UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, DC 20549

 

Form 6-K

 

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 or 15d-16

UNDER THE SECURITIES EXCHANGE ACT OF 1934

 

 

For the month of January 2025

 

Commission File No. 001-32500

 

TRX GOLD Corporation

(Translation of registrant’s name into English)

 

277 Lakeshore Road East, Suite 403

Oakville, Ontario Canada L6J 1H9

(Address of principal executive office)

 

Indicate by check mark whether the registrant files or will file annual reports under the cover Form 20-F or Form 40-F.

 

Form 20-F ☐ Form 40-F ☒

 

 

 

Explanatory Note

 

TRX Gold Corp. (the “Company”) is filing this Form 6-K to provide its financial information for the three months ended November 30, 2024 and 2023, and to incorporate such financial information into the Company’s registration statements referenced below.

 

Exhibits 99.1 and 99.2 attached hereto are hereby incorporated by reference into the Company’s Registration Statements on Form F-10 (Registration Statement File Number 333-283907), Form F-3 (Registration Statement File Numbers 333-252876 and 333-255526) and on Form S-8 (Registration Statement File Number 333-234078) to be a part thereof from the date on which this report is submitted, to the extent not superseded by documents or reports subsequently filed.

 

Exhibits

 

The following exhibits are filed as part of this Form 6-K:

 

Exhibit  Description
  
99.1Unaudited financial statements for the three months ended November 30, 2024 and 2023
99.2Management’s Discussion & Analysis for the three months ended November 30, 2024 and 2023
101.INSInline XBRL Instance Document (the instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document).
101.SCHInline XBRL Taxonomy Extension Schema Document
101.CALInline XBRL Taxonomy Extension Calculation Linkbase Document
101.DEFInline XBRL Taxonomy Extension Definition Linkbase Document
101.LABInline XBRL Taxonomy Extension Label Linkbase Document
101.PREInline XBRL Taxonomy Extension Presentation Linkbase Document
104.Cover Page Interactive Data File (formatted as inline XBRL and contained in Exhibit 101).

 

 

 

SIGNATURES

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

  TRX Gold Corporation
  (Registrant)
     
  By: /s/ Michael P. Leonard
    Michael P. Leonard,
    Chief Financial Officer

 

Date: January 14, 2025

 

false 6-K 2025 Q1 --08-31 0001173643 0001173643 2024-09-01 2024-11-30 0001173643 2024-11-30 0001173643 2024-08-31 0001173643 2023-09-01 2023-11-30 0001173643 ifrs-full:IssuedCapitalMember 2023-08-31 0001173643 ifrs-full:ReserveOfSharebasedPaymentsMember 2023-08-31 0001173643 trx:ReserveForWarrantsMember 2023-08-31 0001173643 trx:AccumulatedDeficitMember 2023-08-31 0001173643 trx:ShareholderequityMember 2023-08-31 0001173643 ifrs-full:NoncontrollingInterestsMember 2023-08-31 0001173643 2023-08-31 0001173643 ifrs-full:IssuedCapitalMember 2023-11-30 0001173643 ifrs-full:ReserveOfSharebasedPaymentsMember 2023-11-30 0001173643 trx:ReserveForWarrantsMember 2023-11-30 0001173643 trx:AccumulatedDeficitMember 2023-11-30 0001173643 trx:ShareholderequityMember 2023-11-30 0001173643 ifrs-full:NoncontrollingInterestsMember 2023-11-30 0001173643 2023-11-30 0001173643 ifrs-full:IssuedCapitalMember 2024-08-31 0001173643 ifrs-full:ReserveOfSharebasedPaymentsMember 2024-08-31 0001173643 trx:ReserveForWarrantsMember 2024-08-31 0001173643 trx:AccumulatedDeficitMember 2024-08-31 0001173643 trx:ShareholderequityMember 2024-08-31 0001173643 ifrs-full:NoncontrollingInterestsMember 2024-08-31 0001173643 ifrs-full:IssuedCapitalMember 2023-09-01 2023-11-30 0001173643 ifrs-full:ReserveOfSharebasedPaymentsMember 2023-09-01 2023-11-30 0001173643 trx:ReserveForWarrantsMember 2023-09-01 2023-11-30 0001173643 trx:AccumulatedDeficitMember 2023-09-01 2023-11-30 0001173643 trx:ShareholderequityMember 2023-09-01 2023-11-30 0001173643 ifrs-full:NoncontrollingInterestsMember 2023-09-01 2023-11-30 0001173643 ifrs-full:IssuedCapitalMember 2023-12-01 2024-08-31 0001173643 ifrs-full:ReserveOfSharebasedPaymentsMember 2023-12-01 2024-08-31 0001173643 trx:ReserveForWarrantsMember 2023-12-01 2024-08-31 0001173643 trx:AccumulatedDeficitMember 2023-12-01 2024-08-31 0001173643 trx:ShareholderequityMember 2023-12-01 2024-08-31 0001173643 ifrs-full:NoncontrollingInterestsMember 2023-12-01 2024-08-31 0001173643 2023-12-01 2024-08-31 0001173643 ifrs-full:IssuedCapitalMember 2024-09-01 2024-11-30 0001173643 ifrs-full:ReserveOfSharebasedPaymentsMember 2024-09-01 2024-11-30 0001173643 trx:ReserveForWarrantsMember 2024-09-01 2024-11-30 0001173643 trx:AccumulatedDeficitMember 2024-09-01 2024-11-30 0001173643 trx:ShareholderequityMember 2024-09-01 2024-11-30 0001173643 ifrs-full:NoncontrollingInterestsMember 2024-09-01 2024-11-30 0001173643 ifrs-full:IssuedCapitalMember 2024-11-30 0001173643 ifrs-full:ReserveOfSharebasedPaymentsMember 2024-11-30 0001173643 trx:ReserveForWarrantsMember 2024-11-30 0001173643 trx:AccumulatedDeficitMember 2024-11-30 0001173643 trx:ShareholderequityMember 2024-11-30 0001173643 ifrs-full:NoncontrollingInterestsMember 2024-11-30 0001173643 trx:TRAMember 2024-09-01 2024-11-30 0001173643 trx:TRAMember 2023-09-01 2023-11-30 0001173643 ifrs-full:GrossCarryingAmountMember trx:ExplorationAndEvaluationExpendituresMember 2024-08-31 0001173643 ifrs-full:GrossCarryingAmountMember ifrs-full:MiningPropertyMember 2024-08-31 0001173643 ifrs-full:GrossCarryingAmountMember trx:ProcessingPlantAndRelatedInfrastructureMember 2024-08-31 0001173643 ifrs-full:GrossCarryingAmountMember ifrs-full:MachineryMember 2024-08-31 0001173643 ifrs-full:GrossCarryingAmountMember trx:RightofuseAssetMember 2024-08-31 0001173643 ifrs-full:GrossCarryingAmountMember trx:OtherMember 2024-08-31 0001173643 ifrs-full:GrossCarryingAmountMember 2024-08-31 0001173643 ifrs-full:GrossCarryingAmountMember trx:ExplorationAndEvaluationExpendituresMember 2024-09-01 2024-11-30 0001173643 ifrs-full:GrossCarryingAmountMember ifrs-full:MiningPropertyMember 2024-09-01 2024-11-30 0001173643 ifrs-full:GrossCarryingAmountMember trx:ProcessingPlantAndRelatedInfrastructureMember 2024-09-01 2024-11-30 0001173643 ifrs-full:GrossCarryingAmountMember ifrs-full:MachineryMember 2024-09-01 2024-11-30 0001173643 ifrs-full:GrossCarryingAmountMember trx:RightofuseAssetMember 2024-09-01 2024-11-30 0001173643 ifrs-full:GrossCarryingAmountMember trx:OtherMember 2024-09-01 2024-11-30 0001173643 ifrs-full:GrossCarryingAmountMember 2024-09-01 2024-11-30 0001173643 ifrs-full:GrossCarryingAmountMember trx:ExplorationAndEvaluationExpendituresMember 2024-11-30 0001173643 ifrs-full:GrossCarryingAmountMember ifrs-full:MiningPropertyMember 2024-11-30 0001173643 ifrs-full:GrossCarryingAmountMember trx:ProcessingPlantAndRelatedInfrastructureMember 2024-11-30 0001173643 ifrs-full:GrossCarryingAmountMember ifrs-full:MachineryMember 2024-11-30 0001173643 ifrs-full:GrossCarryingAmountMember trx:RightofuseAssetMember 2024-11-30 0001173643 ifrs-full:GrossCarryingAmountMember trx:OtherMember 2024-11-30 0001173643 ifrs-full:GrossCarryingAmountMember 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember trx:ExplorationAndEvaluationExpendituresMember 2024-08-31 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:MiningPropertyMember 2024-08-31 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember trx:ProcessingPlantAndRelatedInfrastructureMember 2024-08-31 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:MachineryMember 2024-08-31 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember trx:RightofuseAssetMember 2024-08-31 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember trx:OtherMember 2024-08-31 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember 2024-08-31 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember trx:ExplorationAndEvaluationExpendituresMember 2024-09-01 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:MiningPropertyMember 2024-09-01 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember trx:ProcessingPlantAndRelatedInfrastructureMember 2024-09-01 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:MachineryMember 2024-09-01 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember trx:RightofuseAssetMember 2024-09-01 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember trx:OtherMember 2024-09-01 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember 2024-09-01 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember trx:ExplorationAndEvaluationExpendituresMember 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:MiningPropertyMember 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember trx:ProcessingPlantAndRelatedInfrastructureMember 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember ifrs-full:MachineryMember 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember trx:RightofuseAssetMember 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember trx:OtherMember 2024-11-30 0001173643 ifrs-full:AccumulatedDepreciationAndAmortisationMember 2024-11-30 0001173643 trx:ExplorationAndEvaluationExpendituresMember 2024-08-31 0001173643 ifrs-full:MiningPropertyMember 2024-08-31 0001173643 trx:ProcessingPlantAndRelatedInfrastructureMember 2024-08-31 0001173643 ifrs-full:MachineryMember 2024-08-31 0001173643 trx:RightofuseAssetMember 2024-08-31 0001173643 trx:OtherMember 2024-08-31 0001173643 trx:TotalMember 2024-08-31 0001173643 trx:ExplorationAndEvaluationExpendituresMember 2024-11-30 0001173643 ifrs-full:MiningPropertyMember 2024-11-30 0001173643 trx:ProcessingPlantAndRelatedInfrastructureMember 2024-11-30 0001173643 ifrs-full:MachineryMember 2024-11-30 0001173643 trx:RightofuseAssetMember 2024-11-30 0001173643 trx:OtherMember 2024-11-30 0001173643 trx:TotalMember 2024-11-30 0001173643 trx:PurchaseAgreementMember 2022-08-11 0001173643 2023-07-11 0001173643 2023-09-26 0001173643 2023-11-29 0001173643 2024-05-06 0001173643 2024-10-30 0001173643 trx:DerivativeWarrantLiabilitiesMember 2024-08-31 0001173643 trx:DerivativeWarrantLiabilitiesMember 2024-09-01 2024-11-30 0001173643 trx:DerivativeWarrantLiabilitiesMember 2024-11-30 0001173643 trx:DerivativeWarrantLiabilitiesMember ifrs-full:BottomOfRangeMember 2024-09-01 2024-11-30 0001173643 trx:DerivativeWarrantLiabilitiesMember ifrs-full:TopOfRangeMember 2024-09-01 2024-11-30 0001173643 trx:DerivativeWarrantLiabilitiesMember ifrs-full:BottomOfRangeMember 2023-09-01 2024-08-31 0001173643 trx:DerivativeWarrantLiabilitiesMember ifrs-full:TopOfRangeMember 2023-09-01 2024-08-31 0001173643 trx:DerivativeWarrantLiabilitiesMember 2023-09-01 2024-08-31 0001173643 trx:StockOptionsMember 2024-09-01 2024-11-30 0001173643 ifrs-full:WarrantsMember 2024-09-01 2024-11-30 0001173643 trx:StockOptionsMember 2023-09-01 2023-11-30 0001173643 trx:RestrictedShareUnitMember 2024-09-01 2024-11-30 0001173643 trx:RestrictedShareUnitMember 2023-09-01 2023-11-30 0001173643 ifrs-full:WarrantsMember 2023-09-01 2023-11-30 0001173643 trx:OmnibusEquityIncentivePlanMember 2024-11-30 0001173643 trx:OmnibusEquityIncentivePlanMember 2024-08-31 0001173643 trx:RestrictedStockUnitMember 2024-09-01 2024-11-30 0001173643 trx:RestrictedStockUnitMember 2023-09-01 2023-11-30 0001173643 trx:StockOptions1Member 2024-09-01 2024-11-30 0001173643 trx:CanadianDollarsDenominatedStockOptionsMember 2024-08-31 0001173643 trx:CanadianDollarsDenominatedStockOptionsMember 2024-09-01 2024-11-30 0001173643 trx:CanadianDollarsDenominatedStockOptionsMember 2024-11-30 0001173643 trx:Range1Member trx:StockOptionsMember 2024-11-30 0001173643 trx:Range1Member trx:StockOptionsMember 2024-09-01 2024-11-30 0001173643 trx:Range2Member trx:StockOptionsMember 2024-11-30 0001173643 trx:Range2Member trx:StockOptionsMember 2024-09-01 2024-11-30 0001173643 trx:Range3Member trx:StockOptionsMember 2024-11-30 0001173643 trx:Range3Member trx:StockOptionsMember 2024-09-01 2024-11-30 0001173643 trx:StockOptionsMember 2024-11-30 0001173643 trx:StockOptions1Member 2024-11-30 0001173643 trx:StockOptions1Member 2024-08-31 0001173643 trx:Range1Member trx:StockOptions1Member 2024-11-30 0001173643 trx:Range1Member trx:StockOptions1Member 2024-09-01 2024-11-30 0001173643 trx:Range2Member trx:StockOptions1Member 2024-11-30 0001173643 trx:Range2Member trx:StockOptions1Member 2024-09-01 2024-11-30 0001173643 2023-09-01 2024-08-31 0001173643 trx:PrivatePlacementFinancingWarrantsFebruary112021Member 2024-11-30 0001173643 trx:PrivatePlacementFinancingWarrantsFebruary112021Member 2024-09-01 2024-11-30 0001173643 trx:PrivatePlacementFinancingBrokerWarrantsFebruary112021Member 2024-11-30 0001173643 trx:PrivatePlacementFinancingBrokerWarrantsFebruary112021Member 2024-09-01 2024-11-30 0001173643 trx:PrivatePlacementFinancingWarrantsJanuary262022Member 2024-11-30 0001173643 trx:PrivatePlacementFinancingWarrantsJanuary262022Member 2024-09-01 2024-11-30 0001173643 trx:PrivatePlacementFinancingPlacementAgentWarrantsJanuary262022Member 2024-11-30 0001173643 trx:PrivatePlacementFinancingPlacementAgentWarrantsJanuary262022Member 2024-09-01 2024-11-30 0001173643 ifrs-full:NoncontrollingInterestsMember trx:BuckreefMember 2024-09-01 2024-11-30 0001173643 ifrs-full:NoncontrollingInterestsMember trx:BuckreefMember 2023-09-01 2023-11-30 0001173643 ifrs-full:NoncontrollingInterestsMember trx:BuckreefMember 2024-11-30 0001173643 ifrs-full:NoncontrollingInterestsMember trx:BuckreefMember 2024-08-31 0001173643 trx:RSUsMember 2024-09-01 2024-11-30 0001173643 trx:RSUsMember 2023-09-01 2023-11-30 0001173643 trx:TanzaniaMember 2024-09-01 2024-11-30 0001173643 trx:TanzaniaMember 2023-09-01 2023-11-30 0001173643 trx:CanadaMember 2024-11-30 0001173643 trx:CanadaMember 2024-08-31 0001173643 trx:TanzaniaMember 2024-11-30 0001173643 trx:TanzaniaMember 2024-08-31 0001173643 trx:MineralPropertyPlantAndEquipmentMember 2024-09-01 2024-11-30 0001173643 trx:MineralPropertyPlantAndEquipmentMember 2023-09-01 2023-11-30 iso4217:USD xbrli:shares iso4217:USD xbrli:shares xbrli:pure iso4217:CAD iso4217:CAD xbrli:shares utr:oz

Exhibit 99.1

 

 

 

 

 

 

TRX Gold Corporation

Interim Condensed Consolidated

Financial Statements

(Unaudited)

 

For the three months ended

November 30, 2024 and 2023

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TRX Gold Corporation

Interim Condensed Consolidated Statements of Financial Position

(Unaudited)

(Expressed in Thousands of US Dollars)

 

              
   Note  November 30, 2024   August 31, 2024 
Assets             
Current assets             
Cash     $6,787   $8,331 
Amounts receivable  4   2,307    1,958 
Prepayments and other assets  5   1,215    1,246 
Inventories  6   6,534    6,249 
Total current assets      16,843    17,784 
Other long-term assets  4   3,373    3,259 
Mineral property, plant and equipment  7   82,416    77,817 
Total assets     $102,632   $98,860 
Liabilities             
Current liabilities             
Amounts payable and accrued liabilities     $15,876   $15,545 
Income tax payable  8   840    1,411 
Current portion of deferred revenue  9   1,322    1,653 
Current portion of lease liabilities  10   903    401 
Derivative financial instrument liabilities  11   1,454    2,273 
Total current liabilities      20,395    21,283 
Lease liabilities  10   1,951    942 
Deferred income tax liability  8   10,796    9,505 
Provision for reclamation      1,127    1,091 
Total liabilities      34,269    32,821 
Equity             
Share capital      166,313    165,945 
Share-based payments reserve   13   8,970    9,151 
Warrants reserve   14   1,700    1,700 
Accumulated deficit       (120,912)   (121,893)
Equity attributable to shareholders      56,071    54,903 
Non-controlling interest  15   12,292    11,136 
Total equity      68,363    66,039 
Total equity and liabilities     $102,632   $98,860 

 

 

The accompanying notes are an integral part of these interim condensed consolidated financial statements.

 

 2 

 

TRX Gold Corporation

Interim Condensed Consolidated Statements of Income (Loss) and Comprehensive Income (Loss)

(Unaudited)

(Expressed in Thousands of US Dollars, except per share amounts)

 

 

                
       Three months ended November 30, 
   Note   2024   2023 
             
Revenue   19   $12,528   $9,404 
                
Cost of sales               
Production costs        (5,846)   (4,508)
Royalty        (942)   (695)
Depreciation        (906)   (484)
Total cost of sales        (7,694)   (5,687)
Gross profit        4,834    3,717 
General and administrative expenses   17    (1,425)   (2,211)
Change in fair value of derivative financial instruments   11    819    199 
Foreign exchange losses        (77)   (80)
Interest and other expenses        (321)   (473)
Income before tax        3,830    1,152 
Income tax expense   8    (1,693)   (1,191)
Net income (loss) and comprehensive income (loss)       $2,137   $(39)
                
Net income (loss) and comprehensive income (loss) attributable to:               
Shareholders       $981   $(966)
Non-controlling interest        1,156    927 
Net income (loss) and comprehensive income (loss)       $2,137   $(39)
                
Basic and diluted earnings (loss) per share   12   $0.00   $(0.00)

 

 

 

The accompanying notes are an integral part of these interim condensed consolidated financial statements.

 

 3 

 

TRX Gold Corporation

Interim Condensed Consolidated Statements of Changes in Equity

(Unaudited)

(Expressed in Thousands of US Dollars, except share amounts)

 

                                         
     Share Capital      Reserves                      
     Number of
Shares 
     Amount      Share-based
payments 
     Warrants      Accumulated
deficit 
     Shareholders'
equity 
     Non-
controlling
interests 
     Total
equity 
 
                                         
Balance at August 31, 2023   277,625,317   $164,816   $8,807   $1,700   $(121,423)  $53,900   $7,156   $61,056 
Shares issued for share-based payments (Note 13)   1,465,417    642    (632)   -    -    10    -    10 
Share-based compensation expense (Note 13)   -    -    865    -    -    865    -    865 
Witholding tax impact on share-based payments   -    -    (357)   -    -    (357)   -    (357)
Net (loss) income for the period   -    -    -    -    (966)   (966)   927    (39)
Balance at November 30, 2023   279,090,734   $165,458   $8,683   $1,700   $(122,389)  $53,452   $8,083   $61,535 
Shares issued for share-based payments   1,100,002    487    (489)   -    -    (2)   -    (2)
Share-baseds compensation expense   -    -    1,153    -    -    1,153    -    1,153 
Witholding tax impact on share-based payments   -    -    (196)   -    -    (196)   -    (196)
Net income for the period   -    -    -    -    496    496    3,053    3,549 
Balance at August 31, 2024   280,190,736   $165,945   $9,151   $1,700   $(121,893)  $54,903   $11,136   $66,039 
Shares issued for share-based payments (Note 13)   519,215    368    (370)   -    -    (2)   -    (2)
Share-based compensation expense (Note 13)   -    -    189    -    -    189    -    189 
Net income for the period   -    -    -    -    981    981    1,156    2,137 
Balance at November 30, 2024   280,709,951   $166,313   $8,970   $1,700   $(120,912)  $56,071   $12,292   $68,363 

 

 

 

The accompanying notes are an integral part of these interim condensed consolidated financial statements.

 

 4 

 

TRX Gold Corporation

Interim Condensed Consolidated Statements of Cash Flows

(Unaudited)

(Expressed in Thousands of US Dollars)

 

              
      Three months ended
November 30,
 
   Note  2024   2023 
            
Operating             
Net income (loss)     $2,137   $(39)
Adjustments for items not involving cash:             
Non-cash items  21   1,547    2,955 
Changes in non-cash working capital:             
(Increase) decrease in amounts receivable      (209)   1,032 
Increase in inventories      (446)   (343)
Decrease in prepaid and other assets      31    79 
(Decrease) increase in amounts payable and accrued liabilities      (87)   1,863 
Decrease in income tax payable      (592)   (408)
Cash provided by operating activities     $2,381   $5,139 
              
Investing             
Exploration and evaluation assets and expenditures     $(431)  $(91)
Purchase of mineral property, plant and equipment      (3,155)   (3,683)
Increase in other long-term assets      (114)   (286)
Cash used in investing activities     $(3,700)  $(4,060)
              
Financing             
Withholding taxes on settlement of share-based payments     $(2)  $(357)
Lease payments  10   (223)   (24)
Cash used in financing activities     $(225)  $(381)
              
Net (decrease) increase in cash     $(1,544)  $698 
Cash at beginning of the period      8,331    7,629 
Cash at end of the period     $6,787   $8,327 
              
Taxes paid in cash     $994   $700 
Interest paid on leases      70     1 

 

 

The accompanying notes are an integral part of these interim condensed consolidated financial statements.

 

 5 

TRX Gold Corporation

Notes to the Interim Condensed Consolidated Financial Statements

For the three months ended November 30, 2024 and 2023

(Unaudited)

(Expressed in Thousands of US dollars, except for share and per share amounts)

 

1.Nature of operations

 

TRX Gold Corporation (“TRX Gold” or the “Company”) was incorporated in the Province of Alberta on July 5, 1990 under the Business Corporations Act (Alberta). The Company’s principal business activity is the exploration, development and production of mineral property interests in the United Republic of Tanzania (“Tanzania”).

 

The Company’s registered office is 400 3rd Avenue SW, Suite 3700, Calgary, Alberta, T2P 4H2, Canada and the Company’s principal place of business is 277 Lakeshore Road E, Suite 403, Oakville, Ontario, L6J 6J3, Canada.

 

The Company’s common shares are listed on the Toronto Stock Exchange in Canada (TSX: TRX) and NYSE American in the United States of America (NYSE American: TRX).

 

The Company is primarily focused on development and mining operations, exploring, and evaluating its mineral properties. The business of exploring and mining for minerals involves a high degree of risk. The underlying value of the mineral properties is dependent upon the existence and economic recovery of mineral resources and reserves, the ability to raise long-term financing to complete the development of the properties, government policies and regulations, and upon future profitable production or, alternatively, upon the Company’s ability to dispose of its interest on an advantageous basis; all of which are uncertain.

 

2.Basis of preparation

 

a)Statement of compliance

 

The Company’s interim condensed consolidated financial statements have been prepared in accordance with International Accounting Standards 34, Interim Financial Reporting, as issued by the International Accounting Standards Board (“IASB”). The interim condensed consolidated financial statements do not include all disclosures required by International Financial Reporting Standards (“IFRS”) for annual financial statements and should be read in conjunction with the Company’s consolidated financial statements for the year ended August 31, 2024.

 

These interim condensed consolidated financial statements were approved by the Board of Directors of the Company on January 9, 2025.

 

b)Basis of presentation and measurement

 

These interim condensed consolidated financial statements have been prepared on a going concern basis under the historical cost basis, except for certain financial assets and liabilities which are measured at fair value as disclosed in Note 18. All amounts in these interim condensed consolidated financial statements are presented in United States dollars with all amounts rounded to the nearest thousand, except for share and per share data, or as otherwise noted. Reference herein of $ or USD is to United States dollars and C$ or CAD is to Canadian dollars.

 

 

 

 

 

 

 6 

TRX Gold Corporation

Notes to the Interim Condensed Consolidated Financial Statements

For the three months ended November 30, 2024 and 2023

(Unaudited)

(Expressed in Thousands of US dollars, except for share and per share amounts)

 

3.Material accounting policies, judgements and estimates

 

The accounting policies, judgements and estimates applied in these interim condensed consolidated financial statements are consistent with those set out in Notes 3 and 4 of the Company’s annual consolidated financial statements for the year ended August 31, 2024.

 

4.Amounts receivable

 

          
   November 30, 2024   August 31, 2024 
Sales tax receivable(1)  $5,599   $5,144 
Other   81    73 
Other receivable   5,680    5,217 
Less: Long-term portion   (3,373)   (3,259)
Total amounts receivable  $2,307   $1,958 

 

(1)Sales tax receivables consist of harmonized services tax and value added tax (“VAT”) due from Canadian and Tanzanian tax authorities, respectively. Tanzanian tax regulations allow for VAT receivable to be refunded or set-off against other taxes due to the Tanzania Revenue Authority ("TRA"). The Company has historically experienced delays in receiving payment or confirmation of offset against other taxes. The Company is in communication with the TRA and there is an expectation for either cash payments or offsetting of VAT receivable against other taxes in the future. VAT which the Company does not expect to recover within the next 12 months has been classified as long-term assets.

 

The Company held no collateral for any receivables. During the three months ended November 30, 2024, the Company recovered $0.9 million (2023 - $nil) of VAT refunds from the TRA.

 

5.Prepayments and other assets

 

          
   November 30, 2024   August 31, 2024 
Prepaid expenses  $508   $539 
Deferred financing costs(1)   707    707 
Total prepayments and other assets  $1,215   $1,246 

 

(1)Consists of $0.5 million in commitment fees paid with respect to a share purchase agreement whereby the Company, at its sole discretion, has the right to sell up to $10 million of its common shares over a 36-month period and $0.2 million in deferred financing costs related to an At-the-Market Offering Agreement entered on May 12, 2023.

 

 7 

TRX Gold Corporation

Notes to the Interim Condensed Consolidated Financial Statements

For the three months ended November 30, 2024 and 2023

(Unaudited)

(Expressed in Thousands of US dollars, except for share and per share amounts)

 

6.Inventories

 

          
   November 30, 2024   August 31, 2024 
Ore stockpile  $4,491   $4,533 
Gold in circuit   836    837 
Gold doré   37    55 
Total precious metals inventories   5,364    5,425 
Supplies   1,170    824 
Total inventories  $6,534   $6,249 

 

7.Mineral property, plant and equipment

 

                                    
   Exploration and evaluation expenditures(1)   Mineral properties   Processing plant and related infrastructure   Machinery and equipment(2)  

Right-

of-use assets

    Other(3)   Total 
Cost                                    
As at August 31, 2024  $2,281   $48,161   $29,948   $2,041   $1,721   $ 192    $84,344 
Additions   431    1,217    1,235    127    2,352     -     5,362 
As at November 30, 2024   2,712    49,378    31,183    2,168    4,073     192     89,706 
Accumulated depreciation                                    
As at August 31, 2024  $-   $2,876   $2,465   $1,067   $38   $ 81    $6,527 
Depreciation   -    412    112    72    162     5     763 
As at November 30, 2024   -    3,288    2,577    1,139    200     86     7,290 
Net book value                                    
As at August 31, 2024  $2,281   $45,285   $27,483   $974   $1,683   $ 111    $77,817 
As at November 30, 2024   2,712    46,090    28,606    1,029    3,873     106     82,416 

 

(1)Represents exploration and evaluation expenditures related to the Anfield and Stamford Bridge deposits on the Buckreef property.
(2)Includes automotive and computer equipment and software.
(3)Includes leasehold improvements

 

 

8.Income tax

 

Income tax expense is recognized based on management’s estimate of the weighted average annual income tax rate expected for the full financial year. The maximum amount of tax losses that a business can utilize in Tanzania is 60% (2023 - 70%) of its taxable profit for the current year. The remaining 40% (2023 - 30%) of taxable profit is subject to a statutory tax rate of 30%. As a result, Buckreef’s current income tax is calculated at an effective tax rate of 12% (2023 - 9%) until Buckreef’s tax loss carryforwards are fully utilized. Tax losses in Tanzania can only be utilized by the entity to which the tax losses relate to.

 

The carrying value of Buckreef’s Mineral Property, Plant and Equipment is higher than their tax written down values due to historical mining incentives in Tanzania and accelerated depreciation for tax purposes. The taxable temporary difference between the carrying value of Mineral Property, Plant and Equipment and its tax basis in excess of available tax loss carryforwards resulted in a deferred tax liability.

 

 

 8 

TRX Gold Corporation

Notes to the Interim Condensed Consolidated Financial Statements

For the three months ended November 30, 2024 and 2023

(Unaudited)

(Expressed in Thousands of US dollars, except for share and per share amounts)

 

For the three months ended November 30, 2024, the Company recorded income tax expense of $1.7 million, comprised of current income tax expense of $0.4 million and deferred income tax expense of $1.3 million (2023 - $1.2 million income tax expense comprised of current income tax expense of $0.3 million and deferred income tax expense of $0.9 million).

 

9.Deferred revenue

 

On August 11, 2022, the Company entered into a $5 million prepaid Gold Doré Purchase Agreement (“Agreement”) with OCIM Metals and Mining S.A. The Agreement requires funds to be made available to the Company in two tranches. On July 11, 2023, the Company drew $1.0 million from the second tranche of the Agreement in exchange for delivering 46.4 ounces of gold per month, commencing October 2023, for a total of 603 ounces of gold over 13 months. During November 2023, the Company fully settled $2.5 million drawn on the first tranche of the Agreement. On September 26, 2023, the Company drew an additional $0.5 million from the second tranche of the Agreement in exchange for delivering 23.5 ounces of gold per month, commencing December 2023, for a total of 305.4 ounces of gold over 13 months. On November 29, 2023, the Company drew an additional $1.0 million from the second tranche of the Agreement in exchange for delivering 44.1 ounces of gold per month, commencing February 2024, for a total of 573.2 ounces of gold over 13 months. On May 6, 2024, the Company amended the terms of the Agreement to allow for additional prepayments and drew $1.0 million in exchange for delivering 40.85 ounces of gold per month, commencing June 2024, for a total of 490.2 ounces of gold over 12 months. On October 30, 2024, the Company drew an additional $0.5 million in exchange for delivering 17 ounces of gold per month, commencing November 2024, for a total of 204 ounces of gold over 12 months.

 

     
   Amount 
As at August 31, 2024  $1,653 
Drawdown   500 
Accretion of deferred revenue (Note 21)   84 
Revenue recognized   (915)
As at November 30, 2024  $1,322 

 

10.Lease liabilities

 

Lease liabilities are measured at the discounted value of future lease payments using the lease-specific incremental borrowing rate. Lease payments are apportioned between interest expense and the reduction of the liability. Interest expense is based on the lease-specific incremental borrowing rate at the commencement date of the lease. The incremental borrowing rate differs between each category of asset, location of asset and the duration of the lease. The Company’s lease liabilities primarily comprise of leases for 13 pieces of mobile equipment for use in Buckreef’s mining operations.

 

 

 

 

 

 9 

TRX Gold Corporation

Notes to the Interim Condensed Consolidated Financial Statements

For the three months ended November 30, 2024 and 2023

(Unaudited)

(Expressed in Thousands of US dollars, except for share and per share amounts)

 

The carrying amounts of lease liabilities and movements during the period were:

 

     
   Amount 
As at August 31, 2024  $1,343 
Additions   1,665 
Accretion of lease liabilities (Note 21)   70 
Lease payments   (223)
Foreign exchange   (1)
As at November 30, 2024  $2,854 

 

          
   November 30, 2024   August 31, 2024 
Current portion of lease liabilities  $903   $401 
Lease liabilities   1,951    942 
Balance at end of period  $2,854   $1,343 

 

The following amounts are recognized in the statement of income and comprehensive income:

 

          
   For the three months ended Nov 30, 
   2024   2023 
Depreciation expense for right-of-use assets  $162   $11 
Accretion of lease liabilities   70    1 
Total amount  $232   $12 

 

As at November 30, 2024, the Company was committed to a lease for one additional piece of equipment which had not yet commenced with payments totaling $0.7 million.

 

As at November 30, 2024, the Company had the following lease commitments:

 

     
   Amount 
Not later than one month  $124 
Later than one month and not later than three months   201 
Later than three months and not later than one year   920 
Later than one year and not later than five years   2,177 
Total undiscounted lease commitments  $3,422 

 

As at November 30, 2024, the carrying value of right-of-use assets amounted to $3.9 million (August 31, 2024 - $1.7 million). Mobile equipment under lease contracts are depreciated over their useful life as the purchase price at the end of the lease term is immaterial.

 

 10 

TRX Gold Corporation

Notes to the Interim Condensed Consolidated Financial Statements

For the three months ended November 30, 2024 and 2023

(Unaudited)

(Expressed in Thousands of US dollars, except for share and per share amounts)

 

11.Derivative financial instrument liabilities

 

          
   November 30, 2024   August 31, 2024 
Derivative warrant liabilities  $1,454   $2,273 
Total derivative financial instrument liabilities  $1,454   $2,273 

 

a)Derivative warrant liabilities

 

     
   Amount 
As at August 31, 2024  $2,273 
Change in fair value   (819)
As at November 30, 2024  $1,454 

 

Derivative warrant liabilities of $1.5 million will only be settled by issuing equity of the Company. For the three months ended November 30, 2024, fair value changes amounted to a gain of $0.8 million (2023 - gain of $0.2 million).

 

Fair values of derivative warrant liabilities were calculated using the Black-Scholes Option Pricing Model with the following assumptions:

 

      
   November 30, 2024  August 31, 2024
Share price  $0.36  $0.39
Risk-free interest rate  4.08% - 4.22%  3.82% - 4.13%
Dividend yield  0%  0%
Expected volatility  43% - 45%  47% - 49%
Remaining term (in years)  1.22.2  1.52.4

 

The fair value is classified as level 3 as expected volatilities is determined using adjusted historical volatilities and were therefore not an observable input.

 

Sensitivity analysis

 

If expected volatility, the significant unobservable input, had been higher or lower by 10% and all other variables were held constant, net income and net assets for the three months ended November 30, 2024 would increase or decrease by:

 

          
     November 30, 2024 
10% change in expected volatilities    Increase     Decrease 
(Loss) income  $(493)  $443 

 

 11 

TRX Gold Corporation

Notes to the Interim Condensed Consolidated Financial Statements

For the three months ended November 30, 2024 and 2023

(Unaudited)

(Expressed in Thousands of US dollars, except for share and per share amounts)

 

12.Earnings (loss) per share

 

          
   Three months ended November 30, 
   2024   2023 
Net income (loss) attributable to shareholders  $981   $(966)
Weighted average number of common shares for basic EPS(1)   291,668,469    285,283,429 
Effect of dilutive stock options, warrants, RSUs and share awards   1,826,542    - 
Weighted average number of common shares for diluted EPS(1)   293,495,011    285,283,429 

 

(1)The weighted average number of common shares for basic and diluted EPS include 11.0 million gross number of vested, but unissued, common shares relating to common share awards.

 

For the three months ended November 30, 2024, the weighted average number of common shares for diluted EPS excluded 10.5 million stock options and 36.2 million warrants that were anti-dilutive for the period (2023 - 15.4 million stock options, 2.8 million RSUs, 4.6 million common share awards and 39.0 million warrants).

 

13.Share-based payments reserve

 

Share-based compensation expense for the three months ended November 30, 2024 totaled $0.2 million (2023 - $0.9 million).

 

As at November 30, 2024, the Company had 6,942,109 (August 31, 2024 - 5,997,632) share awards available for issuance under the Omnibus Equity Incentive Plan.

 

a)Stock options

 

Canadian Dollars denominated stock options

 

          
  

Number of stock

options

  

Weighted average

exercise price per share

 
Balance – August 31, 2024   4,986,000    CAD $0.41 
Options exercised(1)   (562,000)   CAD $0.42 
Balance – November 30, 2024   4,424,000    CAD $0.41 

 

(1)The weighted average share price at the time of the option exercise was C$0.53.

 

Options to purchase common shares carry exercise prices and terms to maturity as follows:

 

                  
          Remaining 
   Number of options   Expiry  contractual 
Exercise price  Outstanding   Exercisable   Date  life (years) 
C$0.40   2,259,000    2,259,000   October 11, 2026   1.9 
C$0.43   2,065,000    2,065,000   September 29, 2026   1.8 
C$0.35   100,000    100,000   January 2, 2027   2.1 
C$0.41(1)   4,424,000    4,424,000       1.9(1)

 

(1)Total represents weighted average.

 

 12 

TRX Gold Corporation

Notes to the Interim Condensed Consolidated Financial Statements

For the three months ended November 30, 2024 and 2023

(Unaudited)

(Expressed in Thousands of US dollars, except for share and per share amounts)

 

US Dollars denominated stock options

 

          
   Number of stock options   Weighted average exercise price per share 
Balance – November 30, 2024 and August 31, 2024   10,450,000   $0.49 

 

Options to purchase common shares carry exercise prices and terms to maturity as follows:

 

                  
          Remaining 
   Number of options   Expiry  contractual 
Exercise price  Outstanding   Exercisable   Date  life (years) 
USD $0.50   7,375,000    4,425,000   August 17, 2027   2.7 
USD $0.45   3,075,000    1,230,000   August 28, 2028   3.7 
USD $0.49(1)   10,450,000    5,655,000       3.0(1)
(1)  Total represents weighted average.

 

For the three months ended November 30, 2024, share-based compensation expense related to stock options totaled $0.1 million (2023 - $0.2 million).

 

b)Restricted Share Units:

 

The following table sets out activity with respect to outstanding RSUs:

 

     
   Number of RSUs 
Balance – November 30, 2024 and August 31, 2024   1,498,385 

 

For the three months ended November 30, 2024, share-based payment expenses related to RSUs totaled $0.1 million (2023 - $0.5 million).

 

14.Warrants reserve

 

               
   Number of warrants   Weighted average exercise price per share   Weighted average remaining contractual life (years) 
Balance – August 31, 2024   36,190,769   $0.62    1.9 
Balance – November 30, 2024   36,190,769   $0.62    1.7 

 

 13 

TRX Gold Corporation

Notes to the Interim Condensed Consolidated Financial Statements

For the three months ended November 30, 2024 and 2023

(Unaudited)

(Expressed in Thousands of US dollars, except for share and per share amounts)

 

As at November 30, 2024, the following warrants were outstanding:

 

             
   Number of
Warrants
   Exercise price   Expiry date
Private placement financing warrants - February 11, 2021   16,461,539   $0.80   February 11, 2026
Private placement financing broker warrants - February 11, 2021   1,152,307    $0.80   February 11, 2026
Private placement financing warrants - January 26, 2022   17,948,718   $0.44   January 26, 2027
Private placement financing placement agent warrants - January 26, 2022   628,205   $0.44   January 26, 2027
Balance – November 30, 2024   36,190,769   $0.62(1)   

 

(1)Total represents weighted average.

 

 

15.Non-controlling interest

 

Summarized financial information for Buckreef is disclosed below:

 

          
   Three months ended November 30, 
Income Statement  2024   2023 
Revenue  $12,528   $9,404 
Depreciation   906    484 
Accretion expense   188    140 
Income tax expense   1,693    1,191 
Comprehensive income for the period   2,568    2,061 

 

           
Statement of Financial Position  November 30, 2024   August 31, 2024 
Current assets  $10,746   $11,297 
Non-current assets   83,681    78,952 
Current liabilities   (17,057)   (16,973)
Non-current liabilities   (13,863)   (11,528)
Advances from parent, net   (29,371)   (30,210)

 

           
   Three months ended November 30, 
Statement of Cash Flows  2024   2023 
Cash provided by operating activities  $3,572   $6,110 
Cash used in investing activities   (3,675)   (4,057)
Cash used in financing activities   (1,090)   (1,089)

 

 14 

TRX Gold Corporation

Notes to the Interim Condensed Consolidated Financial Statements

For the three months ended November 30, 2024 and 2023

(Unaudited)

(Expressed in Thousands of US dollars, except for share and per share amounts)

 

16.Related party transactions

 

Related parties include the Board of Directors and officers, extended relatives and enterprises that are controlled by these individuals as well as certain consultants performing similar functions.

 

Remuneration of Directors and key management personnel of the Company was as follows:

 

          
   Three months ended
November 30,
 
Directors and key management personnel  2024   2023 
Remuneration  $366   $436 
Share-based compensation expense   93    693 
Total directors and key management personnel  $459   $1,129 

 

During the three months ended November 30, 2024, $0.1 million for stock options granted to key management personnel was expensed (2023 - $0.2 million) and $nil for RSUs granted to directors and key management personnel was expensed (2023 - $0.3 million).

 

During the three months ended November 30, 2024, $nil related to common share awards granted to key management personnel was expensed (2023 - $0.2 million). As of November 30, 2024, 11.0 million of vested common share awards have yet to be issued.

 

17.General and administrative expenses

 

          
   Three months ended
November 30,
 
   2024   2023 
Directors’ fees (Note 16)  $64   $60 
Insurance   61    85 
Office and general   60    67 
Shareholder information   151    158 
Professional fees   169    189 
Salaries and benefits (Note 16)   477    558 
Consulting   215    177 
Share-based compensation expense (Notes 13 and 16)   156    810 
Travel and accommodation   52    78 
Depreciation   15    13 
Other   5    16 
Total general and administrative expenses  $1,425   $2,211 

 

 15 

TRX Gold Corporation

Notes to the Interim Condensed Consolidated Financial Statements

For the three months ended November 30, 2024 and 2023

(Unaudited)

(Expressed in Thousands of US dollars, except for share and per share amounts)

 

18.Financial instruments

 

Fair value of financial instruments

 

The following table sets out the classification of the Company’s financial instruments as at November 30, 2024 and August 31, 2024:

 

          
   November 30, 2024   August 31, 2024 
Financial Assets          
Measured at amortized cost          
Amounts receivable  $2,307   $1,958 
Measured at fair value through profit or loss          
Cash   6,787    8,331 
           
Financial Liabilities          
Measured at amortized cost          
Amounts payables and accrued liabilities   15,876    15,545 
Measured at fair value through profit or loss          
Derivative financial instrument liabilities   1,454    2,273 

 

Cash, derivative warrant liabilities are classified as measured at fair value through profit and loss. Amounts receivable and amounts payable are classified as measured at amortized cost. The carrying value of the Company’s amounts receivable and amounts payable approximate their fair value due to the relatively short-term nature of these instruments.

 

Fair value estimates are made at a specific point in time based on relevant market information and information about financial instruments. These estimates are subject to and involve uncertainties and matters of significant judgment, and therefore cannot be determined with precision. Changes in assumptions could significantly affect the estimates.

 

The Company classifies its financial instruments carried at fair value according to a three-level hierarchy that reflects the significance of the inputs used in making the fair value measurements. The three levels of fair value hierarchy, giving the highest priority to Level 1 inputs and the lowest priority to Level 3 inputs, are as follows:

 

·Level 1 – Unadjusted quoted prices in active markets for identical assets or liabilities;
·Level 2 – Inputs other than quoted prices that are observable for assets and liabilities, either directly or indirectly; and
·Level 3 – Inputs for assets or liabilities that are not based on observable market data.

 

As at November 30, 2024 and August 31, 2024, cash was classified as Level 1 and derivative financial instruments (Note 11) were classified as Level 3 under the fair value hierarchy.

 

 16 

TRX Gold Corporation

Notes to the Interim Condensed Consolidated Financial Statements

For the three months ended November 30, 2024 and 2023

(Unaudited)

(Expressed in Thousands of US dollars, except for share and per share amounts)

 

19.Segmented information

 

Operating segments

 

The Company’s Chief Operating Decision Maker, its Chief Executive Officer, reviews the operating results, assesses the performance and makes capital allocation decisions of the Company viewed as a single operating segment engaged in mineral exploration and development in Tanzania. All amounts disclosed in the interim condensed consolidated financial statements represent this single reporting segment. The Company’s corporate division only earns interest revenue that is considered incidental to the activities of the Company and does not meet the definition of an operating segment as defined in IFRS 8, Operating Segments.

 

Geographic segments

 

The Company is in the business of mineral exploration and production in Tanzania. Information regarding the Company’s geographic locations are as follows:

 

          
   Three months ended
November 30,
 
Revenue  2024   2023 
Tanzania  $12,528   $9,404 
Total revenue  $12,528   $9,404 

 

During the three months ended November 30, 2024, the Company generated 93% (2023 – 90%) of its revenue from one (2023 – one) customer totalling $11.6 million (2023 – $8.5 million).

 

          
Non-current assets  November 30, 2024   August 31, 2024 
Canada  $30   $36 
Tanzania   85,759    81,040 
Total non-current assets  $85,789   $81,076 

 

 

20.Commitments and contingencies

 

Commitments:

 

In order to maintain its existing mining and exploration licenses, the Company is required to pay annual license fees. As at November 30, 2024 and August 31, 2024, these licenses remained in good standing and the Company is up to date on its license payments.

 

Contingencies:

 

The Company is involved in litigation and disputes arising in the normal course of operations. Management is of the opinion that the outcome of any potential litigation will not have a material adverse impact on the Company’s financial position or results of operations. Accordingly, no provisions for the settlement of outstanding litigation and potential claims have been accrued as at November 30, 2024 and August 31, 2024.

 

 17 

TRX Gold Corporation

Notes to the Interim Condensed Consolidated Financial Statements

For the three months ended November 30, 2024 and 2023

(Unaudited)

(Expressed in Thousands of US dollars, except for share and per share amounts)

 

21.Non-cash items

 

          
   Three months ended
November 30,
 
   2024   2023 
Depreciation  $921   $497 
Change in fair value of derivative financial instruments (Note 11)   (819)   (199)
Share-based compensation expense (Note 13)   189    875 
Accretion of provision for reclamation   36    27 
Deferred income tax expense (Note 8)   1,291    899 
Accretion of lease liabilities (Note 10)   70    1 
Deferred revenue (Note 9)   (415)   578 
Accretion of deferred revenue (Note 9)   84    112 
Foreign exchange losses   190    165 
Total non-cash items  $1,547   $2,955 

 

For the three months ended November 30, 2024, an increase in amounts payable and accrued liabilities related to purchase of mineral property, plant and equipment was $0.1 million (2023 – decrease of $0.6 million).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

18

 

Exhibit 99.2

 

 

TRX GOLD CORPORATION

 

MANAGEMENT’S DISCUSSION AND ANALYSIS

 

For the three month period ended November 30, 2024

 

 

 

 

Management’s Discussion

and Analysis

November 30, 2024 

 

The following Management’s Discussion and Analysis (“MD&A”) of the financial condition and results of operations for TRX Gold Corporation (“TRX Gold” or the “Company”) should be read in conjunction with the Company’s unaudited interim consolidated financial statements for the three months ended November 30, 2024, as well as the Company’s audited consolidated financial statements included in the Company’s Annual Report on Form 40-F and Annual Information Form for the year ended August 31, 2024. The financial statements and related notes of TRX Gold have been prepared in accordance with International Financial Reporting Standards (“IFRS”). Additional information, including our press releases, has been filed electronically on SEDAR+ and is available online under the Company’s profile at www.sedarplus.ca and on our website at www.TRXGold.com.

 

This MD&A reports our activities through January 14, 2025, unless otherwise indicated. References to the 1st quarter of 2025 or Q1 2025, and references to the 1st quarter of 2024 or Q1 2024 mean the three months ended November 30, 2024, and November 30, 2023, respectively. Unless otherwise noted, all references to currency in this MD&A refer to US dollars. Unless clearly otherwise referenced to a specific table, numbers referenced refer to numbered Endnotes on page 43.

 

Disclosure and Cautionary Statement Regarding Forward Looking Information

 

This MD&A contains certain forward-looking statements and forward-looking information, including without limitation statements about TRX Gold’s future business, operations and production capabilities. All statements, other than statements of historical fact, included herein are forward-looking statements and forward-looking information that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Although TRX Gold believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance. The actual achievements of TRX Gold or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors. These risks, uncertainties and factors include general business, legal, economic, competitive, political, regulatory and social uncertainties; actual results of exploration activities and economic evaluations; fluctuations in currency exchange rates; changes in costs; future prices of gold and other minerals; mining method, production profile and mine plan; delays in exploration, development and construction activities; changes in government legislation and regulation; the ability to obtain financing on acceptable terms and in a timely manner or at all; contests over title to properties; employee relations and shortages of skilled personnel and contractors; and the speculative nature of, and the risks involved in, the exploration, development and mining business.

 

Mr. William van Breugel, P.Eng, BASc (Hons), technical advisor to TRX Gold Corporation, is the Company’s Qualified Person under National Instrument 43-101 “Standards of Disclosure for Mineral Projects” (“NI 43-101”) and has reviewed and assumes responsibility for the scientific and technical content in this MD&A.

 

1 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

The disclosure contained in this MD&A of a scientific or technical nature relating to the Company’s Buckreef Project has been summarized or extracted from the technical report entitled “The National Instrument 43-101 Independent Technical Report, Updated Mineral Resource Estimate for the Buckreef Gold Mine Project, Tanzania, East Africa for TRX Gold” with an effective date (the “Effective Date”) of May 15, 2020 (the “2020 Technical Report”). The 2020 Technical Report was prepared by or under the supervision Mr. Wenceslaus Kutekwatekwa (Mining Engineer, Mining and Project Management Consultant) BSc Hons (Mining Eng.), MBA, FSAIMM, of Virimai Projects, and, Dr Frank Crundwell, MBA, PhD, a Consulting Engineer, each of whom is an independent Qualified Person as such term is defined in NI 43-101. The information contained herein is subject to all of the assumptions, qualifications and procedures set out in the 2020 Technical Report and reference should be made to the full details of the 2020 Technical Report which has been filed with the applicable regulatory authorities and is available on the Company’s profile at www.sedarplus.ca. The Company did not complete any new work that would warrant reporting material changes in the previously reported Mineral Resource (“MRE”) and Mineral Reserve statements during the period ended November 30, 2024. The 2020 Technical Report follows the CIM Definition Standards on Mineral Resources and Mineral Reserves (“CIM Definition Standards”) and the CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines (“CIM Guidelines”).

 

Certain information presented in this MD&A may constitute “forward-looking statements” and “forward looking information” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 and under securities legislation applicable in Canada, respectively. Such forward-looking statements and information are based on numerous assumptions, and involve known and unknown risks, uncertainties, and other factors, including risks inherent in mineral exploration and development, which may cause the actual results, performance, or achievements of the Company to be materially different from any projected future results, performance, or achievements expressed or implied by such forward-looking statements and information. Investors are referred to our description of the risk factors affecting the Company, as contained in our U.S. Securities and Exchange Commission (“SEC”) filings, including our Annual Report on Form 40-F and Report of Foreign Private Issuer on Form 6-K, and our Annual Information Form also posted on SEDAR+, for more information concerning these risks, uncertainties, and other factors.

 

TRX Gold Corporation

 

TRX Gold is rapidly advancing the Buckreef Gold Project. Anchored by a Mineral Resource published in May 2020[1], the project currently hosts a Measured and Indicated Mineral Resource (“M&I Resource”) of 35.88 million tonnes (“MT”) at 1.77 grams per tonne (“g/t”) gold containing 2,036,280 ounces (“oz”) of gold and an Inferred Mineral Resource of 17.8 MT at 1.11 g/t gold for 635,540 oz of gold. The leadership team is focused on creating both near-term and long-term shareholder value by increasing gold production to generate positive cash flow. The positive cash flow will be utilized for exploratory drilling with the goal of increasing the current mineral resource base and advancing the larger project development which represents 90% of current mineral resources. TRX Gold’s actions are led by the highest environmental, social and corporate governance (“ESG”) standards, evidenced by the relationships and programs that the Company has developed during its nearly two decades of presence in the Geita Region, Tanzania. Please refer to the Company’s Updated Mineral Resources Estimate for Buckreef Gold Project, dated May 15, 20201 and filed under the Company’s profile on SEDAR+ and with the SEC on June 23, 2020 (the “2020 Technical Report”) for more information.

 

 

 

 

 

 

 

1 See Cautionary Statement

 

2 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Highlights – First Quarter 2025

 

During Q1 2025 the Company continued to use cash flow generated from mining operations to fund additional growth at Buckreef Gold. During Q1 2025, the Company recorded production of 4,841 ounces of gold and continued to benefit from record gold spot prices, resulting in (i) revenue of $12.5 million, (ii) gross profit of $4.8 million, (iii) operating cashflow of $2.4 million, and (iv) Adjusted EBITDA1 of $4.4 million. The Company continued to execute on its business model of using cash flow generated from mining operations to fund additional growth and successful exploration at Buckreef Gold. The Company announced its two best drill results ever, which led to the discovery of a promising new gold mineralization shear zone named the Stamford Bridge Zone, which is highly prospective and may become a bridge between the Buckreef Main Zone, Eastern Porphyry and Anfield Zones. The Company also announced completion of the ongoing metallurgical variability study at Buckreef Gold, with results confirming excellent gold recovery rates for the processing of sulphide ore. The Company is in the process of developing finer grinding initiatives to increase gold recoveries, which is positive for both near term production potential and future Mineral Resource development. These positive results continue to demonstrate the growth potential at Buckreef Gold and reflect successful execution of the Company’s sustainable business plan where cash flow from operations funds value creating activities.

 

Key highlights for Q1 2025 include:

  

·During Q1 2025, the Company sold 4,813 ounces of gold, recognizing revenue of $12.5 million, gross profit of $4.8 million (39%), operating cashflow of $2.4 million and Adjusted EBITDA[1] of $4.4 million. The increase in revenue, gross profit and Adjusted EBITDA1 compared to the prior year comparative period is mainly related to a higher average gold price realized during Q1 2025. During the period, the Company sold 4,813 ounces of gold (Q1 2024: 4,895 ounces) at an average realized price (net)1 of $2,653 per ounce (Q1 2024: $1,942 per ounce).

 

·The Company continues to expect gold production for F2025 to be higher than F2024 levels, reflecting a full year of operations from the expanded 2,000 tpd processing plant, partially offset by a waste stripping campaign required to access high grade ore blocks to deliver consistent higher grade ore feed to the mill. The Company continues to expect cash cost per ounce to be in line with F2024 levels, mainly due to the impact of higher expected gold production and significantly lower mining and processing costs per tonne, offset by a lower average grade profile, in line with the scheduled mine sequence.

 

·During Q1 2025, the company announced the appointment of Richard Boffey as Chief Operating Officer of TRX Gold Corporation. Mr. Boffey is a seasoned executive, bringing more than 35 years of operational experience to the TRX Gold team and will be instrumental in the continued growth and development of Buckreef Gold.

 

·During Q1 2025, the Company announced the discovery of a promising new gold mineralization shear zone, named the “Stamford Bridge Zone”, where results are beginning to form what may become a potential 1-kilometer “bridge” between the Buckreef Gold Main Zone, where current operations are ongoing, with links to the parallel, high-priority, gold mineralization zone known as the Eastern Porphyry, and the prospective Anfield Zone to the southeast.

 

·During Q1 2025, the Company announced its two best drill results ever, on a gram x tonne x meters (“gtm”) basis, intersecting 37 meters (“m”) @ 6.86 g/t Au (253.82 gtm) from 130 m (hole BMDD315) and 35.5 m @ 5.48 g/t Au (194.54 gtm) from 64 m, located along the Stamford Bridge Zone.

 

 

 

Numerical annotations throughout the text of the remainder of this document refer to the endnotes found on page 43.

 

3 
 

Management’s Discussion

and Analysis

November 30, 2024 

·

Subsequent to Q1 2025, the Company announced three additional drill hole results (BMDD319-321) providing further evidence of gold mineralization along the Stamford Bridge Zone.

 

·During Q1 2025, the Company announced completion of the ongoing metallurgical variability study at Buckreef Gold, with results confirming excellent gold recovery rates for the processing of sulphide ore. Results demonstrate that a finer grind size leads to higher recovery rates, and the Company is currently in the process of developing finer grinding initiatives to achieve higher gold recoveries. This is positive for both near term production potential and future Mineral Resource development as the Company continues to focus on development of other high-priority gold zones, such as Stamford Bridge, Anfield and Eastern Porphyry.

 

·The Company achieved zero lost time injuries (“LTI”) and there were no reportable environmental or community related incidents during Q1 2025.

 

Newly Expanded 2,000 TPD Mill is Fully Commissioned and Operational

 

· During Q4 2024 the Company announced completion of the expanded processing plant to 2,000 tpd of nameplate processing capacity, which is expected to benefit plant throughput and gold production over F2025.

 

·The newly expanded processing plant was fully commissioned in early Q1 2025 (September 2024) following installation of the 4-way cyclone cluster and achieved, on average, 1,703 tpd of mill throughput in Q1 2025, a 108% increase over the prior year comparative period (Q1 2024), reaching a maximum of 2,073 tpd.

 

· As part of an initial phase of the plant expansion project to 2,000 tpd, during Q3 2024 the Company completed construction of the new crushing circuit. The expanded crushing system is fully commissioned and achieved an average of 1,610 tpd of crushed material over Q1 2025, including scheduled maintenance downtime, reaching a maximum of 2,674 tpd. The new crushing plant, combined with the old crushing circuit, is rated to process 3,600 to 4,800 tpd of ore at full capacity with new equipment comprising: run-of-mine (“ROM”) bin, apron feeder, conveyors, vibrating grizzly, primary jaw crusher and secondary and tertiary cone crushers. The crushing plant configuration is designed to produce a finely crushed ore ‘product’ suitable for the existing and future ball mills to improve grind size for a more efficient, cost-effective processing of sulphide ore. This new circuit is also expected to help drive increased throughput and recovery percentages and it continues to demonstrate the Company’s overall design philosophy of simplicity, redundancy, and durability making it a key component to support future growth. To assist in optimizing the crushing circuit, the Company has engaged an external consulting firm that specializes in comminution to help study and analyze the processing circuit configuration to identify gaps and optimization potential. The study expects to improve grindability and gold recovery.

 

·The total capital cost of the full mill expansion was budgeted to be approximately $6.0 million, which was completed on time and on budget. This marks Buckreef Gold’s third successful expansion project aimed at increasing annual gold production in a de-risked, self-funded and phased approach. Moreover, through this latest expansion, the project is expected to benefit from greater economies of scale, resulting from higher processing plant throughput and higher overhead cost absorption.

 

Best Drill Hole Results in History of Buckreef Gold – Announcement of Stamford Bridge Zone

 

· During Q1 2025, the Company announced its best drill result ever, on a gtm basis with hole BMDD315 intersecting 37 m @ 6.86 g/t Au (253.82 gtm) from 130 m. This drill hole result is approximately 250 m east of the Buckreef Main Zone, host to Buckreef Gold’s 2M+ ounce Au Mineral Resource1 and where current operations are ongoing in the Main Pit. This drill hole result comes following the previous best drill result, with hole BMDD310 intersecting 35.5 m @ 5.48 g/t Au (194.54 gtm) from 64 m. This drill hole result is approximately 200 m east of the Buckreef Main Zone.

 

4 
 

Management’s Discussion

and Analysis

November 30, 2024 

· The Company also announced the discovery of a promising new gold mineralization shear zone, named the “Stamford Bridge Zone” at which current drill results are revealing geological characteristics and mineral alterations similar to that at Buckreef’s Main Zone. Holes BMDD315 and BMDD310, mentioned above, are located along the Stamford Bridge Zone.

 

· Subsequent to Q1 2025, the Company announced three additional drill hole results (BMDD319-321) providing further evidence of gold mineralization along the Stamford Bridge Zone as follows:

 

· Hole BMDD319 intersected 21.0 m @ 8.63 g/t Au from 81.0 m (181.23 gtm).

 

· Hole BMDD320 intersected 20.5 m @ 5.14 g/t Au from 125.5 m (105.37 gtm).

 

· Hole BMDD321 intersected 5.0 m @ 2.74 g/t Au from 157.0 m (13.7 gtm).

 

· Thus far, drilling has covered 150 m of this newly identified mineralized structure and geological logging confirms the continuity of the structure. These results are beginning to form what can become a potential 1-kilometer “bridge” between the Buckreef Gold Main Zone, where current operations are ongoing, and the parallel, high-priority, gold mineralization zone known as the Eastern Porphyry. The latter also links to the Anfield Zone to the southeast, discovered in 2022.

 

· The Stamford Bridge shear zone has quickly become the Company’s exploration priority. An exploration program is underway to uncover the area’s true gold mineralization potential. The Company is preparing a geophysical survey campaign, which will focus on the Stamford Bridge trend line, as well as an area covering up to 500 meters to both the North and South sides of the trend line. Following the results of this campaign, a strategic drill campaign will resume on newly defined, high-priority targets.

 

Metallurgical Study Results – Higher Gold Recoveries Attainable at Buckreef Gold

 

·During Q1 2025, the Company announced completion of the ongoing metallurgical variability study3 at Buckreef Gold, with results confirming excellent gold recovery rates for the processing of sulphide ore. Metallurgical testing began at the Buckreef Main Zone in June of 2021, whereby a straightforward flowsheet comprising of crush, grind, flotation, regrind and CIL was developed by SGS Canada. In a laboratory, bulk sample testing returned gold recoveries between 85.3% to 95.4%. In June 2023, a 6,500-tonne bulk sample of sulphide ore was tested on site at Buckreef Gold’s existing milling facility. This successful test reported gold recoveries from sulphide ore of 88.7%. The recent and much larger metallurgical variability study reported in Q3 2024, reiterates results from past test work and is now of greater importance as Buckreef Gold is processing a higher proportion of sulphide ore (approximately 80% sulphides to 20% oxides) at its newly expanded milling facility.

 

·Highlights from the results demonstrate that (i) a finer grind size leads to a higher gold recovery as gold recovery rates increased from 81.2% to 92.5% as the grind became finer from 80% - 53 μm to 80% - 5 μm; (ii) recovery results were in line with current operational performance as composites tested showed recovery rates ranging from 79.9% to 87.0% in a gravity + floatation + leaching test at a grind size of 80% - 75 μm, which is consistent with what is being experienced in current operations; (iii) Buckreef Gold is experiencing a relatively consistent tailings grade, regardless of head grade, at a grind size of 80% - 75 μm, further supporting the fact that increased grinding will lead to higher recovery rates; and (iv) gold is finely disseminated in the pyrite and improved recoveries can be achieved by grinding finer below 25µm through rougher flotation and subsequent regrinding of the flotation concentrate, by using the regrind ball mill, with minimum energy consumption. The Company is currently in the process of developing finer grinding initiatives to achieve higher gold recoveries.

 

·These metallurgical study results are positive for future potential Mineral Resource development as the Company continues to focus on development of other high-priority gold zones, such as Stamford Bridge, Anfield and Eastern Porphyry, where brownfield exploration programs returned very similar geologic and mineralization characteristics as the Main Zone, to which similar milling processes could apply.

 

5 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Operational and Financial Details – First Quarter 2025

 

Mining and Processing

 

· During the three months ended November 30, 2024, Buckreef Gold reported zero LTI at site and recorded a safety incident frequency rate of 0 (per million hours), including contractors. The Company’s two main contractors, FEMA Builders Limited (“FEMA”) and STAMICO, recorded a safety incident frequency rate of 0 (per million hours).

 

· During Q1 2025, Buckreef Gold poured 4,841 ounces of gold (Q1 2024: 4,927 ounces) and sold 4,813 ounces of gold (Q1 2024: 4,895 ounces). Gold production in Q1 2025 was mainly in line with the prior year comparative period and reflects higher mill throughput of 1,703 tpd (Q1 2024: 817 tpd) following completion of the 2,000 tpd processing plant in Q4 2024, offset by a lower average recovery of 72% (Q1 2024: 81%) and lower average head grade of 1.29 g/t (Q1 2024: 2.57 g/t). The lower average head grade was due to mine sequencing where the scheduled mine plan is accessing lower grade ore blocks during Q1 2025 (in line with mine plan), concurrent with a scheduled stripping campaign to access higher grade ore blocks in the second half of F2025. The lower average recovery in Q1 2025 was mainly due to a higher proportion of blended material processed in Q1 2025 (24% oxide / 76% sulphide) compared to the prior year period where the mill processed oxide material at a higher average recovery. To assist in optimizing recovery for 2025, the Company has engaged an external consulting firm that specializes in comminution to help analyze the processing circuit configuration to identify gaps and optimization potential. The study expects to improve grindability (finer grind) and gold recovery, consistent with the results announced upon completion of the metallurgical variability study.

 

· Total ore tonnes mined of 103 kt in Q1 2025 were in line with the prior year period (Q1 2024: 102 kt) and waste tonnes mined increased to 821 kt in Q1 2025 (Q1 2024: 454 kt) as stripping activities focused on accelerating the pit expansion to the north end of the main zone in the second layback to expose ore for H2 2025. As a result of the increased stripping activity, the higher proportion of waste to ore tonnes contributed to a higher strip ratio of 8.0 (waste:ore tonnes) compared to the prior year period (4.5 waste:ore tonnes).

 

· Total ore tonnes processed of 1,703 tpd in Q1 2025 was 108% higher than the prior year comparative period (Q1 2024: 817 tpd), reaching a maximum of 2,073 tpd, following commissioning of the newly expanded processing plant in early Q1 2025 (September 2024).

 

· During Q4 2024, the Company entered into a finance lease agreement for fifteen pieces of heavy equipment, including six excavators, one dozer, one motor grader, one backhoe, one compactor, and three loaders. Half of this fleet will replace rented equipment currently operating in the plant, while the remaining equipment will be utilized in site development projects, roadway construction, and maintenance. Additionally, this equipment is capable of supporting and supplementing, when necessary, the contract mining fleet at the site. During Q1 2025, the Company also entered into a purchase agreement to procure a fleet of eight haul trucks to expand haulage capability and capacity. During Q1 2025, the Company received 13 pieces of equipment (of the 15 ordered), along with the delivery of 8 trucks in December 2024. Each piece has been successfully commissioned and is currently being utilized in various capacities across the site. The arrival of this equipment has significantly improved the cost profile in the areas where it has been deployed. To date, the Company has observed notable cost reductions in our site development work (river training and TSF 2.2 phase II raise) as well as plant feed operations, and we anticipate further benefits as the operators gain more experience. The remaining two pieces of equipment, a telehandler and a skid steer, are expected on-site in January 2025. Their arrival will complete the initial equipment purchase and is expected to benefit operating costs and strengthen site development capabilities over the remainder of F2025.

 

6 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

F2025 Outlook

 

· The Company continues to expect F2025 gold production to be higher than F2024 levels, reflecting a full year of operations from the expanded 2,000 tpd processing plant, partially offset by a waste stripping campaign required to access high grade ore blocks to deliver consistent higher grade ore feed to the mill. To maintain prudent capital management and an ability to fund the plant expansion to 2,000 tpd, the Company proactively deferred a portion of waste stripping originally scheduled for F2024, which limited access to certain high grade ore blocks as scheduled in the initial mine sequence. Following commissioning of the 2,000 tpd plant in Q4 2024, the Company has scheduled a waste stripping campaign in F2025 to access the originally scheduled ore blocks. It is expected that the updated mine sequence will begin to access these high grade ore blocks in the second half of F2025 benefiting production starting in Q3 and Q4 2025. As a result, gold production is expected to be lower in H1 2025 and higher production is expected in H2 2025. The Company continues to expect cash cost per ounce to be in line with F2024 levels, mainly due to the impact of higher expected gold production and significantly lower mining and processing costs per tonne, offset by a lower average grade profile, in line with the scheduled mine sequence. Cash cost per ounce is expected to be slightly higher in H1 2025 and lower in H2 2025 as the mine sequence begins to access higher grade ore blocks in H2 2025.

 

· Operating cash flow will be predominantly reinvested in the Company with a focus on value enhancing activities, including: (i) exploration and drilling with a focus on potential mineral resource expansion at Stamford Bridge, Buckreef Main (northeast and south), Buckreef West, Anfield, Eastern Porphyry extension; (ii) additional capital programs focused on plant optimizations, recovery improvements and production growth; and (iii) enhanced CSR/ESG programs.

 

· The Company continues to expect sustaining capital, excluding waste rock stripping, to be consistent with F2024 levels, and includes certain infrastructure investments at Buckreef Gold, including finalizing construction of a significantly expanded TSF (TSF 2.2 Lift 2), procurement of heavy equipment, including 6 excavators, 1 dozer, 1 motor grader, 1 backhoe, 1 compactor, 3 loaders and a fleet of haul trucks to support and supplement, when necessary, the contract mining fleet at site.

 

· Capitalized waste rock stripping will be expensed or capitalized based on the actual quarterly stripping ratio versus the expected life of mine stripping ratio and may be variable quarter over quarter and year over year. In F2025, the Company continues to expect capitalized stripping to be highest in H1 and then incurred evenly over Q3 and Q4 based on the expected mine plan.

 

· The Company continues to expect growth capital to be consistent with F2024 levels and includes expansion initiatives related to the long-term growth of Buckreef Gold, including plant optimizations aimed at increasing recovery, throughput and production and study costs aimed at expanding Buckreef Gold and developing the larger project.

 

· The Company continues to expect exploration spending to increase in F2025 and includes diamond drill and reverse circulation drilling services provided by the State Mining Corporation (“STAMICO”) for a program which includes brownfields drilling at Buckreef Main Zone (NE and SW), Buckreef West, Eastern Porphyry, and greenfield drilling at Stamford Bridge and Anfield.

 

7 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Inventory

 

·As at November 30, 2024, the ROM pad stockpile contained 248,002 tonnes at an average grade of 0.89 g/t with an estimated 7,080 ounces of contained gold. A further stockpile of crushed mill feed of 15,874 tonnes at 1.44 g/t containing an estimated 733 ounces of gold has been accumulated between the crusher and mill. The fair market value of the ounces of gold on the ROM pad stockpile and crushed ore stockpile is approximately $20.7 million using the London PM Fix gold price of $2,651 per ounce as at November 30, 2024. Since year-end August 31, 2024, the Company drew down on the ROM pad stockpile (2,469 ounces) and crushed ore stockpile (123 ounces) to support mill feed. These fluctuations in ROM pad inventory are anticipated throughout the course of the year and are designed to ensure steady state processing. During the three months ended November 30, 2024, the Company processed stockpiled and mined material through the expanded 2,000 tpd processing plant and consequently reported gold in circuit, reflecting a buildup of metal inventory in the CIL tanks. The Company reported 942 ounces of gold in circuit at November 30, 2024, which reflected a decrease of 217 ounces from August 31, 2024, following gold elution and smelting activity during the year.

 

Tailings Storage (TSF 2.2)

 

·During Q1 2025, the Company finished a river training (relocation) project required to be completed prior to the start of the TSF 2.2 Phase II work. The remaining work on phase II construction involves clearing, box cutting, excavation & compaction of the berm, slope finishing, HDPE liner installation, erosion control, and all-weather roadway installation. To date, clearing, box cutting, compacting, and fill placement in the box cut are complete, with berm embankment ongoing. This phase is expected to finish by early 2025, providing storage until early Q1 2026. Meanwhile, the site for TSF 3.0 was identified, and work began on the necessary requirements for construction of this long-term storage solution. Additionally, the company continues to explore the potential for using thickened tails (dry stacking) with co-disposal of pit waste

 

Larger Buckreef Project

 

· The Company is currently working with geological and mine engineering consultants to analyze the options for a larger scale, expanded Buckreef operation, with the goal of exceeding the metrics outlined in the 2020 Technical Report, including annual production, IRR, NPV and key financial metrics. This analysis includes evaluating potential mill expansions to increase annual throughput capacity, flowsheet optimizations to improve mill efficiency, metallurgical engineering to improve ore recovery, open pit mine design to enhance production scheduling, underground mine design to efficiently access deeper ore blocks, and exploration drilling with the goal of expanding current Mineral Resources and extending the life of mine.

 

·The Company is advancing studies on the larger project, and to date, has completed advanced metallurgical testing across the deposit and geotechnical studies for a deeper pit. During Q3 2023, the Company completed field work in determining the ultimate pit slopes of the 2-kilometer-long open pit in conjunction with consultants Terrane Geoscience Inc. During October 2024, the Company announced completion of the ongoing metallurgical variability study3 at Buckreef Gold, with results confirming excellent gold recovery rates for the processing of sulphide ore. The positive grade results confirm the amenability of sulphide material to be processed through the existing processing plant, using its relatively simple flowsheet. The study results also have positive implications for potential plant expansions and a straightforward flow sheet similar to the existing processing plant. The study results also bode well for future Mineral Resource development, as the Company continues to focus on development of other high-priority gold zones, such as Stamford Bridge, Anfield and Eastern Porphyry, where brownfield exploration programs returned very similar geologic and mineralization characteristics as the Main Zone, to which similar milling processes could apply.

 

8 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Environmental, Social and Corporate Governance (“ESG”)

 

·The Company is committed to working to high ESG standards and is implementing several community programs, while continuing to develop a broader framework and policies. There were no reportable environmental or community related incidents during the three months ended November 30, 2024.

 

·Buckreef Gold worked with Geita District Council and local wards to collaboratively identify programs that focus on short to long term educational needs, which in turn is aligned with Buckreef Gold’s local hiring practices and includes Science, Technology, Engineering and Mathematics and gender goals.

 

· An updated Memorandum of Understanding (“MoU”) was signed in March 2024 between Buckreef Gold and the Geita District Council to provide support around education in the wards of Lwamgasa, Kaseme, Busanda and Bugulula, being the host wards for the mine site. During Q1 2025, the Company completed two construction projects on upgrades to the primary schools, secondary schools and health centers in the Busanda and Kaseme districts, and expects to complete the remaining construction projects in the Lwamgasa district in early Q2 2025, in line with the signed MoU.

 

·During Q1 2025, a new CSR plan for F2025 was submitted to the Geita District Council for review and approval. Buckreef Gold and the Geita District Council are partnering to provide further support around education and health assistance in the wards of Lwamgasa, Kaseme and Busanda. A total of 420 million Tanzania Shillings (approximately $180,000) was budgeted by Buckreef Gold for F2025 to support priority areas in agreement with the Geita District Council.

 

·Buckreef Gold’s operations: (i) are connected to the Tanzanian national electricity grid and utilize grid power which is significantly and increasingly sourced from hydroelectric facilities (in Tanzania); (ii) recycle all water used in its operations; (iii) employ a workforce that comprises 100% Tanzanian citizens (145 full-time employees, 358 contract miners and project contractors, 175 part-time/casual employees); (iv) include development and building activities that are focused on maximizing local content; and (v) exhibit a ‘100 mile diet’ by procuring all food locally. In addition, the Company is evaluating utilization of dry stack tailings for the larger project.

 

·The Company supports local procurement in its activities by first sourcing within the immediate wards, then out to district, region and nation. Only those items or services not available in Tanzania are purchased externally, first prioritizing East Africa, Africa, then globally.

 

·The Company will continue to develop a broader ESG program, including reporting aligned with definitions from the World Economic Forum, and identifying its contributions to the United Nations Sustainable Development Goals over F2025.

 

Financial

 

·During Q1 2025, Buckreef Gold poured 4,841 ounces of gold (Q1 2024: 4,927) and sold 4,813 ounces of gold (Q1 2024: 4,895) at an average realized price1 of $2,653 per ounce (Q1 2024: $1,942) excluding the revenue and gold ounces sold related to the prepaid gold purchase agreement with OCIM Metals & Mining SA (“OCIM”) (“average realized price (net)1”).

 

·During Q1 2025, the Company recognized revenue of $12.5 million (Q1 2024: $9.4 million), cost of sales of $7.7 million (Q1 2024: $5.7 million), and cash cost1 of $1,410 per ounce (Q1 2024: $1,063). The Company generated gross profit of $4.8 million (39% gross profit margin) (Q1 2024: $3.7 million), operating cashflow of $2.4 million (Q1 2024: $5.1 million), and Adjusted EBITDA1 of $4.4 million (Q1 2024: $2.6 million). The increase in revenue, gross profit and Adjusted EBITDA1 is mainly related to a higher average realized price of $2,653 per ounce (Q1 2024: $1,942) compared to the prior comparative period.

 

9 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

·The increase in cash cost compared to the prior year comparative period was mainly due to a decrease in head grade (Q1 2025: 1.29 g/t, 1 2024: 2.57 g/t) and recovery rates (Q1 2025: 72%, Q1 2024: 81%), partially offset by a decrease in mining cost per tonne and processing cost per tonne. Mining costs per tonne of $4.00 in Q1 2025 was lower than the prior year comparative period (Q1 2024: $4.25) primarily due to the impact of higher tonnes mined on the fixed portion of the mining contractor management fee. The Company expects mining costs per tonne to improve over time as owner operated equipment will be utilized to provide cost effective support for site development projects as well as plant feed operations. Processing costs per tonne of $12.60 in Q1 2025 were significantly lower than the prior year comparative period (Q1 2024: $ 26.56 per tonne) predominantly due to greater economies of scale following final commissioning of the expanded 2,000 tpd processing facility. The higher processing plant throughput of 1,703 tpd in Q1 2025 (Q1 2024: 817) provided a higher proportion of overhead cost absorption, thus benefiting processing cost per tonne in Q1 2025.

 

·As at November 30, 2024, the Company had cash of $6.8 million and negative working capital of $0.8 million after adjusting for derivative liabilities which will only be settled by issuing equity of the Company and for the current portion of deferred revenue related to the OCIM prepaid gold purchase agreement. Working capital in Q1 2025 was impacted by a scheduled stripping campaign focused on accelerating the pit expansion to the north end of the main zone in the second layback to expose ore for H2 2025. As a result of the increased stripping activity, the Company mined a higher proportion of waste tonnes, which is expected to provide access to higher grade ore blocks in the second half of F2025, benefiting production starting in Q3 and Q4 2025. As a result, working capital is expected to improve in H2 2025.

 

· During Q4 2022 the Company entered into a $5.0 million prepaid Gold Doré Purchase Agreement with OCIM. The Agreement required that funds to be made available to the Company in two tranches. After fully settling $2.5 million drawn on the first tranche of the Agreement, on September 26, 2023, the Company drew an additional $0.5 million from the second tranche of the Agreement in exchange for delivering 23.5 ounces of gold per month, commencing December 2023, for a total of 305.4 ounces of gold over 13 months. On November 29, 2023, the Company drew an additional $1.0 million from the second tranche of the Agreement in exchange for delivering 44.1 ounces of gold per month, commencing February 2024, for a total of 573.2 ounces of gold over 13 months. On May 6, 2024, the Company amended the terms of the Agreement to allow for additional prepayments and drew $1.0 million in exchange for delivering 40.85 ounces of gold per month, commencing June 2024, for a total of 490.2 ounces of gold over 12 months. During Q1 2025, the Company drew an additional $0.5 million in exchange for delivering 17.0 ounces of gold per month, commencing November 2024, for a total of 204.1 ounces of gold over 12 months. The $0.5 million drawdown in Q1 2025 was used to help finance the procurement of heavy equipment and haul trucks to supplement the contractor-owned fleet with an owner’s operated fleet for Buckreef’s mining operations.

 

·As at November 30, 2024, the Company recognized $5.7 million of sales tax receivable on the Consolidated Statements of Financial Position. Sales tax receivables consist of harmonized services tax and value added tax (“VAT”) due from Canadian and Tanzanian tax authorities, respectively. Tanzanian tax regulations allow for VAT receivable to be refunded or set-off against other taxes due to the Tanzania Revenue Authority ("TRA"). During the three months ended November 30, 2024, the Company recovered VAT refunds from the TRA of $0.9 million. Subsequent to Q1, 2025, the Company recovered VAT refunds from the TRA of $0.6 million.

 

10 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Other

 

·On December 6, 2024, the Company announced the appointment of Richard Boffey as Chief Operating Officer (“COO”). Mr. Boffey is a seasoned executive, bringing more than 35 years of operational experience to the TRX Gold team and will be instrumental in the continued growth and development of Buckreef Gold. Mr. Boffey joins TRX Gold, having previously held senior executive positions with other multi-national mining companies. Most recently, he held the position of General / Country Manager at the Tara Resources Brskovo Mine Project in Montenegro, where he led the technical studies, engineering design, resource drilling, project financing, and site preparation activities for the construction and development of a mining operation. Prior to this, he was the Chief Operating Officer at the Matilda Gold Mine for Blackham Resources in Western Australia, where he recommenced open pit and underground mining for a 2 million tonne per annum operation, including process plant commissioning, establishment of technical and operating teams, and development of policies, systems and processes to optimize operations. Mr. Boffey also held the roles of General Manager at the Khoemacau Copper Mine in Botswana for Cupric Canyon Capital and General Manager of the Efemcukuru Gold Mine in Turkey for Eldorado Gold Corporation. Mr. Boffey previously spent 5.5 years at Barrick Gold Corporation, serving 4.5 years as Regional Mining Manager for the Barrick Africa Regional Business Unit, overseeing 3 operations and 1 development project in Tanzania, and 1 development project in South Africa. Prior to that, Mr. Boffey spent 10 years at Placer Dome Inc. Mr. Boffey holds a Bachelor of Mining Engineering (Hons) from the University of Auckland and is a Member of AusIMM, Competent Person (Reserves) under JORC, NI 43-101.

 

 

 

 

 

 

 

11 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Operational Overview

 

The Buckreef Gold Project

 

The Company is focused on the Buckreef Gold Project located in the Geita District of the Geita Region south of Lake Victoria, approximately 110 km southwest of the City of Mwanza, Tanzania (Figure 1). The Buckreef Gold Project area can be accessed by ferry across Smiths Sound, via a paved national road and, thereafter, via well maintained unpaved regional roads. The Buckreef Gold Project comprises several prospects, namely Buckreef, Eastern Porphyry, Anfield and the newly discovered Stamford Bridge. The Buckreef Gold Project itself encompasses three main mineralized zones: Buckreef South, Buckreef Main and Buckreef North. The Buckreef Gold Project is fully licensed for mining and the extraction of gold.

 

The Buckreef Gold Project Mineral Resources as of May 15, 2020, are as follows:

 

    Measured    Indicated    Inferred    Total (Measured + Indicated) 
    Tonnes    Grade    Au    Tonnes    Grade    Au    Tonnes    Grade    Au    Tonnes    Grade    Au 
Area   MT    g/t    Oz    MT    g/t    Oz    MT    g/t    Oz    MT    g/t    Oz 
Buckreef   19.98    1.99    1,281,160    15.89    1.48    755,120    17.82    1.11    635,540    35.88    1.77    2,036,280 
Eastern Porphyry   0.09    1.20    3,366    1.02    1.17    38,339    1.24    1.39    55,380    1.10    1.18    41,705 
Tembo   0.02    0.99    531    0.19    1.77    10,518    0.27    1.92    16,461    0.20    1.70    11,048 
Bingwa   0.90    2.84    82,145    0.49    1.48    23,331    0.22    1.49    10,541    1.39    2.36    105,477 
Total   20.99    2.03    1,367,202    17.59    1.46    827,308    19.55    1.14    717,922    38.57    1.77    2,194,510 

 

Note: Main Zone at 0.4 g/t cut-off, and Eastern Porphyry, Bingwa and Tembo at 0.5 g/t cut-off

Mineral Resources inclusive of Mineral Reserves

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability

All resources below 540 mRL are classified as inferred

Estimates over variable widths of 2 to 40 meters

Bulk Density ranges 2.0 g/cm3 to 2.8 g/cm3

55% attributable to the Company

Effective Date: May 15, 2020

 

The Buckreef Gold Project Mineral Reserves remained as of the May 15, 2020 Technical Report and are tabulated below.

 

Buckreef Reserves  Tonnes   Grade   In Situ Gold Content 
  (Mt)   Au (g/t)   Kg   oz 
Proven-Stockpile   119,726    1.86    223    7,160 
Proven   9,352,183    1.72    16,092    517,358 
Probable   9,730,764    1.36    13,265    426,492 
Mineral Reserves   19,202,673    1.54    29,580    951,010 

 

1)Mineral Reserves is inclusive of Mineral Reserve shapes, mining recovery, mining dilution and open pit preproduction development costs. Mineral Reserve estimate includes dilution.
2)Mineral Reserves were estimated in accordance with the CIM Definition Standards and CIM Guidelines.
3)Contained metal may differ due to rounding.

 

Mineral Resource and Reserve Statements

 

The Company did not complete any new work that would warrant reporting material changes in the previously reported Mineral Resource (“MRE”) and Mineral Reserve statements during the period ended August 31, 2024. The 2020 Technical Report follows the CIM Definition Standards on Mineral Resources and Mineral Reserves (“CIM Definition Standards”) and the CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines (“CIM Guidelines”).

 

12 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Figure 1: Location of Buckreef Gold Project Licences in the Lake Victoria Greenstone Belt

 

 

 

 

13 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Processing Plant and Operations

 

Select operating, financial and stockpile information from the operation for the three months ended November 30, 2024, follows below:

 

Select Operating and Financial Data        
            
   Unit  Three months ended November 30, 2024   Three months ended November 30, 2023 
Operating Data             
Ore Mined  k tonnes   103    102 
Waste Mined  k tonnes   821    454 
Total Mined  k tonnes   924    556 
Strip Ratio  w:o   8.0    4.5 
Mining Rate  tpd   10,154    6,112 
Mining Cost  US$/t  $4.00   $4.25 
Plant Ore Milled  k tonnes   155    74 
Head Grade  g/t   1.29    2.57 
Plant Utilization  %   88    93 
Plant Recovery Rate  %   72    81 
Processing Cost  US$/t  $12.60   $26.56 
Plant Mill Throughput  tpd   1,703    817 
Gold Ounces Poured  oz   4,841    4,927 
Gold Ounces Sold  oz   4,813    4,895 
Financial Data             
Revenue1  $('000s)   12,528    9,404 
Gross Profit  $('000s)   4,834    3,717 
Net income  $('000s)   2,137    (39)
Adjusted EBITDA2  $('000s)   4,394    2,587 
Operating Cash Flow  $('000s)   2,381    5,139 
Average Realized Price (gross)2  $/oz   2,603    1,921 
Average Realized Price (net)2,3  $/oz   2,653    1,942 
Cash Cost2  $/oz   1,410    1,063 

 

1 Revenue includes immaterial amounts from the sale of by-product silver and copper. 

2 Refer to the "Non-IFRS Performance Measures" section. 

3 Net of revenue and ounces of gold sold related to OCIM gold prepaid purchase agreement. 

 

14 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Gold Production and Sales

 

During Q1 2025, Buckreef Gold poured 4,841 ounces of gold (Q1 2024: 4,927 ounces) and sold 4,813 ounces of gold (Q1 2024: 4,895 ounces). Gold production in Q1 2025 was mainly in line with the prior year comparative period and reflects higher mill throughput of 1,703 tpd (Q1 2024: 817 tpd) following completion of the 2,000 tpd processing plant in Q4 2024, offset by a lower average recovery of 72% (Q1 2024: 81%) and lower average head grade of 1.29 g/t (Q1 2024: 2.57 g/t). The lower average head grade was due to mine sequencing where the scheduled mine plan is accessing lower grade ore blocks during Q1 2025 (in line with mine plan), concurrent with a scheduled stripping campaign to access higher grade ore blocks in the second half of F2025. The lower average recovery in Q1 2025 was mainly due to a higher proportion of blended material processed in Q1 2025 (24% oxide / 76% sulphide) compared to the prior year period where the mill processed oxide material at a higher average recovery. To assist in optimizing recovery for 2025, the Company has engaged an external consulting firm that specializes in comminution to help analyze the processing circuit configuration to identify gaps and optimization potential. The study expects to improve grindability (finer grind) and gold recovery, consistent with the results announced upon completion of the metallurgical variability study.

 

Mining

 

Total ore tonnes mined of 103 kt in Q1 2025 were in line with the prior year period (Q1 2024: 102 kt) and waste tonnes mined increased to 821 kt in Q1 2025 (Q1 2024: 454 kt) as stripping activities focused on accelerating the pit expansion to the north end of the main zone in the second layback to expose ore for H2 2025. As a result of the increased stripping activity, the higher proportion of waste to ore tonnes contributed to a higher strip ratio of 8.0 (waste:ore tonnes) compared to the prior year period (4.5 waste:ore tonnes).

 

Mining costs per tonne primarily reflect contractor mining costs following the hiring of FEMA on a contract basis to mine ore, waste, and to construct the TSF at Buckreef Gold. Mining costs per tonne of $4.00 in Q1 2025 was lower than the prior year comparative period ($4.25) primarily due to the impact of higher tonnes mined on the fixed portion of the mining contractor management fee. The Company expects mining cost per tonne to improve over time as owner operated equipment will be utilized to provide cost effective support for site development projects as well as plant feed operations.

 

During Q4 2024, the Company entered into a finance lease agreement for fifteen pieces of heavy equipment, including six excavators, one dozer, one motor grader, one backhoe, one compactor, and three loaders. Half of this fleet will replace rented equipment currently operating in the plant, while the remaining equipment will be utilized in site development projects, roadway construction, and maintenance. Additionally, this equipment is capable of supporting and supplementing, when necessary, the contract mining fleet at the site. During Q1 2025, the Company also entered into a purchase agreement to procure a fleet of eight haul trucks to expand haulage capability and capacity. During Q1 2025, the Company received 13 pieces of equipment (of the 15 ordered), along with the delivery of 8 trucks. Each piece has been successfully commissioned and is currently being utilized in various capacities across the site. The arrival of this equipment has significantly improved the cost profile in the areas where it has been deployed. To date, the Company has observed notable cost reductions in our site development work (river training and TSF 2.2 phase II raise) as well as plant feed operations, and we anticipate further benefits as the operators gain more experience. The remaining two pieces of equipment, a telehandler and a skid steer, are expected on-site in January 2025. Their arrival will complete the initial equipment purchase and is expected to benefit operating costs and strengthen site development capabilities over the remainder of F2025.

 

15 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Processing

 

During Q4 2024 the Company announced completion of the expanded processing plant to 2,000 tpd of nameplate processing capacity, which is expected to benefit plant throughput, gold recovery and gold production over F2025. The newly expanded processing plant was fully commissioned in early Q1 2025 (September 2024) following installation of the 4-way cyclone cluster and achieved, on average, 1,703 tpd of mill throughput in Q1 2025, a 108% increase over the prior year comparative period (Q1 2024), reaching a maximum of 2,073 tpd. During Q1 2025 the processing plant achieved the following statistics: (i) average throughput of 1,703 tpd (Q1 2024: 817 tpd); (ii) plant availability of 88% (Q1 2024: 93%); and (iii) an average recovery rate of 72% (Q1 2024: 81%). While the Company benefitted from an increase in average throughput following completion of the expanded 2,000 tpd processing plant, the mill processed a higher proportion of blended material (24% oxide / 76% sulphide) in Q1 2025, compared to mainly oxide material processed in Q1 2024, which impacted average recoveries. The Company is currently developing finer grinding initiatives to achieve higher gold recoveries, consistent with the results announced upon completion of the metallurgical variability study.

 

For the three months ended November 30, 2024, processing costs per tonne of $12.60 were significantly lower than the prior year comparative period (Q1 2024: $ 26.56 per tonne) predominantly due to greater economies of scale following final commissioning of the expanded 2,000 tpd processing facility. The higher processing plant throughput of 1,703 tpd in Q1 2025 (Q1 2024: 817) provided a higher proportion of overhead cost absorption, thus benefiting processing cost per tonne in Q1 2025.

 

Stockpile, Gold in Circuit (GIC) and Finished Goods Inventory

 

As at November 30, 2024, the ROM pad stockpile contained 248,002 tonnes at an average grade of 0.89 g/t with an estimated 7,080 ounces of contained gold. A further stockpile of crushed mill feed of 15,874 tonnes at 1.44 g/t containing an estimated 733 ounces of gold has been accumulated between the crusher and mill. The fair market value of the ounces of gold on the ROM pad stockpile and crushed ore stockpile is approximately $20.7 million using the London PM Fix gold price of $2,651 per ounce as at November 30, 2024. Since year-end August 31, 2024, the Company drew down on the ROM pad stockpile (2,469 ounces) and crushed ore stockpile (123 ounces) to support mill feed. These fluctuations in ROM pad inventory are anticipated throughout the course of the year and are designed to ensure steady state processing. During the three months ended November 30, 2024, the Company processed stockpiled and mined material through the expanded 2,000 tpd processing plant and consequently reported gold in circuit, reflecting a buildup of metal inventory in the CIL tanks. The Company reported 942 ounces of gold in circuit at November 30, 2024, which reflected a decrease of 217 ounces from August 31, 2024, following gold elution and smelting activity during the year. A summary of the ROM pad and crushed ore stockpile statistics are contained in the table below: 

 

Table: RoM Stockpile Summary (as at 30 November, 2024)
Summary RoM Stockpile   Volume (m3)     Tonnes      Grade (g/t Au)      Metal (oz)  
Feed Grade Ore   45,195    46,918    1.34    2,014 
Low Grade   120,973    201,084    0.78    5,066 
Total (RoM)   166,168    248,002    0.89    7,080 
Crushed Ore (COS)   8,962    15,874    1.44    733 
Total   175,130    263,876    0.92    7,813 

 

16 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Figure 2: 1,000+ tpd Processing Plant at Buckreef Gold, showing CIL tanks and conveyor feed to the ball mills (Q1 2024)

 

 

Figure 3a: Buckeef Gold new and expanded crushing circuit (Q2 2024)

 

 

17 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Figure 3b: Buckeef Gold ore moving through new crushing circuit (Q3 2024)

 

 

Figure 3c: Buckeef Gold’s new 1,000 tpd ball mill (Q3 2024)

 

 

 

18 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Figure 4: Buckreef Gold Tailings Storage Facility Expansion at TSF 2.2 (Q2 2024 – first lift completed and TSF is now fully operational)

 

 

Figure 5: Buckeef Gold’s Open Pit Mining Operations (Q4 2024)

 

 

19 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Figure 6: Google Earth Satellite Image of Buckreef Gold Infrastructure (as of May 13, 2024)

 

Note: Google Earth image retrieved on 13 May 2024. Image can be retrieved by entering “Buckreef Gold” into the search engine on Google Earth.

 

Figure 8: New 350 Excavator and Haul Truck (as of December 20, 2024)

 

 

 

20 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Exploration & Mineral Resources

 

The Company continues to evaluate the full potential of the Buckreef Gold property and identify opportunities for the discovery of additional mineral resources and their conversion to mineral reserves. Successful exploration will also provide greater production flexibility and growth. To achieve this goal the Company, in conjunction with Buckreef Gold, has:

 

· Announced in F2025 its best drill results ever, on a gtm basis with hole BMDD315 intersecting 37 m @ 6.86 g/t Au (253.82 gtm) from 130 m. This drill hole result is approximately 250 m east of the Buckreef Main Zone, host to Buckreef Gold’s 2M+ ounce Au Mineral Resource1 and where current operations are ongoing in the Main Pit. This drill hole result comes following the Company’s previous best drill hole result, with hole BMDD310 intersecting 35.5 m @ 5.48 g/t Au (194.54 gtm) from 64 m. This drill hole result is approximately 200 m east of the Buckreef Main Zone. These drill holes led to the discovery of a promising new gold mineralization shear zone, named the “Stamford Bridge Zone” at which current drill results are revealing geological characteristics and mineral alterations similar to that at Buckreef’s Main Zone. Holes BMDD315 and BMDD310, mentioned above, are located along the Stamford Bridge Zone. During Q1 2025, the Company drilled 2,420 meters along the Stamford Bridge Zone on newly defined, high-priority targets. Thus far, drilling has covered 150 m of this newly identified mineralized structure and geological logging confirms the continuity of the structure. These results are beginning to form what can become a potential 1-kilometer “bridge” between the Buckreef Gold Main Zone, where current operations are ongoing, and the parallel, high-priority, gold mineralization zone known as the Eastern Porphyry. The latter also links to the Anfield Zone to the southeast, discovered in 2022. The Company has planned a geophysical survey campaign, which will focus on the Stamford Bridge trend line, as well as an area covering up to 500 meters to both the North and South sides of the trend line. Following the results of this campaign, a strategic drill campaign will resume on newly defined, high-priority targets.

 

·Announced in F2023 near surface drilling results from the Anfield and Eastern Porphyry Zones, with highlights of 14 m @ 3.5 g/t including 3.0 m @ 10.9 g/t from 47 m from the Eastern Porphyry, and 2.94 m grading at 13.74 g/t, from 43.00 m in the Anfield zone (full results provided in Table 3). The zones are located at the northern end of a 3-kilometer-long zone of identified gold mineralization that is subparallel to the east of Buckreef Main Zone (Figure 7). The intercepts confirm multiple zones of strong mineralization towards the south-west of the known Eastern Porphyry deposit and the first diamond drill hole intersections on the Anfield Zone. Both mineralized zones are in close proximity to the Buckreef Main Zone and present an opportunity (assuming exploration success) to host future mineral resources outside of the Buckreef Main Zone.

 

·Re-evaluated the Buckreef Main Zone for strike extensions, off-shoot splays, and at depth potential. The deposit is open in all directions (See Figure 7). To date, the Company has tested the NE Extension and successfully identified gold mineralization over an additional 300 meters. The deposit remains open along strike to the NE and future infill drilling is warranted. The SW extension has also been tested with wide-spaced drilling and the exploration program has returned encouraging results. The deposit now remains open along strike to the SW.

 

·Collectively, between the NE extension and SW drilling the known strike extent of gold mineralization on the deposit structure has been expanded approximately 500 meters, or by nearly 30% since exploration recommenced. The Company will continue to identify areas offering the best opportunity to add gold ounces to the mineral resource inventory and commence an infill drilling program.

 

21 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Best Drill Hole Results in History of Buckreef Gold – Announcement of Stamford Bridge Zone

 

During Q1 2025, the Company announced its best drill results ever, on a gtm basis with hole BMDD315 intersecting 37 m @ 6.86 g/t Au (253.82 gtm) from 130 m. This drill hole result is approximately 250 m east of the Buckreef Main Zone, host to Buckreef Gold’s 2M+ ounce Au Mineral Resource1 and where current operations are ongoing in the Main Pit. This drill hole result comes following the previous best drill result, with hole BMDD310 intersecting 35.5 m @ 5.48 g/t Au (194.54 gtm) from 64 m. This drill hole result is approximately 200 m east of the Buckreef Main Zone.

 

The Company also announced the discovery of a promising new gold mineralization shear zone, named the “Stamford Bridge Zone” at which current drill results are revealing geological characteristics and mineral alterations similar to that at Buckreef’s Main Zone. Holes BMDD315 and BMDD310, mentioned above, are located along the Stamford Bridge Zone.

 

Stamford Bridge Shear Zone Highlights:

 

1.Hole BMDD315 intersected 37 m @ 6.86 g/t Au from 130 m; including 23 m @ 9.31 g/t Au from 139 m.

 

2.Hole BMDD310 intersected 35.5 m @ 5.48 g/t Au from 64 m; including 13m @8.06g/t Au.

 

3.Hole BMDD312 intersected 17.2 m @ 3.14 g/t Au from 164.6 m.

 

4.Geotechnical hole BMGT001 intersected 11.39 m @ 2.80 g/t Au from 104.0 m, and 22.0 m @ 2.36 g/t Au from 186.6 m. Both results are interpreted to be part of the Stamford Bridge Zone trend.

 

5.BMGT001 intersected the Buckreef Main Zone of 32.80 m @ 1.70 g/t Au (ending in mineralization) from 393.0 m.

 

Subsequent to Q1 2025, the Company announced three additional drill hole results (BMDD319-321) providing further evidence of gold mineralization along the Stamford Bridge Zone as follows:

 

6.Hole BMDD319 intersected 21.0 m @ 8.63 g/t Au from 81.0 m.

 

7.Hole BMDD320 intersected 20.5 m @ 5.14 g/t Au from 125.5 m.

 

8.Hole BMDD321 intersected 5.0 m @ 2.74 g/t Au from 157.0 m.

 

The Stamford Bridge Zone was discovered through detailed geological mapping of the Main Pit floor that identified a trend of high-grade mineralization on the eastern side of the Main Pit trending 070 East (Figure 7). This is an exceptional discovery at the Buckreef Gold Project, resulting in the most significant mineralization identified within Buckreef Gold’s drill history.

 

The exploration team then identified that geotechnical hole BMGT001 (one of geotechnical holes drilled as part of the Buckreef Main Zone geotechnical study completed by Terrane Geoscience Inc.) located 160 m east of the Main Pit, drilled across the Stamford Bridge (Figure 7), and was subsequently relogged (Table 1). The logging confirmed the presence of three mineralization zones, including the Stamford Bridge Zone. The zones were sampled, and the assay results are summarized below (Table 1). To date, the new Stamford Bridge Zone has shown evidence of a sheared mineralized zone with similar geological characteristics to that found in the Main Zone, i.e., zones are measured as being near vertical with strong alteration.

 

Thus far, drilling has covered more than 150 m of this newly identified mineralized structure and geological logging confirms the continuity of the structure. These results are beginning to form what can become a potential 1-kilometer “bridge” between the Buckreef Gold Main Zone, where current operations are ongoing, and the parallel, high-priority, gold mineralization zone known as the Eastern Porphyry (see Figure 7). The latter also links to the Anfield Zone to the southeast, discovered in 2022.

 

22 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

The Company has planned an expanded diamond drill program to test for further mineralization along this newly developing trend.  Although these are early-stage results, and only two sections along the newly identified trend have been drilled, key interpretations include:

 

1.The Stamford Bridge Zone is potentially a significant shear zone and geologically similar to the Buckreef Main Zone. It bridges the gap between Buckreef Main Zone and the Eastern Porphyry deposit to the Southeast.

 

2.Pinching and swelling of the Stamford Bridge Zone has been observed in the first section drilled; 4m wide in the first drillhole and over 17 m wide on the second drillhole down dip; and

 

3.The second section has intercepted a significant shear zone, over 35 m wide with distorted shear fabric by alteration overprint. Therefore, a minimal number of follow-up drillholes will be required to understand geometry of this new discovery.

 

Figure 7: Buckreef Gold Showing Location of Stamford Bridge Zone and Drill Hole Results

 

 

23 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Figure 8. Drill sections - Stamford Bridge Zone (Drill Holes BMDD 310 – 312)

 

 

Figure 9: Cross-section results for drill hole BMDD315 - Stamford Bridge Zone

 

 

24 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Table 1: Summary of Results – Stamford Bridge

 

Stamford Bridge  Assay Results
Hole ID Hole Type Drill Holes Location Sample Depth Width (m) Assay Grade (gpt) Lithology  Comment
Easting (m) Northing (m) RL (m) Azimuth Dip From (m) To (m)
BMGT001 DD 391,780 9,658,453 1,218 270 -50 105.0 115.4 10.4 3.03 Msh Stamford Bridge Mineralised shear zone with strong alteration
              186.6 208.0 21.4 2.42 Msh  
              393.0 425.8 32.8 1.70 Msh Buckreef main shearzone
                         
BMDD309 DD 391,676 9,658,400 1,217 334 -60 101.8 104.5 2.7 1.65 Msh  
                        Mineralised shear zone with strong alteration
BMDD310 DD 391,723 9,658,418 1,217 334 -60 64.5 100.0 35.5 5.48 Msh  
                         
BMDD312 DD 391,685 9,658,382 1,216 335 -60 164.6 180.8 16.2 3.14 Msh Mineralised shear zone with strong alteration
                         
BMDD315 DD 391,770 9,658,435 1,217 335 -60 130.0 166.0 36.0 7.04 Msh Mineralised shear zone with strong alteration
                         
BMDD319 DD 391,729 9,658,404 1,217 335 -60 76.0 79.0 3.0 1.21 Msh Mineralised shear zone with strong alteration
                         
BMDD319 DD 391,729 9,658,404 1,217 335 -60 81.0 102.0 21.0 8.63 Msh Mineralised shear zone with strong alteration
                         
BMDD320 DD 391,765 9,658,447 1,218 335 -60 125.5 146.0 20.5 5.14 Msh Mineralised shear zone with strong alteration
                         
BMDD321 DD 391,790 9,658,441 1,218 335 -60 157.0 162.0 5.0 2.74 Msh Mineralised shear zone with strong alteration

 

Notes: Sample Protocol QA/QC – see endnote 2. Sampled widths are not true widths.

 

Buckreef Gold Main Zone Drilling Results and Interpretation

 

The significant mineralized intercepts of the Buckreef Main Zone are as shown in Figure 10. It is evident that the deposit remains open on trend to the NE and SW. As previously noted, the Company had initiated a drill program, specifically to explore potential mineralization extensions to the NE and SW.

 

During F2023, the Company received assay results from its exploration program which has provided another extension of known mineralization on the Buckreef Gold Main Zone to the south.

 

The results are positive and significant for the Company as they continue to demonstrate: (i) continuity of gold mineralization along strike to the southwest of the Main Zone deposit; and (ii) continued gold mineralization under the (historical) South Pit. The deposit, therefore, remains ‘open at depth and on strike,’ and in combination with the 300 meter extension of the NE (announced previously) represents approximately a 30% increase in the Main Zone deposit strike length to over 2.0 kms.

 

Highlights include:

 

  · Hole BMDD250 intersected 34.8 m grading @ 1.26 g/t Au from 87.2 m, including 10.0 m grading @ 3.08 g/t from 89.9 m; and

 

  · Hole BMDD275 intersected 16.5 m grading @ 2.01 g/t Au from 53.7 m, including 7.0 m grading @ 3.28 g/t from 56.0 m.

 

Notes: Sample Protocol QA/QC – see endnotes. Sampled widths are not true widths.

 

Extension of Buckreef Main Zone South by a further 200 meters: Expansion of the gold deposit mineralization by 300 meters in the NE and 200 meters in the southwest (increases in the strike length of the Buckreef Main Zone deposit, or known gold mineralization, to over 2.0 kms) on the Buckreef Gold deposit which contains over 2.0 million ounces of gold in the Measured and Indicated Mineral Resources in the Buckreef Main Zone. The Company has drilled a total of 24 drill holes representing 4,255 meters in the southwest area, with full results provided in Table 2. The Buckreef Main Zone continues to be open further to the NE and extending to the Buckreef Special Mining License boundary and to the SW (see Figure 11). In the latter the trend is aligned to several historical artisanal scale miner pits.

 

25 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Table 2: Buckreef Main Zone South Drill Hole Sample Results Summary  

                         
Buckreef South Assay Results
Hole ID Hole Type Drill Holes Location Sample Depth Width (m) Assay Grade (gpt) Lithology  Comment
Easting (m) Northing (m) RL (m) Azimuth Dip From (m) To (m)
BMDD248 DD 391,071.5 9,657,427.0 1,214.5 306 -58 143.0 148.0 5.0 0.45 Msz Shear zone with Mild alteration
              192.5 198.0 5.5 0.38 Msz Shear zone with mild alteration
                         
BMDD249 DD 391,042.0 9,657,447.3 1,215.5 306 -54 120.4 128.0 7.6 0.41 Msz Shear zone with mild alteration
                         
                         
BMDD250 DD 391,114.5 9,658,259.0 1,227.8 306 -60 30.0 33.0 3.0 0.42 Msz Shear zone with mild alteration
              87.2 122.0 34.8 1.26 Msz Mineralised shear zone with mild to strong alteration
              89.0 99.0 10.0 3.08 Msz Shear zone with strong alteration
                         
BMDD252 DD 391,061.7 9,657,528.7 1,216.3 306 -48 34.0 38.7 4.7 0.32 Msz Shear zone with mild alteration
              79.5 99.0 19.5 0.74 Msz Mineralised Shear zone with mild alteration
                         
                         
BMDD253 DD 390,927.6 9,657,500.0 1,218.1 126 -51 82.1 85.5 3.4 0.96 Msz Mineralised shear zone with mild alteration
                         
BMDD254 DD 391,137.4 9,657,821.0 1,220.2 306 -57 56.0 59.8 3.8 1.3 Msz Mineralised shear zone with mild alteration
                         
BMDD256 DD 391,122.7 9,657,787.0 1,219.6 306 -57 27.9 30.0 2.1 1.21 Msz Mineralised shear zone with mild to strong alteration
              43.3 45.0 1.7 0.56    
              54.0 57.7 3.7 1.73    
              77.0 81.0 4.0 0.5    
                         
BMDD258 DD 391,078.9 9,657,620.0 1,217.3 306 -50 23.0 25.0 2.0 1.76 Msz Mineralised shear zone with mild alteration
              41.0 44.0 3.0 0.47    
                         
BMDD259 DD 391,156.0 9,657,714.0 1,217.7 306 -53 82.0 83.5 1.5 0.82    
              108.0 110.0 2.0 0.71 Msz Mineralised shear zone with mild alteration
              131.0 136.0 5.0 0.52    
                         
BMDD267 DD 390,966.4 9,657,379.9 1,213.7 305 -62 165.0 167.0 2.0 1.41 Msz Shear zone with mild alteration
                         
BMDD273 DD 390,969.4 9,657,256.9 1,210.3 306 -57 36.1 37.7 1.6 0.49 Msz Shear zone with mild alteration
                         
BMDD274 DD 390,918.3 9,657,289.7 1,212.0 306 -57 39.4 41.0 1.7 0.78 Msz Shear zone with mild alteration
                         
BMDD275 DD 390,940.4 9,657,216.0 1,210.0 306 -57 27.5 29.2 1.8 0.51    
              43.0 52.1 9.1 0.58    
              53.7 70.2 16.5 2.01 Msz Mineralised shear zone with mild to strong alteration
              56.0 63.0 7.0 3.27    
              80.3 84.6 4.3 0.96    
                         
BMDD278 DD 390,967.1 9,657,195.1 1,209.2 306 -57 63.6 71.6 8.1 0.65    
              83.0 89.3 6.3 1.00 Msz Mineralised shear zone with mild alteration
              128.0 131.0 3.0 0.74    
                         
BMDD279 DD 390,996.1 9,657,175.3 1,208.9 306 -57 41.0 46.0 5.0 1.13    
              48.0 51.0 3.0 0.63    
              140.6 142.0 1.4 2.72 Msz Mineralised shear zone with mild to strong alteration
              148.9 159.4 10.5 0.96    
                         
                         

 

Notes: Sample Protocol QA/QC – see endnote 2. Sampled widths are not true widths.

 

26 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Table 3: Buckreef Eastern Porphyry and Anfield Zone Sample Results Summary

 

Eastern Porphyry  Significant Assay Results
Hole ID Hole Type Drill Holes Location Sample Depth  Width (m)   Assay Grade (gpt)  Lithology  Comment
Easting (m) Northing (m) RL (m) Azimuth Dip From (m) To (m)
                         
BMDD297 DD 391955 9657841 1223 126 55 12.90 19.00           6.10        1.41 FP Oxidised Felsic pophyry with preserved shear fabric hosting quartz veins
              61.40 64.00           2.60        2.08 FP Slightly sheared felsic porphyry with Quartz, Carbonate pyrite alterations.
              70.00 73.82           3.82        3.10 FP
              98.80 113.50         14.70        1.22 FP Sheared unit of Felsic intrussive interfingering with mafic volanics. Quartz carbonate and pyrite altered.
                       
                         
BMDD298 DD 391997 9657844 1223 124 60 27.00 41.00         14.00        3.48 FP Oxidised Felsic porphyry with preserved shear fabric hosting quartz veins
        Including 27.00 30.00          3.00      10.96  
              47.00 72.23         25.23        1.62 FP Weakly sheared felsic porphyry with moderate to strong Quatrz, Carbonate pyrite alterations.
              84.00 89.00           5.00        1.07 FP
                         
BMDD299 DD 391901 9657813 1223 126 60 21.61 28.00           6.39        1.04 FP Moderate to weakly oxidised Felsic pophyry with preserved shear fabric 
                       
                         
BMDD300 DD 391989 9657821 1191 126 55 33.65 37.26           3.61        6.80 FP Moderately oxidised Felsic pophyry with preserved shear fabric and hosting quartz vein

 

 

Anfield Prospect Significant Intercept Assay Results
Hole ID Hole Type Drill Holes Location Sample Depth Width (m) Assay Grade (gpt) Lithology  Comment
Easting (m) Northing (m) RL (m) Azimuth Dip From (m) To (m)
AFDD001 DD 391180.90 9657185.00 1210.275 135 -60 43 45.94 2.94 13.74 MB Sheared mafic volcanic rock hosting quartz vein
                         
AFDD002 DD 391164.50 9657169.00 1210.136 135 -60 42.71 44.54 1.83 1.17 MB Sheared mafic volcanic rock
              83.42 88.34 4.92 0.9    
                         
AFDD004 DD 391209.40 9657173.00 1209.381 315 -60 32.45 38.54 6.09 1.41 MB Sheared mafic volcanic rock
                         
AFDD005 DD 391191.90 9657155.00 1209.368 315 -60 17.09 21.35 4.26 1.01 MB Sheared mafic volcanic rock hosting quartz vein
              42.8 44.8 2.00 2.53   Sheared mafic volcanic rock
              47.09 51.15 4.06 1.27    
                         
AFDD007 DD 391108.36 9657186.36 1210.026 126 -55 137.5 138.5 1.00 5.71 MB Sheared mafic volcanic rock with strong quartz carbonate pyrite alteration

 

Notes: Sample Protocol QA/QC – see endnote 2. Sampled widths are not true widths.

 

27 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Figure 10: NE Buckreef Main Zone and location of the Eastern Porphyry - Anfield Zone trend

 

 

28 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Figure 11: Map Showing Mineralization Extension and Location of Drill Results at Buckreef Main Zone Southwest Extension

 

 

29 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Larger Project – Metallurgical Results, Ongoing Test Work and Results of Metallurgical Variability Study

 

The Company continues to work on its mid-to-long-term larger project and has received assay results from its 19-hole metallurgical variability sampling program on the Buckreef Main Zone. The samples were dispatched to SGS South Africa for the metallurgical test work.

 

The results are positive and significant for the Company because they continue to demonstrate: (i) continuity of mineralization down dip and along strike of the deposit; and (ii) excellent width and grade of mineralization.

 

Highlights include:

 

·Hole BMMT015 intersected 28.0 m grading @ 10.68 g/t Au from 0 m;

 

·Hole BMMT020 intersected 123.0 m grading @ 2.69 g/t Au from 3 m;

 

·Hole BMMT009 intersected 121.0 m grading @ 2.96 g/t Au from 3 m;

 

·Hole BMMT022 intersected 106.0 m grading @ 4.19 g/t Au from 85 m, 77 m grading @ 3.09 g/t from 241 m; and

 

·Hole BMMT021 intersected 90.0 m grading @ 1.56 g/t Au from 139 m.

 

Detailed results are shown in Table 4 and locations are shown in Figure 12.

 

Figure 12: Map Showing Location of Metallurgical Drill Holes and Their Result Highlights

 

 

30 
 

Management’s Discussion

and Analysis

November 30, 2024 


Table 4: Metallurgy Drill Hole Sample Results Summary

 

Metallurgy Samples Assay Results
Hole ID Hole Type Drill Holes Location Sample Depth Width (m) Assay Grade (gpt) Lithology  Comment
Easting (m) Northing (m) RL (m) Azimuth Dip From (m)

To (m)

BMMT004 DD 391,096.8 9,657,894.8 1,217.7 127 -72 4.0 22.0 17.0 2.17 Msz Oxidised and Mineralised shear zone 
                         
BMMT005 DD 391,134.7 9,657,947.9 1,217.6 119 -88 0.0 21.0 21.0 0.52 Msz Oxidised and Mineralised Shear zone
                         
BMMT006 DD 391,184.0 9,658,008.0 1,217.7 303 -77 4.0 15.6 11.6 0.68 Msz Oxidised and Mineralised Shear zone
                         
BMMT007 DD 391,223.8 9,658,080.1 1,214.7 304 -81 0.0 8.0 8.0 0.39 Msz Oxidised and Mineralised Shear zone
                         
BMMT008 DD 391,292.3 9,658,148.7 1,220.1 306 -77 2.0 94.0 89.0 1.72 Msz Mineralised shear zone with Quartz Veining
                         
BMMT009 DD 391,337.4 9,658,225.5 1,222.1 303 -82 3.0 124.0 121.0 2.96 Msz Oxidised and Mineralised shear zone
              127.0 148.0 21.0 0.79 Msz Shear zone with mild alteration
              152.0 157.0 5.0 0.2 Msz Shear zone with mild alteration
                         
BMMT010 DD 391,194.4 9,658,008.3 1,217.5 329 -87 69.0 86.0 17.0 3.82 Msz Mineralised shear zone with strong alteration
              87.0 97.0 10.0 0.82 Msz Shear zone with mild alteration
              100.0 129.0 29.0 3.28 Msz Mineralised shear zone with strong alteration
              144.0 170.0 26.0 3.59 Msz Mineralised shear zone with strong alteration
                         
BMMT011 DD 391,112.2 9,657,940.2 1,217.5 136 -67 20.0 84.0 64.0 1.17 Msz Mineralised shear zone with strong alteration
              85.0 114.0 29.0 0.37 Msz Shear zone with mild alteration
              127.0 137.0 10.0 2.08 Msz Mineralised shear zone with strong alteration
                         
BMMT012 DD 391,253.7 9,658,097.7 1,215.1 242 -75 4.0 28.0 24.0 2.28 Msz Mineralised shear zone with Quartz Veining
                         
BMMT014 DD 391,055.0 9,657,666.9 1,218.3 90 -78 27.0 42.0 15.0 0.59 Msz Mineralised shear zone with mild alteration
                         
BMMT015 DD 391,231.1 9,658,072.9 1,215.3 310 -80 0.0 28.0 28.0 10.68 Msz Mineralised shear zone with Quartz Veining
                         
BMMT016 DD 391,353.7 9,658,331.9 1,223.4 306 -81 7.0 41.0 34.0 2.03 Msz Mineralised shear zone with strong alteration
              49.0 76.0 27.0 1.45   Mineralised shear zone with strong alteration
              96.0 101.0 5.0 0.37 Msz Shear zone with mild alteration
                         
BMMT017 DD 391,469.3 9,658,387.0 1,219.9 142 -80 4.0 26.0 22.0 3.30 Msz Oxidised and Mineralised shear zone
                         
BMMT018 DD 391,521.8 9,658,681.8 1,218.6 126 -82 4.0 33.0 29.0 2.97 Msz Mineralised shear zone with Quartz Veining
              43.0 53.0 10.0 0.34 Msz Mineralised shear zone with mild alteration
              57.0 141.8 84.8 0.64 Msz Mineralised shear zone with mild alteration
              143.0 169.0 26.0 0.63 Msz Mineralised shear zone with mild alteration
                         
BMMT019 DD 391,464.1 9,658,771.4 1,220.0 130 -67 50.0 78.0 28.0 2.33 Msz Mineralised shear zone with strong alteration
              86.0 91.0 5.0 0.43 Msz Mineralised shear zone with mild alteration
              100.0 111.0 11.0 0.55 Msz Mineralised shear zone with mild alteration
              135.0 142.0 7.0 0.77 Msz Mineralised shear zone with mild alteration
              161.0 167.0 6.0 0.55 Msz Mineralised shear zone with mild alteration
              200.0 212.0 12.0 0.75 Msz Mineralised shear zone with mild alteration
              214.0 218.0 4.0 0.32 Msz Mineralised shear zone with mild alteration
              222.0 229.8 7.8 0.55 Msz Mineralised shear zone with mild alteration
                         
BMMT020 DD 391,519.4 9,658,607.6 1,219.9 126 -80 3.0 126.0 123.0 2.69 Msz Mineralised shear zone with strong alteration
              128.0 130.0 2.0 1.55 Msz Mineralised shear zone with strong alteration
              152.0 154.0 2.0 2.00 Msz Mineralised shear zone with strong alteration
              202.0 208.0 6.0 2.82 Msz Mineralised shear zone with strong alteration
                         
BMMT021 DD 391,493.7 9,658,549.5 1,220.9 134 -85 2.0 80.0 78.0 0.58 Msz Mineralised shear zone with quartz veining
              88.0 91.0 3.0 0.33 Msz Mineralised shear zone with quartz veining
              118.0 126.0 8.0 0.54 Msz Mineralised shear zone with mild alteration
              139.0 229.0 90.0 1.56 Msz Mineralised shear zone with strong alteration
              238.0 245.0 7.0 0.95 Msz Mineralised shear zone with mild alteration
                         
BMMT022 DD 391,467.7 9,658,451.6 1,221.0 127 -82 42.0 54.0 12.0 0.3 Msz Mineralised shear zone with mild alteration
              58.0 72.0 14.0 0.76 Msz Mineralised shear zone with mild alteration
              85.0 191.0 106.0 4.19 Msz Mineralised shear zone with strong alteration
              194.0 211.0 17.0 1.16 Msz  
              213.0 240.0 27.0 1.78 Msz Mineralised shear zone with strong alteration
              241.0 318.0 77.0 3.09 Msz Mineralised shear zone with strong alteration
              321.0 338.0 17.0 2.95 Msz Mineralised shear zone with strong alteration

 

Notes: Sample Protocol QA/QC – see endnote 2. Sampled widths are not true widths. Of 19 holes drilled, 18 are reported, with the remaining hole unreported due to an incomplete intersection of the Main Zone.

 

31 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

During Q1 2025, the Company announced completion of the ongoing metallurgical variability study3 at the Buckreef Gold Project, with results confirming the potential for excellent gold recovery rates for the processing of sulphide ore. Metallurgical test work on the sulphide ore portion of the project, which encompasses approximately 90% of the Buckreef Main Zone’s 2M+ ounce Au Measured and Indicated Mineral Resources1, has been an important area of focus for the Company, as it continues to grow the project in a low-risk, low-cost, value accretive manner. As a key value driver for the Company, metallurgical testing began at the Buckreef Main Zone in June of 2021, whereby a straightforward flowsheet comprising of crush, grind, flotation, regrind and CIL was developed by SGS Canada. In a laboratory, bulk sample testing returned gold recoveries between 85.3% to 95.4%. In June 2023, a 6,500-tonne bulk sample of sulphide ore was tested on site at Buckreef Gold’s existing milling facility. This successful test reported gold recoveries from sulphide ore of 88.7%. The recent and much larger metallurgical variability study reported on in October 2024, reiterates results from past test work and is now of greater importance as Buckreef Gold is processing a higher proportion of sulphide ore (80% sulphides to 20% oxides) at its newly expanded milling facility. As part of this recent phase of test work, drill core from a total of 18 metallurgical holes (2,367 meters) along the entire strike of the Buckreef Main deposit, were blended into samples that were then processed and tested against variable benchmarks within a processing flowsheet. Highlights from the results demonstrate:

 

· A finer grind size leads to a higher gold recovery: Batch samples were each milled at a specific grind size, incrementally finer in nature, resulting in incrementally improved gold recovery grades. The gold recovery rate increased from 81.2% to 92.5% as the grind became finer from 80% - 53 μm to 80% - 5 μm.

 

· Results in line with current operational performance: For the 15 composites tested in the most recent study, recovery rates ranged from 79.9% to 87.0% in a gravity + floatation + leaching test at a grind size of 80% - 75 μm, which is consistent with what is being experienced in current operations. Buckreef Gold is also experiencing a relatively consistent tailings grade, regardless of head grade, at a grind size of 80% - 75 μm, further supporting the fact that increased grinding will lead to higher recovery rates.

 

· Increasing gold recovery in current operations: Test results showed that the gold is finely disseminated in the pyrite and improved recoveries can be achieved by grinding finer below 25µm. An upgrade of the existing Buckreef Process Plant flowsheet to include rougher flotation and subsequent regrinding of the flotation concentrate, by using the regrind ball mill, is expected to achieve the targeted grind size (gold liberation) with minimum energy consumption. The Company is currently developing finer grinding initiatives to achieve higher gold recoveries.

 

· Low cost expansion opportunities can continue: The positive grade recovery results and increased understanding of the metallurgy of the Buckreef Gold Project provide the Company with the optionality for near term mine planning of the sulphide ore. The results also speak to the robust project economics of the Buckreef Gold Project. The Company is currently in the process of evaluating ways to expedite potential future plant expansions and optimizations.

 

· Positive outlook for additional Mineral Resources: This also bodes well for future Mineral Resource development, as the Company continues to focus on development of other high-priority gold zones, such as Stamford Bridge, Anfield and Eastern Porphyry, where brownfield exploration programs returned very similar geologic and mineralization characteristics as the Main Zone, to which similar milling processes could apply.

 

32 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Geotechnical Analysis Field Work

 

SGSC – Terrane Geoscience completed the geotechnical analysis work for the deeper pit design. Field work included a drilling program that constituted 5 holes for 1,571 meters in 2023. Associated detailed field work involving packer tests, downhole televiewer, co-axial rock strength testing and standard geotechnical logging of the footwall and hanging wall lithologies has been completed and analysis of results continues. Selected samples have been sent to a geomechanical laboratory in Canada for further analysis. The results of this work will be instrumental in determining pit slope angles for the ultimate pit. This work is now complete, and results are being incorporated into long term mine plans for optimal and safe open pit ore extraction.

 

Financial Highlights – First Quarter 2025

 

For the three months ended November 30, 2024, Buckreef Gold poured 4,841 ounces of gold and sold 4,813 ounces of gold at an average realized price (net)1 of $2,653 per ounce. The Company recognized revenue of $12.5 million for the three months ended November 30, 2024.

 

Cost of sales, which includes production costs, royalties and depreciation, was $7.7 million generating a gross profit of $4.8 million or 39% during Q1 2025. After general and administrative expenses, revaluation of derivative financial instruments, foreign exchange, interest and other expenses, and income taxes, the Company recorded net income of $2.1 million for Q1 2025.

 

Mining costs per tonne of $4.00 in Q1 2025 was lower than the prior year comparative period (Q1 2024: $4.25) primarily due to the impact of higher tonnes mined on the fixed portion of the mining contractor management fee. The Company expects mining costs per tonne to improve over time as owner operated equipment will be utilized to provide cost effective support for site development projects as well as plant feed operations. Processing costs per tonne of $12.60 in Q1 2025 were significantly lower than the prior year comparative period (Q1 2024: $ 26.56 per tonne) predominantly due to greater economies of scale following final commissioning of the expanded 2,000 tpd processing facility. The higher processing plant throughput of 1,703 tpd in Q1 2025 (Q1 2024: 817) provided a higher proportion of overhead cost absorption, thus benefiting processing cost per tonne in Q1 2025.

 

Q1 2025 ounces sold (4,813 ounces) generated positive operating cash flow of $2.4 million. Positive operating cash flow is being used to fund value creating activities, including plant expansions, exploration, and advancing the larger project.

 

As at November 30, 2024, the Company had a cash balance of $6.8 million and negative working capital of $0.8 million after adjusting for derivative liabilities which will only be settled by issuing equity of the Company and for the current portion of deferred revenue related to the OCIM prepaid gold purchase agreement (non-cash). Working capital in Q1 2025 was impacted by a scheduled stripping campaign focused on accelerating the pit expansion to the north end of the main zone in the second layback to expose ore for H2 2025. As a result of the increased stripping activity, the Company mined a higher proportion of waste tonnes, which is expected to provide access to higher grade ore blocks in the second half of F2025, benefiting production starting in Q3 and Q4 2025. As a result, working capital is expected to improve in H2 2025.

 

Capital Expenditures

 

During the three months ended November 30, 2024, the Company incurred a total of $3.7 million in cash capital expenditures (including value added tax). Net additions increased as the Company continued to invest in infrastructure and development for the Buckreef Gold property during the quarter, including expenditures related to finalizing the plant expansion to 2,000 tpd, equipment leases for mobile equipment to supplement the contractor-owned fleet with an owner’s operated fleet for Buckreef’s mining operations, processing plant security system upgrades, dewatering pumps to support mining activity during the wet season and construction of a significantly expanded TSF to provide storage until early Q1 2026.

 

33 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Selected Financial Information

 

The following information has been extracted from the Company’s interim condensed consolidated financial statements for the three months ended November 30, 2024, prepared in accordance with IFRS.

 

$(000's)   As at and for the
three months ended November 30, 2024
    As at and for the three months ended November 30, 2023 
Net income (loss) and comprehensive income (loss) attributable to shareholders   981    (966)
Basic income (loss) per share   0.00    0.00 
Total assets   102,632    87,063 
Total long term financial liabilities   13,874    6,382 

 

Financial Results

 

Three months ended November 30, 2024

 

   Three months ended November 30, 
   2024   2023 
Revenue  $12,528   $9,404 
Cost of sales   (7,694)   (5,687)
Gross profit   4,834    3,717 
General and administrative expense   (1,425)   (2,211)
Change in fair value of derivative financial instruments   819    199 
Foreign exchange   (77)   (80)
Interest, net and other expense   (321)   (473)
Income tax expense   (1,693)   (1,191)
Net income and comprehensive income  $2,137   $(39)
Net income and comprehensive income          
attributable to non-controlling interests   1,156    927 
Net (loss) income and comprehensive (loss) income          
attributable to shareholders   981    (966)

 

Revenue

 

For the three months ended November 30, 2024, the Company recognized revenue of $12.5 million (Q1 2024: $9.4 million). The increase in revenue is primarily related to a higher average realized gold price compared to the prior year comparative period. During the period, the Company sold 4,813 ounces of gold (Q1 2024: 4,895 ounces) at an average realized price (net)1 of $2,653 per ounce (Q1 2024: $1,942 per ounce).

 

Cost of sales

 

Cost of sales for the three months ended November 30, 2024, was $7.7 million (Q1 2024: $5.7 million) and is comprised of production costs, (including mining, processing and site general and administrative costs), royalties and depreciation. Assets are depreciated on a straight-line basis over their useful life or depleted on a units-of-production basis over the reserves to which they relate.

 

34 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

For the three months ended November 30, 2024, the Company recorded production costs of $5.8 million (Q1 2024: $4.5 million) and royalties of $0.9 million (Q1 2024: $0.7 million) based on a 7.3% statutory royalty rate in Tanzania.

 

Cash cost1 which includes production costs and royalties were $1,410 per ounce (Q1 2024: $1,063 per ounce). The increase in cost of sales and cash cost1 compared to the prior year comparative period is primarily related to a decrease in head grade (Q1 2025: 1.29 g/t, 1 2024: 2.57 g/t) and recovery rates (Q1 2025: 72%, Q1 2024: 81%), partially offset by a decrease in mining cost per tonne (Q1 2025: $4.00, Q1 2024: $4.25) and processing cost per tonne (Q1 2025: $12.60, Q1 2024: $26.56). Royalties were higher due to the impact of the 7.3% statutory royalty rate on higher quarterly revenue as a result of a higher average realized price (net)1 of $2,653 per ounce (Q1 2024: $1,942 per ounce). While cost of sales increased relative to the prior year comparative period, gross profit increased to $4.8 million (Q1 2024: $3.7 million) as the Company benefitted from a higher average realized gold price.

 

On November 1, 2022, the Company declared commercial production for the processing plant at Buckreef after successful construction, commissioning and ramp-up of processing to a steady state throughput at nameplate capacity. Upon declaration of commercial production, capitalization of mine development costs ceases, and depreciation of capitalized mine development costs commences. For the three months ended November 30, 2024, the Company recorded depreciation of $0.9 million (Q1 2024: $0.5 million).

 

General and administrative expenses

 

During the three months ended November 30, 2024, the Company recorded general and administrative expenses of $1.4 million compared to $2.2 million for the prior year period. The variance compared to the prior year period was mainly due to a decrease in share based expense as a result of timing of vesting of equity based compensation for certain key management personnel in connection with their employment contracts.

 

Change in fair value of derivative financial instruments

 

During the three months ended November 30, 2024, the Company recorded a gain on change in fair value of derivative financial instruments of $0.8 million compared to a gain of $0.2 million in the prior year period. The gain on revaluation of derivative financial instruments is mainly related to revaluation of derivative warrant liabilities and was principally due to a quarterly decrease in the Company’s share price (Q1 2025: $0.36, Q4 2024: $0.39), a reduction in the remaining term of the warrants (due to the passage of time), and a decrease in the expected volatility assumption under the Black Scholes option pricing model.

 

Interest and other expense

 

During the three months ended November 30, 2024, the Company recorded interest and other expense of $0.3 million compared to $0.5 million in the prior year period. This is primarily due to accretion of deferred revenue related to the OCIM prepaid gold purchase agreement and accretion for the provision for reclamation recorded during Q4 2024.

 

Income tax expense

 

Income tax expense is recognized based on management’s estimate of the weighted average annual income tax rate expected for the full financial year. During the three months ended November 30, 2024, the Company recorded income tax expense of $1.7 million (Q1 2024: $1.2 million), comprised of a current income tax expense of $0.4 million (Q1 2024: $0.3 million) and deferred income tax expense of $1.3 million (Q1 2024: $0.9 million) based on current Tanzanian statutory tax rates.

 

35 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Net income and comprehensive income

 

The Company reported net income for the three month period ended November 30, 2024, of $2.1 million ($1.0 million net income attributable to shareholders, basic and diluted earnings per share of $0.00) compared to a net loss of $nil in the prior year period ($1.0 million net loss attributable to shareholders, basic and diluted loss per share of $0.00). The increase in net income compared to the prior year comparative period is primarily due to an increase in gross profit of $4.8 million (Q1 2024: $3.7 million) resulting from an increase in average realized price (Q1 2025: $2,653, Q1 2024: $1,942 per ounce). This, combined with lower general and administrative expenses and an increased gain on change in fair value of derivative financial instruments, was partially offset by an increase in income tax expense following an increase in net income realized during Q1 2025.

 

Summary of Quarterly Results

 

($(000's), except per share amounts)                                
US$ unless otherwise stated  2025 Q1   2024 Q4   2024 Q3   2024 Q2   2024 Q1   2023 Q4   2023 Q3   2023 Q2 
                                 
Net income (loss) and comprehensive income (loss)   2,137    3,284    (1,656)   1,921    (39)   2,309    (374)   (50)
Net income (loss) and comprehensive income (loss) attributable to:                                        
Non-controlling interests   1,156    1,229    983    841    927    908    890    1,349 
Common shareholders   981    2,055    (2,639)   1,080    (966)   1,401    (1,264)   (1,399)
Net income (loss) and comprehensive income (loss)   2,137    3,284    (1,656)   1,921    (39)   2,309    (374)   (50)

 

During the three months ended November 30, 2024, the Company reported net income of $2.1 million ($1.0 million net income attributable to shareholders), compared to net income of $3.3 million ($2.1 million net income attributable to shareholders) in the prior quarter (Q4 2024). The decrease in net income compared to the prior quarter is primarily due to a decrease in gross profit following lower ounces of gold sold (Q1 2025: 4,813, Q4 2024: 5,715), partially offset by an increase in average realized price (Q1 2025: $2,653, Q4 2024: $2,412), combined with a lower gain on change in fair value of derivative financial instruments of $0.8 million (Q4 2024: $1.9 million) due to a decrease in the Company’s share price from Q4 2024 to Q1 2025 (Q1 2025: $0.36, Q4 2024: $0.39).

 

Liquidity and Capital Resources

 

At November 30, 2024, the Company had $6.8 million of cash (August 31, 2024: $8.3 million) and negative working capital of $0.8 million after adjusting for derivative liabilities which will only be settled by issuing equity of the Company and for the current portion of deferred revenue related to the OCIM prepaid gold purchase agreement (non-cash) (August 31, 2024: $0.4 million). Working capital in Q1 2025 was impacted by a scheduled stripping campaign focused on accelerating the pit expansion to the north end of the main zone in the second layback to expose ore for H2 2025. As a result of the increased stripping activity, the Company mined a higher proportion of waste tonnes, which is expected to provide access to higher grade ore blocks in the second half of F2025, benefiting production starting in Q3 and Q4 2025. As a result, working capital is expected to improve in H2 2025.

 

The decrease in cash of $1.5 million over August 31, 2024, was primarily due to an increase in operating cash flow (Q1 2024: $2.4 million), offset by an increase in capital investment for infrastructure and development at Buckreef Gold (three months ended November 30, 2024: $3.7 million). During the three months ended November 30, 2024, the Company poured 4,841 ounces of gold and sold 4,813 ounces of gold which contributed to positive operating cash flow of $2.4 million. The increase in operating cash flow was more than offset by an increase in capital expenditures during Q1 2025. For the three months ended November 30, 2024, the Company incurred a total of $3.7 million in cash capital expenditures, mainly related to expenditures in finalizing the plant expansion to 2,000 tpd, equipment leases for mobile equipment to supplement the contractor-owned fleet with an owner’s operated fleet for Buckreef’s mining operations, processing plant security system upgrades, dewatering pumps to support mining activity during the wet season and construction of a significantly expanded TSF to provide storage until early Q1 2026.

 

36 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

To help supplement the Company’s liquidity and to fund productivity enhancing purchases, during Q4 2022 the Company entered into a $5.0 million prepaid Gold Doré Purchase Agreement with OCIM. The Agreement required that funds to be made available to the Company in two tranches. After fully settling $2.5 million drawn on the first tranche of the Agreement, on September 26, 2023, the Company drew an additional $0.5 million from the second tranche of the Agreement in exchange for delivering 23.5 ounces of gold per month, commencing December 2023, for a total of 305.4 ounces of gold over 13 months. On November 29, 2023, the Company drew an additional $1.0 million from the second tranche of the Agreement in exchange for delivering 44.1 ounces of gold per month, commencing February 2024, for a total of 573.2 ounces of gold over 13 months. On May 6, 2024, the Company amended the terms of the Agreement to allow for additional prepayments and drew $1.0 million in exchange for delivering 40.85 ounces of gold per month, commencing June 2024, for a total of 490.2 ounces of gold over 12 months. During Q1 2025, the Company drew an additional $0.5 million in exchange for delivering 17.0 ounces of gold per month, commencing November 2024, for a total of 204.1 ounces of gold over 12 months. The $0.5 million drawdown in Q1 2025 was used to help finance the procurement of heavy equipment and haul trucks to supplement the contractor-owned fleet with an owner’s operated fleet for Buckreef’s mining operations.

 

To provide the Company with access to additional liquidity, during Q3 2023, the Company announced that it entered into an At The Market Offering Agreement (“ATM”) with H.C. Wainwright & Co., LLC as Lead Agent and Roth Capital Partners, LLC as Co-Agent, pursuant to which the Company, at its discretion, may offer and sell, from time to time, common shares having an aggregate offering price of up to $10 million. If the Company chooses to sell shares under the ATM Offering, the Company intends to use the net proceeds of this offering for working capital and for other general corporate purposes. To date, no shares have been sold under the ATM agreement.

 

In addition, to provide the Company with access to supplementary liquidity, during Q2 2022, TRX Gold entered into a purchase agreement with Lincoln Park Capital Fund, LLC (“Lincoln Park”). This agreement provides TRX Gold with the right to sell up to $10 million of its shares to Lincoln Park over a 36-month period at its sole discretion. TRX Gold has control over the timing and amount of any sales to Lincoln Park and will use the proceeds as needed to develop the Buckreef Gold asset. In mid-January 2025, the purchase agreement with Lincoln Park terminated pursuant to its terms

 

As of November 30, 2024, the Company has accumulated losses of $120.9 million since inception (August 31, 2024: $121.9 million).

 

Commitments

 

In order to maintain existing site mining and exploration licenses, the Company is required to pay annual license fees. As at November 30, 2024, these licenses remained in good standing and the Company is up to date on license payments.

 

Contingencies

 

The Company is involved in litigation and disputes arising in the normal course of operations. Management is of the opinion that the outcome of any potential litigation will not have a material adverse impact on the Company’s financial position or results of operations. Accordingly, no provisions for the settlement of outstanding litigation and potential claims have been accrued.

 

Off-Balance Sheet Arrangements

 

The Company has no off-balance sheet arrangements.

 

Transactions with Related Parties

 

The Company may enter into related party transactions that are in the normal course of business. Transactions with Related Parties disclosure can be found in Note 16 of the Unaudited Interim Consolidated Financial Statements for the three months ended November 30, 2024.

 

37 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Omnibus Equity Incentive Plan

 

Effective June 26, 2019, the Company adopted the Omnibus Equity Incentive Plan dated June 26, 2019 (the “Omnibus Plan”), which Omnibus Plan was approved by the shareholders on August 16, 2019, subsequently updated and approved by the shareholders on February 25, 2022.

 

The purposes of the Omnibus Plan are: (a) to advance the interests of the Company by enhancing the ability of the Company and its subsidiaries to attract, motivate and retain employees, officers, directors, and consultants, which either of directors or officers may be consultants or employees; (b) to reward such persons for their sustained contributions; and (c) to encourage such persons to consider the long-term corporate performance of the Company.

 

The Omnibus Plan provides for the grant of options, restricted share units (“RSUs”), deferred share units (“DSUs”) and performance share units (“PSUs”) (collectively, the “Omnibus Plan Awards”), all of which are described in detail in the Form 40-F Annual Report for the year ended August 31, 2022, and the Information Circular dated January 21, 2022, filed on SEDAR+ on January 27, 2022.

 

The Omnibus Plan provides for the grant of other share-based awards to participants (“Other Share-Based Awards”), which awards would include the grant of common shares. All Other Share-Based Awards will be granted by an agreement evidencing the Other Share-Based Awards granted under the Omnibus Plan.

 

Subject to adjustments as provided for under the Omnibus Plan, the maximum number of shares issuable pursuant to Omnibus Plan Awards outstanding at any time under the Omnibus Plan shall not exceed 10% of the aggregate number of common shares outstanding from time to time on a non-diluted basis; provided that the acquisition of common shares by the Company for cancellation shall not constitute non-compliance with the Omnibus Plan for any Omnibus Plan Awards outstanding prior to such purchase of common shares for cancellation.

 

For more particulars about the Omnibus Plan, we refer you to the copy of the Omnibus Plan previously filed as an exhibit with the SEC and on SEDAR+. The Omnibus Plan replaces all previous equity compensation plans of the Company, including the Restricted Stock Unit Plan and Stock Option Plan.

 

Changes in Accounting Polices and Critical Accounting Estimates and Judgements

 

Material accounting policies as well as any changes in accounting policies are discussed in Note 3 “Material Accounting Policies” of the Company’s Unaudited Interim Consolidated Financial Statements for the three months ended November 30, 2024.

 

 

38 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Non-IFRS Performance Measures

 

Average realized price per ounce of gold sold

 

Average realized price per ounce of gold sold is a non-IFRS measure and does not constitute a measure recognized by IFRS and does not have a standardized meaning defined by IFRS. Average realized price per ounce of gold sold is calculated by dividing revenue by ounces of gold sold. It may not be comparable to information in other gold producers’ reports and filings.

 

     Three Months Ended      Three Months Ended  
     November 30, 2024      November 30, 2023  
Revenue per financial statements  $12,528   $9,404 
Revenue recognized from OCIM prepaid gold purchase agreement   (915)   (922)
Revenue from gold spot sales   11,613    8,482 
Ounces of gold sold   4,813    4,895 
Ounces of gold sold from OCIM prepaid gold purchase agreement   (435)   (527)
Ounces from gold spot sales   4,378    4,368 
Average realized price (gross)  $2,603   $1,921 
Average realized price net OCIM prepaid gold purchase agreement  $2,653   $1,942 

 

Cash cost per ounce of gold sold

 

Cash cost per ounce of gold sold is a non-IFRS performance measure and does not constitute a measure recognized by IFRS and does not have a standardized meaning defined by IFRS. Cash cost per ounce may not be comparable to information in other gold producers’ reports and filings. The following table provides a reconciliation of total cash cost per ounce of gold sold to cost of goods sold per the financial statements for the three months ended November 30, 2024.

 

   Three Months Ended   Three Months Ended 
   November 30, 2024   November 30, 2023 
Cost of sales per financial statements  $7,694   $5,687 
Less: Depreciation  $(906)  $(484)
Total cash cost  $6,788   $5,203 
Ounces of gold sold   4,813    4,895 
Cash cost per ounce of gold sold  $1,410   $1,063 

 

Adjusted EBITDA

 

Adjusted EBITDA is a non-IFRS performance measure and does not constitute a measure recognized by IFRS and does not have a standardized meaning defined by IFRS. Adjusted EBITDA may not be comparable to information in other gold producers’ reports and filings. Adjusted EBITDA is presented as a supplemental measure of the Company’s performance and ability to service its obligations. Adjusted EBITDA is frequently used by securities analysts, investors and other interested parties in the evaluation of companies in the industry, many of which present Adjusted EBITDA when reporting their results. Issuers present Adjusted EBITDA because investors, analysts and rating agencies consider it useful in measuring the ability of those issuers to meet their obligations. Adjusted EBITDA represents net income (loss) before interest, income taxes, and depreciation and also eliminates the impact of a number of items that are not considered indicative of ongoing operating performance.

 

39 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Certain items of expense are added, and certain items of income are deducted from net income that are not likely to recur or are not indicative of the Company’s underlying operating results for the reporting periods presented or for future operating performance and consist of:

 

·Change in fair value of derivative financial instruments;
·Accretion related to the provision for reclamation; and
·Share-based compensation expense.

 

The following table provides a reconciliation of net income and comprehensive income to Adjusted EBITDA per the financial statements for the three months ended November 30, 2024.

 

   Three Months Ended   Three Months Ended 
   November 30, 2024   November 30, 2023 
Net income and comprehensive income per financial statements   2,137    (39)
Add:          
Depreciation   906    484 
Interest and other non-recurring expenses   321    340 
Income tax expense   1,693    1,191 
Change in fair value of derivative financial instruments   (819)   (199)
Share-based payment expense   156    810 
Adjusted EBITDA   4,394    2,587 

 

The Company has included “average realized price per ounce of gold sold”, “cash cost per ounce of gold sold” and “Adjusted EBITDA” as non-IFRS performance measures throughout this MD&A as TRX Gold believes that these generally accepted industry performance measures provide a useful indication of the Company’s operational performance. The Company believes that certain investors use this information to evaluate the Company’s performance and ability to generate cash flow. Accordingly, they are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

 

Disclosure of Outstanding Share Data

 

As at November 30, 2024, there were 280,709,951 common shares outstanding, 36,190,769 share purchase warrants outstanding, 1,498,385 RSUs outstanding, nil PSUs/DSUs outstanding, and 14,874,000 stock options outstanding.

 

Risks Factors

 

The Company is subject to a number of extraneous risk factors over which it has no control. These factors are common to most mineral exploration and development companies and include, among others: project ownership, exploration and development risk, depressed equity markets and related financing risk, commodity price risk, fluctuating exchange rates, environmental risk, insurance risk, sovereign risk. For further details on the risk factors affecting the Company, please see the Company’s Form 40-F Annual Report for the year ended August 31, 2024, filed with the SEC on November 29, 2024, and on SEDAR+ as the Company’s Annual Information Form on November 29, 2024.

 

40 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Internal Control Over Financial Reporting (“ICFR”)

 

Management of the Company is responsible for establishing and maintaining adequate internal controls over financial reporting (“ICFR”) for the Company as defined in Rule 13a-15(f) under the Securities and Exchange Act of 1934. The Company’s management, including the Company’s Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”) have conducted an evaluation of the design and effectiveness of the Company’s ICFR as of August 31, 2023. In making this assessment, the Company’s management used the criteria established in Internal Control – Integrated Framework, issued by the Committee of Sponsoring Organizations of the Treadway Commission (“COSO 2013”). This evaluation included review of the documentation of controls, evaluation of the design and operating effectiveness of controls, and a conclusion on this evaluation. Based on this evaluation, management concluded that ICFR were not effective for the year ended August 31, 2024, due to a material weakness relating to its information technology general controls (“ITGC”). The Company relies on a third-party service provider that manages its enterprise resource planning (“ERP”) software. As at August 31, 2024, the vendor did not have an assurance audit report to confirm the appropriate ITGCs were in place. As a result, the Company was unable to assess the internal controls related to security, availability, processing integrity and confidentiality surrounding the ERP. The Company did not have appropriate controls to monitor the vendor’s control environment and ITGCs as per the criteria established in the COSO 2013 Framework.

 

Remediation of Material Weaknesses

 

The control deficiency described immediately above was concluded on by management during the year ended August 31, 2024. The Company has prioritized the remediation of the material weakness and is working with its vendor to resolve the issue.

 

During the year ended August 31, 2024, the Company continued to strengthen its internal controls and is committed to ensuring that such controls are designed and operating effectively. The Company is implementing process and control improvements, and management made the following changes during the year to improve the internal control framework, including the following:

 

·Continued working with a third-party service provider to implement and test the design and operating effectiveness of key controls developed in the prior year period. Based on this work, the Company concluded that the majority of internal control deficiencies previously identified have been substantially remediated, except for the material weakness described above.

 

·Continued to build an experienced team at Buckreef Gold Company Limited, the Company’s operating subsidiary, including hiring a new site Supply Chain Superintendent and adding additional headcount to enhance controls over the procurement process, document management, segregation of duties and optimization of the Company’s financial reporting close process.

 

It is the Company’s intention to remediate the material weakness by working closely with its vendor and, if required, designing and implementing additional compensating controls over ITGCs over the course of fiscal 2025.

 

41 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Additional Information

 

The Company is a Canadian public company listed on the Toronto Stock Exchange trading under the symbol “TRX” and also listed on the NYSE American trading under the symbol “TRX”. Additional information about the Company and its business activities is available on SEDAR+ at www.sedarplus.ca; with the SEC at sec.gov; and the Company’s website at www.TRXgold.com.

 

Approval

 

The Board of Directors of TRX Gold Corporation has approved the disclosure contained in this Q1 2025 MD&A. A copy of this Q1 2025 MD&A will be provided to anyone who requests it. It is also available on the SEDAR+ website at www.sedarplus.ca.

 

 

 

 

 

 

 

 

 

42 
 

Management’s Discussion

and Analysis

November 30, 2024 

 

Endnotes

 

1  Refer to “Non-IFRS Performance Measures” section.

 

2  Notes Regarding Sample Protocol QA/QC: The sample chain of custody is managed by the Buckreef Gold geology team on site. Reported results are from diamond drilled core samples. Intervals of core to be analyzed are split into half using a mechanized core cutter, with one half sent to the Laboratory for geochemical analysis and the remaining half kept in storage for future reference and uses. Diamond drilled core has been HQ size and recoveries are consistently 100% across all drill holes intercept reported.

 

Sampling and analytical procedures are subject to a comprehensive quality assurance and quality control program. The QA/QC program involves insertion of duplicate samples, blanks and certified reference materials in the sample stream. Gold analyses are performed by standard fire assaying protocols using a 50-gram charge with atomic absorption (AAS) finish and a gravimetric finish performed for assays greater than 10 grams per tonne.

 

Sample Preparation and analysis are performed by independent SGS Laboratory in Mwanza, Tanzania. SGS Laboratory is ISO17025 accredited and employs a Laboratory Information Management System for sample tracking, quality control and reporting.

 

The results summarized in this MD&A from the “Buckreef Main Zone NEE” prospect is an extension of the known Buckreef Main Zone. The intercepts confirm a continuity of over 200 m of known Buckreef main deposit to the Northeast. The intersections reported here are a down-hole length and may not represent true width, however the true width is estimated to be between 50% - 60% of the length.

 

The results summarized in this MD&A from the “Stamford Bridge” target show intercepts that confirm an interpreted mineralized shear zone trending 070 degrees (ENE) that is over a km long. The intersections reported only covers the first 100 m strike length, they are a down-hole length and may not represent true width, however the true width is estimated to be between 50% - 60% of the length.

 

3  Notes Regarding Sample Protocol from Metallurgical Variability Test Results: A 1 kg aliquot of each of Composite 3 to Composite 14 at a crush size of 100% - 1.18 mm were blended to form the master composite. The master composite was split into 1 kg aliquots using a rotary splitter. Three 1 kg aliquots from the master composite were milled in a rod mill to target grinds of 80% - 53 µm, 80% - 38 µm and 80% -25 µm. A 200 g aliquot was split from the 80% - 53 µm and wet milled in a ceramic charged ball mill to a target grind of 80% - 5 µm. The grinds were checked by screening the milled material on the specific screens and weighing the oversize material. A 20 g aliquot of the 80% - 5 µm was submitted to an external laboratory for particle size distribution. One 500 g aliquot of the milled sample was submitted for the head chemical analysis.

  

 

 

43

 

v3.24.4
Cover
3 Months Ended
Nov. 30, 2024
Cover [Abstract]  
Document Type 6-K
Amendment Flag false
Document Period End Date Nov. 30, 2024
Document Fiscal Period Focus Q1
Document Fiscal Year Focus 2025
Current Fiscal Year End Date --08-31
Entity File Number 001-32500
Entity Registrant Name TRX GOLD Corporation
Entity Central Index Key 0001173643
Entity Address, Address Line One 277 Lakeshore Road East
Entity Address, Address Line Two Suite 403
Entity Address, City or Town Oakville
Entity Address, State or Province ON
Entity Address, Country CA
Entity Address, Postal Zip Code L6J 1H9
v3.24.4
Interim Condensed Consolidated Statements of Financial Position (Unaudited) - USD ($)
$ in Thousands
Nov. 30, 2024
Aug. 31, 2024
Current assets    
Cash $ 6,787 $ 8,331
Amounts receivable 2,307 1,958
Prepayments and other assets 1,215 1,246
Inventories 6,534 6,249
Total current assets 16,843 17,784
Other long-term assets 3,373 3,259
Mineral property, plant and equipment 82,416 77,817
Total assets 102,632 98,860
Current liabilities    
Amounts payable and accrued liabilities 15,876 15,545
Income tax payable 840 1,411
Current portion of deferred revenue 1,322 1,653
Current portion of lease liabilities 903 401
Derivative financial instrument liabilities 1,454 2,273
Total current liabilities 20,395 21,283
Lease liabilities 1,951 942
Deferred income tax liability 10,796 9,505
Provision for reclamation 1,127 1,091
Total liabilities 34,269 32,821
Equity    
Share capital 166,313 165,945
Share-based payments reserve 8,970 9,151
Warrants reserve 1,700 1,700
Accumulated deficit (120,912) (121,893)
Equity attributable to shareholders 56,071 54,903
Non-controlling interest 12,292 11,136
Total equity 68,363 66,039
Total equity and liabilities $ 102,632 $ 98,860
v3.24.4
Interim Condensed Consolidated Statements of Income (Loss) and Comprehensive Income (Loss) (Unaudited) - USD ($)
$ in Thousands
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Profit or loss [abstract]    
Revenue $ 12,528 $ 9,404
Cost of sales    
Production costs (5,846) (4,508)
Royalty (942) (695)
Depreciation (906) (484)
Total cost of sales (7,694) (5,687)
Gross profit 4,834 3,717
General and administrative expenses (1,425) (2,211)
Change in fair value of derivative financial instruments 819 199
Foreign exchange losses (77) (80)
Interest and other expenses (321) (473)
Income before tax 3,830 1,152
Income tax expense (1,693) (1,191)
Net income (loss) and comprehensive income (loss) 2,137 (39)
Shareholders 981 (966)
Non-controlling interest 1,156 927
Net income (loss) and comprehensive income (loss) $ 2,137 $ (39)
Basic (loss) earnings per share $ 0.00 $ (0.00)
Diluted (loss) earnings per share $ 0.00 $ (0.00)
v3.24.4
Interim Condensed Consolidated Statements of Changes in Equity (Unaudited) - USD ($)
$ in Thousands
Issued capital [member]
Reserve of share-based payments [member]
Reserve For Warrants [member]
Accumulated deficit [member]
Shareholders' equity [member]
Non-controlling interests [member]
Total
Beginning balance, value at Aug. 31, 2023 $ 164,816 $ 8,807 $ 1,700 $ (121,423) $ 53,900 $ 7,156 $ 61,056
Beginning balance, shares at Aug. 31, 2023 277,625,317            
IfrsStatementLineItems [Line Items]              
Shares issued for share-based payments (Note 13) $ 642 (632) 10 10
Shares issued for share-based payments, shares 1,465,417            
Share-based compensation expense (Note 13) 865 865 865
Witholding tax impact on share-based payments (357) (357) (357)
Net (loss) income for the period (966) (966) 927 (39)
Ending balance, value at Nov. 30, 2023 $ 165,458 8,683 1,700 (122,389) 53,452 8,083 61,535
Ending balance, shares at Nov. 30, 2023 279,090,734            
IfrsStatementLineItems [Line Items]              
Shares issued for share-based payments $ 487 (489) (2) (2)
Shares issued for share-based payments, shares 1,100,002            
Share-baseds compensation expense 1,153 1,153 1,153
Witholding tax impact on share-based payments (196) (196) (196)
Net income for the period 496 496 3,053 3,549
Ending balance, value at Aug. 31, 2024 $ 165,945 9,151 1,700 (121,893) 54,903 11,136 66,039
Ending balance, shares at Aug. 31, 2024 280,190,736            
IfrsStatementLineItems [Line Items]              
Shares issued for share-based payments (Note 13) $ 368 (370) (2) (2)
Shares issued for share-based payments, shares 519,215            
Share-based compensation expense (Note 13) 189 189 189
Net income for the period 981 981 1,156 2,137
Ending balance, value at Nov. 30, 2024 $ 166,313 $ 8,970 $ 1,700 $ (120,912) $ 56,071 $ 12,292 $ 68,363
Ending balance, shares at Nov. 30, 2024 280,709,951            
v3.24.4
Interim Condensed Consolidated Statements of Cash Flows (Unaudited) - USD ($)
$ in Thousands
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Operating    
Net income (loss) $ 2,137 $ (39)
Adjustments for items not involving cash:    
Non-cash items 1,547 2,955
Changes in non-cash working capital:    
(Increase) decrease in amounts receivable (209) 1,032
Increase in inventories (446) (343)
Decrease in prepaid and other assets 31 79
(Decrease) increase in amounts payable and accrued liabilities (87) 1,863
Decrease in income tax payable (592) (408)
Cash provided by operating activities 2,381 5,139
Investing    
Exploration and evaluation assets and expenditures (431) (91)
Purchase of mineral property, plant and equipment (3,155) (3,683)
Increase in other long-term assets (114) (286)
Cash used in investing activities (3,700) (4,060)
Financing    
Withholding taxes on settlement of share-based payments (2) (357)
Lease payments (223) (24)
Cash used in financing activities (225) (381)
Net (decrease) increase in cash (1,544) 698
Cash at beginning of the period 8,331 7,629
Cash at end of the period 6,787 8,327
Taxes paid in cash 994 700
Interest paid on leases $ 70 $ 1
v3.24.4
Nature of operations
3 Months Ended
Nov. 30, 2024
Nature Of Operations  
Nature of operations

 

1.Nature of operations

 

TRX Gold Corporation (“TRX Gold” or the “Company”) was incorporated in the Province of Alberta on July 5, 1990 under the Business Corporations Act (Alberta). The Company’s principal business activity is the exploration, development and production of mineral property interests in the United Republic of Tanzania (“Tanzania”).

 

The Company’s registered office is 400 3rd Avenue SW, Suite 3700, Calgary, Alberta, T2P 4H2, Canada and the Company’s principal place of business is 277 Lakeshore Road E, Suite 403, Oakville, Ontario, L6J 6J3, Canada.

 

The Company’s common shares are listed on the Toronto Stock Exchange in Canada (TSX: TRX) and NYSE American in the United States of America (NYSE American: TRX).

 

The Company is primarily focused on development and mining operations, exploring, and evaluating its mineral properties. The business of exploring and mining for minerals involves a high degree of risk. The underlying value of the mineral properties is dependent upon the existence and economic recovery of mineral resources and reserves, the ability to raise long-term financing to complete the development of the properties, government policies and regulations, and upon future profitable production or, alternatively, upon the Company’s ability to dispose of its interest on an advantageous basis; all of which are uncertain.

v3.24.4
Basis of preparation
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Basis of preparation

 

2.Basis of preparation

 

a)Statement of compliance

 

The Company’s interim condensed consolidated financial statements have been prepared in accordance with International Accounting Standards 34, Interim Financial Reporting, as issued by the International Accounting Standards Board (“IASB”). The interim condensed consolidated financial statements do not include all disclosures required by International Financial Reporting Standards (“IFRS”) for annual financial statements and should be read in conjunction with the Company’s consolidated financial statements for the year ended August 31, 2024.

 

These interim condensed consolidated financial statements were approved by the Board of Directors of the Company on January 9, 2025.

 

b)Basis of presentation and measurement

 

These interim condensed consolidated financial statements have been prepared on a going concern basis under the historical cost basis, except for certain financial assets and liabilities which are measured at fair value as disclosed in Note 18. All amounts in these interim condensed consolidated financial statements are presented in United States dollars with all amounts rounded to the nearest thousand, except for share and per share data, or as otherwise noted. Reference herein of $ or USD is to United States dollars and C$ or CAD is to Canadian dollars.

v3.24.4
Material accounting policies, judgements and estimates
3 Months Ended
Nov. 30, 2024
Material Accounting Policies Judgements And Estimates  
Material accounting policies, judgements and estimates

 

3.Material accounting policies, judgements and estimates

 

The accounting policies, judgements and estimates applied in these interim condensed consolidated financial statements are consistent with those set out in Notes 3 and 4 of the Company’s annual consolidated financial statements for the year ended August 31, 2024.

v3.24.4
Amounts receivable
3 Months Ended
Nov. 30, 2024
Amounts Receivable  
Amounts receivable

 

4.Amounts receivable

 

          
   November 30, 2024   August 31, 2024 
Sales tax receivable(1)  $5,599   $5,144 
Other   81    73 
Other receivable   5,680    5,217 
Less: Long-term portion   (3,373)   (3,259)
Total amounts receivable  $2,307   $1,958 

 

(1)Sales tax receivables consist of harmonized services tax and value added tax (“VAT”) due from Canadian and Tanzanian tax authorities, respectively. Tanzanian tax regulations allow for VAT receivable to be refunded or set-off against other taxes due to the Tanzania Revenue Authority ("TRA"). The Company has historically experienced delays in receiving payment or confirmation of offset against other taxes. The Company is in communication with the TRA and there is an expectation for either cash payments or offsetting of VAT receivable against other taxes in the future. VAT which the Company does not expect to recover within the next 12 months has been classified as long-term assets.

 

The Company held no collateral for any receivables. During the three months ended November 30, 2024, the Company recovered $0.9 million (2023 - $nil) of VAT refunds from the TRA.

v3.24.4
Prepayments and other assets
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Prepayments and other assets

 

5.Prepayments and other assets

 

          
   November 30, 2024   August 31, 2024 
Prepaid expenses  $508   $539 
Deferred financing costs(1)   707    707 
Total prepayments and other assets  $1,215   $1,246 

 

(1)Consists of $0.5 million in commitment fees paid with respect to a share purchase agreement whereby the Company, at its sole discretion, has the right to sell up to $10 million of its common shares over a 36-month period and $0.2 million in deferred financing costs related to an At-the-Market Offering Agreement entered on May 12, 2023.

 

v3.24.4
Inventories
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Inventories

 

6.Inventories

 

          
   November 30, 2024   August 31, 2024 
Ore stockpile  $4,491   $4,533 
Gold in circuit   836    837 
Gold doré   37    55 
Total precious metals inventories   5,364    5,425 
Supplies   1,170    824 
Total inventories  $6,534   $6,249 
v3.24.4
Mineral property, plant and equipment
3 Months Ended
Nov. 30, 2024
Mineral Property Plant And Equipment  
Mineral property, plant and equipment

 

7.Mineral property, plant and equipment

 

                                    
   Exploration and evaluation expenditures(1)   Mineral properties   Processing plant and related infrastructure   Machinery and equipment(2)  

Right-

of-use assets

    Other(3)   Total 
Cost                                    
As at August 31, 2024  $2,281   $48,161   $29,948   $2,041   $1,721   $ 192    $84,344 
Additions   431    1,217    1,235    127    2,352     -     5,362 
As at November 30, 2024   2,712    49,378    31,183    2,168    4,073     192     89,706 
Accumulated depreciation                                    
As at August 31, 2024  $-   $2,876   $2,465   $1,067   $38   $ 81    $6,527 
Depreciation   -    412    112    72    162         763 
As at November 30, 2024   -    3,288    2,577    1,139    200     86     7,290 
Net book value                                    
As at August 31, 2024  $2,281   $45,285   $27,483   $974   $1,683   $ 111    $77,817 
As at November 30, 2024   2,712    46,090    28,606    1,029    3,873     106     82,416 

 

(1)Represents exploration and evaluation expenditures related to the Anfield and Stamford Bridge deposits on the Buckreef property.
(2)Includes automotive and computer equipment and software.
(3)Includes leasehold improvements

 

v3.24.4
Income tax
3 Months Ended
Nov. 30, 2024
Income Tax  
Income tax

 

8.Income tax

 

Income tax expense is recognized based on management’s estimate of the weighted average annual income tax rate expected for the full financial year. The maximum amount of tax losses that a business can utilize in Tanzania is 60% (2023 - 70%) of its taxable profit for the current year. The remaining 40% (2023 - 30%) of taxable profit is subject to a statutory tax rate of 30%. As a result, Buckreef’s current income tax is calculated at an effective tax rate of 12% (2023 - 9%) until Buckreef’s tax loss carryforwards are fully utilized. Tax losses in Tanzania can only be utilized by the entity to which the tax losses relate to.

 

The carrying value of Buckreef’s Mineral Property, Plant and Equipment is higher than their tax written down values due to historical mining incentives in Tanzania and accelerated depreciation for tax purposes. The taxable temporary difference between the carrying value of Mineral Property, Plant and Equipment and its tax basis in excess of available tax loss carryforwards resulted in a deferred tax liability.

 

For the three months ended November 30, 2024, the Company recorded income tax expense of $1.7 million, comprised of current income tax expense of $0.4 million and deferred income tax expense of $1.3 million (2023 - $1.2 million income tax expense comprised of current income tax expense of $0.3 million and deferred income tax expense of $0.9 million).

v3.24.4
Deferred revenue
3 Months Ended
Nov. 30, 2024
Deferred Revenue  
Deferred revenue

 

9.Deferred revenue

 

On August 11, 2022, the Company entered into a $5 million prepaid Gold Doré Purchase Agreement (“Agreement”) with OCIM Metals and Mining S.A. The Agreement requires funds to be made available to the Company in two tranches. On July 11, 2023, the Company drew $1.0 million from the second tranche of the Agreement in exchange for delivering 46.4 ounces of gold per month, commencing October 2023, for a total of 603 ounces of gold over 13 months. During November 2023, the Company fully settled $2.5 million drawn on the first tranche of the Agreement. On September 26, 2023, the Company drew an additional $0.5 million from the second tranche of the Agreement in exchange for delivering 23.5 ounces of gold per month, commencing December 2023, for a total of 305.4 ounces of gold over 13 months. On November 29, 2023, the Company drew an additional $1.0 million from the second tranche of the Agreement in exchange for delivering 44.1 ounces of gold per month, commencing February 2024, for a total of 573.2 ounces of gold over 13 months. On May 6, 2024, the Company amended the terms of the Agreement to allow for additional prepayments and drew $1.0 million in exchange for delivering 40.85 ounces of gold per month, commencing June 2024, for a total of 490.2 ounces of gold over 12 months. On October 30, 2024, the Company drew an additional $0.5 million in exchange for delivering 17 ounces of gold per month, commencing November 2024, for a total of 204 ounces of gold over 12 months.

 

     
   Amount 
As at August 31, 2024  $1,653 
Drawdown   500 
Accretion of deferred revenue (Note 21)   84 
Revenue recognized   (915)
As at November 30, 2024  $1,322 
v3.24.4
Lease liabilities
3 Months Ended
Nov. 30, 2024
Lease Liabilities  
Lease liabilities

 

10.Lease liabilities

 

Lease liabilities are measured at the discounted value of future lease payments using the lease-specific incremental borrowing rate. Lease payments are apportioned between interest expense and the reduction of the liability. Interest expense is based on the lease-specific incremental borrowing rate at the commencement date of the lease. The incremental borrowing rate differs between each category of asset, location of asset and the duration of the lease. The Company’s lease liabilities primarily comprise of leases for 13 pieces of mobile equipment for use in Buckreef’s mining operations.

 

The carrying amounts of lease liabilities and movements during the period were:

 

     
   Amount 
As at August 31, 2024  $1,343 
Additions   1,665 
Accretion of lease liabilities (Note 21)   70 
Lease payments   (223)
Foreign exchange   (1)
As at November 30, 2024  $2,854 

 

          
   November 30, 2024   August 31, 2024 
Current portion of lease liabilities  $903   $401 
Lease liabilities   1,951    942 
Balance at end of period  $2,854   $1,343 

 

The following amounts are recognized in the statement of income and comprehensive income:

 

          
   For the three months ended Nov 30, 
   2024   2023 
Depreciation expense for right-of-use assets  $162   $11 
Accretion of lease liabilities   70    1 
Total amount  $232   $12 

 

As at November 30, 2024, the Company was committed to a lease for one additional piece of equipment which had not yet commenced with payments totaling $0.7 million.

 

As at November 30, 2024, the Company had the following lease commitments:

 

     
   Amount 
Not later than one month  $124 
Later than one month and not later than three months   201 
Later than three months and not later than one year   920 
Later than one year and not later than five years   2,177 
Total undiscounted lease commitments  $3,422 

 

As at November 30, 2024, the carrying value of right-of-use assets amounted to $3.9 million (August 31, 2024 - $1.7 million). Mobile equipment under lease contracts are depreciated over their useful life as the purchase price at the end of the lease term is immaterial.

v3.24.4
Derivative financial instrument liabilities
3 Months Ended
Nov. 30, 2024
Derivative Financial Instrument Liabilities  
Derivative financial instrument liabilities

 

11.Derivative financial instrument liabilities

 

          
   November 30, 2024   August 31, 2024 
Derivative warrant liabilities  $1,454   $2,273 
Total derivative financial instrument liabilities  $1,454   $2,273 

 

a)Derivative warrant liabilities

 

     
   Amount 
As at August 31, 2024  $2,273 
Change in fair value   (819)
As at November 30, 2024  $1,454 

 

Derivative warrant liabilities of $1.5 million will only be settled by issuing equity of the Company. For the three months ended November 30, 2024, fair value changes amounted to a gain of $0.8 million (2023 - gain of $0.2 million).

 

Fair values of derivative warrant liabilities were calculated using the Black-Scholes Option Pricing Model with the following assumptions:

 

      
   November 30, 2024  August 31, 2024
Share price  $0.36  $0.39
Risk-free interest rate  4.08% - 4.22%  3.82% - 4.13%
Dividend yield  0%  0%
Expected volatility  43% - 45%  47% - 49%
Remaining term (in years)  1.22.2  1.52.4

 

The fair value is classified as level 3 as expected volatilities is determined using adjusted historical volatilities and were therefore not an observable input.

 

Sensitivity analysis

 

If expected volatility, the significant unobservable input, had been higher or lower by 10% and all other variables were held constant, net income and net assets for the three months ended November 30, 2024 would increase or decrease by:

 

          
     November 30, 2024 
10% change in expected volatilities    Increase     Decrease 
(Loss) income  $(493)  $443 

 

v3.24.4
Earnings (loss) per share
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Earnings (loss) per share

 

12.Earnings (loss) per share

 

          
   Three months ended November 30, 
   2024   2023 
Net income (loss) attributable to shareholders  $981   $(966)
Weighted average number of common shares for basic EPS(1)   291,668,469    285,283,429 
Effect of dilutive stock options, warrants, RSUs and share awards   1,826,542    - 
Weighted average number of common shares for diluted EPS(1)   293,495,011    285,283,429 

 

(1)The weighted average number of common shares for basic and diluted EPS include 11.0 million gross number of vested, but unissued, common shares relating to common share awards.

 

For the three months ended November 30, 2024, the weighted average number of common shares for diluted EPS excluded 10.5 million stock options and 36.2 million warrants that were anti-dilutive for the period (2023 - 15.4 million stock options, 2.8 million RSUs, 4.6 million common share awards and 39.0 million warrants).

v3.24.4
Share-based payments reserve
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Share-based payments reserve

 

13.Share-based payments reserve

 

Share-based compensation expense for the three months ended November 30, 2024 totaled $0.2 million (2023 - $0.9 million).

 

As at November 30, 2024, the Company had 6,942,109 (August 31, 2024 - 5,997,632) share awards available for issuance under the Omnibus Equity Incentive Plan.

 

a)Stock options

 

Canadian Dollars denominated stock options

 

          
  

Number of stock

options

  

Weighted average

exercise price per share

 
Balance – August 31, 2024   4,986,000    CAD $0.41 
Options exercised(1)   (562,000)   CAD $0.42 
Balance – November 30, 2024   4,424,000    CAD $0.41 

 

(1)The weighted average share price at the time of the option exercise was C$0.53.

 

Options to purchase common shares carry exercise prices and terms to maturity as follows:

 

                  
          Remaining 
   Number of options   Expiry  contractual 
Exercise price  Outstanding   Exercisable   Date  life (years) 
C$0.40   2,259,000    2,259,000   October 11, 2026   1.9 
C$0.43   2,065,000    2,065,000   September 29, 2026   1.8 
C$0.35   100,000    100,000   January 2, 2027   2.1 
C$0.41(1)   4,424,000    4,424,000       1.9(1)

 

(1)Total represents weighted average.

 

US Dollars denominated stock options

 

          
   Number of stock options   Weighted average exercise price per share 
Balance – November 30, 2024 and August 31, 2024   10,450,000   $0.49 

 

Options to purchase common shares carry exercise prices and terms to maturity as follows:

 

                  
          Remaining 
   Number of options   Expiry  contractual 
Exercise price  Outstanding   Exercisable   Date  life (years) 
USD $0.50   7,375,000    4,425,000   August 17, 2027   2.7 
USD $0.45   3,075,000    1,230,000   August 28, 2028   3.7 
USD $0.49(1)   10,450,000    5,655,000       3.0(1)
(1)  Total represents weighted average.

 

For the three months ended November 30, 2024, share-based compensation expense related to stock options totaled $0.1 million (2023 - $0.2 million).

 

b)Restricted Share Units:

 

The following table sets out activity with respect to outstanding RSUs:

 

     
   Number of RSUs 
Balance – November 30, 2024 and August 31, 2024   1,498,385 

 

For the three months ended November 30, 2024, share-based payment expenses related to RSUs totaled $0.1 million (2023 - $0.5 million).

v3.24.4
Warrants reserve
3 Months Ended
Nov. 30, 2024
Warrants Reserve  
Warrants reserve

 

14.Warrants reserve

 

               
   Number of warrants   Weighted average exercise price per share   Weighted average remaining contractual life (years) 
Balance – August 31, 2024   36,190,769   $0.62    1.9 
Balance – November 30, 2024   36,190,769   $0.62    1.7 

 

 

As at November 30, 2024, the following warrants were outstanding:

 

             
   Number of
Warrants
   Exercise price   Expiry date
Private placement financing warrants - February 11, 2021   16,461,539   $0.80   February 11, 2026
Private placement financing broker warrants - February 11, 2021   1,152,307    $0.80   February 11, 2026
Private placement financing warrants - January 26, 2022   17,948,718   $0.44   January 26, 2027
Private placement financing placement agent warrants - January 26, 2022   628,205   $0.44   January 26, 2027
Balance – November 30, 2024   36,190,769   $0.62(1)   

 

(1)Total represents weighted average.

 

v3.24.4
Non-controlling interest
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Non-controlling interest

 

15.Non-controlling interest

 

Summarized financial information for Buckreef is disclosed below:

 

          
   Three months ended November 30, 
Income Statement  2024   2023 
Revenue  $12,528   $9,404 
Depreciation   906    484 
Accretion expense   188    140 
Income tax expense   1,693    1,191 
Comprehensive income for the period   2,568    2,061 

 

           
Statement of Financial Position  November 30, 2024   August 31, 2024 
Current assets  $10,746   $11,297 
Non-current assets   83,681    78,952 
Current liabilities   (17,057)   (16,973)
Non-current liabilities   (13,863)   (11,528)
Advances from parent, net   (29,371)   (30,210)

 

           
   Three months ended November 30, 
Statement of Cash Flows  2024   2023 
Cash provided by operating activities  $3,572   $6,110 
Cash used in investing activities   (3,675)   (4,057)
Cash used in financing activities   (1,090)   (1,089)

 

v3.24.4
Related party transactions
3 Months Ended
Nov. 30, 2024
Related Party Transactions  
Related party transactions

 

16.Related party transactions

 

Related parties include the Board of Directors and officers, extended relatives and enterprises that are controlled by these individuals as well as certain consultants performing similar functions.

 

Remuneration of Directors and key management personnel of the Company was as follows:

 

          
   Three months ended
November 30,
 
Directors and key management personnel  2024   2023 
Remuneration  $366   $436 
Share-based compensation expense   93    693 
Total directors and key management personnel  $459   $1,129 

 

During the three months ended November 30, 2024, $0.1 million for stock options granted to key management personnel was expensed (2023 - $0.2 million) and $nil for RSUs granted to directors and key management personnel was expensed (2023 - $0.3 million).

 

During the three months ended November 30, 2024, $nil related to common share awards granted to key management personnel was expensed (2023 - $0.2 million). As of November 30, 2024, 11.0 million of vested common share awards have yet to be issued.

v3.24.4
General and administrative expenses
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
General and administrative expenses

 

17.General and administrative expenses

 

          
   Three months ended
November 30,
 
   2024   2023 
Directors’ fees (Note 16)  $64   $60 
Insurance   61    85 
Office and general   60    67 
Shareholder information   151    158 
Professional fees   169    189 
Salaries and benefits (Note 16)   477    558 
Consulting   215    177 
Share-based compensation expense (Notes 13 and 16)   156    810 
Travel and accommodation   52    78 
Depreciation   15    13 
Other   5    16 
Total general and administrative expenses  $1,425   $2,211 

 

v3.24.4
Financial instruments
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Financial instruments

 

18.Financial instruments

 

Fair value of financial instruments

 

The following table sets out the classification of the Company’s financial instruments as at November 30, 2024 and August 31, 2024:

 

          
   November 30, 2024   August 31, 2024 
Financial Assets          
Measured at amortized cost          
Amounts receivable  $2,307   $1,958 
Measured at fair value through profit or loss          
Cash   6,787    8,331 
           
Financial Liabilities          
Measured at amortized cost          
Amounts payables and accrued liabilities   15,876    15,545 
Measured at fair value through profit or loss          
Derivative financial instrument liabilities   1,454    2,273 

 

Cash, derivative warrant liabilities are classified as measured at fair value through profit and loss. Amounts receivable and amounts payable are classified as measured at amortized cost. The carrying value of the Company’s amounts receivable and amounts payable approximate their fair value due to the relatively short-term nature of these instruments.

 

Fair value estimates are made at a specific point in time based on relevant market information and information about financial instruments. These estimates are subject to and involve uncertainties and matters of significant judgment, and therefore cannot be determined with precision. Changes in assumptions could significantly affect the estimates.

 

The Company classifies its financial instruments carried at fair value according to a three-level hierarchy that reflects the significance of the inputs used in making the fair value measurements. The three levels of fair value hierarchy, giving the highest priority to Level 1 inputs and the lowest priority to Level 3 inputs, are as follows:

 

·Level 1 – Unadjusted quoted prices in active markets for identical assets or liabilities;
·Level 2 – Inputs other than quoted prices that are observable for assets and liabilities, either directly or indirectly; and
·Level 3 – Inputs for assets or liabilities that are not based on observable market data.

 

As at November 30, 2024 and August 31, 2024, cash was classified as Level 1 and derivative financial instruments (Note 11) were classified as Level 3 under the fair value hierarchy.

v3.24.4
Segmented information
3 Months Ended
Nov. 30, 2024
Segmented Information  
Segmented information

 

19.Segmented information

 

Operating segments

 

The Company’s Chief Operating Decision Maker, its Chief Executive Officer, reviews the operating results, assesses the performance and makes capital allocation decisions of the Company viewed as a single operating segment engaged in mineral exploration and development in Tanzania. All amounts disclosed in the interim condensed consolidated financial statements represent this single reporting segment. The Company’s corporate division only earns interest revenue that is considered incidental to the activities of the Company and does not meet the definition of an operating segment as defined in IFRS 8, Operating Segments.

 

Geographic segments

 

The Company is in the business of mineral exploration and production in Tanzania. Information regarding the Company’s geographic locations are as follows:

 

          
   Three months ended
November 30,
 
Revenue  2024   2023 
Tanzania  $12,528   $9,404 
Total revenue  $12,528   $9,404 

 

During the three months ended November 30, 2024, the Company generated 93% (2023 – 90%) of its revenue from one (2023 – one) customer totalling $11.6 million (2023 – $8.5 million).

 

          
Non-current assets  November 30, 2024   August 31, 2024 
Canada  $30   $36 
Tanzania   85,759    81,040 
Total non-current assets  $85,789   $81,076 

 

v3.24.4
Commitments and contingencies
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Commitments and contingencies

 

20.Commitments and contingencies

 

Commitments:

 

In order to maintain its existing mining and exploration licenses, the Company is required to pay annual license fees. As at November 30, 2024 and August 31, 2024, these licenses remained in good standing and the Company is up to date on its license payments.

 

Contingencies:

 

The Company is involved in litigation and disputes arising in the normal course of operations. Management is of the opinion that the outcome of any potential litigation will not have a material adverse impact on the Company’s financial position or results of operations. Accordingly, no provisions for the settlement of outstanding litigation and potential claims have been accrued as at November 30, 2024 and August 31, 2024.

v3.24.4
Non-cash items
3 Months Ended
Nov. 30, 2024
Non-cash Items  
Non-cash items

 

21.Non-cash items

 

          
   Three months ended
November 30,
 
   2024   2023 
Depreciation  $921   $497 
Change in fair value of derivative financial instruments (Note 11)   (819)   (199)
Share-based compensation expense (Note 13)   189    875 
Accretion of provision for reclamation   36    27 
Deferred income tax expense (Note 8)   1,291    899 
Accretion of lease liabilities (Note 10)   70    1 
Deferred revenue (Note 9)   (415)   578 
Accretion of deferred revenue (Note 9)   84    112 
Foreign exchange losses   190    165 
Total non-cash items  $1,547   $2,955 

 

For the three months ended November 30, 2024, an increase in amounts payable and accrued liabilities related to purchase of mineral property, plant and equipment was $0.1 million (2023 – decrease of $0.6 million).

 

v3.24.4
Amounts receivable (Tables)
3 Months Ended
Nov. 30, 2024
Amounts Receivable  
Schedule of amounts receivables
          
   November 30, 2024   August 31, 2024 
Sales tax receivable(1)  $5,599   $5,144 
Other   81    73 
Other receivable   5,680    5,217 
Less: Long-term portion   (3,373)   (3,259)
Total amounts receivable  $2,307   $1,958 

 

(1)Sales tax receivables consist of harmonized services tax and value added tax (“VAT”) due from Canadian and Tanzanian tax authorities, respectively. Tanzanian tax regulations allow for VAT receivable to be refunded or set-off against other taxes due to the Tanzania Revenue Authority ("TRA"). The Company has historically experienced delays in receiving payment or confirmation of offset against other taxes. The Company is in communication with the TRA and there is an expectation for either cash payments or offsetting of VAT receivable against other taxes in the future. VAT which the Company does not expect to recover within the next 12 months has been classified as long-term assets.
v3.24.4
Prepayments and other assets (Tables)
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Schedule of prepayments and other assets
          
   November 30, 2024   August 31, 2024 
Prepaid expenses  $508   $539 
Deferred financing costs(1)   707    707 
Total prepayments and other assets  $1,215   $1,246 

 

(1)Consists of $0.5 million in commitment fees paid with respect to a share purchase agreement whereby the Company, at its sole discretion, has the right to sell up to $10 million of its common shares over a 36-month period and $0.2 million in deferred financing costs related to an At-the-Market Offering Agreement entered on May 12, 2023.
v3.24.4
Inventories (Tables)
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Schedule of inventory
          
   November 30, 2024   August 31, 2024 
Ore stockpile  $4,491   $4,533 
Gold in circuit   836    837 
Gold doré   37    55 
Total precious metals inventories   5,364    5,425 
Supplies   1,170    824 
Total inventories  $6,534   $6,249 
v3.24.4
Mineral property, plant and equipment (Tables)
3 Months Ended
Nov. 30, 2024
Mineral Property Plant And Equipment  
Schedule of mineral property, plant and equipment
                                    
   Exploration and evaluation expenditures(1)   Mineral properties   Processing plant and related infrastructure   Machinery and equipment(2)  

Right-

of-use assets

    Other(3)   Total 
Cost                                    
As at August 31, 2024  $2,281   $48,161   $29,948   $2,041   $1,721   $ 192    $84,344 
Additions   431    1,217    1,235    127    2,352     -     5,362 
As at November 30, 2024   2,712    49,378    31,183    2,168    4,073     192     89,706 
Accumulated depreciation                                    
As at August 31, 2024  $-   $2,876   $2,465   $1,067   $38   $ 81    $6,527 
Depreciation   -    412    112    72    162         763 
As at November 30, 2024   -    3,288    2,577    1,139    200     86     7,290 
Net book value                                    
As at August 31, 2024  $2,281   $45,285   $27,483   $974   $1,683   $ 111    $77,817 
As at November 30, 2024   2,712    46,090    28,606    1,029    3,873     106     82,416 

 

(1)Represents exploration and evaluation expenditures related to the Anfield and Stamford Bridge deposits on the Buckreef property.
(2)Includes automotive and computer equipment and software.
(3)Includes leasehold improvements
v3.24.4
Deferred revenue (Tables)
3 Months Ended
Nov. 30, 2024
Deferred Revenue  
Schedule of deferred revenue liability
     
   Amount 
As at August 31, 2024  $1,653 
Drawdown   500 
Accretion of deferred revenue (Note 21)   84 
Revenue recognized   (915)
As at November 30, 2024  $1,322 
v3.24.4
Lease liabilities (Tables)
3 Months Ended
Nov. 30, 2024
Lease Liabilities  
Schedule of carrying amounts of lease liabilities
     
   Amount 
As at August 31, 2024  $1,343 
Additions   1,665 
Accretion of lease liabilities (Note 21)   70 
Lease payments   (223)
Foreign exchange   (1)
As at November 30, 2024  $2,854 
Schedule of lease liabilities
          
   November 30, 2024   August 31, 2024 
Current portion of lease liabilities  $903   $401 
Lease liabilities   1,951    942 
Balance at end of period  $2,854   $1,343 
Schedule of statement of income and comprehensive income
          
   For the three months ended Nov 30, 
   2024   2023 
Depreciation expense for right-of-use assets  $162   $11 
Accretion of lease liabilities   70    1 
Total amount  $232   $12 
Schedule of lease commitments
     
   Amount 
Not later than one month  $124 
Later than one month and not later than three months   201 
Later than three months and not later than one year   920 
Later than one year and not later than five years   2,177 
Total undiscounted lease commitments  $3,422 
v3.24.4
Derivative financial instrument liabilities (Tables)
3 Months Ended
Nov. 30, 2024
Derivative Financial Instrument Liabilities  
Schedule of derivative financial instrument liabilities
          
   November 30, 2024   August 31, 2024 
Derivative warrant liabilities  $1,454   $2,273 
Total derivative financial instrument liabilities  $1,454   $2,273 
Schedule of derivative warrant liabilities
     
   Amount 
As at August 31, 2024  $2,273 
Change in fair value   (819)
As at November 30, 2024  $1,454 
Schedule of assumptions fair value of derivative warrant liabilities
      
   November 30, 2024  August 31, 2024
Share price  $0.36  $0.39
Risk-free interest rate  4.08% - 4.22%  3.82% - 4.13%
Dividend yield  0%  0%
Expected volatility  43% - 45%  47% - 49%
Remaining term (in years)  1.22.2  1.52.4
Schedule of net loss and net assets
          
     November 30, 2024 
10% change in expected volatilities    Increase     Decrease 
(Loss) income  $(493)  $443 
v3.24.4
Earnings (loss) per share (Tables)
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Schedule of earnings (loss) per share
          
   Three months ended November 30, 
   2024   2023 
Net income (loss) attributable to shareholders  $981   $(966)
Weighted average number of common shares for basic EPS(1)   291,668,469    285,283,429 
Effect of dilutive stock options, warrants, RSUs and share awards   1,826,542    - 
Weighted average number of common shares for diluted EPS(1)   293,495,011    285,283,429 

 

(1)The weighted average number of common shares for basic and diluted EPS include 11.0 million gross number of vested, but unissued, common shares relating to common share awards.
v3.24.4
Share-based payments reserve (Tables)
3 Months Ended
Nov. 30, 2024
IfrsStatementLineItems [Line Items]  
Schedule of continuity of outstanding stock options
          
  

Number of stock

options

  

Weighted average

exercise price per share

 
Balance – August 31, 2024   4,986,000    CAD $0.41 
Options exercised(1)   (562,000)   CAD $0.42 
Balance – November 30, 2024   4,424,000    CAD $0.41 

 

(1)The weighted average share price at the time of the option exercise was C$0.53.
Schedule of restricted stock outstanding
     
   Number of RSUs 
Balance – November 30, 2024 and August 31, 2024   1,498,385 
Stock Options [Member]  
IfrsStatementLineItems [Line Items]  
Schedule of options to purchase common shares exercise prices
                  
          Remaining 
   Number of options   Expiry  contractual 
Exercise price  Outstanding   Exercisable   Date  life (years) 
C$0.40   2,259,000    2,259,000   October 11, 2026   1.9 
C$0.43   2,065,000    2,065,000   September 29, 2026   1.8 
C$0.35   100,000    100,000   January 2, 2027   2.1 
C$0.41(1)   4,424,000    4,424,000       1.9(1)

 

(1)Total represents weighted average.
Stock Options 1 [Member]  
IfrsStatementLineItems [Line Items]  
Schedule of options to purchase common shares exercise prices
                  
          Remaining 
   Number of options   Expiry  contractual 
Exercise price  Outstanding   Exercisable   Date  life (years) 
USD $0.50   7,375,000    4,425,000   August 17, 2027   2.7 
USD $0.45   3,075,000    1,230,000   August 28, 2028   3.7 
USD $0.49(1)   10,450,000    5,655,000       3.0(1)
(1)  Total represents weighted average.
Schedule of outstanding stock options
          
   Number of stock options   Weighted average exercise price per share 
Balance – November 30, 2024 and August 31, 2024   10,450,000   $0.49 
v3.24.4
Warrants reserve (Tables)
3 Months Ended
Nov. 30, 2024
Warrants Reserve  
Schedule of warrants reserve
               
   Number of warrants   Weighted average exercise price per share   Weighted average remaining contractual life (years) 
Balance – August 31, 2024   36,190,769   $0.62    1.9 
Balance – November 30, 2024   36,190,769   $0.62    1.7 
Schedule of warrants outstanding
             
   Number of
Warrants
   Exercise price   Expiry date
Private placement financing warrants - February 11, 2021   16,461,539   $0.80   February 11, 2026
Private placement financing broker warrants - February 11, 2021   1,152,307    $0.80   February 11, 2026
Private placement financing warrants - January 26, 2022   17,948,718   $0.44   January 26, 2027
Private placement financing placement agent warrants - January 26, 2022   628,205   $0.44   January 26, 2027
Balance – November 30, 2024   36,190,769   $0.62(1)   

 

(1)Total represents weighted average.
v3.24.4
Non-controlling interest (Tables)
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Schedule of summarized financial information
          
   Three months ended November 30, 
Income Statement  2024   2023 
Revenue  $12,528   $9,404 
Depreciation   906    484 
Accretion expense   188    140 
Income tax expense   1,693    1,191 
Comprehensive income for the period   2,568    2,061 

 

           
Statement of Financial Position  November 30, 2024   August 31, 2024 
Current assets  $10,746   $11,297 
Non-current assets   83,681    78,952 
Current liabilities   (17,057)   (16,973)
Non-current liabilities   (13,863)   (11,528)
Advances from parent, net   (29,371)   (30,210)

 

           
   Three months ended November 30, 
Statement of Cash Flows  2024   2023 
Cash provided by operating activities  $3,572   $6,110 
Cash used in investing activities   (3,675)   (4,057)
Cash used in financing activities   (1,090)   (1,089)
v3.24.4
Related party transactions (Tables)
3 Months Ended
Nov. 30, 2024
Related Party Transactions  
Schedule of related parties compensation
          
   Three months ended
November 30,
 
Directors and key management personnel  2024   2023 
Remuneration  $366   $436 
Share-based compensation expense   93    693 
Total directors and key management personnel  $459   $1,129 
v3.24.4
General and administrative expenses (Tables)
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Schedule of general and administrative expense
          
   Three months ended
November 30,
 
   2024   2023 
Directors’ fees (Note 16)  $64   $60 
Insurance   61    85 
Office and general   60    67 
Shareholder information   151    158 
Professional fees   169    189 
Salaries and benefits (Note 16)   477    558 
Consulting   215    177 
Share-based compensation expense (Notes 13 and 16)   156    810 
Travel and accommodation   52    78 
Depreciation   15    13 
Other   5    16 
Total general and administrative expenses  $1,425   $2,211 
v3.24.4
Financial instruments (Tables)
3 Months Ended
Nov. 30, 2024
Notes and other explanatory information [abstract]  
Schedule of financial instruments
          
   November 30, 2024   August 31, 2024 
Financial Assets          
Measured at amortized cost          
Amounts receivable  $2,307   $1,958 
Measured at fair value through profit or loss          
Cash   6,787    8,331 
           
Financial Liabilities          
Measured at amortized cost          
Amounts payables and accrued liabilities   15,876    15,545 
Measured at fair value through profit or loss          
Derivative financial instrument liabilities   1,454    2,273 
v3.24.4
Segmented information (Tables)
3 Months Ended
Nov. 30, 2024
Segmented Information  
Schedule of revenue
          
   Three months ended
November 30,
 
Revenue  2024   2023 
Tanzania  $12,528   $9,404 
Total revenue  $12,528   $9,404 
Schedule of non-current assets
          
Non-current assets  November 30, 2024   August 31, 2024 
Canada  $30   $36 
Tanzania   85,759    81,040 
Total non-current assets  $85,789   $81,076 
v3.24.4
Non-cash items (Tables)
3 Months Ended
Nov. 30, 2024
Non-cash Items  
Schedule of non-cash items
          
   Three months ended
November 30,
 
   2024   2023 
Depreciation  $921   $497 
Change in fair value of derivative financial instruments (Note 11)   (819)   (199)
Share-based compensation expense (Note 13)   189    875 
Accretion of provision for reclamation   36    27 
Deferred income tax expense (Note 8)   1,291    899 
Accretion of lease liabilities (Note 10)   70    1 
Deferred revenue (Note 9)   (415)   578 
Accretion of deferred revenue (Note 9)   84    112 
Foreign exchange losses   190    165 
Total non-cash items  $1,547   $2,955 

 

For the three months ended November 30, 2024, an increase in amounts payable and accrued liabilities related to purchase of mineral property, plant and equipment was $0.1 million (2023 – decrease of $0.6 million).

v3.24.4
Amounts receivable (Details) - USD ($)
$ in Thousands
Nov. 30, 2024
Aug. 31, 2024
Amounts Receivable    
Sales tax receivable [1] $ 5,599 $ 5,144
Other 81 73
Other receivable 5,680 5,217
Less: Long-term portion (3,373) (3,259)
Total amounts receivable $ 2,307 $ 1,958
[1] Sales tax receivables consist of harmonized services tax and value added tax (“VAT”) due from Canadian and Tanzanian tax authorities, respectively. Tanzanian tax regulations allow for VAT receivable to be refunded or set-off against other taxes due to the Tanzania Revenue Authority ("TRA"). The Company has historically experienced delays in receiving payment or confirmation of offset against other taxes. The Company is in communication with the TRA and there is an expectation for either cash payments or offsetting of VAT receivable against other taxes in the future. VAT which the Company does not expect to recover within the next 12 months has been classified as long-term assets.
v3.24.4
Amounts receivable (Details Narrative) - USD ($)
$ in Millions
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
TRA [Member]    
IfrsStatementLineItems [Line Items]    
VAT refunds $ 0.9 $ 0.0
v3.24.4
Prepayments and other assets (Details) - USD ($)
$ in Thousands
Nov. 30, 2024
Aug. 31, 2024
Notes and other explanatory information [abstract]    
Prepaid expenses $ 508 $ 539
Deferred financing costs [1] 707 707
Total prepayments and other assets $ 1,215 $ 1,246
[1] Consists of $0.5 million in commitment fees paid with respect to a share purchase agreement whereby the Company, at its sole discretion, has the right to sell up to $10 million of its common shares over a 36-month period and $0.2 million in deferred financing costs related to an At-the-Market Offering Agreement entered on May 12, 2023.
v3.24.4
Inventories (Details) - USD ($)
$ in Thousands
Nov. 30, 2024
Aug. 31, 2024
Notes and other explanatory information [abstract]    
Ore stockpile $ 4,491 $ 4,533
Gold in circuit 836 837
Gold doré 37 55
Total precious metals inventories 5,364 5,425
Supplies 1,170 824
Total inventories $ 6,534 $ 6,249
v3.24.4
Mineral property, plant and equipment (Details) - USD ($)
$ in Thousands
3 Months Ended
Nov. 30, 2024
Aug. 31, 2024
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment $ 82,416 $ 77,817
Exploration And Evaluation Expenditures [Member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment [1] 2,712 2,281
Mining property [member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment 46,090 45,285
Processing Plant And Related Infrastructure [Member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment 28,606 27,483
Machinery [member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment [2] 1,029 974
Rightofuse Asset [Member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment [3] 3,873 1,683
Other [Member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment [3] 106 111
Total [Member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment 82,416 $ 77,817
Gross carrying amount [member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment 84,344  
Additions other than through business combinations, property, plant and equipment 5,362  
Mineral property, plant and equipment 89,706  
Gross carrying amount [member] | Exploration And Evaluation Expenditures [Member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment [1] 2,281  
Additions other than through business combinations, property, plant and equipment [1] 431  
Mineral property, plant and equipment [1] 2,712  
Gross carrying amount [member] | Mining property [member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment 48,161  
Additions other than through business combinations, property, plant and equipment 1,217  
Mineral property, plant and equipment 49,378  
Gross carrying amount [member] | Processing Plant And Related Infrastructure [Member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment 29,948  
Additions other than through business combinations, property, plant and equipment 1,235  
Mineral property, plant and equipment 31,183  
Gross carrying amount [member] | Machinery [member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment [2] 2,041  
Additions other than through business combinations, property, plant and equipment [2] 127  
Mineral property, plant and equipment [2] 2,168  
Gross carrying amount [member] | Rightofuse Asset [Member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment [3] 1,721  
Additions other than through business combinations, property, plant and equipment [3] 2,352  
Mineral property, plant and equipment [3] 4,073  
Gross carrying amount [member] | Other [Member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment [3] 192  
Additions other than through business combinations, property, plant and equipment [3]  
Mineral property, plant and equipment [3] 192  
Accumulated depreciation and amortisation [member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment 6,527  
Additions other than through business combinations, property, plant and equipment 763  
Mineral property, plant and equipment 7,290  
Accumulated depreciation and amortisation [member] | Exploration And Evaluation Expenditures [Member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment [1]  
Additions other than through business combinations, property, plant and equipment [1]  
Mineral property, plant and equipment [1]  
Accumulated depreciation and amortisation [member] | Mining property [member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment 2,876  
Additions other than through business combinations, property, plant and equipment 412  
Mineral property, plant and equipment 3,288  
Accumulated depreciation and amortisation [member] | Processing Plant And Related Infrastructure [Member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment 2,465  
Additions other than through business combinations, property, plant and equipment 112  
Mineral property, plant and equipment 2,577  
Accumulated depreciation and amortisation [member] | Machinery [member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment [2] 1,067  
Additions other than through business combinations, property, plant and equipment [2] 72  
Mineral property, plant and equipment [2] 1,139  
Accumulated depreciation and amortisation [member] | Rightofuse Asset [Member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment [3] 38  
Additions other than through business combinations, property, plant and equipment [3] 162  
Mineral property, plant and equipment [3] 200  
Accumulated depreciation and amortisation [member] | Other [Member]    
IfrsStatementLineItems [Line Items]    
Mineral property, plant and equipment [3] 81  
Additions other than through business combinations, property, plant and equipment [3] 5  
Mineral property, plant and equipment [3] $ 86  
[1] Represents exploration and evaluation expenditures related to the Anfield and Stamford Bridge deposits on the Buckreef property.
[2] Includes automotive and computer equipment and software.
[3] Includes leasehold improvements
v3.24.4
Income tax (Details Narrative) - USD ($)
$ in Millions
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Income Tax    
Income tax expenses $ 1.7 $ 1.2
Current income tax expense 0.4 0.3
Deferred income tax expense $ 1.3 $ 0.9
v3.24.4
Deferred revenue (Details)
$ in Thousands
3 Months Ended
Nov. 30, 2024
USD ($)
Deferred Revenue  
Deferred revenue, beginning $ 1,653
Drawdown 500
Accretion of deferred revenue 84
Revenue recognized (915)
Deferred revenue, ending $ 1,322
v3.24.4
Deferred revenue (Details Narrative) - USD ($)
$ in Millions
3 Months Ended
Nov. 30, 2023
Oct. 30, 2024
May 06, 2024
Nov. 29, 2023
Sep. 26, 2023
Jul. 11, 2023
Aug. 11, 2022
IfrsStatementLineItems [Line Items]              
Deferred revenue undrawn   $ 0.5 $ 1.0 $ 1.0 $ 0.5 $ 1.0  
Deferred revenue description the Company fully settled $2.5 million drawn on the first tranche of the Agreement.            
Purchase Agreement [Member]              
IfrsStatementLineItems [Line Items]              
Prepaid gold ore             $ 5.0
v3.24.4
Lease liabilities (Details)
$ in Thousands
3 Months Ended
Nov. 30, 2024
USD ($)
Lease Liabilities  
lease liabilities, beginning $ 1,343
Additions 1,665
Accretion of lease liabilities 70
Lease payments (223)
Foreign exchange (1)
lease liabilities, ending $ 2,854
v3.24.4
Lease liabilities (Details 1) - USD ($)
$ in Thousands
Nov. 30, 2024
Aug. 31, 2024
Lease Liabilities    
Current portion of lease liabilities $ 903 $ 401
Lease liabilities 1,951 942
Balance at end of period $ 2,854 $ 1,343
v3.24.4
Lease liabilities (Details 2) - USD ($)
$ in Thousands
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Lease Liabilities    
Depreciation expense for right-of-use assets $ 162 $ 11
Accretion of lease liabilities 70 1
Total amount $ 232 $ 12
v3.24.4
Lease liabilities (Details 3)
$ in Thousands
Nov. 30, 2024
USD ($)
Lease Liabilities  
Not later than one month $ 124
Later than one month and not later than three months 201
Later than three months and not later than one year 920
Later than one year and not later than five years 2,177
Total undiscounted lease commitments $ 3,422
v3.24.4
Lease liabilities (Details Narrative) - USD ($)
$ in Millions
Nov. 30, 2024
Aug. 31, 2024
Lease Liabilities    
Payments to additional piece of equipment $ 0.7  
Right-of-use assets $ 3.9 $ 1.7
v3.24.4
Derivative financial instrument liabilities (Details) - USD ($)
$ in Thousands
Nov. 30, 2024
Aug. 31, 2024
Derivative Financial Instrument Liabilities    
Derivative warrant liabilities $ 1,454 $ 2,273
Total derivative financial instrument liabilities $ 1,454 $ 2,273
v3.24.4
Derivative financial instrument liabilities (Details 1) - Derivative Warrant Liabilities [Member]
$ in Thousands
3 Months Ended
Nov. 30, 2024
USD ($)
IfrsStatementLineItems [Line Items]  
Beginning balance at derivative warrant liabilities $ 2,273
Change in fair value (819)
Ending balance at derivative warrant liabilities $ 1,454
v3.24.4
Derivative financial instrument liabilities (Details 2) - Derivative Warrant Liabilities [Member] - $ / shares
3 Months Ended 12 Months Ended
Nov. 30, 2024
Aug. 31, 2024
IfrsStatementLineItems [Line Items]    
Share price $ 0.36 $ 0.39
Dividend yield 0.00% 0.00%
Bottom of range [member]    
IfrsStatementLineItems [Line Items]    
Risk-free interest rate 4.08% 3.82%
Expected volatility 43.00% 47.00%
Remaining term (in years) 1 year 2 months 12 days 1 year 6 months
Top of range [member]    
IfrsStatementLineItems [Line Items]    
Risk-free interest rate 4.22% 4.13%
Expected volatility 45.00% 49.00%
Remaining term (in years) 2 years 2 months 12 days 2 years 4 months 24 days
v3.24.4
Derivative financial instrument liabilities (Details 3)
$ in Thousands
3 Months Ended
Nov. 30, 2024
USD ($)
Derivative Financial Instrument Liabilities  
Increase loss income $ (493)
Decrease loss income $ 443
v3.24.4
Derivative financial instrument liabilities (Details Narrative) - USD ($)
$ in Millions
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Derivative Financial Instrument Liabilities    
Derivative warrant liabilities $ 1.5  
Gain loss on fair value $ 0.8 $ 0.2
v3.24.4
Earnings (loss) per share (Details) - USD ($)
$ in Thousands
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Notes and other explanatory information [abstract]    
Net income (loss) attributable to shareholders $ 981 $ (966)
Weighted average number of common shares for basic EPS [1] 291,668,469 285,283,429
Effect of dilutive stock options, warrants, RSUs and share awards 1,826,542
Weighted average number of common shares for diluted EPS [1] 293,495,011 285,283,429
[1] The weighted average number of common shares for basic and diluted EPS include 11.0 million gross number of vested, but unissued, common shares relating to common share awards.
v3.24.4
Earnings (loss) per share (Details Narrative) - shares
shares in Millions
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Stock Options [Member]    
IfrsStatementLineItems [Line Items]    
Weighted average number of common shares 10.5 15.4
Warrants [member]    
IfrsStatementLineItems [Line Items]    
Weighted average number of common shares 36.2 39.0
Restricted Share Unit [Member]    
IfrsStatementLineItems [Line Items]    
Weighted average number of common shares 2.8 4.6
v3.24.4
Share-based payments reserve (Details) - Canadian Dollars Denominated Stock Options [Member]
3 Months Ended
Nov. 30, 2024
shares
$ / shares
IfrsStatementLineItems [Line Items]  
Number of shares outstanding, Beginning | shares 4,986,000
Weighted average exercise price, Beginning | $ / shares $ 0.41
options exercised | shares (562,000) [1]
Weighted average exercise price, Option exercised | $ / shares $ 0.42 [1]
Number of shares outstanding, Ending | shares 4,424,000
Weighted average exercise price, Ending | $ / shares $ 0.41
[1] The weighted average share price at the time of the option exercise was C$0.53.
v3.24.4
Share-based payments reserve (Details 1) - Stock Options [Member]
3 Months Ended
Nov. 30, 2024
shares
$ / shares
IfrsStatementLineItems [Line Items]  
Exercise price | $ / shares $ 0.41 [1]
Number of options outstanding 4,424,000
Number of options exercisable 4,424,000
Remaining contractual life 1 year 10 months 24 days [1]
Range 1 [Member]  
IfrsStatementLineItems [Line Items]  
Exercise price | $ / shares $ 0.40
Number of options outstanding 2,259,000
Number of options exercisable 2,259,000
Expiry date Oct. 11, 2026
Remaining contractual life 1 year 10 months 24 days
Range 2 [Member]  
IfrsStatementLineItems [Line Items]  
Exercise price | $ / shares $ 0.43
Number of options outstanding 2,065,000
Number of options exercisable 2,065,000
Expiry date Sep. 29, 2026
Remaining contractual life 1 year 9 months 18 days
Range 3 [Member]  
IfrsStatementLineItems [Line Items]  
Exercise price | $ / shares $ 0.35
Number of options outstanding 100,000
Number of options exercisable 100,000
Expiry date Jan. 02, 2027
Remaining contractual life 2 years 1 month 6 days
[1] Total represents weighted average.
v3.24.4
Share-based payments reserve (Details 2) - Stock Options 1 [Member]
Nov. 30, 2024
USD ($)
$ / shares
Aug. 31, 2024
USD ($)
$ / shares
IfrsStatementLineItems [Line Items]    
Number of stock option | $ 10,450,000 10,450,000
Weighted average exercise price per share | $ / shares $ 0.49 $ 0.49
v3.24.4
Share-based payments reserve (Details 3) - Stock Options 1 [Member]
3 Months Ended
Nov. 30, 2024
$ / shares
shares
IfrsStatementLineItems [Line Items]  
Exercise price | $ / shares $ 0.49 [1]
Number of options outstanding 10,450,000
Number of options exercisable 5,655,000
Remaining contractual life 3 years [1]
Range 1 [Member]  
IfrsStatementLineItems [Line Items]  
Exercise price | $ / shares $ 0.50
Number of options outstanding 7,375,000
Number of options exercisable 4,425,000
Expiry date Aug. 17, 2027
Remaining contractual life 2 years 8 months 12 days
Range 2 [Member]  
IfrsStatementLineItems [Line Items]  
Exercise price | $ / shares $ 0.45
Number of options outstanding 3,075,000
Number of options exercisable 1,230,000
Expiry date Aug. 28, 2028
Remaining contractual life 3 years 8 months 12 days
[1] Total represents weighted average.
v3.24.4
Share-based payments reserve (Details 4) - shares
Nov. 30, 2024
Aug. 31, 2024
Notes and other explanatory information [abstract]    
Number of RSUs shares 1,498,385 1,498,385
v3.24.4
Share-based payments reserve (Details Narrative) - USD ($)
$ in Millions
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Aug. 31, 2024
IfrsStatementLineItems [Line Items]      
Share based compensation expense $ 0.2 $ 0.9  
Stock Options [Member]      
IfrsStatementLineItems [Line Items]      
Share based compensation expense 0.1 0.2  
Restricted Stock Unit [Member]      
IfrsStatementLineItems [Line Items]      
Share based compensation expense $ 0.1 $ 0.5  
Omnibus Equity Incentive Plan [Member]      
IfrsStatementLineItems [Line Items]      
Number of shares issued for options 6,942,109   5,997,632
v3.24.4
Warrants reserve (Details) - $ / shares
3 Months Ended 12 Months Ended
Nov. 30, 2024
Aug. 31, 2024
Warrants Reserve    
Number of warrants outstanding, beginning balance 36,190,769  
Weighted average exercise price per share, beginning balance $ 0.62  
Weighted average remaining contractual life (years) 1 year 8 months 12 days 1 year 10 months 24 days
Number of warrants outstanding, ending balance 36,190,769 36,190,769
Weighted average exercise price per share, ending balance $ 0.62 $ 0.62
v3.24.4
Warrants reserve (Details 1)
3 Months Ended
Nov. 30, 2024
$ / shares
shares
IfrsStatementLineItems [Line Items]  
Number of warrants | shares 36,190,769
Warrants exercise price | $ / shares $ 0.62 [1]
Private Placement Financing Warrants - February 11, 2021 [Member]  
IfrsStatementLineItems [Line Items]  
Number of warrants | shares 16,461,539
Warrants exercise price | $ / shares $ 0.80
Warrants expiry date February 11, 2026
Private Placement Financing Broker Warrants - February 11, 2021 [Member]  
IfrsStatementLineItems [Line Items]  
Number of warrants | shares 1,152,307
Warrants exercise price | $ / shares $ 0.80
Warrants expiry date February 11, 2026
Private Placement Financing Warrants – January 26, 2022 [Member]  
IfrsStatementLineItems [Line Items]  
Number of warrants | shares 17,948,718
Warrants exercise price | $ / shares $ 0.44
Warrants expiry date January 26, 2027
Private Placement Financing Placement Agent Warrants – January 26, 2022 [Member]  
IfrsStatementLineItems [Line Items]  
Number of warrants | shares 628,205
Warrants exercise price | $ / shares $ 0.44
Warrants expiry date January 26, 2027
[1] Total represents weighted average.
v3.24.4
Non-controlling interest (Details) - USD ($)
$ in Thousands
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Aug. 31, 2024
IfrsStatementLineItems [Line Items]      
Revenue $ 12,528 $ 9,404  
Income tax expense 1,693 1,191  
Comprehensive income for the period 2,137 (39)  
Current assets 16,843   $ 17,784
Current liabilities 20,395   21,283
Cash provided by operating activities 2,381 5,139  
Cash used in investing activities (3,700) (4,060)  
Cash used in financing activities (225) (381)  
Non-controlling interests [member] | Buckreef [Member]      
IfrsStatementLineItems [Line Items]      
Revenue 12,528 9,404  
Depreciation 906 484  
Accretion expense 188 140  
Income tax expense 1,693 1,191  
Comprehensive income for the period 2,568 2,061  
Current assets 10,746   11,297
Non-current assets 83,681   78,952
Current liabilities (17,057)   (16,973)
Non-current liabilities (13,863)   (11,528)
Advances from parent, net (29,371)   $ (30,210)
Cash provided by operating activities 3,572 6,110  
Cash used in investing activities (3,675) (4,057)  
Cash used in financing activities $ (1,090) $ (1,089)  
v3.24.4
Related party transactions (Details) - USD ($)
$ in Thousands
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Related Party Transactions    
Remuneration $ 366 $ 436
Share-based compensation expense 93 693
Total directors and key management personnel $ 459 $ 1,129
v3.24.4
Related party transactions (Details Narrative) - USD ($)
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
IfrsStatementLineItems [Line Items]    
Shares granted $ 0 $ 200,000
Stock Options [Member]    
IfrsStatementLineItems [Line Items]    
Compensation expense 100,000 200,000
RSUs [Member]    
IfrsStatementLineItems [Line Items]    
Compensation expense $ 0 $ 300,000
v3.24.4
General and administrative expenses (Details) - USD ($)
$ in Thousands
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Notes and other explanatory information [abstract]    
Directors’ fees (Note 16) $ 64 $ 60
Insurance 61 85
Office and general 60 67
Shareholder information 151 158
Professional fees 169 189
Salaries and benefits (Note 16) 477 558
Consulting 215 177
Share-based compensation expense (Notes 13 and 16) 156 810
Travel and accommodation 52 78
Depreciation 15 13
Other 5 16
Total general and administrative expenses $ 1,425 $ 2,211
v3.24.4
Financial instruments (Details) - USD ($)
$ in Thousands
Nov. 30, 2024
Aug. 31, 2024
Measured at amortized cost    
Amounts receivable $ 2,307 $ 1,958
Measured at fair value through profit or loss    
Cash 6,787 8,331
Measured at amortized cost    
Amounts payables and accrued liabilities 15,876 15,545
Measured at fair value through profit or loss    
Derivative financial instrument liabilities $ 1,454 $ 2,273
v3.24.4
Segmented Information (Details) - USD ($)
$ in Thousands
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
IfrsStatementLineItems [Line Items]    
Total revenue $ 12,528 $ 9,404
Tanzania [Member]    
IfrsStatementLineItems [Line Items]    
Total revenue $ 12,528 $ 9,404
v3.24.4
Segmented information (Details 1) - USD ($)
$ in Thousands
Nov. 30, 2024
Aug. 31, 2024
IfrsStatementLineItems [Line Items]    
Total non-current assets $ 85,789 $ 81,076
Canada [Member]    
IfrsStatementLineItems [Line Items]    
Total non-current assets 30 36
Tanzania [Member]    
IfrsStatementLineItems [Line Items]    
Total non-current assets $ 85,759 $ 81,040
v3.24.4
Segmented information (Details Narrative) - USD ($)
$ in Millions
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Segmented Information    
Revenue percentage 93.00% 90.00%
Revenue from customer $ 11.6 $ 8.5
v3.24.4
Non-cash items (Details) - USD ($)
$ in Thousands
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Non-cash Items    
Depreciation $ 921 $ 497
Change in fair value of derivative financial instruments (Note 11) 819 199
Share-based compensation expense (Note 13) 189 875
Accretion of provision for reclamation 36 27
Deferred income tax expense (Note 8) 1,291 899
Accretion of lease liabilities (Note 10) 70 1
Deferred revenue (Note 9) (415) 578
Accretion of deferred revenue (Note 9) 84 112
Foreign exchange losses 190 165
Total non-cash items $ 1,547 $ 2,955
v3.24.4
Non-cash items (Details Narrative) - USD ($)
$ in Millions
3 Months Ended
Nov. 30, 2024
Nov. 30, 2023
Mineral Property Plant And Equipment [Member]    
IfrsStatementLineItems [Line Items]    
Amounts payable and accrued liabilities $ 0.1 $ 0.6

TRX Gold (AMEX:TRX)
Historical Stock Chart
From Dec 2024 to Jan 2025 Click Here for more TRX Gold Charts.
TRX Gold (AMEX:TRX)
Historical Stock Chart
From Jan 2024 to Jan 2025 Click Here for more TRX Gold Charts.