HONG
KONG, June 27, 2024 /PRNewswire/ -- CNOOC
Limited (the "Company", SEHK: 00883 (HKD Counter) and 80883 (RMB
Counter), SSE: 600938) announces today that Enping 21-4 Oilfield
Development Project has commenced production.
The project is located in eastern South China Sea, with an
average water depth of approximately 89 meters. It will be
developed by leveraging the existing production facilities and is
expected to achieve a peak production of approximately 5,300
barrels of oil equivalent per day in 2025. The oil property is
light crude.
The Company endeavors to improve project efficiency through
technological and managerial innovation. Enping 21-4 oilfield was
developed with 2 extra extended reach wells drilled from the
existing production platform. The well depth exceeds 9,500 meters.
The successful application of the development mode has set an
example for similar projects of the Company.
CNOOC Limited holds 100% interest in this project and acts as
the operator.
— End —
Notes to Editors:
More information about the Company is available at
http://www.cnoocltd.com.
*** *** *** ***
This press release includes forward looking information,
including statements regarding the likely future developments in
the business of the Company and its subsidiaries, such as expected
future events, business prospects or financial results. The words
"expect", "anticipate", "continue", "estimate", "objective",
"ongoing", "may", "will", "project", "should", "believe", "plans",
"intends" and similar expressions are intended to identify such
forward-looking statements. These statements are based on
assumptions and analyses made by the Company as of this date in
light of its experience and its perception of historical trends,
current conditions and expected future developments, as well as
other factors that the Company currently believes are appropriate
under the circumstances. However, whether actual results and
developments will meet the current expectations and predictions of
the Company is uncertain. Actual results, performance and financial
condition may differ materially from the Company's expectations,
including but not limited to those associated with macro-political
and economic factors, fluctuations in crude oil and natural gas
prices, the highly competitive nature of the oil and natural gas
industry, climate change and environmental policies, the Company's
price forecast, mergers, acquisitions and divestments activities,
HSSE and insurance policies and changes in anti-corruption,
anti-fraud, anti-money laundering and corporate
governance laws and regulations.
Consequently, all of the forward-looking statements made in this
press release are qualified by these cautionary statements. The
Company cannot assure that the results or developments anticipated
will be realised or, even if substantially realised, that they will
have the expected effect on the Company, its business or
operations.
*** *** *** ***
For further enquiries, please contact:
Ms. Cui Liu
Media & Public Relations
CNOOC Limited
Tel: +86-10-8452-6641
Fax: +86-10-8452-1441
E-mail: mr@cnooc.com.cn
Mr. Bunny Lee
Porda Havas International Finance Communications Group
Tel: +852 3150 6707
Fax: +852 3150 6728
E-mail: cnooc.hk@pordahavas.com
View original content to download
multimedia:https://www.prnewswire.com/news-releases/cnooc-limited-announces-enping-21-4-oilfield-development-project-commences-production-302184308.html
SOURCE CNOOC Limited