VANCOUVER, BC, Dec. 10,
2024 /CNW/ - MCF Energy Ltd. (TSX.V: MCF)
(FRA: DC6) (OTCQX: MCFNF) ("MCF", "MCF Energy" or the "Company") is
pleased to provide an update the continuing testing of the
Welchau-1 well in Austria.
Background
The upper part of the Reifling formation has been perforated and
an initial flow test conducted. The initial flow test did not
result in sufficient flow into the well bore for reservoir fluids
to enter the tubing string and allow the Reifling reservoir fluid
composition to be determined or sampled.
Sampling of the inflow has recovered primarily workover fluids
(brine) and traces of black solid particles of unknown composition,
which may be affecting well flow. The composition of the solid
particles is being analysed at a specialist laboratory.
The well has been left shut in and the work over rig demobilised
until further sample analysis and well data become available from
Welchau-1.
Forward Program
Well head pressure recording equipment of suitable accuracy will
be fitted to the well head to enable the recording of the potential
pressure build up due to well inflow. If sufficient inflow is
observed, then further sampling will be undertaken, and the well
will be swabbed using wire line to reduce hydrostatic pressure
which may induce further flow.
If hydrocarbons are recovered it is intended that further
testing of the shallowest Reifling formation will be resumed, most
likely, after acidization of the reservoir to overcome well bore
damage and enhance productivity in the carbonate reservoir.
In parallel with the above-mentioned activities, samples
recovered from the testing of the Steinalm formation will be
analysed to determine if hydrocarbons are present as well as
determining the composition and likely source of solid black
particles which were also encountered during the Reifling formation
flow test.
The results of the well pressure monitoring, sampling and well
fluid analysis are expected to be available early in the new year
after which a decision on further stimulation or testing operations
will be taken.
About MCF Energy
MCF Energy was established in 2022 by leading energy executives
to strengthen Europe's energy
security through responsible exploration and development of natural
gas resources within the region. The Company has secured interests
in several significant natural gas exploration projects in
Austria and Germany with additional concession
applications pending. MCF Energy is also evaluating additional
opportunities throughout Europe.
The Company's leaders have extensive experience in the European
energy sector and are working to develop a cleaner, cheaper, and
more secure natural gas industry as a transition to renewable
energy sources. MCF Energy is a publicly traded company (TSX.V:
MCF; FRA: DC6; OTCQX: MCFNF) and headquartered in Vancouver, British Columbia. For further
information, please visit: www.mcfenergy.com.
Additional information on the Company is available at
www.sedarplus.ca under the Company's profile.
Cautionary Statements:
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES
PROVIDER (AS THAT TERM IS DEFINED IN POLICIES OF THE TSX VENTURE
EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF
THIS RELEASE.
Advisories:
Forward-Looking Information
This press release contains forward-looking statements and
forward-looking information (collectively "forward-looking
information") within the meaning of applicable securities laws
relating to the Company's plans and other aspects of our
anticipated future operations, management focus, strategies,
financial, operating and production results, industry conditions,
commodity prices and business opportunities. In addition, and
without limiting the generality of the foregoing, this press
release contains forward-looking information regarding the
anticipated timing of development plans and resource potential with
respect to the Company's right to assets in Austria. Forward-looking information typically
uses words such as "anticipate", "believe", "project", "expect",
"goal", "plan", "intend" or similar words suggesting future
outcomes, statements that actions, events or conditions "may",
"would", "could" or "will" be taken or occur in the future.
The forward-looking information is based on certain key
expectations and assumptions made by MCF Energy's management,
including expectations and assumptions noted subsequently in this
press release under oil and gas advisories, and in addition with
respect to prevailing commodity prices which may differ materially
from the price forecasts applicable at the time of the respective
Resource Audits conducted by GCA, and differentials, exchange
rates, interest rates, applicable royalty rates and tax laws;
future production rates and estimates of operating costs;
performance of future wells; resource volumes; anticipated timing
and results of capital expenditures; the success obtained in
drilling new wells; the sufficiency of budgeted capital
expenditures in carrying out planned activities; the timing,
location and extent of future drilling operations; the state of the
economy and the exploration and production business; results of
operations; performance; business prospects and opportunities; the
availability and cost of financing, labour and services; the impact
of increasing competition; the ability to efficiently integrate
assets and employees acquired through acquisitions, the ability to
market natural gas successfully and MCF's ability to access
capital. Although the Company believes that the expectations and
assumptions on which such forward-looking information is based are
reasonable, undue reliance should not be placed on the
forward-looking information because MCF Energy can give no
assurance that they will prove to be correct. Since forward-looking
information addresses future events and conditions, by its very
nature they involve inherent risks and uncertainties. MCF Energy's
actual results, performance or achievement could differ materially
from those expressed in, or implied by, the forward-looking
information and, accordingly, no assurance can be given that any of
the events anticipated by the forward-looking information will
transpire or occur, or if any of them do so, what benefits that we
will derive therefrom. Management has included the above summary of
assumptions and risks related to forward-looking information
provided in this press release in order to provide securityholders
with a more complete perspective on future operations and such
information may not be appropriate for other purposes.
Readers are cautioned that the foregoing lists of factors are
not exhaustive. These forward-looking statements are made as of the
date of this press release and we disclaim any intent or obligation
to update publicly any forward-looking information, whether as a
result of new information, future events or results or otherwise,
other than as required by applicable securities laws.
Oil & Gas Advisories
Abbreviations:
Bcf
|
billion cubic feet
|
Bcfe
|
billion cubic feet of natural gas
equivalent
|
Bbl
|
barrels
|
Boe
|
barrels of oil equivalent
|
M
|
thousand
|
MM
|
million
|
MMbbls
|
million barrels of oil
|
MMBOE
|
million barrels of oil
equivalent
|
MMBC
|
million barrels of condensate
|
MMcf
|
million cubic feet of natural
gas
|
Mcfe
|
thousand cubic feet of natural gas
equivalent
|
MMcfe/d
|
million cubic feet equivalent per
day
|
Scf
|
standard cubic feet
|
Tcf
|
trillion cubic feet
|
Km2
|
square kilometres
|
€
|
Euros
|
SOURCE MCF Energy Ltd.