Hana Mining Ltd. ("Hana" or the "Company") (TSX VENTURE:HMG)(FRANKFURT:4LH) is
pleased to announce its most recent drilling results from the completion of nine
infill diamond drill holes in the Banana Zone at its Ghanzi sediment hosted
Copper-Silver Project in Botswana.


Infill and down dip drilling was carried out on the South Limb Definition Area
(between sections 64650 to 65525; Figures 1 and 2) to convert a substantial
amount of the NI 43- 101 compliant resources within this area into the Indicated
category from the Inferred category and to extend current Indicated resources
down dip.


These results are from new holes and are in addition to those used in the most
recent NI 43-101 compliant Inferred mineral resource calculation (see Table 1 at
the end of this press release for the results from all 12 drill holes). The
mineralization remains open at depth.


Highlights of recent drilling results:



    --  The latest results continue to confirm the continuity of copper-
        silver mineralization at the South Limb Definition area of the
        Banana Zone. 
    --  Core lengths intercepts of 
        --  2.13% CuEq(1) (1.81% Cu and 22.0 g/t Ag) over 2.6 metres within 
            a wider mineralized interval of 1.10% CuEq(1) (0.95% Cu and 11.0
            g/t Ag) over 6.2 metres in hole HA-451-D; 
        --  1.48% CuEq(1) (1.27% Cu and 14.0 g/t Ag) over 5.6 metres within 
            a wider mineralized interval of 1.34% CuEq(1) (1.15% Cu and 13.0
            g/t Ag) over 6.5 metres in hole HA-454-D; 
        --  1.98% CuEq(1) (1.65% Cu and 23.0 g/t Ag) over 4.5 metres in hole
            HA-449-D; 
        --  1.66% CuEq(1) (1.38% Cu and 19.0 g/t Ag) over 5.7 metres in hole
            HA-450-D. 
            
            
1.  Copper equivalent calculated using US$3.00/lb Cu, US$30/oz Ag and is not
    adjusted for metallurgical recoveries. The formula used is as follows:
    CuEq = Cu% + (Ag g/t x 0.01458). 



Discussion of Results:

The infill drilling program at the South Limb continues to confirm that
copper-silver mineralization is relatively high-grade and continuous along
strike and at depth at the South Limb (Figure 3). This drilling will add to the
current down dip indicated resource and allow for the conversion of more mineral
resources from the Inferred category into the Indicated category.


To view Figures 1 - 3 included with this news release, please click the
following link: http://media3.marketwire.com/docs/HMG_Fig1-3.pdf. 


Development Update

The following engineering and consultation activities are ongoing:



--  Work on the revised resource estimate for the Banana Zone is continuing
    as expected and the Company expects to release the results of this
    resource estimate in the second quarter of 2012. 
--  Work continues on the Preliminary Economic Assessment ("PEA") which is
    also expected to be completed in the second quarter of 2012. 



Hana Mining's CEO and Chairman, Marek Kreczmer, commented as follows:

"Infill drilling along the South Limb area shows consistent high-grade
copper-silver mineralization at depth. I continue to believe that the South Limb
area could contribute significantly to our overall resource base at the Banana
Zone."


Qualified Person and Quality Assurance/Quality Control

The drilling program and results are reviewed and approved by Marek Kreczmer,
Chief Executive Officer for Hana. He is the qualified person as defined in NI
43-101 and has reviewed the technical information in this press release.


Drill core is logged and photographed. Mineralized intervals are split in half
by sawing and sampled at site. The remainder of the core is kept as a permanent
record. Samples are placed into labelled bags, closed and packed into sealed
bags that are shipped to ALS Chemex Laboratory in Johannesburg, South Africa or
Scientific Services Laboratory in Cape Town, South Africa. Hana has implemented
an industry-standard QA/QC program that includes the blind insertion of
certified standards, duplicates and blanks into the sample stream.


About Hana Mining's Ghanzi Copper-Silver Project in Botswana:

The Ghanzi Project is located in the center of the Kalahari Copper Belt in
northwestern Botswana. The Ghanzi property covers 2,149 square kilometres, and
contains sediment- hosted copper-silver deposits with a demonstrated cumulative
tested strike length of 70 kilometres. This favorable geology extends over an
estimated strike length of 600 kilometres. Hana Mining released results of its
most recent NI 43-101 compliant resource estimate for the Ghanzi Project on
December 20, 2010, announcing an Indicated mineral resource of 762 million
pounds of copper and 16 million ounces of silver from 37.4 million tonnes at a
grade of 0.93% copper and 13.4 g/t silver. All of the Indicated resources are
from the Banana Zone. There are also Inferred resources of 5.6 billion pounds of
copper and 85.4 million ounces of silver from 423.9 million tonnes. This
Inferred mineral resource estimate consists of 225.4 million tonnes grading
0.64% Cu and 8.1 g/t Ag in the Banana Zone, 20.7 million tonnes grading 1.23% Cu
and 8.7 g/t Ag in Zone 5, 16.7 million tonnes grading 0.86% Cu and 4.0 g/t Ag in
Zone 6, and 161.1 million tonnes grading 0.45% Cu and 3.6 g/t Ag in the
Chalcocite Zone; all at a cut-off grade of 0.30% Cu.


The Banana Zone exhibits certain areas of higher grade Cu and Ag mineralization,
particularly between sections 49700 to 52000 on the North limb and sections
63000 to 71000 on both the North and South limbs, which represent an opportunity
to locate starter pits and mine initial tonnages at higher than average grades.
These higher grade pockets tend to be well within open pit depth parameters and
represent opportunities to improve early cash flow and overall returns in
development.


The project will benefit from proposed rail and power infrastructure expansions,
along with proximity to local population centers and workforce. A feasibility
study is currently underway (funded by the World Bank and the governments of
Botswana and Namibia) to support completion of a rail line link that would
connect Botswana with the Namibian port of Walvis Bay, on the Atlantic coast.
The closest existing railhead to port is at Gobabis, in Namibia, approximately
550 km from our property. Construction has begun on the 600MW expansion of the
government-owned Moropule Power Plant, having secured US$825 million project
funding in May 2009. The Ghanzi Copper- Silver Project is currently accessed by
the paved Trans-Kalahari highway, which passes within 15 km of the property.


The Ghanzi property is one of Africa's premier future copper-silver resources.

Table 1: Drill Results from South Limb, Banana Zone, Sections 64650 to 65525 -
Interval indicates down hole interval




----------------------------------------------------------------------------
                                                        Est.                
                                                        True   Cu           
                    Mineralized   From    To  Interval Width   Eq   Cu    Ag
Hole #     Section  Zone           (m)    (m)      (m)   (m)  (%)  (%) (g/t)
----------------------------------------------------------------------------
HA-448-D   SD64650  South Limb  185.00 194.00     9.00  7.65 0.69 0.60   6.0
                    Def          
  includes                      187.61 194.00     6.39  5.43 0.90 0.77   9.0
----------------------------------------------------------------------------
HA-449-D   SD64825  South Limb  168.82 174.15     5.33  4.53 1.98 1.65  23.0
                    Def   
----------------------------------------------------------------------------
HA-450-D   SD64750  South Limb  205.32 212.00     6.68  5.68 1.66 1.38  19.0
                    Def
----------------------------------------------------------------------------
HA-451-D   SD64925  South Limb  175.67 182.93     7.26  6.17 1.11 0.95  11.0
                    Def         
  includes                      178.91 181.98     3.07  2.61 2.13 1.81  22.0
----------------------------------------------------------------------------
HA-452-D   SD65025  South Limb  147.56 155.62     8.06  6.85 0.74 0.65   6.0
                    Def           
  includes                      149.81 153.13     3.32  2.82 1.48 1.29  13.0
----------------------------------------------------------------------------
HA-453-D   SD65125  South Limb  211.48 219.96     8.48  7.21 0.97 0.84   9.0
                    Def         
  includes                      213.40 219.96     6.56  5.58 1.20 1.02  12.0
----------------------------------------------------------------------------
HA-454-D   SD65225  South Limb  188.39 196.00     7.61  6.47 1.34 1.15  13.0
                    Def         
  includes                      188.67 195.20     6.53  5.55 1.48 1.27  14.0
----------------------------------------------------------------------------
HA-456-D   SD65325  South Limb  204.24 213.00     8.76  7.45 0.71 0.61   7.0
                    Def           
  includes                      207.41 212.50     5.09  4.33 1.02 0.88  10.0
----------------------------------------------------------------------------
HA-459-D   SD65525  South Limb  160.96 171.51    10.55  8.97 0.55 0.46   6.0
                    Def         
  includes                      166.00 169.61     3.61  3.07 1.03 0.88  10.0
----------------------------------------------------------------------------



Statements in this press release, other than purely historical information,
including statements relating to the Company's future plans and objectives or
expected results, may include forward-looking statements. Forward-looking
statements are based on numerous assumptions and are subject to all of the risks
and uncertainties inherent in resource exploration and development. As a result,
actual results may vary materially from those described in the forward-looking
statements.


Hana Mining Ltd. (TSXV:HMG)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Hana Mining Ltd. Charts.
Hana Mining Ltd. (TSXV:HMG)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Hana Mining Ltd. Charts.