Santoy Highlights Include True Width
Intercepts of 29 g/t Au over 2.1 Meters, 31 g/t Au Over 1.9
Meters
Porky Main and Porky West Drilling Returns
Broad Intercepts of Near Surface Mineralization, Potential for
Future Open Pit Development
SSR Mining Inc. (NASDAQ/TSX: SSRM, ASX: SSR) (“SSR Mining” or
the “Company”) is pleased to announce results from 377 diamond
drill holes completed at the Seabee property in Saskatchewan,
Canada, for the September, 2021 to November, 2022 exploration
period (the “Exploration Period”). These results build upon, and
are subsequent to, the Seabee 2021 Technical Report Summary (the
“2021 Seabee TRS”), which highlighted a six-year Mineral Reserve
life averaging approximately 96,000 ounces of annual gold
production. The life of mine plan in the 2021 TRS was based on
580,000 ounces of Proven and Probable Mineral Reserves calculated
using a cut-off grade of 2.5 g/t Au and a 1.8 meter minimum mining
width.
This press release features multimedia. View
the full release here:
https://www.businesswire.com/news/home/20221208005798/en/
Figure 1: Plan map of the Seabee
property, highlighting existing infrastructure and exploration
targets. (Graphic: Business Wire)
Activity during the Exploration Period included both near-mine
resource development drilling adjacent to current underground
infrastructure at the Santoy Mine Complex (“Santoy”), as well as
more regional activity across the Seabee property (Figure 1).
Notably, the regional exploration activity included drilling at the
Porky Main and Porky West targets, with results to-date returning
broad intercepts of near-surface mineralization potentially
amenable to open pit mining in the future. Additional regional
exploration included the initial delineation of the Shane target,
which remains open along strike and is located adjacent to the
Santoy Road that connects the mine to the Seabee processing
facility.
A total of 279 resource development drill holes were completed
at Santoy during the Exploration Period. Santoy is the source of
the current production feed for the Seabee processing plant and
contributes the entirety of the existing Seabee Mineral Reserves.
Exploration activity at Santoy aims to extend existing
mineralization, upgrade Mineral Resources to Mineral Reserves, and
provide greater confidence in currently defined Mineral Reserves
for future mine planning purposes. Drilling focused on areas
immediately adjacent to current mine development, with the positive
results indicating possible continuity of the mineralization
currently being mined and demonstrating potential for Mineral
Reserve growth and mine life extensions.
Step-out drilling highlights from Santoy include (see Figure 2)
(see Table 1) (all intercepts true width):
- SUG-22-605: 28.9 g/t Au over 2.1 meters from 217
meters
- SUG-21-043: 8.3 g/t Au over 8.9 meters from 212 meters
- Including: 31.3 g/t Au over 1.9 meters from 212 meters
Drilling highlights from currently defined Mineral Resource
blocks not included in the 2021 Seabee TRS life of mine plan
include (all intercepts true width):
- SUG-22-945: 17.7 g/t Au over 3.7 meters from 175
meters
- SUG-22-923: 18.9 g/t Au over 1.9 meters from 155
meters
- SUG-21-402: 6.1 g/t Au over 5.8 meters from 50 meters
- Including: 18.6 g/t Au over 2.0 meters from 55 meters
Rod Antal, President and CEO of SSR Mining, said, “Building on
Seabee’s long history of successfully replacing depletion, drilling
activity continues to focus on defining and converting additional
Mineral Reserves at Santoy, supporting the potential for mine life
extensions at Seabee. At the same time, exploration has progressed
at more regional targets as we endeavor to define a longer-term
production pathway for the asset. These results from the Shane,
Porky Main, and Porky West targets illustrate the significant
brownfield growth potential for Seabee and could potentially
represent future production opportunities for the mine. While still
an early-stage opportunity, the broad, near surface intercepts
suggest the potential for open pit mining at the Porky targets in
the future. Given the number of prospective targets at Seabee, we
currently expect to expand our exploration program at the mine
again in 2023 as we look for ways to aggressively advance these
opportunities towards potential development.”
The Porky Main and Porky West targets are located approximately
four kilometers north-northwest of the Seabee processing facility.
SSR Mining completed nearly 10,800 meters of drilling (53 diamond
drill holes) at the Porky targets in 2022. Porky Main and Porky
West 2022 drilling highlights include (see Figure 3 and Figure 4)
(see Table 2) (all intercepts core length):
- PKY-22-028: 1.9 g/t Au over 31.3 meters from 51
meters
- PKY-22-007: 1.3 g/t Au over 23.7 meters from 6
meters
- PKY-22-005: 5.5 g/t Au over 9.3 meters from 83
meters
- GAS-22-165: 12.8 g/t Au over 11.1 meters from 214
meters
The Shane target represents the intersection of a number of
historical zones of gold mineralization at various stages of
exploration maturity. SSR Mining completed over 19,600 meters (45
diamond drill holes) of drilling at Shane targeting five structures
including the S1, S2, S3, S4 and the Shane Hangingwall (“Shane HW”)
structures. This recent drilling, combined with past operator
exploration, has resulted in approximately 30,000 meters of
drilling across almost 100 diamond drill holes at the target. Shane
drilling highlights include (see Figure 5) (see Table 3) (all
intercepts true width):
- SHA-21-046: 54.3 g/t Au over 4.6 meters from 175 meters
- Including: 172.0 g/t over 1.0 meter from 175 meters
- SHA-22-057: 12.3 g/t Au over 2.1 meters from 111
meters
- SHA-21-053: 11.9 g/t Au over 2.3 meters from 383
meters
Table 1: Significant gold intercepts from recent drilling at
Santoy.
Hole ID
From
(m)
To
(m)
True Width
(m)
Gold
(g/t Au)
Zone
SUG-21-043
212.0
221.0
8.9
8.3
SHW 1
Including
212.0
213.9
1.9
31.3
SHW 1
SUG-21-378
33.7
50.5
9.0
18.6
8A
SUG-21-379
46.5
71.0
10.1
10.3
8A
SUG-22-605
217.0
221.5
2.1
28.9
8A HW
SUG-21-400
34.5
39.4
4.8
22.2
8A
SUG-22-945
174.6
178.6
3.7
17.7
9A
SUG-22-923
154.8
156.8
1.9
18.9
9C
SUG-22-907
215.8
217.4
1.3
75.0
9A
SUG-22-922
162.2
165.2
2.9
27.8
9A
SUG-22-925
152.5
155.9
3.3
22.0
9A
SUG-21-402
49.6
58.2
5.8
6.1
8A
Including
54.7
57.1
2.0
18.6
8A
Notes: All Santoy drilling intercepts reflect true width
intersections. Santoy results are cut to 75 g/t Au. For complete
drillhole results from Santoy during the Exploration Period, see
Appendix Table 4 and Table 7. Santoy Hangingwall denoted as “SHW”,
Hangingwall denoted as “HW”.
Overview of the Porky Main and Porky West Targets
The Porky Main and Porky West targets are located approximately
four kilometers north-northwest of the Seabee processing facility.
Mineralization occurs along a 12 kilometer long openly folded
unconformity, separating arenaceous sedimentary rocks of the Rae
Lake synform to the north from mafic volcanic rocks of the Seabee
mine area to the south. Both Porky Main and Porky West are
characterized by the same calc-silicate alteration package,
however, the unconformity and arenites host most of the auriferous
quartz veins at the Porky West deposit.
Porky Main and Porky West were discovered in 2002. A Mineral
Resource is currently defined at Porky West and contributed 52,000
tonnes of Measured and Indicated Mineral Resources at 5.0 g/t Au
and 516,000 tonnes of Inferred Mineral Resource at 4.4 g/t Au in
the 2021 Seabee TRS. However, previous exploration activity at both
Porky Main and Porky West envisaged satellite underground
operations. As described above, more recent interpretation suggests
the potential for open pit mining at the targets in the future,
which will be evaluated through additional drilling, as well as
geotechnical and metallurgical analysis going forward.
Table 2: Significant gold intercepts from recent drilling at the
Porky Main and Porky West targets.
Hole ID
From
(m)
To
(m)
Interval
(m)
Gold
(g/t)
Zone
GAS-22-165
214.4
227.0
11.1
12.8
Porky West
PKY-22-003
50.5
55.0
4.5
0.2
Porky Main
59.5
64.0
4.5
4.5
82.0
89.5
7.5
1.5
93.5
102.0
8.5
0.6
112.1
117.0
5.0
4.3
123.0
131.4
8.4
7.4
PKY-22-028
51.0
82.3
31.3
1.9
Porky West
GAS-22-153
165.0
177.0
9.2
6.0
Porky West
GAS-22-159
178.0
195.0
16.5
3.2
Porky West
PKY-22-005
47.3
54.8
7.5
2.6
Porky Main
60.8
75.0
14.2
0.6
83.0
92.3
9.3
5.5
PKY-22-006
16.5
24.0
7.5
0.4
Porky Main
33.2
39.2
6.0
0.6
54.2
58.7
4.5
0.9
93.6
102.1
8.5
5.9
GAS-22-161
213.1
230.0
14.7
3.0
Porky West
PKY-22-023
149.0
165.0
16.0
2.5
Porky West
PKY-22-007
6.3
30.0
23.7
1.3
Porky Main
55.9
62.0
6.1
0.5
66.5
71.0
4.5
0.2
Notes: All Porky Main and Porky West drilling intercepts reflect
core length intersections. Porky Main and Porky West results are
uncut, reported at a 0.3 g/t Au cut-off and include a maximum of
three meters internal dilution. For complete drillhole results for
the Porky Main and Porky West targets during the Exploration
Period, see Appendix Table 5 and Table 8.
Overview of the Shane Target
The Shane target is located adjacent to the Santoy Road, which
connects the Santoy Mine Complex to the Seabee processing facility
and is paralleled by the main powerline feeding Santoy. Drilling in
the vicinity of the currently defined Shane target was first
completed in 2002 and 47 diamond drill holes have been completed by
past operators totaling over 10,000 meters, which identified a
number of gold bearing zones at various stages of exploration
maturity. During the Exploration Period, SSR Mining drilled 45
diamond drill holes at the Shane target totaling over 19,600
meters.
The focus of SSR Mining’s drilling at Shane has been to advance
exploration at Shane’s S1, S2, S3 and S4 targets as a proof of
concept for exploring the property more broadly. The S1-S3 targets
are located along the hangingwall, footwall and within the steeply
south dipping Pine Lake Conglomerate (“PLC”); a kilometer scale,
east striking unit preserved in a sinistral shear zone, known as
the Pine Lake Shear Zone (“PLSZ”). The plunge of S1 mineralization
continues over approximately 500 meters. The S4 target is hosted
within a mafic volcanic unit 50 meters north of the PLSZ. All
four targets are planar and roughly sub-parallel to the contact of
the PLC.
During the exploration of these zones a new target was
discovered in a southeast striking, more moderately dipping splay
of the PLSZ named the Shane HW. The Shane HW structure returned the
highest grade and broadest mineralized intervals of the program
highlighting the importance of structures oriented oblique to the
PLSZ for future exploration. Economic grades and widths were
encountered on all five structures tested with the most continuous
mineralization encountered on the S1 structure. Step out holes have
traced the host lithology to a depth of approximately 700 meters.
While still early stage, the Shane target represents a target for
follow up exploration and resource development drilling going
forward.
Table 3: Significant gold intercepts from recent drilling at the
Shane target.
Hole ID
From
(m)
To
(m)
True Width
(m)
Gold
(g/t Au)
Zone
SHA-21-046
175.3
181.0
4.6
54.3
Shane HW
Including
175.3
177.0
1.0
172.0
Shane HW
SHA-21-053
382.5
386.4
2.3
11.9
S1
SHA-22-057
111.3
114.6
2.1
12.3
S1
SHA-21-039
271.9
275.7
3.1
7.1
S1
SHA-22-084
403.8
407.0
2.4
8.3
S3
Notes: All Shane drilling intercepts reflect true width
intersections. Shane results are uncut. For complete drillholes
results for the Shane target during the Exploration Period, see
Appendix Table 6 and Table 9.
Seabee Property Overview
SSR Mining’s Seabee property is 100% owned and includes the
Fisher claims, of which the acquisition of 100% ownership was
completed in 2022. Near mine activity during the Exploration Period
focused on Mineral Resource conversion at the 8A, 9A, and Santoy
Hanging Wall (“SHW”) zones. During the Exploration Period, a total
of 377 diamond drill holes were completed across the Seabee
property, including 253 holes drilled from underground drives at
Santoy totaling over 45,200 meters. Following the completion of a
new underground drill chamber in the third quarter of 2022, the
Company initiated drilling of the high grade zone mined in the
first quarter of 2022. Results from these activities are expected
in the coming months and will be used to guide mine planning,
including the evaluation of additional mining in this high grade
zone, during 2023.
The 2021 Seabee TRS highlighted a six-year Mineral Reserve life
averaging approximately 96,000 ounces of annual gold production.
The life of mine plan was based on 580,000 ounces of Proven and
Probable Mineral Reserves calculated using a cut-off grade of 2.5
g/t Au and a 1.8 meter minimum mining width. Exploration continues
to focus on extending the Mineral Reserve life of the Santoy Mine
Complex while simultaneously conducting more regional activity to
evaluate the longer-term development potential of the multitude of
exploration targets across the broader Seabee property.
Technical Procedural Information
Sampling and Analytical Procedures
All drill samples in respect of the Seabee underground drilling
program and some samples from the surface program were assayed by
our onsite non-accredited assay laboratory, which is not
independent from SSR Mining. Surface drilling samples not analyzed
by our onsite assay laboratory were analyzed at SRC Geoanalytical
Laboratories Inc. (“SRC”) in Saskatoon, Saskatchewan, which also
serves as the QAQC laboratory for our onsite lab. Duplicate check
assays were conducted at site as well as at SRC, which is
independent from SSR Mining. Mean results of the spot checks were
consistent with those reported. Sampling interval was established
by minimum or maximum sampling lengths and geological and/or
structural criteria.
Seabee’s site lab typically prepares two hundred-gram samples
that were pulverized until greater than 80 percent passed through a
150-mesh screen. Thirty-gram pulp samples were then analyzed for
gold by fire assay with gravimetric finish (0.01 g/t gold detection
limit). SRC prepares a minus-150 mesh pulp (95% passing) weighing
250 grams from a minus 10 mesh coarse crush reject. Fire assay with
Atomic Absorption finish was completed on a 30-gram aliquot to
produce gold analytical results with a 0.005 g/t gold detection
limit. Fire assay with gravimetric finish was prepared on those
samples with greater than 3 g/t gold.
External review of data and processes relating to Seabee
exploration data has been completed by independent consultant Carl
Edmunds in November 2022. There were no adverse material results
detected and the QA/QC indicates the information collected is
acceptable, and the database can be used for further studies.
Qualified Persons
The scientific and technical data contained in this news release
relating to exploration activity at the Seabee property has been
reviewed and approved by Anders Carlson, P.Geo., Senior Manager,
Exploration, and a qualified person for purposes of Subpart 1300 of
Regulation S-K and National Instrument 43-101 - Standards of
Disclosure for Mineral Projects. Scientific and technical data in
this news release relating to resource development activity at the
Seabee property has been reviewed and approved by Jeffrey Kulas,
P.Geo., Manager, Resource Development, and a qualified person for
purposes of Subpart 1300 of Regulation S-K and National Instrument
43-101 - Standards of Disclosure for Mineral Projects.
You are encouraged to also review the 2021 Seabee TRS, which is
available on SSR Mining’s Current Report on Form 8-K filed with the
Securities and Exchange Commission’s EDGAR system (sec.gov) on
September 29, 2022. You are encouraged to also review the 2021
Seabee TRS, which is available on SSR Mining’s Current Report on
Form 8-K filed with the Securities and Exchange Commission’s EDGAR
system (sec.gov) on September 29, 2022.
About SSR Mining
SSR Mining Inc. is a leading, free cash flow focused gold
company with four producing assets located in the USA, Türkiye,
Canada, and Argentina, combined with a global pipeline of
high-quality development and exploration assets. In 2021, the four
operating assets produced approximately 794,000 gold-equivalent
ounces. SSR Mining is listed under the ticker symbol SSRM on the
NASDAQ and the TSX, and SSR on the ASX.
To receive SSR Mining’s news releases by e-mail, please register
using the SSR Mining website at www.ssrmining.com.
Cautionary Note Regarding Forward-Looking Information
Except for statements of historical fact relating to us, certain
statements contained in this news release constitute
forward-looking information, future oriented financial information,
or financial outlooks (collectively “forward-looking information”)
within the meaning of applicable securities laws. Forward-looking
information may be contained in this document and our other public
filings. Forward-looking information relates to statements
concerning our outlook and anticipated events or results and, in
some cases, can be identified by terminology such as “may”, “will”,
“could”, “should”, “expect”, “plan”, “anticipate”, “believe”,
“intend”, “estimate”, “projects”, “predict”, “potential”,
“continue” or other similar expressions concerning matters that are
not historical facts.
Forward-looking information and statements in this news release
are based on certain key expectations and assumptions made by us.
Although we believe that the expectations and assumptions on which
such forward-looking information and statements are based are
reasonable, undue reliance should not be placed on the
forward-looking information and statements because we can give no
assurance that they will prove to be correct. Forward-looking
information and statements are subject to various risks and
uncertainties which could cause actual results and experience to
differ materially from the anticipated results or expectations
expressed in this news release. The key risks and uncertainties
include, but are not limited to: local and global political and
economic conditions; governmental and regulatory requirements and
actions by governmental authorities, including changes in
government policy, government ownership requirements, changes in
environmental, tax and other laws or regulations and the
interpretation thereof; developments with respect to the COVID-19
pandemic, including the duration, severity and scope of the
pandemic and potential impacts on mining operations; and other risk
factors detailed from time to time in our reports filed with the
Securities and Exchange Commission on EDGAR and the Canadian
securities regulatory authorities on SEDAR.
Forward-looking information and statements in this news release
include any statements concerning, among other things: preliminary
cost reporting in this document; production, grade, operating,
cost, and capital expenditure guidance; our operational and
development targets and catalysts and the impact of any suspension
on operations; forecasts and outlook, including related to
production guidance; timing and expectations regarding the impact
of any interruptions caused on our operations; the results of any
gold reconciliations; the ability to discover additional gold ore;
matters relating to proposed exploration; communications with local
stakeholders; maintaining community and government relations;
negotiations of joint ventures; negotiation and completion of
transactions; commodity prices; Mineral Resources, Mineral
Reserves, conversion of Mineral Resources, realization of Mineral
Reserves, and the existence or realization of Mineral Resource
estimates; the development approach; the timing and amount of
future production; the timing of studies, announcements, and
analysis; the timing of construction and development of proposed
mines and process facilities; capital and operating expenditures;
economic conditions; availability of sufficient financing;
exploration plans; receipt of regulatory approvals; and any and all
other timing, exploration, development, operational, financial,
budgetary, economic, legal, social, environmental, regulatory, and
political matters that may influence or be influenced by future
events or conditions. True width intervals are calculated using the
current geometric interpretation of mineralized structures.
Continued exploration activity could result in updates to those
interpretations that impacts the calculation of true widths.
Such forward-looking information and statements are based on a
number of material factors and assumptions, including, but not
limited in any manner to, those disclosed in any other of our
filings on EDGAR and SEDAR, and include: the inherent speculative
nature of exploration results; the ability to explore;
communications with local stakeholders; maintaining community and
governmental relations; status of negotiations of joint ventures;
weather conditions at our operations; commodity prices; the
ultimate determination of and realization of Mineral Reserves;
existence or realization of Mineral Resources; the development
approach; availability and receipt of required approvals, titles,
licenses and permits; sufficient working capital to develop and
operate the mines and implement development plans; access to
adequate services and supplies; foreign currency exchange rates;
interest rates; access to capital markets and associated cost of
funds; availability of a qualified work force; ability to
negotiate, finalize, and execute relevant agreements; lack of
social opposition to our mines or facilities; lack of legal
challenges with respect to our properties; the timing and amount of
future production; the ability to meet production, cost, and
capital expenditure targets; timing and ability to produce studies
and analyses; capital and operating expenditures; economic
conditions; availability of sufficient financing; the ultimate
ability to mine, process, and sell mineral products on economically
favorable terms; and any and all other timing, exploration,
development, operational, financial, budgetary, economic, legal,
social, geopolitical, regulatory and political factors that may
influence future events or conditions. While we consider these
factors and assumptions to be reasonable based on information
currently available to us, they may prove to be incorrect.
The above list is not exhaustive of the factors that may affect
any of the Company’s forward-looking information. You should not
place undue reliance on forward-looking information and statements.
Forward-looking information and statements are only predictions
based on our current expectations and our projections about future
events. Actual results may vary from such forward-looking
information for a variety of reasons including, but not limited to,
risks and uncertainties disclosed in our filings on our website at
www.ssrmining.com, on SEDAR at www.sedar.com, on EDGAR at
www.sec.gov and on the ASX at www.asx.com.au and other unforeseen
events or circumstances. Other than as required by law, we do not
intend, and undertake no obligation to update any forward-looking
information to reflect, among other things, new information or
future events. The information contained on, or that may be
accessed through, our website is not incorporated by reference
into, and is not a part of, this document.
Qualified Persons
The scientific and technical information concerning our mineral
projects in this news release have been reviewed and approved by a
“qualified person” under S-K 1300. For details on the “qualified
persons” approving such information, a description of the key
assumptions, parameters and methods used to estimate mineral
reserves and mineral resources for SSR Mining Inc.’s material
properties included in this news release, as well as data
verification procedures and a general discussion of the extent to
which the estimates may be affected by any known environmental,
permitting, legal, title, taxation, sociopolitical, marketing or
other relevant factors, please review the Technical Report
Summaries for each of the Company’s material properties which are
available at www.sec.gov.
Table 4: All drill holes completed at Santoy during the
Exploration Period.
Hole ID
From
(m)
To
(m)
True Width (m)
Gold
(g/t Au)
Zone
SUG-21-035
222.5
226.0
2.8
0.5
SHW 1
SUG-21-036
229.5
235.5
5.3
0.1
SHW 1
SUG-21-037
205.5
210.5
4.4
0.3
SHW 1
SUG-21-038
216.0
220.5
4.0
0.1
SHW 1
SUG-21-039
237.5
242.5
4.5
3.3
SHW 1
SUG-21-040
246.0
251.4
5.0
1.5
SHW 1
SUG-21-041
226.5
231.5
4.8
0.1
SHW 1
SUG-21-042
215.5
222.0
6.2
0.3
SHW 1
SUG-21-043
212.0
221.0
8.9
8.3
SHW 1
Including
212.0
213.9
1.9
31.3
SHW 1
SUG-21-044
217.2
224.9
7.4
0.5
SHW 1
SUG-21-045
220.5
225.6
4.6
0.2
SHW 1
SUG-21-046
208.5
211.5
2.9
0.2
SHW 1
SUG-21-047
197.0
202.6
5.4
3.9
SHW 1
SUG-21-048
204.0
210.0
5.7
1.5
SHW 1
SUG-21-049
205.0
215.5
9.7
4.6
SHW 1
SUG-21-050
212.5
214.5
1.8
0.5
SHW 1
SUG-21-051
221.5
225.5
3.4
0.1
SHW 1
239.0
247.0
6.9
1.1
SHW2
SUG-21-052
NSI
SUG-21-053
329.0
330.1
0.9
0.1
SHW
SUG-21-054
203.5
205.5
2.0
0.0
SHW
SUG-21-055
187.5
191.5
4.0
0.1
SHW
SUG-21-056
176.0
180.0
4.0
0.1
SHW
SUG-21-057
195.5
199.5
3.8
0.2
SHW
SUG-21-058
186.0
192.0
4.9
0.0
SHW
SUG-21-059
225.0
229.5
3.7
0.3
SHW
SUG-21-060
NSI
SUG-21-061
212.0
213.5
1.5
0.1
SHW
SUG-21-062
182.5
188.0
5.5
1.2
SHW
SUG-21-063
193.5
198.0
4.5
5.6
SHW
SUG-21-064
211.5
213.0
1.3
4.1
SHW
SUG-21-065
234.0
235.0
0.9
1.1
SHW
SUG-21-066
202.5
210.0
7.3
0.0
SHW
SUG-21-376
42.0
51.7
4.5
5.1
8A
SUG-21-377
28.3
41.0
8.6
6.9
8A
SUG-21-378
33.7
50.5
9.0
18.6
8A
SUG-21-379
46.5
71.0
10.1
10.3
8A
SUG-21-380
25.1
38.4
11.2
7.7
8A
SUG-21-381
56.8
61.3
2.4
11.8
8A
SUG-21-382
63.7
66.9
1.2
2.7
8A
SUG-21-383
43.4
45.5
1.4
0.3
8A
SUG-21-384
53.1
54.9
0.9
11.3
8A
SUG-21-385
76.8
79.5
1.2
26.4
8A
SUG-21-386
79.5
81.2
0.5
1.0
8A
SUG-21-387
87.5
95.2
2.7
7.3
8A
SUG-21-388
99.6
111.5
2.9
1.1
8A
SUG-21-389
71.5
80.0
3.5
6.2
8A
SUG-21-390
84.5
97.0
3.6
6.5
8A
SUG-21-391
87.0
111.0
5.5
1.2
8A
SUG-21-392
65.5
71.2
2.4
4.7
8A
SUG-21-393
75.7
91.7
5.5
1.8
8A
SUG-21-394
71.5
89.0
9.8
1.9
8A
SUG-21-395
76.5
94.0
8.5
0.6
8A
SUG-21-396
80.0
88.8
2.1
11.6
8A
SUG-21-397
87.7
101.7
4.7
5.9
8A
SUG-21-398
65.9
68.7
1.0
8.1
8A
SUG-21-399
35.5
38.7
2.1
3.9
8A
SUG-21-400
34.5
39.4
4.8
22.2
8A
SUG-21-401
44.4
48.8
3.2
15.3
8A
SUG-21-402
49.6
58.2
5.8
6.1
8A
Including
54.7
57.1
2.0
18.6
8A
SUG-21-403
38.5
43.5
4.2
12.1
8A
SUG-21-404
38.3
42.6
2.7
0.4
8A
SUG-21-405
49.8
52.5
1.3
29.9
8A
SUG-21-616
151.1
154.6
3.0
0.1
8A
SUG-21-618
138.2
142.4
2.1
0.1
8A
289.0
295.0
2.9
6.8
SUG-21-619
209.2
209.7
0.1
1.2
8A
SUG-21-620
NSI
SUG-21-621
119.0
124.3
3.1
0.7
8A
SUG-21-622
NSI
SUG-21-623
NSI
SUG-21-624
NSI
SUG-21-625
128.9
131.8
1.6
0.0
8A
SUG-21-626
138.0
140.5
1.3
1.6
8A
SUG-21-627
159.0
164.5
3.3
0.4
8A
SUG-21-628
NSI
SUG-21-629
388.6
393.4
0.7
2.2
926
SUG-21-630
193.1
196.4
2.3
1.4
8A
225.2
226.5
0.9
0.1
8AFW
SUG-21-631
246.0
255.0
5.5
1.6
8A
SUG-21-632
279.0
290.0
4.1
0.0
8A
SUG-21-912
224.3
227.1
1.0
6.6
SHW 1
SUG-21-913
238.1
240.8
2.3
0.1
SHW 1
266.5
270.0
3.0
2.2
SHW 2
SUG-21-914
211.5
214.0
2.1
12.6
SHW 1
SUG-21-915
264.0
267.6
2.6
1.2
SHW 1
SUG-21-916
231.1
236.7
3.6
1.1
SHW 1
268.0
272.8
3.1
6.3
SHW2
SUG-21-917
NSI
SUG-22-001
182.0
182.8
0.8
6.4
SHW
SUG-22-002
206.5
208.0
1.4
5.2
SHW
SUG-22-003
196.5
208.4
11.8
1.1
SHW
SUG-22-004
195.0
199.5
4.5
0.5
SHW
SUG-22-005
189.0
192.0
3.0
0.8
SHW
SUG-22-006
222.0
232.5
10.1
0.2
SHW
SUG-22-007
69.8
84.5
13.5
0.9
GHW
SUG-22-008
92.5
110.5
14.5
0.6
GHW
SUG-22-009
158.5
171.0
6.1
0.9
GHW
SUG-22-010
196.6
217.1
7.2
1.4
GHW
SUG-22-011
45.6
104.5
54.6
0.4
GHW
SUG-22-012
62.2
120.0
44.8
0.7
GHW
SUG-22-013
54.8
69.7
8.5
1.3
GHW
SUG-22-014
47.2
67.0
8.3
0.8
GHW
SUG-22-015
39.4
77.0
2.8
1.1
GHW
SUG-22-016
50.3
68.9
10.6
1.0
GHW
SUG-22-017
190.0
196.0
5.0
1.7
SHW 2
SUG-22-300
34.0
37.5
2.2
0.2
8A
SUG-22-301
60.3
63.1
1.2
3.9
8A
SUG-22-302
45.6
53.0
3.7
12.2
8A
SUG-22-303
57.0
63.8
3.1
2.8
8A
SUG-22-304
136.4
153.0
6.6
10.2
8A
SUG-22-305
76.5
81.0
1.6
0.1
8A
SUG-22-306
55.7
64.0
4.5
0.1
8A
SUG-22-307
77.5
84.0
2.3
7.9
8A
SUG-22-308
62.0
86.7
10.2
1.1
8A
SUG-22-309
62.1
64.3
1.4
0.0
8A
SUG-22-310
52.4
58.5
3.1
0.0
8A
SUG-22-311
93.0
105.0
4.5
0.8
8A
SUG-22-312
87.0
89.5
1.0
0.1
8A
SUG-22-313
54.0
56.5
1.8
0.0
8A
SUG-22-314
37.0
43.0
1.5
6.5
8A
SUG-22-315
64.5
69.1
3.3
0.1
8A
SUG-22-316
66.3
71.2
3.4
0.1
8A
SUG-22-317
26.0
38.5
10.6
3.7
8A
SUG-22-318
36.7
53.0
12.9
3.4
8A
SUG-22-319
52.3
64.5
5.7
10.5
8A
SUG-22-320
46.5
54.7
5.3
1.5
8A
SUG-22-321
46.3
63.0
7.8
0.8
8A
SUG-22-322
51.0
71.0
7.5
0.3
8A
SUG-22-323
40.4
63.1
15.5
1.6
8A
SUG-22-324
47.9
65.2
8.3
0.4
8A
SUG-22-325
44.0
55.0
6.4
0.1
8A
SUG-22-326
73.0
80.0
3.8
7.7
8A
SUG-22-327
66.3
71.5
3.3
3.5
8A
SUG-22-328
54.7
56.2
1.2
0.2
8A
SUG-22-329
77.1
80.0
1.3
0.4
8A
SUG-22-330
45.0
50.8
5.2
2.3
8A
SUG-22-331
50.1
56.1
4.4
0.7
8A
SUG-22-332
67.8
71.7
2.0
1.0
8A
SUG-22-333
82.2
86.2
1.6
0.1
8A
SUG-22-334
81.9
88.1
2.7
0.0
8A
SUG-22-335
68.5
74.9
3.5
2.2
8A
SUG-22-336
54.9
60.4
3.8
1.5
8A
SUG-22-337
82.0
95.5
5.4
0.7
8A
SUG-22-338
72.0
83.5
4.9
0.2
8A
SUG-22-339
58.2
62.6
2.2
1.0
8A
SUG-22-340
63.7
70.7
2.8
0.0
8A
SUG-22-341
47.8
52.2
2.5
6.4
8A
SUG-22-342
73.5
79.5
2.1
7.1
8A
SUG-22-343
102.0
108.2
2.0
15.3
8A
SUG-22-344
107.1
109.4
0.7
0.7
8A
SUG-22-345
91.6
95.7
1.5
2.0
8A
SUG-22-346
54.5
60.0
2.6
0.0
8A
SUG-22-347
48.4
51.0
1.4
0.1
8A
SUG-22-348
61.0
66.2
2.0
0.0
8A
SUG-22-349
40.0
45.2
3.5
16.7
8A
SUG-22-350
24.2
28.4
2.4
0.4
8AFW
47.3
50.3
1.7
10.7
8A
SUG-22-351
20.1
21.0
0.5
8.5
8AFW
45.7
52.1
3.5
1.8
8A
SUG-22-352
18.1
20.6
1.7
0.5
8AFW
32.0
37.3
3.7
1.7
8A
SUG-22-353
31.3
40.1
6.2
3.8
8A
SUG-22-354
25.3
30.8
4.9
0.8
8A
SUG-22-356
31.6
34.0
2.0
5.6
8A
SUG-22-357
21.2
22.2
0.7
0.2
8AFW
33.3
36.0
2.0
8.5
8A
SUG-22-358
32.0
43.7
4.3
5.0
8AFW
65.5
69.5
1.4
2.0
8A
SUG-22-359
31.5
36.5
3.6
13.8
8A
SUG-22-360
31.4
32.5
0.6
1.2
8AFW
43.5
70.5
13.9
3.6
8A
SUG-22-361
36.0
46.3
8.1
2.1
8A
SUG-22-362
34.1
38.8
4.4
9.9
8A
SUG-22-363
27.0
27.7
0.5
0.4
8AFW
40.9
48.3
5.3
2.4
8A
SUG-22-364
22.7
24.9
1.9
0.8
8AFW
32.2
43.1
9.4
6.9
8A
SUG-22-365
30.6
45.0
9.6
5.1
8AFW
52.0
53.1
0.7
42.8
8A
SUG-22-366
39.5
48.0
3.8
7.5
8AFW
62.3
73.4
5.1
1.4
8A
SUG-22-367
36.4
47.7
5.6
6.6
8AFW
56.6
85.0
14.0
1.2
8A
SUG-22-368
43.1
47.3
1.8
0.1
8AFW
56.9
75.0
8.0
0.6
8A
SUG-22-369
30.2
31.8
1.1
3.0
8AFW
34.5
57.1
15.9
2.7
8A
SUG-22-370
32.1
57.5
14.2
7.8
8AFW
63.0
76.5
7.4
0.6
8A
SUG-22-371
42.2
63.5
10.3
2.6
8AFW
81.0
85.6
2.3
0.1
8A
SUG-22-372
28.0
39.0
8.1
1.4
8AFW
40.0
54.2
10.2
5.6
8A
SUG-22-373
32.0
45.1
8.3
7.7
8AFW
46.5
75.0
17.9
3.8
8A
SUG-22-374
42.0
48.7
3.7
13.6
8AFW
57.0
72.5
8.8
2.7
8A
SUG-22-375
NSI
SUG-22-376
41.0
44.0
1.5
2.2
8AFW
52.5
59.4
3.4
0.1
8A
SUG-22-377
33.2
37.7
2.7
0.2
8AFW
45.2
50.3
3.1
1.5
8A
SUG-22-378
38.8
39.5
0.3
0.1
8AFW
55.2
61.7
3.2
1.1
8A
SUG-22-379
27.8
29.5
1.2
0.1
8AFW
37.9
44.5
4.4
6.5
8A
SUG-22-380
24.9
26.8
1.5
1.2
8AFW
32.9
39.0
4.9
0.8
8A
SUG-22-381
30.4
30.9
0.3
0.1
8AFW
40.1
44.0
2.4
1.5
8A
SUG-22-382
34.0
38.2
3.4
0.0
8AFW
38.2
45.0
5.5
0.6
8A
SUG-22-383
31.7
34.0
2.1
10.1
8A
SUG-22-384
31.5
34.0
2.3
1.0
8A
SUG-22-385
39.7
51.3
6.5
1.8
8AFW
56.7
70.5
7.6
1.5
8A
SUG-22-386
25.1
27.3
1.9
0.1
8AFW
34.3
40.3
5.2
9.6
8A
SUG-22-387
25.0
30.0
4.5
0.4
8AFW
33.2
41.6
7.5
3.2
8A
SUG-22-388
33.1
42.5
6.8
2.7
8AFW
42.5
54.6
8.6
3.2
8A
SUG-22-389
32.5
45.4
7.3
3.8
8AFW
45.4
58.5
7.4
3.3
8A
SUG-22-390
40.0
57.7
10.7
7.2
8AFW
57.7
74.0
9.9
2.6
8A
SUG-22-391
38.0
41.6
3.3
0.6
8A
SUG-22-392
42.8
50.5
4.4
1.4
8AFW
66.0
67.5
0.9
2.0
8A
SUG-22-393
42.0
55.2
6.7
4.8
8AFW
61.5
65.3
1.9
2.4
8A
Including
49.0
55.2
2.8
7.1
8A
SUG-22-600
271.0
273.0
0.7
12.4
8A
293.5
297.8
1.6
0.2
8AFW
SUG-22-601
226.4
234.0
3.2
1.7
8A
250.0
263.0
5.4
0.8
8AFW
SUG-22-602
268.5
274.5
2.2
4.0
8A
290.2
295.7
2.2
11.7
8AFW
SUG-22-603
334.5
336.0
0.5
1.4
8A
372.0
375.0
1.0
3.8
8AFW
SUG-22-604
203.6
209.4
2.2
2.6
Unknown
316.0
333.6
6.3
0.1
8A
SUG-22-605
217.0
221.5
2.1
28.9
8AHW
SUG-22-606
331.8
349.4
7.4
0.0
8A
SUG-22-607
170.7
175.4
2.3
3.5
8AHW
309.3
315.3
3.1
0.0
8A
SUG-22-608
260.9
264.0
1.8
0.0
8A
SUG-22-609
198.2
201.2
2.0
0.1
8A
SUG-22-610
128.1
129.7
1.5
2.3
8A
SUG-22-611
141.5
147.0
4.9
2.5
8A
SUG-22-612
130.1
136.9
6.4
1.6
8A
SUG-22-900
166.0
168.5
2.2
1.5
9C
192.0
192.5
0.4
32.5
9A
SUG-22-901
206.1
208.3
1.6
0.0
9C
224.0
228.5
3.3
0.5
9A
SUG-22-902
231.2
232.3
0.7
0.0
9C
255.0
257.3
1.6
12.7
9A
SUG-22-903
257.9
261.4
0.7
12.0
9C
SUG-22-904
175.5
179.0
2.9
3.9
9C
204.0
210.0
5.1
1.7
9A
SUG-22-905
152.0
155.0
0.9
4.2
9C
181.9
185.7
1.2
0.1
9A
SUG-22-906
142.0
154.2
2.4
0.1
9C
163.4
165.1
0.3
4.5
9A
SUG-22-907
193.8
199.2
4.2
0.4
9C
215.8
217.4
1.3
75.0
9A
SUG-22-908
235.0
238.5
2.5
0.6
9A
SUG-22-909
229.0
231.5
2.0
1.8
9A
SUG-22-910
219.4
227.4
6.2
0.1
9A
SUG-22-911
186.8
188.7
1.6
27.3
9C
192.5
194.1
1.4
3.5
9A
SUG-22-912
288.5
292.0
2.2
0.3
9C
312.5
316.0
2.2
0.7
9A
SUG-22-913
262.7
264.9
1.4
0.0
9C
290.7
294.3
2.2
0.9
9A
SUG-22-914
221.4
222.1
0.5
0.0
9C
252.8
259.5
4.5
1.1
9A
SUG-22-915
224.5
226.7
1.4
0.0
9C
257.9
259.0
0.7
5.0
9A
SUG-22-916
189.5
193.5
2.9
0.1
9C
227.5
231.5
3.0
8.9
9A
SUG-22-917
173.8
176.8
2.4
0.9
9C
213.6
215.5
1.6
11.5
9A
SUG-22-918
166.5
169.2
2.3
1.2
9C
181.4
185.4
3.4
1.0
9A
SUG-22-919
173.3
183.2
8.6
1.8
9C
187.6
189.9
2.0
0.0
9A
SUG-22-920
153.1
157.4
3.8
11.4
9C
163.5
165.6
1.8
5.5
9A
SUG-22-921
156.9
163.0
5.5
3.5
9C
175.2
177.7
2.3
0.5
9A
SUG-22-922
145.2
149.8
4.4
4.2
9C
162.2
165.2
2.9
27.8
9A
SUG-22-923
154.8
156.8
1.9
18.9
9C
160.5
161.7
1.1
7.7
9A
SUG-22-924
146.0
149.0
2.9
9.8
9C
153.7
155.1
1.4
0.1
9A
SUG-22-925
143.7
145.7
1.9
1.3
9C
152.5
155.9
3.3
22.0
9A
SUG-22-926
139.4
142.0
2.6
0.1
9C
152.0
154.5
2.5
0.8
9A
SUG-22-927
146.0
149.0
2.9
0.1
9C
156.0
160.7
4.6
3.8
9A
SUG-22-928
141.7
143.5
1.7
0.1
9C
150.0
155.5
5.2
1.3
9A
SUG-22-929
175.0
179.0
3.7
0.2
9C
SUG-22-930
162.0
170.5
7.2
0.2
9C
186.1
187.4
1.1
0.0
9A
SUG-22-931
151.0
155.4
3.5
0.4
9C
159.9
163.3
2.7
5.6
9A
SUG-22-932
153.4
164.0
7.6
0.2
9C
183.4
184.0
0.4
0.0
9A
SUG-22-933
172.1
174.1
1.6
0.0
9C
198.5
200.3
1.4
0.0
9A
SUG-22-934
144.5
148.3
3.8
0.3
9C
161.5
165.7
4.2
0.0
9A
SUG-22-935
140.9
143.1
2.2
0.2
9C
183.0
186.0
3.0
0.1
9A
SUG-22-936
141.3
144.4
3.0
0.2
9C
182.8
183.6
0.8
0.2
9A
SUG-22-937
164.0
168.5
4.1
0.1
9C
186.9
196.8
9.0
0.0
9A
SUG-22-938
185.0
191.5
4.8
0.3
9C
206.2
207.9
1.3
0.0
9A
SUG-22-939
148.5
150.6
2.1
2.1
9C
164.5
168.5
3.9
0.0
9A
SUG-22-940
145.5
147.0
1.5
1.8
9C
164.5
166.5
1.9
0.2
9A
SUG-22-941
149.5
152.1
2.4
0.1
9C
163.5
164.5
0.9
0.2
9A
SUG-22-942
203.8
205.9
1.3
0.2
9C
SUG-22-943
147.5
149.5
1.9
0.1
9C
162.0
164.0
1.9
0.2
9A
SUG-22-944
183.0
186.0
2.4
11.1
9C
198.4
202.7
3.4
0.0
9A
SUG-22-945
162.6
164.5
1.7
0.1
9C
174.6
178.6
3.7
17.7
9A
JOY-21-961
207.1
209.0
1.4
3.0
SHW 2
217.0
220.7
2.7
0.1
SHW 1
JOY-21-962
61.0
65.5
4.1
1.7
609
231.5
235.4
3.6
0.4
SHW 2
248.1
250.0
1.8
0.3
SHW 1
JOY-21-963
272.9
281.0
5.9
0.2
SHW 1
JOY-21-964
282.1
287.3
5.0
0.2
8G
323.1
331.6
8.0
0.0
8F
JOY-21-965
292.0
305.2
10.7
0.0
8G
332.0
333.2
1.0
0.1
8F
JOY-21-966
334.1
337.5
2.4
0.0
8G
370.1
371.6
1.1
0.0
8F
JOY-21-967
272.1
275.1
2.6
0.1
8G
293.2
293.9
0.6
0.0
8F
JOY-21-968
304.8
308.5
3.3
3.5
8G
JOY-21-969
NSI
JOY-21-970
NSI
JOY-21-971
283.6
288.5
4.2
0.3
8G
330.0
331.0
0.9
0.1
8F
JOY-21-972
170.9
171.2
0.3
3.5
8A
JOY-21-973
NSI
JOY-21-974
NSI
JOY-21-975
401.4
404.2
2.2
1.6
8A
JOY-22-976
NSI
JOY-22-977
NSI
JOY-22-978
NSI
JOY-22-979
NSI
JOY-22-980
NSI
JOY-22-981
NSI
JOY-22-982
506.0
509.7
3.7
4.1
9C
519.3
524.0
4.6
0.5
9A
JOY-22-983
530.6
532.6
1.9
0.4
9C
544.2
546.8
2.5
0.3
9A
JOY-22-984
804.9
810.5
5.1
0.0
621
JOY-22-985
NSI
JOY-22-986
570.7
574.3
3.2
0.9
9C
581.1
585.0
3.5
0.9
9A
Notes: All Santoy drilling intercepts reflect true width
intersections. Santoy results are cut to 75 g/t Au.
NSI – No Significant Intercepts
Table 5: All drill holes completed at Porky Main and Porky West
during the Exploration Period.
Hole ID
From
(m)
To
(m)
Interval
(m)
Gold
(g/t Au)
Zone
GAS-22-142
257.0
265.5
7.9
4.8
Porky West
GAS-22-143
229.5
232.5
2.8
1.4
Porky West
GAS-22-144
200.0
205.5
5.3
2.7
Porky West
GAS-22-145
289.6
294.7
4.0
4.4
Porky West
GAS-22-146
255.9
261.0
4.5
3.0
Porky West
GAS-22-147
253.0
259.0
4.1
1.0
Porky West
GAS-22-149
216.8
219.0
1.9
3.0
Porky West
GAS-22-150
201.0
205.0
3.6
0.2
Porky West
GAS-22-151
185.2
197.0
9.1
0.4
Porky West
GAS-22-152
160.3
169.9
9.0
2.4
Porky West
GAS-22-153
165.0
177.0
9.2
6.0
Porky West
GAS-22-154
185.9
192.7
4.6
0.3
Porky West
GAS-22-155
151.2
159.4
7.9
3.8
Porky West
GAS-22-156
145.5
153.3
7.8
2.2
Porky West
GAS-22-157
139.8
147.0
6.5
1.4
Porky West
GAS-22-158
185.5
191.0
5.1
4.4
Porky West
GAS-22-159
178.0
195.0
16.5
3.2
Porky West
GAS-22-160
182.1
194.8
12.3
2.9
Porky West
GAS-22-161
213.1
230.0
14.7
3.0
Porky West
GAS-22-162
232.1
246.0
12.2
1.1
Porky West
GAS-22-165
214.4
227.0
11.1
12.8
Porky West
GAS-22-172
446.4
450.8
4.2
3.0
Porky West
PKY-22-001
25.2
30.0
4.8
0.3
Porky Main
42.5
59.0
16.5
0.8
PKY-22-002
13.6
16.6
3.0
0.6
Porky Main
20.5
24.4
3.9
0.7
39.0
43.8
4.8
1.3
69.0
72.0
3.0
5.5
94.6
101.2
6.6
1.9
PKY-22-003
50.5
55.0
4.5
0.2
Porky Main
59.5
64.0
4.5
4.5
82.0
89.5
7.5
1.5
93.5
102.0
8.5
0.6
112.1
117.0
5.0
4.3
123.0
131.4
8.4
7.4
PKY-22-004
73.6
87.0
13.4
0.9
Porky Main
91.5
99.0
7.5
0.4
121.5
126.0
4.5
0.7
140.5
144.8
4.3
0.3
152.3
156.8
4.5
0.8
PKY-22-005
47.3
54.8
7.5
2.6
Porky Main
60.8
75.0
14.2
0.6
83.0
92.3
9.3
5.5
PKY-22-006
16.5
24.0
7.5
0.4
Porky Main
33.2
39.2
6.0
0.6
54.2
58.7
4.5
0.9
93.6
102.1
8.5
5.9
PKY-22-007
6.3
30.0
23.7
1.3
Porky Main
55.9
62.0
6.1
0.5
66.5
71.0
4.5
0.2
PKY-22-008
10.1
23.6
13.5
0.3
Porky Main
PKY-22-009
13.2
36.3
23.1
0.7
Porky Main
60.5
63.5
3.0
0.7
93.0
97.5
4.5
0.6
PKY-22-010
85.0
92.5
7.5
2.2
Porky Main
104.5
109.0
4.5
0.2
PKY-22-011
NSI
Porky Main
PKY-22-012
35.6
42.6
7.0
0.4
Porky Main
PKY-22-013
53.6
62.0
8.4
0.5
Porky Main
PKY-22-014
NSI
Porky Main
PKY-22-015
35.2
58.3
23.1
0.8
Porky Main
PKY-22-016
99.7
102.7
3.0
0.6
Porky Main
121.8
127.3
5.5
0.7
PKY-22-017
53.0
57.5
4.5
0.9
Porky Main
PKY-22-018
NSI
Porky West
PKY-22-019
64.0
67.8
3.8
1.1
Porky West
PKY-22-020
49.0
55.0
6.0
0.3
Porky West
102.0
113.5
11.5
0.5
PKY-22-021
NSI
Porky West
PKY-22-022
12.0
15.3
3.3
1.9
Porky West
PKY-22-022A
NSI
Porky West
PKY-22-023
149.0
165.0
16.0
2.5
Porky West
PKY-22-024
135.5
146.0
10.5
0.7
Porky West
158.4
164.4
6.0
0.4
PKY-22-025
107.3
111.5
4.2
2.5
Porky West
125.0
131.0
6.0
2.2
137.0
140.0
3.0
0.6
PKY-22-025A
NSI
Porky West
PKY-22-026
59.7
67.0
7.3
2.1
Porky West
128.0
148.3
20.3
0.5
PKY-22-027
38.0
42.9
4.9
0.9
Porky West
47.3
51.8
4.5
1.5
82.1
85.0
2.9
0.8
97.5
117.0
19.5
0.7
121.5
124.5
3.0
0.6
PKY-22-028
51.0
82.3
31.3
1.9
Porky West
PKY-22-029
59.9
64.4
4.5
0.4
Porky West
Notes: All Porky Main and Porky West drilling intercepts reflect
core length intersections. Porky Main and Porky West results are
uncut, reported at a 0.3 g/t Au cut-off and include a maximum of
three meters internal dilution.
NSI – No Significant Intercepts
Table 6: All drill holes completed at the Shane target during
the Exploration Period.
Hole ID
From
(m)
To
(m)
True Width
(m)
Gold
(Au g/t)
Zone
SHA-21-039
155.9
158.1
1.8
4.2
Shane HW
271.9
275.7
3.1
7.1
S1
380.7
383.4
2.2
1.7
S4
SHA-21-040
252.8
262.2
6.1
0.2
Shane HW
329.6
331.5
1.3
4.8
S1
450.2
455.3
3.5
0.3
S4
SHA-21-041
NSI
No Zone
SHA-21-042
NSI
No Zone
SHA-21-046
175.3
181.0
4.6
54.3
Shane HW
Including
175.3
177.0
1.0
172.0
Shane HW
315.0
323.8
7.2
2.1
S1
SHA-21-047
201.7
205.8
2.5
0.2
Shane HW
390.7
392.9
1.4
3.0
S1
SHA-21-048
301.2
306.9
4.4
2.0
S1
SHA-21-049
176.5
179.7
2.1
7.5
Shane HW
SHA-21-050
197.4
202.0
2.7
0.2
Shane HW
SHA-21-051
177.2
189.9
11.8
2.7
Shane HW
SHA-21-052
290.2
293.8
2.7
0.3
S1
361.0
363.4
1.8
1.3
S2
390.2
391.9
1.3
3.6
S3
396.3
399.3
2.3
2.5
S4
SHA-21-053
303.2
306.0
1.6
0.4
Shane HW
382.5
386.4
2.3
11.9
S1
412.4
414.4
1.2
0.7
S2
SHA-22-055
103.7
105.4
1.2
1.1
S1
160.2
162.2
1.4
2.7
S2
186.1
189.1
2.2
1.7
S3
208.3
212.3
2.9
0.3
S4
SHA-22-056
88.0
91.5
2.7
0.1
S1
100.8
103.1
1.8
0.9
S2
134.1
135.1
0.8
0.0
S3
173.6
174.6
0.8
4.0
S4
SHA-22-057
111.3
114.6
2.1
12.3
S1
120.0
122.5
1.6
0.0
S2
178.5
182.5
2.7
0.8
S3
SHA-22-058
154.1
158.7
2.2
1.7
S1
164.5
169.5
2.4
3.2
S2
SHA-22-059
111.8
112.4
0.4
0.0
S1
129.0
131.0
1.5
0.0
S2
SHA-22-060
126.0
129.9
2.3
1.3
S1
155.9
158.3
1.5
0.3
S2
241.5
243.3
1.1
0.3
S3
257.3
258.6
0.8
1.0
S4
SHA-22-061
155.6
157.6
0.9
0.6
S1
226.0
229.4
1.6
0.1
S2
261.4
266.6
2.5
0.3
S3
326.8
328.1
0.6
0.8
S4
SHA-22-063
259.0
261.0
1.1
0.7
Shane HW
SHA-22-064
225.0
230.5
1.8
0.2
Shane HW
SHA-22-065
136.0
140.6
2.5
6.5
S1
164.0
167.7
2.0
0.5
S2
241.5
244.5
1.7
0.7
S3
286.1
288.7
1.5
3.1
S4
SHA-22-066
196.0
197.6
1.0
7.9
S1
246.9
249.1
1.5
3.6
S2
311.0
313.0
1.4
0.0
S3
325.4
325.8
0.3
0.0
S4
SHA-22-067
226.0
227.2
0.6
2.6
S1
272.0
277.0
2.7
0.5
S2
SHA-22-068
10.5
12.8
1.1
0.0
S4
52.6
53.6
0.5
0.1
S3
138.8
140.8
1.1
1.6
S1
SHA-22-069
70.1
72.3
0.8
6.9
S3
142.5
144.0
0.6
0.0
S2
178.0
183.2
2.2
1.8
S1
SHA-22-070
54.0
56.0
0.9
0.0
S3
141.9
143.0
0.5
0.0
S2
174.0
175.4
0.7
1.2
S1
SHA-22-071
73.6
76.7
1.2
2.5
S3
163.0
166.3
1.3
0.2
S2
200.5
207.5
2.9
3.4
S1
SHA-22-072
61.0
62.0
0.4
0.4
S3
196.1
202.0
2.5
2.0
S1
SHA-22-073
369.8
373.4
2.0
1.0
Shane HW
476.0
478.0
1.1
0.9
S1
530.6
533.1
1.4
0.5
S2
556.0
559.0
1.7
0.9
S3
SHA-22-074
402.6
406.0
2.2
5.5
S1
SHA-22-075
314.5
318.3
2.8
1.2
S1
SHA-22-076
285.0
288.4
2.9
1.5
S1
372.3
374.0
1.5
2.7
S4
SHA-22-077
370.0
373.0
2.0
0.5
S1
SHA-22-078
777.0
782.6
3.5
0.1
S1
796.0
800.0
2.6
0.2
S2
SHA-22-079
721.4
726.1
3.1
0.3
S1
761.5
763.8
1.5
0.0
S2
SHA-22-080
779.8
781.5
1.0
0.0
S1
SHA-22-081
45.0
46.0
0.4
0.1
Unknown
494.8
496.4
0.8
4.1
S1
SHA-22-082
366.4
367.6
0.8
0.1
S1
372.0
373.5
1.1
0.0
S2
433.6
436.5
2.1
0.0
S3
464.4
472.7
6.0
0.5
S4
SHA-22-083
441.7
445.4
2.0
1.5
S1
472.0
473.0
0.5
0.0
S2
552.7
555.1
1.3
0.8
S3
613.8
617.9
2.3
0.4
S4
SHA-22-084
217.5
218.5
0.7
0.1
Shane HW
331.5
336.0
3.3
2.6
S1
371.5
373.0
1.1
0.1
S2
403.8
407.0
2.4
8.3
S3
SHA-22-085
28.3
32.0
2.2
1.6
Unknown
226.1
228.1
1.4
1.0
Shane HW
366.5
372.7
4.3
0.7
S1
399.4
402.3
2.0
0.7
S2
422.4
445.0
15.5
0.0
S3
459.1
461.7
1.9
0.4
S4
SHA-22-086
26.6
28.9
1.5
2.0
Unknown
199.4
202.2
1.9
2.5
Shane HW
365.0
369.5
3.2
0.2
S1
411.2
413.3
1.5
0.2
S2
442.6
443.5
0.6
0.4
S3
489.3
491.7
1.7
0.3
S4
SHA-22-089
714.6
717.1
1.6
0.8
S1
742.4
744.3
1.2
1.4
S2
787.0
789.3
1.5
0.1
S3
820.3
825.9
3.7
0.9
S4
SHA-22-090
736.4
740.0
2.2
1.8
S1
766.4
770.6
2.6
0.1
S2
821.0
822.0
0.6
0.1
S3
Notes: All Shane drilling intercepts reflect true width
intersections. Shane results are uncut.
NSI – No Significant Intercepts
Supporting Drilling Information to SSR Mining
Announcement
This document provides supporting drill collar locations and
composite assay results for the Shane property drilling program
referenced in the announcement “SSR Mining Announces Positive
Exploration Results at Seabee”, December 8, 2022. Drill collar
locations are surveyed in UTM Zone 13N, NAD83 grid using
differential GPS in units of meters. The elevation datum is
CGG2013.
Table 7: Supporting collar coordinates for surface drill holes
at Santoy.
Hole ID
Easting
Northing
Elevation
(m)
Azimuth
(deg.)
Dip
(deg.)
EOH Depth
(m)
JOY-21-961
599892
6170220
438
245
-50
258
JOY-21-962
600086
6170053
442
160
-52
426
JOY-21-963
600086
6170053
442
150
-55
426
JOY-21-964
600263
6169616
442
210
-45
510
JOY-21-965
600263
6169616
442
210
-55
525
JOY-21-966
600263
6169616
442
215
-72
621
JOY-21-967
600263
6169616
442
225
-65
402
JOY-21-968
600270
6169620
443
220
-50
375
JOY-21-969
600270
6169620
442
205
-65
396
JOY-21-970
600268
6169620
443
200
-45
366
JOY-21-971
600269
6169620
443
205
-55
375
JOY-21-972
600156
6169317
461
205
-55
876
JOY-21-973
600156
6169317
461
215
-75
426
JOY-21-974
600305
6169258
460
200
-47
426
JOY-21-975
600305
6169258
460
200
-67
465
JOY-22-976
598586
6171056
455
178
-45
528
JOY-22-977
598586
6171056
455
178
-65
444
JOY-22-978
598586
6171056
455
178
-75
408
JOY-22-979
598447
6171121
459
178
-45
372
JOY-22-980
598447
6171121
459
178
-65
381
JOY-22-981
598447
6171121
459
178
-88
396
JOY-22-982
599174
6171155
436
180
-58
591
JOY-22-983
599174
6171155
436
180
-67
636.4
JOY-22-984
599174
6171155
436
198
-65
942
JOY-22-985
599174
6171155
436
198
-72
333
JOY-22-986
599174
6171156
435
198
-72
654
Table 8: Collar coordinates for drill holes at the Porky Main
and Porky West targets.
Hole ID
Easting
Northing
Elevation
(m)
Azimuth
(deg.)
Dip
(deg.)
EOH Depth
(m)
GAS-22-142
584574
6174887
467
34
-69
300
GAS-22-143
584575
6174889
466
35
-59
270
GAS-22-144
584575
6174889
466
35
-46
252
GAS-22-145
584600
6174846
465
35
-70
340
GAS-22-146
584600
6174846
465
35
-62
321
GAS-22-147
584630
6174883
464
35
-72
300
GAS-22-149
584686
6174845
457
41
-58
255
GAS-22-150
584686
6174845
457
41
-50
362
GAS-22-151
584729
6174871
464
35
-64
270
GAS-22-152
584729
6174871
464
35
-50
264
GAS-22-153
584757
6174887
466
35
-64
261
GAS-22-154
584757
6174887
466
35
-72
291
GAS-22-155
584757
6174887
466
30
-55
237
GAS-22-156
584757
6174887
466
15
-48
246
GAS-22-157
584757
6174887
466
25
-48
258
GAS-22-158
584813
6174891
467
32
-69
327
GAS-22-159
584813
6174891
467
32
-54
252
GAS-22-160
584841
6174890
464
32
-55
318
GAS-22-161
584841
6174890
464
25
-71
306
GAS-22-162
584841
6174890
464
40
-72
360
GAS-22-165
584947
6174917
463
15
-72
363
GAS-22-172
584566
6174617
460
25
-45
522
PKY-22-001
585874
6174267
454
64
-47
111
PKY-22-002
585859
6174314
456
64
-47
102
PKY-22-003
585822
6174321
457
65
-45
135
PKY-22-004
585768
6174371
461
65
-52
160
PKY-22-005
585798
6174372
464
65
-50
162
PKY-22-006
585838
6174359
460
65
-48
162
PKY-22-007
585837
6174404
460
65
-48
120
PKY-22-008
585818
6174434
465
68
-45
90
PKY-22-009
585803
6174411
466
62
-50
120
PKY-22-010
585746
6174416
463
65
-50
162
PKY-22-011
585712
6174456
463
65
-50
150
PKY-22-012
585761
6174452
467
65
-50
132
PKY-22-013
585739
6174492
466
65
-49
120
PKY-22-014
585699
6174534
469
51
-51
111
PKY-22-015
585717
6174519
467
65
-57
111
PKY-22-016
585674
6174506
467
74
-48
150
PKY-22-017
585675
6174521
466
58
-51
141
PKY-22-018
585054
6174992
456
8
-45
132
PKY-22-019
585026
6174952
460
16
-55
132
PKY-22-020
584982
6175005
459
4
-50
144
PKY-22-021
585021
6174993
460
8
-45
141
PKY-22-022
584915
6175013
462
5
-42
77
PKY-22-022A
584915
6175013
462
5
-53
81
PKY-22-023
584930
6174936
461
5
-52
165
PKY-22-024
584890
6174953
463
8
-45
192
PKY-22-025
584805
6174912
467
3
-44
141
PKY-22-025A
584805
6174913
464
2
-45
88
PKY-22-026
584837
6174950
462
10
-43
171
PKY-22-027
584855
6174995
460
8
-45
150
PKY-22-028
584822
6175006
457
4
-45
141
PKY-22-029
584753
6174975
461
4
-45
120
Table 9: Collar coordinates for drill holes at the Shane
target.
Hole ID
Easting
Northing
Elevation
(m)
Azimuth
(deg.)
Dip
(deg.)
Length
(m)
SHA-21-039
593064
6171593
454
40
-48
432
SHA-21-040
593064
6171593
454
17
-65
546
SHA-21-041
592482
6171922
438
10
-48
420
SHA-21-042
592482
6171922
438
10
-62
455
SHA-21-046
593064
6171593
454
40
-58
345
SHA-21-047
593064
6171593
454
40
-68
432
SHA-21-048
593064
6171593
454
57
-48
345
SHA-21-049
593064
6171593
454
57
-58
438
SHA-21-050
593064
6171593
454
57
-65
486
SHA-21-051
593062
6171590
454
15
-45
387
SHA-21-052
593074
6171590
453
0
-58
465
SHA-21-053
593074
6171590
453
0
-75
462
SHA-22-055
593361
6171612
446
45
-45
240
SHA-22-056
593361
6171612
446
0
-50
180
SHA-22-057
593361
6171612
446
0
-62
270
SHA-22-058
593361
6171612
447
0
-72
231
SHA-22-059
593305
6171644
443
22
-55
171
SHA-22-060
593305
6171644
443
22
-65
291
SHA-22-061
593305
6171644
443
22
-75
351
SHA-22-063
593313
6171657
444
225
-45
276
SHA-22-064
593313
6171657
444
250
-45
261
SHA-22-065
593302
6171646
445
0
-68
300
SHA-22-066
593302
6171594
445
30
-70
396
SHA-22-067
593302
6171594
445
45
-70
411
SHA-22-068
593313
6171805
444
190
-50
192
SHA-22-069
593313
6171805
444
190
-58
231
SHA-22-070
593313
6171805
445
205
-55
210
SHA-22-071
593314
6171804
446
210
-60
250
SHA-22-072
593313
6171804
444
220
-55
225
SHA-22-073
593044
6171567
455
22
-76
561
SHA-22-074
593045
6171567
456
22
-70
501
SHA-22-075
593045
6171567
456
22
-55
480
SHA-22-076
593045
6171567
456
22
-48
441
SHA-22-077
592995
6171606
453
20
-68
531
SHA-22-078
592857
6171462
452
15
-73
825
SHA-22-079
592857
6171463
454
5
-73
822
SHA-22-080
592854
6171463
452
352
-73
810
SHA-22-081
592995
6171606
453
20
-78
501
SHA-22-082
592922
6171650
456
20
-70
531
SHA-22-083
592922
6171649
455
25
-77
672
SHA-22-084
593048
6171563
457
30
-54
411
SHA-22-085
593048
6171565
458
35
-64
513
SHA-22-086
593048
6171565
458
48
-54
500
SHA-22-089
592669
6171515
455
22
-71
879
SHA-22-090
592668
6171513
452
12
-72
927
View source
version on businesswire.com: https://www.businesswire.com/news/home/20221208005798/en/
SSR Mining Contacts:
F. Edward Farid, Executive Vice President, Chief Corporate
Development Officer Alex Hunchak, Director, Corporate Development
and Investor Relations
SSR Mining Inc. E-Mail: invest@ssrmining.com Phone: +1 (888)
338-0046
Soulgate Inc. (NASDAQ:SSR)
Historical Stock Chart
From May 2024 to Jun 2024
Soulgate Inc. (NASDAQ:SSR)
Historical Stock Chart
From Jun 2023 to Jun 2024