Shares Outstanding: 222,274,246
Trading Symbols: TSX: GGD
OTCQX: GLGDF
HALIFAX, NS, June 17, 2020 /CNW/ - GoGold Resources
Inc. (TSX: GGD) (OTCQX: GLGDF) ("GoGold", "the
Company") is pleased to release the assay results from 9
diamond drill holes at the Los Ricos South Project, including 3 at
San Juan, 4 at the Main area, 1 at
Rascadero and the first results from the East Vein.
Hole LRGG-20-174 was drilled on section 475N in the Main area of
the project and intersected the Los Ricos quartz vein from 214.5 to
229.5m for 15.0m of 365 g/t silver equivalent, consisting of
2.56 g/t gold and 173 g/t silver. The intersect included
4.4m of 1,120 g/t silver
equivalent.
Hole LRGG-20-178 is the Company's first hole drilled at the East
Vein. The vein sits 400m to the
east of the Main area and parallels the Los Ricos vein
structure. The mineralization and alteration observed in the
East Vein is very similar to the Main area and was explored in the
1920's by underground workings from the Cinco Minas Level. The
initial drill holes are testing the up-dip projection towards
surface. The drill hole intersected 4.4m of 178 g/t silver equivalent from 118.0 to
122.4m, including 2.0m of 312 g/t silver equivalent.
Hole LRGG-20-169 was drilled on section 750N in the San Juan area and intersected the Los Ricos
quartz vein from 245.9 to 250.0m for
4.1m of 426 g/t silver equivalent,
consisting of 3.18 g/t gold and 188 g/t silver.
"These holes represent the first round of drill results from our
restarted drilling program, and also include our first drill
intercept from the East Vein which is encouraging. With the
drilling at Los Ricos North underway, we await assay results over
the coming weeks which we believe could substantially broaden the
potential of the Los Ricos district," said Brad Langille, President and CEO.
Detailed intersections are listed in Table 1, and the hole
locations are shown in Table 2.
A longitudinal section summary of all the holes drilled at Los
Ricos to date is available at
https://gogoldresources.com/component/rsfiles/preview?path=diagrams/LosRicos_LongSec_20200617.pdf
Table 1: Drill Hole Intersections
Hole
ID
|
Area
|
Section
|
From
|
To
|
Length1
|
Au
|
Ag
|
AuEq2
|
AgEq2
|
|
|
|
(m)
|
(m)
|
(m)
|
(g/t)
|
(g/t)
|
(g/t)
|
(g/t)
|
LRGG-20-168
|
Main
|
300N
|
147.5
|
172.9
|
25.4
|
0.13
|
33.6
|
0.58
|
43.5
|
|
including
|
|
166.5
|
172.9
|
6.3
|
0.22
|
72.2
|
1.18
|
88.6
|
LRGG-20-169
|
San Juan
|
750N
|
245.9
|
250.0
|
4.1
|
3.18
|
187.7
|
5.68
|
426.2
|
LRGG-20-170
|
Main
|
250N
|
174.0
|
199.5
|
25.5
|
0.09
|
27.8
|
0.46
|
34.4
|
LRGG-20-171
|
San Juan
|
1000N
|
154.4
|
168.0
|
13.7
|
0.40
|
40.8
|
0.94
|
70.4
|
LRGG-20-172
|
San Juan
|
950N
|
280.0
|
291.3
|
11.3
|
0.22
|
33.7
|
0.66
|
49.9
|
LRGG-20-173
|
Main
|
325N
|
213.4
|
235.5
|
22.2
|
0.15
|
63.8
|
1.00
|
75.4
|
|
including
|
|
230.6
|
235.5
|
4.9
|
0.44
|
177.7
|
2.81
|
210.9
|
LRGG-20-174
|
Main
|
475N
|
214.5
|
229.5
|
15.0
|
2.56
|
172.7
|
4.86
|
364.8
|
|
including
|
|
225.1
|
229.5
|
4.4
|
8.33
|
496.0
|
14.94
|
1,120.4
|
LRGG-20-175
|
Rascadero
|
1000N
|
96.9
|
104.9
|
8.1
|
0.15
|
36.5
|
0.63
|
47.5
|
LRGG-20-178
|
East Vein
|
125N
|
118.0
|
122.4
|
4.4
|
1.09
|
97.0
|
2.38
|
178.4
|
|
including
|
|
119.0
|
121.0
|
2.0
|
1.88
|
171.3
|
4.17
|
312.4
|
- Not true width
- AuEq and AqEq converted using a silver to
gold ratio of 75:1
- Holes LRGG-20-176 and LRG-20-177 are excluded
as they are pending assays
|
Table 2: Drill Hole Locations
Hole
ID
|
Easting
|
Northing
|
Elevation
|
Azimuth
|
Dip
|
Length
|
LRGG-20-168
|
0300N
|
610801
|
2327757
|
1425
|
230
|
-40
|
LRGG-20-169
|
0750N
|
610158
|
2327824
|
1257
|
50
|
-65
|
LRGG-20-170
|
0250N
|
610855
|
2327741
|
1418
|
230
|
-40
|
LRGG-20-171
|
1000N
|
610168
|
2328144
|
1341
|
50
|
-45
|
LRGG-20-172
|
950N
|
610062
|
2327989
|
1323
|
50
|
-65
|
LRGG-20-173
|
325N
|
610809
|
2327801
|
1442
|
230
|
-43
|
LRGG-20-174
|
475N
|
610703
|
2327908
|
1471
|
230
|
-45
|
LRGG-20-175
|
1000N
|
610219
|
2328186
|
1354
|
50
|
-45
|
LRGG-20-178
|
175N
|
611070
|
2327824
|
1419
|
50
|
-45
|
Los Ricos Exploration Projects
The Company's two
exploration projects at its Los Ricos property are in Jalisco state, Mexico. The South Project
began in March 2019 and includes the
'Main' area, which is focused on drilling around a number of
historical mines including El
Abra, El Troce, San Juan,
and Rascadero. The South Project also includes the
Cerro Colorado, Las Lamas and East
Vein targets. The North Project was launched in March 2020 and includes drilling at the Monte del
Favor, Salomon, La Trini, and Mololoa targets.
Procedure, Quality Assurance / Quality Control and Data
Verification
The diamond drill core (HQ size) is
geologically logged, photographed and marked for sampling. When the
sample lengths are determined, the full core is sawn with a diamond
blade core saw with one half of the core being bagged and tagged
for assay. The remaining half portion is returned to the core trays
for storage and/or for metallurgical test work.
The sealed and tagged sample bags are transported to the ActLabs
facility in Zacatecas, Mexico.
ActLabs crushes the samples and prepares 200-300 gram pulp samples
with ninety percent passing Tyler 150 mesh (106μm). The pulps
are assayed for gold using a 50-gram charge by fire assay (Code
1A2-50) and over limits greater than 10 grams per tonne are
re-assayed using a gravimetric finish (Code 1A3-50). Silver and
multi-element analysis is completed using total digestion (Code 1F2
Total Digestion ICP). Over limits greater than 100 grams per tonne
silver are re-assayed using a gravimetric finish (Code 8-Ag FA-GRAV
Ag).
Quality assurance and quality control ("QA/QC") procedures
monitor the chain-of-custody of the samples and includes the
systematic insertion and monitoring of appropriate reference
materials (certified standards, blanks and duplicates) into the
sample strings. The results of the assaying of the QA/QC material
included in each batch are tracked to ensure the integrity of the
assay data. All results stated in this announcement have
passed GoGold's QA/QC protocols.
Mr. David Duncan, P. Geo. is the
qualified person as defined by National Instrument 43-101 and is
responsible for the technical information of this
release.
About GoGold Resources
GoGold Resources (TSX: GGD) is
a Canadian-based silver and gold producer focused on operating,
developing, exploring and acquiring high quality projects in
Mexico. The Company operates the Parral Tailings project in
the state of Chihuahua and has the
Los Ricos exploration project in the state of Jalisco. Headquartered in Halifax, NS, GoGold is building a portfolio of
low cost, high margin projects. For more information visit
gogoldresources.com.
CAUTIONARY STATEMENT:
The securities described herein
have not been, and will not be, registered under the United States
Securities Act of 1933, as amended (the "U.S. Securities Act"), or
any state securities laws, and may not be offered or sold within
the United States or to, or for
the benefit of, U.S. persons (as defined in Regulation S under the
U.S. Securities Act) except in compliance with the registration
requirements of the U.S. Securities Act and applicable state
securities laws or pursuant to exemptions therefrom. This release
does not constitute an offer to sell or a solicitation of an offer
to buy of any of GoGold's securities in the United States.
This news release may contain "forward-looking information" as
defined in applicable Canadian securities legislation. All
statements other than statements of historical fact, included in
this release, including, without limitation, statements regarding
the Parral tailings project, the Los Ricos project, future
operating margins, future production and processing, and future
plans and objectives of GoGold, constitute forward looking
information that involve various risks and uncertainties.
Forward-looking information is based on a number of factors and
assumptions which have been used to develop such information but
which may prove to be incorrect, including, but not limited to,
assumptions in connection with the continuance of GoGold and its
subsidiaries as a going concern, general economic and market
conditions, mineral prices, the accuracy of mineral resource
estimates, and the performance of the Parral project There can be
no assurance that such information will prove to be accurate and
actual results and future events could differ materially from those
anticipated in such forward-looking information.
Important factors that could cause actual results to differ
materially from GoGold's expectations include exploration and
development risks associated with GoGold's projects, the failure to
establish estimated mineral resources or mineral reserves,
volatility of commodity prices, variations of recovery rates, and
global economic conditions. For additional information with respect
to risk factors applicable to GoGold, reference should be made to
GoGold's continuous disclosure materials filed from time to time
with securities regulators, including, but not limited to, GoGold's
Annual Information Form. The forward-looking information contained
in this release is made as of the date of this release.
View original
content:http://www.prnewswire.com/news-releases/gogold-intersects-4-4m-of-1-120-gt-silver-equivalent-301078530.html
SOURCE GoGold Resources Inc.