National Grid Joint Venture Awards EUR1.1 Billion in Contracts
July 23 2019 - 8:06AM
Dow Jones News
By Oliver Griffin
A joint venture between National Grid PLC (NG.LN) and Energinet,
Denmark's state-owned system operator, has dished out three
contracts worth 1.1 billion euros ($1.2 billion) as it builds a
472-mile power cable between Britain and its Nordic neighbor.
National Grid said Tuesday that the 1.4 gigawatt high-voltage
direct-current interconnector will be the first such connection
between the U.K. and Denmark. The cable will be the longest
electricity interconnector in the world when completed and will
stretch from the Lincolnshire coast to western Denmark.
The 50-50 joint venture, called Viking Link, will help
decarbonize the U.K.'s power supply and will be National Grid's
sixth interconnector to Europe. Others include operational links
with France, the Netherlands and Belgium. Two further projects are
under construction, including a second link with France and one
with Norway.
Three contracts have been awarded for the construction of the
cable, to subsidiaries of Prysmian SpA (PRY.MI) and NKT AS
(NKT.KO), and also to Siemens AG (SIE.XE).
A spokesperson for National Grid confirmed that Prysmian
Powerlink SRL and NKT HV Cables AB will be paid EUR695 million and
EUR85 million respectively, while Siemens will be paid EUR340
million.
Prysmian will deliver four of the five cable lots, while NKT
will deliver the onshore cable lot in Denmark. Siemens will supply
and install equipment for two converter station sites, one in
Lincolnshire and one in Revsing, Denmark.
Construction is expected to be completed by the end of 2023,
National Grid said.
Write to Oliver Griffin at oliver.griffin@dowjones.com;
@OliGGriffin
(END) Dow Jones Newswires
July 23, 2019 08:51 ET (12:51 GMT)
Copyright (c) 2019 Dow Jones & Company, Inc.
Prysmian (BIT:PRY)
Historical Stock Chart
From Nov 2024 to Dec 2024
Prysmian (BIT:PRY)
Historical Stock Chart
From Dec 2023 to Dec 2024