other
industry participants, stock market volatility. Although the
Company believes that the expectations in its forward-looking
statements are reasonable, its forward-looking statements have
been based on factors and assumptions concerning future events
which may prove to be inaccurate. Those factors and assumptions
are based upon currently available information. Such statements are
subject to known and unknown risks, uncertainties and other
factors that could influence actual results or events and cause
actual results or events to differ materially from those stated,
anticipated or implied in the forward-looking statements.
Accordingly, readers are cautioned not to place undue reliance on
the forward-looking statements, as no assurance can be provided as
to future results, levels of activity or achievements. Risks,
uncertainties, material assumptions and other factors that could
affect actual results are discussed in our public disclosure
documents available at www.sedar.com including
the Filing Statement dated November 15,
2021. Furthermore, the forward-looking statements contained
in this document are made as of the date of this document and,
except as required by applicable law, the Company does not
undertake any obligation to publicly update or to revise any of
the included forward-looking statements, whether as a result of new
information, future events or otherwise. The forward-looking
statements contained in this document are expressly qualified by
this cautionary statement.
Neither the TSX Venture Exchange Inc. nor its Regulation
Services Provider (as that term is defined in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
FIGURE 1 – Manibridge Project Location and Planned Drill
Program Location
FIGURE 2 – Planned Drill Holes Within Manibridge
Mineralization Shell (looking west)
SOURCE Metal Energy