Symbol: CNG - TSX.V
Symbol: ZEO - Frankfurt
VANCOUVER, Oct. 16, 2012 /CNW/ - Canadian Mining Company
Inc. (TSX.V: CNG; the "Company") is very pleased to announce
that drilling is underway at the Company's Sun Group Zeolite
Project near Princeton, BC.
The objective of the drill program is to provide Canadian Mining
with a qualified 43-101 resource report. Having a compliant
43-101 Resource Report will not only establish the size and grade
of the zeolite deposit but will allow the Company to certify its
zeolite for use by Municipalities, organic growers, vineyards,
composting, animal waste treatment and radioactive containment both
nationally and internationally.
Drill locations and site preparation was conducted over the past
several weeks under the direction of the Company's qualified
person, Mr. John Beck, Mining
Engineer. Hardrock Drilling of Princeton, BC will commence drilling
operations on Tuesday, October 16,
2012.
Following the "chain of custody" standard, the zeolite core will
be logged, split, photographed, labeled and forwarded to Maxxam
Analytical, Burnaby BC, for
whole-rock analysis (WRA) and cation exchange capacity (CEC).
Founded over 40 years ago, Maxxam has developed into Canada's leader in analytical services.
Mr. Ray Paquette, CEO states
"this is a very important and exciting phase for Canadian Mining in
moving its Sun Group Zeolite Project forward." The Company
continues to receive National and International inquiries on the
availability of its Clinoptilolite Zeolite, which is in demand
worldwide.
On behalf of the Board
Ray Paquette CEO
604.684.3301
Please see our web site for additional details:
www.canadianmining.ca
Neither TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
SOURCE Canadian Mining Company Inc.