Goldstone Resources Inc. (TSX: GRC)(PINK SHEETS: GRSZF) today
announced that it, together with its joint venture partner and
operator Premier Gold Mines Limited (TSX: PG), has received an
updated National Instrument (NI) 43-101 compliant mineral resource
estimate from Micon International Limited for the Hardrock Project
in which Goldstone holds a 30 percent carried interest. The
estimate reports a significant increase in all categories,
including the use of a measured category for the first time and is
summarized in Table 1. All final data available as of February 28,
2011 were used in completing the estimate. In 2010, there were
114,000 metres of drilling at Hardrock, located near Geraldton in
Northwestern Ontario, on multiple near surface and deeper zones.
Many of these remain open for expansion and are the subject of an
ongoing drill program in 2011.
Highlights of Micon's new mineral resource estimate include:
-- A 269% increase in Measured and Indicated resources to 2.5 million
ounces.
-- A 164% increase in Inferred resources to 1.1 million ounces.
-- A 30% increase in the "potential open pit" Measured and Indicated
resource grade to 2.37 grams per tonne gold (g/t Au).
-- A 37% increase in the "potential open pit" Inferred resource grade to
2.48 g/t Au.
-- Some 40% of the Measured and Indicated resource ounces are categorized
as "Measured."
-- A "Whittle-Pit" analysis suggesting a strip ratio on potential open pit
mineral resources of 2.1 to 1.
-- The Kailey ("potential open pit") Deposit resource is included and
contains 127,000 ounces of Measured and Indicated Resources at 1.57 g/t
Au and 10,000 ounces of Inferred resources at 1.48 g/t Au
"We are very pleased with progress at the Hardrock Project and
support Premier's goal of developing a significant gold deposit
potentially capable of mid-tier production," said Phil Cunningham,
Goldstone Chairman and Interim CEO. "At the same time we continue
to conduct an aggressive exploration program on our 100
percent-owned Key Lake property which is contiguous to
Hardrock."
In 2011, more than 70,000 metres of drilling is planned to
continue to expand and upgrade these resources. Additionally,
regional exploration in the search of the "next one" in the
Hardrock area is underway. The near-term goal is to secure permits
for Advanced Exploration, which will include de- watering of the
historic mine workings and the construction of an Exploration Ramp.
The ramp will allow underground drilling to be completed in support
of a preliminary economic assessment to evaluate the potential for
a future mining operation to be established at Hardrock.
The mineral resources estimated for the Hardrock project (both
the Hardrock and Kailey Deposits) are set out in Table 1 below.
They have been subdivided into potentially underground or open pit
mineable resources and reported using different cutoff grades.
Table 1 - Hardrock Project Indicated & Inferred Mineral Resources
----------------------------------------------------------------------------
Cut-off Grade Resource Contained
Material Classification (au g/t) Estimate Tonnes Au Ozs
(Au g/t)
----------------------------------------------------------------------------
Open Pit Measured 0.83 2.446 6,865,000 540,000
Open Pit Indicated 0.83 2.280 5,833,000 427,500
Open Pit Measured + Indicated 0.83 2.370 12,698,000 967,500
Open Pit Inferred 0.83 2.483 615,000 49,200
----------------------------------------------------------------------------
Underground Measured 2.80 5.993 2,312,000 445,800
Underground Indicated 2.80 5.827 5,757,000 1,078,500
Underground Measured + Indicated 2.80 5.875 8,069,000 1,524,300
Underground Inferred 2.80 5.397 6,187,000 1,073,500
----------------------------------------------------------------------------
OP + UG Measured --- 3.340 9,177,000 985,800
OP + UG Indicated --- 4.042 11,590,000 1,506,000
OP + UG Measured + Indicated --- 3.732 20,767,000 2,491,800
OP + UG Inferred --- 5.133 6,802,000 1,122,700
----------------------------------------------------------------------------
(i) Figures may not sum due to rounding
(1) Mineral resources which are not mineral reserves do not have
demonstrated economic viability. The estimate of mineral resources may
be materially affected by environmental, permitting, legal, title,
socio-political, marketing, or other relevant issues.
(2) The mineral resources were estimated using a block model with parent
blocks of 25x30x10 sub-blocked to a minimum size of 5x3x2 and using
Inverse Distance Cubed methods for grade estimation. A total of 12
individual mineralized domains were identified and estimated using an
average top cut of 48 g/t Au. For a "potential open pit" mineral
resource a cut-off grade of 0.83 g/t Au is based on a Whittle optimized
pit shell and a mining recovery of 100%. For potential underground
mineral resources a cut-off grade of 2.80 g/t Au and an assumed mining
recovery of 100% outside of the potential open pit mining areas was
used.
(3) The quantity and grade of reported inferred resources in this estimation
are uncertain in nature and there has been insufficient exploration to
define these inferred resources as an indicated or measured mineral
resource and it is uncertain if further exploration will result in
upgrading them to an indicated or measured mineral resource category.
(4) The mineral resources in this press release were estimated using the
Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM
Standards on Mineral Resources and Reserves, Definitions and Guidelines
prepared by the CIM Standing Committee on Reserve Definitions and
adopted by CIM Council November 27, 2010.
Tables 3 and 4 below, present the tonnes and grades from the
block model used for the Mineral Resource estimate at a range of
cut-off grades in order to demonstrate the sensitivity of the
estimates. The cut-off value of 0.83 g/t Au for "potential open
pit" and 2.80 g/t Au for deeper, potential underground
mineralization, was derived using the parameters listed in Table 2
below.
Table 2 - Assumed operating costs, metal pricing, and metallurgical recovery
used to determine cut-off grades for the Hardrock Mineral Resource
Estimate.
----------------------------------------------------------------------------
Item Units Cost
----------------------------------------------------------------------------
Open Pit Mining Cost CAN$/All Material Tonne $3.00
Underground Mining Cost CAN$/Ore Tonne $60.00
Processing Cost CAN$/Ore Tonne $20.00
G&A Cost CAN$/Ore Tonne $1.00
Gold Price US$/Troy Ounce $1,000.00
Mill Recovery Percent 90%
Exchange Rate US$ to CAN$ 1.000
----------------------------------------------------------------------------
Table 3 - Sensitivity of the "Potential Open Pit"
Resource Estimates at Various Cutoff Grades
Measured and Indicated Resources
-------------------------------------------------------
Cutoff Au Resource Contained
(Au g/t) (g/t) Tonnes Au Ozs
-------------------------------------------------------
0.5 1.848 18,201,000 1,081,500
0.8 2.327 13,055,000 976,900
1.0 2.611 10,896,000 914,600
1.5 3.422 6,871,000 756,100
2.0 4.181 4,744,000 637,800
2.5 4.890 3,480,000 547,200
3.0 5.591 2,626,000 472,200
3.5 6.269 2,040,000 411,100
4.0 6.961 1,601,000 358,500
4.5 7.703 1,259,000 311,800
5.0 8.456 1,004,000 273,000
-------------------------------------------------------
Inferred Resources
-------------------------------------------------------
Cutoff Au Resource Contained
(Au g/t) (g/t) Tonnes Au Ozs
-------------------------------------------------------
0.5 1.848 937,000 55,700
0.8 2.437 633,000 49,600
1.0 2.681 547,000 47,100
1.5 3.629 328,000 38,300
2.0 4.969 193,000 30,800
2.5 6.745 117,000 25,400
3.0 8.792 78,000 22,000
3.5 11.318 53,000 19,500
4.0 13.473 42,000 18,000
4.5 16.179 32,000 16,800
5.0 18.646 27,000 15,900
-------------------------------------------------------
Table 4 - Sensitivity of the Potential Underground
Resource Estimates at Various Cutoff Grades
Measured and Indicated Resources
-------------------------------------------------------
Cutoff Resource Contained
(Au g/t) Au (g/t) Tonnes Au Ozs
-------------------------------------------------------
2.0 4.567 12,848,000 1,886,500
2.5 5.389 9,497,000 1,645,700
3.0 6.222 7,226,000 1,445,700
3.5 7.074 5,623,000 1,278,900
4.0 7.864 4,547,000 1,149,600
4.5 8.719 3,678,000 1,031,300
5.0 9.548 3,044,000 934,500
-------------------------------------------------------
Inferred Resources
-------------------------------------------------------
Cutoff Resource Contained
(Au g/t) Au (g/t) Tonnes Au Ozs
-------------------------------------------------------
2.0 4.410 9,145,000 1,296,600
2.5 5.080 6,989,000 1,141,500
3.0 5.690 5,533,000 1,012,500
3.5 6.302 4,428,000 897,400
4.0 6.904 3,588,000 796,600
4.5 7.698 2,763,000 683,800
5.0 8.342 2,272,000 609,400
-------------------------------------------------------
Hardrock Deposit
The Hardrock Project is located approximately 4 kilometres south
of the town of Geraldton, Ontario and is host to several
past-producing mines which collectively produced more than 3
million ounces of gold from depths primarily within 600 metres of
surface between 1938 and 1968. Underground resources are located
proximal to and below the historic mine workings. New discoveries
including the High-Grade North Zone and the F2 East Zone will be
the focus of the planned underground drill program. The current
Mineral Resource estimate uses 11 identified mineralized domains to
develop a combination potential open pit and underground mineral
resource. The Hardrock Project benefits from development advantages
with the Trans-Canada Highway, Trans-Canada Pipeline, and major
power lines running through, or in close proximity to, the Project
site. Significant services and a skilled labour pool exist with
several communities located within 30 kilometres. The Hardrock
Project is operated under a joint venture with Goldstone Resources
Inc. (TSX: GRC).
Kailey Deposit
The Kailey deposit is located about 2 km north of the Hardrock
deposit at the location of the former historically operated Little
Long Lac gold mine. The Kailey mineralized zone is a small
lower-grade potential open pit mineral resource.
Resource Statement
The mineral resource estimates in this press release use the
Canadian Institute of Mining, Metallurgy and Petroleum (CIM),
Standards on Mineral Resources and Reserves, Definitions and
Guidelines prepared by CIM Standing Committee on Reserve
Definitions and adopted by CIM Council on November 27, 2010. The
mineral resource estimates provided in this report are classified
as "measured", "indicated", or "inferred" as defined by CIM.
According to the CIM definitions, a Mineral Resource must be
potentially economic in that it must be "in such form and quantity
and of such grade or quality that it has reasonable prospects for
economic extraction". For the Hardrock deposit, a gold cut-off
grade was assigned based on economic assumptions and was used in
the resource estimations. Table 2 above shows the economic
parameters used in the gold cut-off grade calculation.
The estimated costs for the Hardrock deposit, mined as an open
pit, are $3.00 + $20.00 + $1.00 = $24.00/t milled which works out
to an estimated gold cut-off of 0.83 g/t. The estimated costs for
the Hardrock deposit, mined as an underground, are $60.00 + $20.00
+ $1.00 = $81.00/t milled which works out to an estimated gold
cut-off of 2.80 g/t. Resources reported in this press release use
an estimated potential open pit gold cut-off of 0.83 g/t and for a
potential underground use 2.80 g/t.
The mineral resource estimate presented in Table 1 is effective
as of 5 April 2011. The mineral resources listed in Table 1 were
estimated by Sam J. Shoemaker, Jr., M.AusIMM, and Registered
Member-SME. Mr. Shoemaker is a QP as defined in NI 43-101 and is
independent of Premier Gold.
Stephen McGibbon, P. Geo., is the Qualified Person for the
information contained in this press release and is a Qualified
Person within the meaning of National Instrument 43-101.
About Goldstone
Formed by a late 2009 merger of Ontex Resources and Roxmark
Mines, Goldstone Resources is a gold exploration and development
company operating in the historically significant Geraldton-
Beardmore camp of Northwestern Ontario and focused on gold
exploration and deposit delineation at its Key Lake, Brookbank,
Northern Empire and Leitch-Sand River gold properties, and as a
partner in the Hardrock Project joint venture with Premier Gold
Mines Limited. The camp is host to several past producers in a
district that has historical production of more than 4.1 million
ounces of gold from high grade ore before being shut down primarily
as a result of a $35 gold price-and to Goldstone's fully permitted,
expandable 200-TPD Northern Empire mill.
Further information is available on the Company's website at
www.grcmines.com and on SEDAR under the Company's profile at
www.sedar.com.
Forward-Looking Statements
This news release may contain forward-looking information under
applicable securities laws concerning Goldstone's business,
operations, financial performance, condition and prospects, as well
as management's objectives, strategies, beliefs and intentions.
Forward looking information is frequently identified by such words
as "may", "will", "plan", "expect", "anticipate", "intend" and
similar words referring to future events and results. This
forward-looking information is subject to known and unknown risks,
uncertainties and other factors that may cause actual results to
differ materially from those implied by the forward-looking
information. Factors that may cause actual results to vary
materially include, but are not limited to, inaccurate assumptions
concerning the exploration for and development of mineral deposits,
delay or inability to raise additional financing on satisfactory
terms, unanticipated operational or technical difficulties, changes
in laws or regulations, the risks of obtaining necessary licenses
and permits, changes in general economic conditions and changes in
conditions in the financial markets. Readers are cautioned not to
place undue reliance on this forward-looking information as actual
results may differ materially from those expressed or implied in
the forward looking information. Goldstone does not assume the
obligation to revise or update this forward-looking information
after the date of this release or to revise such information to
reflect the occurrence of future unanticipated events, except as
may be required under applicable securities laws.
Contacts: Goldstone Resources Inc. Philip Cunningham Chairman
and Interim CEO (416) 860-1636 www.grcmines.com
Gold Springs Resource (TSX:GRC)
Historical Stock Chart
From Nov 2024 to Dec 2024
Gold Springs Resource (TSX:GRC)
Historical Stock Chart
From Dec 2023 to Dec 2024