All Dollar Amounts are in U.S. Dollars ("US$") Unless Otherwise Indicated

Ivernia Inc. ("Ivernia" or, collectively with its subsidiaries, the "Company")
(TSX:IVW) today reported its first quarter 2013 results. During the first
quarter of 2013, the Company's Paroo Station lead mine (the "Mine") continued
the preparation work required for a restart of operations. In April 2013,
mining, processing and transportation operations were recommenced at the Mine.


The Company recorded net loss after tax of $7.3 million or $0.01 per common
share for the first quarter of 2013, compared to net loss after tax of $1.9
million or $0.00 per common share for the same period last year.


FIRST QUARTER 2013 HIGHLIGHTS

Financial



--  Gross loss of $7.1 million for the first quarter of 2013. 
--  Net loss after tax of $7.3 million for the first quarter of 2013. Net
    loss after tax for the first quarter of 2013 includes a foreign exchange
    gain of $0.5 million mainly related to Rosslyn Hill Mining Pty Ltd's
    ("Rosslyn Hill Mining") functional currency being the A$ while Ivernia's
    reporting currency is the US$. The gain was as a consequence of the A$
    strengthening against the US$ in the first quarter of 2013 with the
    US$/A$ rate increasing from 1.0392 on December 31, 2012 to 1.0426 on
    March 31, 2013. The foreign currency gain is mainly related to foreign
    exchange movements on US$ and C$ intercompany loans. These intercompany
    loans are with wholly owned subsidiaries of the Company and are
    eliminated from the Statement of Financial Position on consolidation. 
--  On January 29, 2013, the Company closed a C$20 million secured loan
    facility, bearing a monthly compounded interest rate of 12% per annum
    (the "Sprott Facility") with Sprott Resources Lending Partnership
    ("Sprott"), with a C$15 million and C$5 million drawdown made on January
    29, 2013 and March 20, 2013, respectively. The Sprott Facility matures
    February 28, 2015. 
--  In conjunction with the Sprott Facility, Enirgi Group Corporation
    ("Enirgi Group"), the Company's majority shareholder, agreed to extend
    the expiry date of its fully drawn C$6 million loan facility (the
    "Enirgi Facility") to March 31, 2015. 



Operational



--  On March 27, 2013, the OEPA issued a news release confirming that the
    Company had completed all of the management and monitoring plans
    required to restart transportation of lead carbonate concentrate from
    the Mine pursuant to Ministerial Statement 905, which contains the
    majority of the Company's new operating and transportation conditions
    (the "Operating Conditions"). 
--  On March 28, 2013, the Company announced it was recommencing operations
    at the Mine. Mining, processing and export operations were recommenced
    in April 2013. 
--  The Mine expects to produce between 40,000 to 45,000 tonnes of lead
    contained in concentrate and to sell between 45,000 to 50,000 tonnes of
    lead contained in concentrate for the year ended December 31, 2013. Full
    production levels at the Mine are targeted by the end of 2013. 
--  The main capital project (completed in the first quarter of 2013)
    required prior to restart, was upgrading the infrastructure and systems
    around the concentrate handling process at the Mine and along the
    transport route including building a significant hardstanding and
    washdown area at the Mine. 
--  On December 28, 2012, the Company entered into management services
    agreements (the "Management Services Agreements") with Enirgi Group and
    its wholly owned Australian subsidiary Enirgi Metal Group Pty Ltd.
    ("EMG"), pursuant to which, among other things Enirgi Group is managing
    the day to day operations of Ivernia and EMG is managing the restart and
    ongoing operation of the Mine. Enirgi Group and EMG have performed well
    to date against the Management Services Agreements and provided the Mine
    with increased support and expertise. 



FINANCIAL AND OPERATING HIGHLIGHTS

The following table is a summary of Ivernia's financial and operating highlights
for the three months ended March 31, 2013 and 2012:




(in thousands of United States dollars, unless otherwise      2013     2012 
 indicated and per share amounts)                                $        $ 
----------------------------------------------------------------------------
Financial Highlights                                                        
Revenue(1)                                                       -        - 
Operating costs                                             (7,144)  (1,952)
----------------------------------------------------------------------------
Gross loss                                                  (7,144)  (1,952)
----------------------------------------------------------------------------
General and administrative                                  (2,538)  (3,244)
Stock option costs                                            (199)    (204)
Foreign exchange                                               545    2,535 
Other income (expenses)                                         (4)       - 
Gain on sale of available for sale investments                 172        - 
Net Interest income (expense)                                 (390)     109 
Accretion                                                     (227)    (130)
----------------------------------------------------------------------------
                                                            (2,641)    (934)
----------------------------------------------------------------------------
Loss before tax                                             (9,785)  (2,886)
Deferred income tax recovery                                 2,500    1,021 
----------------------------------------------------------------------------
Net loss                                                    (7,285)  (1,865)
Unrealized (loss) gain on investments                           11       (5)
Foreign currency translation differences                      (343)    (920)
----------------------------------------------------------------------------
Comprehensive loss, net of tax                              (7,617)  (2,790)
----------------------------------------------------------------------------
Basic and fully diluted loss per share(2)                    (0.01)   (0.00)
----------------------------------------------------------------------------
Weighted average shares outstanding - thousands            752,120  745,131 
----------------------------------------------------------------------------
Cash provided by (used in) operations before changes in                     
 non-cash working capital                                  (10,145)  (5,954)
----------------------------------------------------------------------------
Cash flow (used in) provided by operating activities        (6,627)  (5,049)
----------------------------------------------------------------------------
Operating Highlights                                                        
Ore milled - (000's tonnes)                                      -        - 
Average head grade - (% lead)                                    -        - 
Recovery - (%)                                                   -        - 
Concentrate produced - (000's dry tonnes)                        -        - 
Concentrate sold - (000's dry tonnes)                            -        - 
Lead metal in concentrate produced - (000's tonnes)              -        - 
Lead metal in concentrate sold - (000's tonnes)                  -        - 
Concentrate inventory - (000's of dry tonnes)                 10.1     10.1 
Average lead price - LME cash settlement- ($ per pound)       1.04     0.95 
Ivernia's average lead sale price - ($ per pound)                -        - 
Cash cost per pound sold - ($ per pound)(3)                    N/A      N/A 
----------------------------------------------------------------------------
                                                                            
(1)  Ivernia restarted operations at the Mine in late February, 2010. A     
     ramp-up of operations took place throughout 2010. On April 5, 2011, the
     Company voluntarily ceased transportation and operations as a result of
     the detection of lead bearing mud on one of its shipping containers.   
     With the uncertainty surrounding these results and what was the third  
     transportation disruption since December 31, 2010 the decision was made
     to undertake a comprehensive review of its business practices before   
     the recommencement of transportation would resume. As such, the Mine's 
     workforce commenced an orderly shutdown of operations and the Mine was 
     placed on full care and maintenance in April 2011. In April 2013, the  
     Company recommenced mining, processing and transportation operations.  
(2)  Per share data was calculated on the basis of the weighted average     
     shares outstanding (basic and diluted) for the relevant period.        
(3)  Cash cost per pound sold is a non-IFRS measure. Cash cost of lead sold 
     is not currently meaningful as the Mine worked through the issues      
     surrounding transportation and then care and maintenance during 2011   
     through 2013. Once the Mine achieves steady state production run rates 
     information about the cash cost of lead sold will be reintroduced.     



OPERATIONS REVIEW

On July 27, 2012, the Company received the Operating Conditions from the
Minister for Environment, Water for Western Australia (the "Minister") which, in
general were consistent with the draft recommended conditions (the "Draft
Recommended Conditions") for the Mine that were released by the Environmental
Protection Authority of Western Australia ("EPA"). The Operating Conditions
replace and supersede the Interim Implementation Conditions, which were issued
on February 23, 2011 and the previous Ministerial Statements 559 and 783. See
"New Operating Conditions" below.


Following the receipt of the Operating Conditions in the third quarter of 2012,
the Company completed its internal planning process in preparation for the
restart of operations, which included critical path planning, capital
expenditure requirements and the identification of key recruitment milestones.
The operations remained on care and maintenance for the remainder of 2012 and
the first quarter of 2013. Consequently, there was no production or sales of
lead carbonate concentrate in 2012 or the first quarter of 2013.


Principal activities during the first quarter of 2013 focused on completing
activities required to restart the Mine. The Company completed construction of a
hardstanding area at the Mine. In addition, in conjunction with work being
completed by the road and rail contractor, the facilities at the Leonora rail
yard were being upgraded to include a hardstanding area for the Company's
containers. During the quarter, the Company completed maintenance work on the
plant aimed to maximize plant availability during the restart period and
substantially completed all recruitment required to restart operations. On March
28, 2013, the Company announced that it was recommencing operations at the Mine.
In April 2013, mining, processing and transportation operations were recommenced
at the Mine.


New Operating Conditions

On July 27, 2012, the Company received the Operating Conditions from the
Minister which, in general, were consistent with the Draft Recommended
Conditions for the Mine that were released by the EPA in 2011. The Operating
Conditions preserve the strict auditing, monitoring and reporting requirements
that were imposed on the Company pursuant to the Interim Implementation
Conditions.


Pursuant to the Operating Conditions, the Company can ship lead carbonate
concentrate through the Port of Fremantle for only five years from the date of
issuance of the Operating Conditions. The Company is strongly committed
throughout this five year period to demonstrating that containerized shipping of
the Company's product is both safe and appropriate. As with its other regulatory
compliance and approval processes, including maintaining current operating
licenses and permits and obtaining approvals to expand or alter the Mine's
operations, the Company will need to demonstrate its sound environmental
performance to maintain current licenses and permits or obtain approvals for new
licenses or renewals for existing licenses on reasonable terms. See "Risk
Factors - Regulatory Compliance and Approvals" in the annual information form
dated March 28, 2013 (the "2012 AIF").


In addition, the Operating Conditions require that certain actions be undertaken
by the Company prior to the re-commencement of transportation of any lead
carbonate concentrate from the mine site. In accordance with the Operating
Conditions, the Company:




--  carried out a risk assessment ("Environmental Risk Assessment") of all
    key aspects of the operations regarding the potential pathways for lead
    carbonate concentrate contamination and submitted a report on such
    findings to the Chief Executive Officer ("CEO") of the of the OEPA; 
--  prepared and submitted to the CEO of the OEPA for approval (and on
    advice of the Department of Mines and Petroleum ("DMP") of Western
    Australia), an environmental management program ("Environmental
    Management Program") which among other things, documents standards,
    guidelines and codes of practice relating to management of lead
    carbonate concentrate and details procedures relating to mining,
    processing, storing, packaging and transport of lead carbonate
    concentrate; 
--  engaged a third party expert approved by the CEO of the OEPA to carry
    out an evaluation of the sampling methodology and analysis methodology
    ("Sampling Evaluation") for all rainwater tank, static dust, air, soil,
    drainage sump and benthic sediment sampling required under the Operating
    Conditions and reported to the CEO of the OEPA on its implementation of
    the recommendations in the Sampling Evaluation; and 
--  engaged the services of an independent inspector approved by the CEO of
    the OEPA to, among other things, visually inspect all sealed bags
    containing lead carbonate concentrate and established and documented the
    detailed roles and responsibilities of the inspector to the satisfaction
    of the CEO of the OEPA, in consultation with the Department of
    Environment and Conservation (the "DEC") and DMP (the "Inspector
    Report"). 



The Operating Conditions also require that shipping containers be free of all
visible mud containing lead carbonate concentrate prior to being removed from
the mine site and prior to being loaded onto trains at the Leonora rail yard. In
the first quarter of 2013, the Company completed construction of a hardstanding
area at the Mine. In addition, in conjunction with work being completed by the
road and rail contractor, the design of facilities at the Leonora rail yard were
completed to include a container washing facility and hardstanding area for the
Company's containers, which is expected to be completed in the second quarter of
2013.


As required under the Operating Conditions, on January 31, 2013, the Company
provided the CEO of the OEPA, a report detailing options for downstream
processing of lead carbonate concentrate that, among other things, details the
available options against best environmental practice (the "Downstream
Processing Report"). The Downstream Processing Report was peer reviewed by an
independent expert approved by the CEO of the OEPA. The Downstream Processing
Report was a requirement of the Operating Conditions and the Company has not
sought any change to its existing lead carbonate concentrate mining proposal in
the Operating Conditions to include downstream processing. Further, the
Downstream Processing Report did not require the Company to opine on the
economic feasibility of a downstream processing facility. However, in 2011, the
Company commissioned and received a process selection study from an independent
third party engineering firm and delivered its preliminary findings to the OEPA
and the Minister in January 2012. Those preliminary findings indicated that at
current lead prices and exchanges rates, downstream processing of lead produced
from the Mine remains uneconomic.


In the first quarter of 2013, the Company completed all material actions
specified in the Operating Conditions that were required to be undertaken prior
to the recommencement of transportation of lead carbonate concentrate from the
mine site. On March 27, 2013, the OEPA issued a news release confirming that the
Company had completed all of the management and monitoring plans required to
restart transportation of lead carbonate concentrate from the Mine pursuant to
the Operating Conditions. On March 28, 2013, the Company announced that it was
recommencing processing operations at the Mine. In April 2013, mining,
processing and transportation operations were recommenced at the Mine.


Mine Update and Restart Planning

During the care and maintenance period, all process vessels were drained,
flushed and inspected with minor repairs conducted and the process vessels then
refilled with water to prevent corrosion. Major equipment including motors,
pumps and agitators were operated on a routine basis to ensure that they are in
good working order. The power supply was rationalized in line with reduced power
requirements. In the first quarter of 2013, the Company completed maintenance
work on the plant aimed to maximize plant availability during the restart
period.


At the start of the care and maintenance period, all haul roads were secured.
Access to the open pits were limited to authorised personnel and regular
inspections indicate that the pits have remained in geotechnically stable
condition in connection with a restart of mining activities.


In 2004, the mining contractor was awarded a five year contract, since extended
to December 31, 2014, to carry out the mining and supply of ore to the
concentrator. Following the decision to enter care and maintenance in April
2011, the Company amended its open pit mining contract (the "Amended Mining
Contract") to suspend the services of the mining contractor at the Mine.
Pursuant to the Amended Mining Contract, the Company is permitted to reinstitute
the services of the mining contractor following the Company providing notice of
re-commencement of work. In addition, the expiry date of the Amended Mining
Contract will be extended by the length of the suspension period that commenced
on April 6, 2011 and that terminates following the issuance of a notice of
recommencement of work to the mining contractor. In the first quarter of 2013,
the Company advanced discussions with the mining contractor on the
re-mobilization of its workforce from the temporary suspension under the
contract. When in operation, ore is extracted via open pit operations over the
life of the Mine. The pits are shallow with a maximum depth of 50 metres and
excavators are used to dig and load waste and ore into 85 tonne haulage trucks.
Qualified personnel employed or contracted directly by the Company carry out
Mine planning and grade control. The mining contractor recommenced mining
operations in April 2013.


As security for the punctual performance of the Emergency Response Plan under
the Operating Conditions, prior to removing shipping containers with lead
carbonate concentrate from the Mine, the Company was required to issue in favour
of the Minister for Environment and the CEO of the OEPA an A$5 million
unconditional and irrevocable guarantee from a bank (the "Bond") acceptable to
the OEPA. In November 2012, the Company had the A$5 million bond refunded that
was previously in place to cover shipments from the Mine to use as working
capital. In March, 2013, the Company received a C$5 million final advance under
the Sprott Facility to refund the A$5 million Bond and the Bond has been
reinstated. The Company's aggregate current performance bonds as at March 31,
2013 are A$7.6 million.


Throughout the first quarter of 2013, a total of approximately 140 employee
positions were filled in Perth and at the Mine as part of the restart of
operations.


At the time that the transport operations were stopped in April 2011 there were
approximately 10,100 tonnes of lead concentrate stockpiled on site at an
estimated average concentrate grade of 64% lead, containing approximately 6,450
tonnes of contained lead in concentrate. This concentrate is stored in sealed
bags and protected from the weather. There was no production or ore processed in
2012. Transportation of the stockpiles of lead carbonate concentrate commenced
in April 2013.


Production Outlook

With the resumption of operations in the second quarter of 2013, the Company
expects to produce between 40,000 and 45,000 tonnes of lead contained in
concentrate in 2013. The Company expects to sell between 45,000 and 50,000
tonnes of lead contained in concentrate in 2013.


Financing activities

Sprott Facility

On January 29, 2013, the Company announced that it had entered into the Sprott
Facility with Sprott which is expected to provide the Company with the funding
needed to restart operations at the Mine. On the closing of the Sprott Facility,
the Company drew down a C$15 million initial advance under the Sprott Facility.
A subsequent advance of C$5 million was drawn down on March 20, 2013 to fund the
Bond required for punctual performance of the Emergency Response Plan under the
Company's Operating Conditions. The Sprott Facility is secured by the Mine and
all of its assets.


The Sprott Facility matures on February 28, 2015 after twelve equal principal
repayments starting March 31, 2014, however early repayment of the Sprott
Facility, at Ivernia's option, is allowed without penalty provided that Ivernia
has paid at least six months of interest under the Sprott Facility. The Sprott
Facility bears interest at a rate of 12% per annum, compounded monthly, which is
payable at the end of each month. In addition to the payment of interest, under
the Sprott Facility, Ivernia also issued 10,169,491 Ivernia common shares to
Sprott and its nominees having a value of C$1.2 million and paid a cash
structuring fee of C$0.2 million.


As a condition to the execution of the Sprott Facility, Enirgi Group agreed to
postpone the maturity date of the Enirgi Facility to March 31, 2015.


Capital Resources and Working Capital Requirements

As of March 31, 2013, the Company had approximately $7.6 million in cash. At
current lead prices and foreign exchange rates, the Company expects that it has
sufficient working capital to fund the Mine until operations turn cashflow
positive. Operations are expected to turn cashflow positive in the third quarter
of 2013. While the Company anticipates that cashflow from operating activities
will be sufficient to fund non- operating activities going forward, the
Company's financial condition will remain subject to certain risks and
uncertainties as it ramps-up operations over the course of 2013. For instance,
ongoing cash flow from operating activities is exposed and continues to be
exposed to fluctuations in metal prices, production and shipping rates and the
A$/US$ exchange rate. See "Risk Factors - Funding Requirements" in the 2012 AIF
and "Forward-Looking Statements" below.


Management's Discussion and Analysis and Consolidated Financial Statements

Ivernia's unaudited financial statements and management's discussion and
analysis for the three months ended March 31, 2013 will be filed today and will
be available on the Ivernia website at www.ivernia.com or SEDAR at
www.sedar.com.


About Ivernia

Ivernia is an international base metal mining company and the owner of the Paroo
Station Mine in Western Australia.


Ivernia trades under the symbol "IVW" on the Toronto Stock Exchange. Additional
information on Ivernia is available on the Company's website at www.ivernia.com
and at SEDAR at www.sedar.com.


Forward-Looking Statements

Certain statements contained in this news release are forward-looking
information within the meaning of securities laws. All statements included
herein (other than statements of historical facts) which address activities,
events or developments that management anticipates will or may occur in the
future are forward-looking statements, including statements as to the following:
future targets and estimates for production and sales, projections with respect
to cash flows and working capital, any additional financing requirements to
restart the Mine, the cost and timing for completion of capital projects
necessary for restart or ongoing operations, the Company's ability to comply
with the new Operating Conditions, capital expenditures, operating costs, cash
costs, mineral resources, mineral reserves, life of mine, recovery rates, grades
and prices, business strategies and measures to implement such strategies,
competitive strengths, estimated goals and plans for Ivernia's future business
operations, lead market outlook and other such matters. Forward-looking
statements are often, but not always, identified by the use of words such as
"seek", "anticipate", "contemplate", "target", "believe", "plan", "estimate",
"expect", and "intend" and statements that an event or result "may", "will",
"can", "should", "could" or "might" occur or be achieved and other similar
expressions.

These statements are based upon certain reasonable factors, assumptions and
analyses made by management in light of its experience and perception of
historical trends, current conditions and expected future developments, as well
as other factors management believes are appropriate in the circumstances.
However, whether actual results and developments will conform with management's
expectations is subject to a number of risks and uncertainties, including
factors underlying management's assumptions, such as, expected concentrate
sales, the costs and other capital expenditures required to recommence
operations and transportation, the timing, need and ability to raise any
additional financing and the risks relating to ramping up mining and milling
throughput and operations, funding requirements, operations being placed on care
and maintenance, matters relating to regulatory compliance and approvals,
shareholder dilution, matters relating to public opinion, presence of a majority
shareholder and Management Services Agreements, matters related to the Esperance
settlement and shipments through the Port of Fremantle, regulatory proceedings
and litigation and general operating risks such as metal price volatility, lead
carbonate concentrate treatment charges, exchange rates, the fact that the
Company has a single mineral property, health and safety, environmental factors,
mining risks, metallurgy, labour and employment regulations, government
regulations, insurance, dependence on key personnel, constraints on cash
distribution from the Mine, the nature of mineral exploration and development
and common share price volatility. Additional factors and considerations are
discussed in the 2012 AIF and elsewhere in other documents filed from time to
time by Ivernia with Canadian securities regulatory authorities. While Ivernia
considers these assumptions to be reasonable based on information currently
available to it, they may prove to be incorrect. These factors may cause the
actual results of the Company to differ materially from those discussed in the
forward-looking statements, and there can be no assurance that the actual
results or developments anticipated by management will be realized or, even if
substantially realized, that they will have the expected results on the Company.
Undue importance should not be placed on forward-looking information nor should
reliance be placed upon this information as of any other date. Except as
required by law, while it may elect to, Ivernia is under no obligation and does
not undertake to update this information at any particular time.


FOR FURTHER INFORMATION PLEASE CONTACT: 
Ivernia Inc.: Jessica Helm
Corporate Communications Officer
Enirgi Group Corporation
(416) 365-2783
investor@ivernia.ca
www.ivernia.com

Emergeo Solutions Worldwide Inc. (TSXV:EMG)
Historical Stock Chart
From May 2024 to Jun 2024 Click Here for more Emergeo Solutions Worldwide Inc. Charts.
Emergeo Solutions Worldwide Inc. (TSXV:EMG)
Historical Stock Chart
From Jun 2023 to Jun 2024 Click Here for more Emergeo Solutions Worldwide Inc. Charts.