VANCOUVER, BC, Aug. 19,
2022 /CNW/ - Power Metals
Corp. ("Power Metals" or the "Company")
(TSXV: PWM) (FRANKFURT: OAA1) (OTCQB: PWRMF) is pleased to announce
that drill holes have intersected high-grade Li, Cs and Ta
(Lithium, Cesium and Tantalum) mineralization on the West Joe Dyke
and Li and Ta mineralization on the Main Dyke, Case Lake property,
Cochrane, Ontario.
Johnathan More, Chairman &
CEO of Power Metals, commented "These fantastic drill results
continue to impress our strong geological team. Drilling is ongoing
and we are extremely excited for the next round of assays to be
received from the lab."
The lithium mineralization is mainly spodumene, but also
lepidolite at West Joe and is spodumene on the Main Dyke. Cesium
mineralization is pollucite at West Joe and Ta mineralization is
Ta-oxides at West Joe and Main Dykes.
Assay highlights on West Joe Dyke include (Table 1):
- 1.11 % Li2O (lithium), 2.15 % Cs2O
(cesium) and 365.46 ppm Ta (tantalum) over 6.84 m, PWM-22-128 (Figure 1)
- 1.28 % Li2O, 6.53 % Cs2O and 324.0 ppm Ta
over 1.0 m, PWM-22-128
- 1.75 % Li2O, 0.06 % Cs2O and 221.0 ppm Ta
over 1.0 m, PWM-22-129
- 1.74 % Li2O, 0.01 % Cs2O, 197.0 ppm Ta
over 0.79 m, PWM-22-130.
Table 1 Assay highlights for West Joe Dyke, drill holes
PWM-22-128 to 131.
Drill Hole
|
Including
|
From (m)
|
To (m)
|
Length
(m)
|
Li2O
(%)
|
Cs2O
(%)
|
Ta
(ppm)
|
PWM-22-128
|
|
17.56
|
24.40
|
6.84
|
1.11
|
2.15
|
365.46
|
PWM-22-128
|
including
|
19.00
|
22.00
|
3.00
|
1.33
|
4.42
|
232.13
|
PWM-22-128
|
including
|
19.00
|
20.00
|
1.00
|
1.73
|
4.90
|
88.40
|
PWM-22-128
|
including
|
21.00
|
22.00
|
1.00
|
1.28
|
6.53
|
324.00
|
PWM-22-128
|
including
|
22.00
|
23.00
|
1.00
|
0.71
|
0.68
|
831.00
|
PWM-22-129
|
|
23.88
|
25.84
|
1.96
|
0.40
|
0.05
|
287.14
|
PWM-22-129
|
|
41.00
|
42.00
|
1.00
|
1.75
|
0.06
|
221.00
|
PWM-22-130
|
|
40.73
|
41.73
|
1.00
|
0.05
|
0.02
|
1487.00
|
PWM-22-130
|
|
54.21
|
56.00
|
1.79
|
1.36
|
0.03
|
174.09
|
PWM-22-130
|
including
|
54.21
|
55.00
|
0.79
|
1.74
|
0.01
|
197.00
|
PWM-22-131
|
|
62.60
|
63.63
|
1.03
|
0.77
|
0.03
|
53.10
|
|
|
|
|
|
|
|
|
Drill holes are oriented perpendicular to the strike length of
the pegmatite, so mineralization is close to true width.
Drill hole PWM-22-131 intersected biotite-rich metasedimentary
host rock with elevated Li, Rb and Cs contents from
45.89-47.30 m, 1.41m interval with 0.49 % Li2O, 3094 ppm Rb and
0.47 % Cs2O. This metasomatized host rock can be used as a
pathfinder to locate blind pegmatites on the property.
Assay highlights on Main Dyke include (Table 2):
- 1.71 % Li2O and 240.77 ppm Ta over 12.0 m, PWM-22-132 (Figure 2)
- 1.20 % Li2O and 218.68 ppm Ta over 19.0 m, PWM-22-133.
Table 2 Assay highlights for Main Dyke, drill holes PWM-22-132
and 133.
Drill Hole
|
Including
|
From (m)
|
To (m)
|
Length
(m)
|
Li2O
(%)
|
Ta
(ppm)
|
PWM-22-132
|
|
11.00
|
25.00
|
12.00
|
1.71
|
240.77
|
PWM-22-132
|
including
|
15.00
|
24.00
|
9.00
|
1.99
|
273.36
|
PWM-22-133
|
|
39.00
|
59.00
|
19.00
|
1.20
|
218.68
|
PWM-22-133
|
including
|
40.00
|
41.00
|
1.00
|
2.81
|
74.30
|
PWM-22-133
|
including
|
56.00
|
58.00
|
2.00
|
2.49
|
146.50
|
|
|
|
|
|
|
|
Drill holes are oriented perpendicular to the strike length of
the pegmatite, so mineralization is close to true width.
Power Metals' 2022 summer drill program is for 5,000 m and over 2,000
m has been completed to date. This press release reports
assays received to date from drill hole PWM-22-128 to 131 on the
West Joe Dyke and drill holes PWM-22-132 and 133 on the Main Dyke.
The purpose of each drill hole was to infill on known
mineralization to aid in a future resource estimate.
Drill hole collar coordinates are given in Table 3.
Table 3 West Joe and Main Dyke, Case Lake drill hole
collar coordinates. NAD 83, Zone 17. Trimble DGPS survey with 2
cm
accuracy in the horizontal.
|
Drill Hole
|
Easting (m)
|
Northing (m)
|
Elevation
(m)
|
Azimuth
(°)
|
Dip
(°)
|
Length
(m)
|
PWM-22-128
|
576303.19
|
5431120.71
|
344.48
|
170
|
-45
|
42
|
PWM-22-129
|
576301.01
|
5431131.20
|
343.99
|
170
|
-45
|
52
|
PWM-22-130
|
576296.52
|
5431156.87
|
341.39
|
170
|
-45
|
75
|
PWM-22-131
|
576295.62
|
5431166.32
|
339.45
|
170
|
-45
|
87
|
PWM-22-132
|
578235.18
|
5431690.26
|
347.46
|
150
|
-45
|
111
|
PWM-22-133
|
578184.92
|
5431705.06
|
344.34
|
150
|
-45
|
177
|
|
|
|
|
|
|
|
Quality Control
The drill core was sampled so that 1
m of the Case Batholith tonalite host rock was sampled
followed by 1 m long samples of the
pegmatite dyke and 1 m of the Case
Batholith. The sampling followed lithology boundaries so that only
one lithology unit is within a sample, except for the < 20 cm
pegmatite veins in tonalite which were merged into one sample. The
drill core samples were delivered to SGS preparation lab in
Cochrane by Power Metals'
geologists. The core was prepared at SGS Garson and analyzed at SGS
Burnaby, British Columbia which
has ISO 17025 certification. Every 20 samples included one external
quartz blank, one external lithium standard and one core duplicate.
The ore grade Li2O% was prepared by sodium peroxide
fusion with analysis by ICP-OES with a detection limit of 0.002 %
Li2O. The ore grade Cs2O% was prepared by
acid digestion with analysis by AAS with a detection limit of 0.01
% Cs. A QA/QC review of the standards and blanks for this drill
program indicate that they passed and the drill core assays are
accurate and not contaminated.
Case Lake Property
Case Lake Property is located 80 km east of Cochrane, northeastern Ontario close to the Ontario-Quebec border. Case Lake Property consists of
585 cell claims in Steele, Case, Scapa, Pliny, Abbotsford and Challies townships, Larder Lake
Mining Division. The Property is 10 km x 9.5 km in size with 14
identified tonalite domes. The Case Lake pegmatite swarm consists
of six spodumene dykes: North, Main, South, East and Northeast
Dykes on the Henry Dome and the West Joe Dyke on a new tonalite
dome. The Case Lake Property is owned 100% by Power Metals Corp. A
National Instrument 43-101 Technical Report has been prepared on
Case Lake Property and filed on July 18,
2017.
Qualified Person
Julie Selway, Ph.D., P.Geo.
supervised the preparation of the scientific and technical
disclosure in this news release. Dr. Selway is the VP of
Exploration for Power Metals and the Qualified Person ("QP") as
defined by National Instrument 43-101. Dr. Selway is supervising
the exploration program at Case Lake. Dr. Selway completed a Ph.D.
on granitic pegmatites in 1999 and worked for 3 years as a
pegmatite geoscientist for the Ontario Geological Survey. Dr.
Selway also has twenty-three scientific journal articles on
pegmatites.
About Power Metals Corp.
Power Metals Corp. is a diversified Canadian mining company with
a mandate to explore, develop and acquire high quality mining
projects. We are committed to building an arsenal of projects in
both lithium and high-growth specialty metals and minerals. We see
an unprecedented opportunity to supply the tremendous growth of the
lithium battery and clean-technology industries. Learn more at
www.powermetalscorp.com
ON BEHALF OF THE BOARD,
Johnathan More, Chairman &
CEO
Neither the TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of
the content of this news release.
No securities regulatory authority has either approved or
disapproved of the contents of this news release. The securities
being offered have not been, and will not be, registered under the
United States Securities Act of 1933, as amended (the "U.S.
Securities Act"), or any state securities laws, and may not be
offered or sold in the United
States, or to, or for the account or benefit of, a "U.S.
person" (as defined in Regulation S of the U.S. Securities Act)
unless pursuant to an exemption therefrom. This press release is
for information purposes only and does not constitute an offer to
sell or a solicitation of an offer to buy any securities of the
Company in any jurisdiction.
Cautionary Note Regarding
Forward-Looking Information
This press release contains forward-looking information based
on current expectations, including the use of funds raised under
the Offering. These statements should not be read as
guarantees of future performance or results. Such statements
involve known and unknown risks, uncertainties and other factors
that may cause actual results, performance or achievements to be
materially different from those implied by such statements.
Although such statements are based on management's reasonable
assumptions, Power Metals assumes no responsibility to update or
revise forward-looking information to reflect new events or
circumstances unless required by law.
Although the Company believes that the expectations and
assumptions on which the forward-looking statements are based are
reasonable, undue reliance should not be placed on the
forward-looking statements because the Company can give no
assurance that they will prove to be correct. Since forward-looking
statements address future events and conditions, by their very
nature they involve inherent risks and uncertainties. These
statements speak only as of the date of this press release. Actual
results could differ materially from those currently anticipated
due to several factors and risks including various risk factors
discussed in the Company's disclosure documents which can be found
under the Company's profile onwww.sedar.com.
This press release contains "forward-looking statements"
within the meaning of Section 27A of the Securities Act of 1933, as
amended, and Section 21E the Securities Exchange Act of 1934, as
amended and such forward-looking statements are made pursuant to
the safe harbor provisions of the Private Securities Litigation
Reform Act of 1995. The TSXV has neither reviewed nor approved the
contents of this press release.
SOURCE POWER METALS CORP