UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE
ACT OF 1934
For the month of June, 2022
Commission File Number: 001-35936
B2Gold
Corp.
(Translation of registrant’s name into English)
British Columbia, Canada
(Jurisdiction of incorporation or organization)
Suite 3400, Park Place
666 Burrard Street
Vancouver, British Columbia
V6C 2X8
Canada
(Address of principal executive office)
Indicate by check mark whether
the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:
[ ] Form 20-F |
[X] Form 40-F |
Indicate by check mark if the registrant
is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b) (1): [ ]
Indicate by check mark if the registrant
is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b) (7): [ ]
DOCUMENTS INCLUDED AS PART
OF THIS FORM 6-K
See the Exhibit Index hereto.
SIGNATURES
Pursuant to the requirements of the Securities Exchange
Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
B2Gold Corp. |
|
|
|
|
|
|
|
|
|
Date: June 22,
2022 |
By: |
/s/ Roger Richer |
|
|
Name: |
Roger Richer |
|
|
Title: |
Executive Vice President, General Counsel & Secretary |
|
EXHIBIT INDEX
Exhibit 99.1

News Release
B2Gold Announces Positive Exploration Drill
Results in Mali from
Fekola North and Anaconda Area Exploration Drilling
Vancouver, BC, June 22, 2022 - B2Gold Corp.
(TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) (“B2Gold” or the “Company”) is pleased to announce additional positive
exploration drilling results from Fekola North and the Anaconda area, and provide an update on the development of the Anaconda area.
Highlights
| • | High grade results from the Fekola North target area such as drill hole FKD_64, which returned 4.28 grams
per tonne (“g/t”) gold over 19.15 metres, from 529.0 metres, provides strong support for ongoing evaluation of underground
development of the deepest portions of the Fekola Mine deposit |
| • | In the Anaconda area, approximately 20 kilometres north of the Fekola Mine, drill hole MSD_212, which
returned 8.09 g/t gold over 15.8 metres, from 431.1 metres, confirms the presence of high grade sulphide, approximately 100 metres below
the limits of the current Mineral Resource pit boundary. The good grade and width combinations at the Anaconda area continue
to provide a strong indication of the potential for Fekola-style plunging bodies of sulphide mineralization, which remain open at depth |
| • | Ongoing drilling by the Company on the Anaconda area to infill and extend the saprolite Mineral Resource
area, and to follow up on the sulphide mineralization, including the Mamba and Adder zones, as well as several other targets below the
saprolite mineralization, continues to generate positive drill results in both saprolite and sulphide domains and demonstrates strong
potential to further increase the updated Anaconda area Mineral Resource estimate |
| • | Following the recent acquisition of the Bakolobi permit, immediately south of the Menankoto permit, the
Company will conduct an approximately $3.4 million exploration program for 50,200 metres of diamond and reverse circulation drilling in
the second half of 2022 |
| • | The Company recently announced the acquisition of Oklo Resources Limited and its Dandoko project, located
approximately 25 kilometres from the Fekola Mine (subject to completion) |

2022 Exploration Drilling
B2Gold is currently conducting a 225,000
metre drill program in western Mali with a 2022 exploration budget of $35 million, including drill programs on the Fekola North deposit
to further test the underground potential, and the Anaconda area, including the Mamba, Adder, Anaconda. Cascabel, Viper and Cobra zones.
To date in 2022, the Company has completed approximately 70,000 metres of combined diamond, reverse circulation and aircore drilling on
targets near the Fekola Mine, primarily targeting deep extensions of the Fekola deposit to the north and below the current reserve pit,
and in the Anaconda Area, primarily on the Mamba, Adder and Cascabel zones), between 20 and 25 kilometres north of the Fekola Mine.
Fekola North Exploration
Drilling undertaken since December 2021 at the Fekola
North deposit has partially infilled areas of the deepest portions of the current Mineral Resource area and also tested beyond the limits
of the current Mineral Resource pit in areas believed to be amenable to underground development. Drill holes such as FKD_641, which returned
4.28 g/t gold over 19.15 metres, from 529.0 metres, and hole FKD_632 which returned 3.86 g/t gold over 9.73 metres, from 502.14 metres,
intersect high grade sulphide mineralization in step outs beyond the limit of the current Mineral Resource pit and provide strong positive
support to the ongoing evalution of underground mining at Fekola. The Company has completed approximately 15,000 metres of deep diamond
drilling on the Fekola North deposit in 2022, with two drill rigs currently active.
Select results from the Fekola North from drilling
since December 2021 include:
Hole ID |
Depth From |
Depth To |
Interval |
Au g/t |
FKD_620 |
530.00 |
548.3 |
18.3 |
4.00 |
FKD_622 |
550.78 |
557.00 |
6.22 |
4.64 |
FKD_623 |
502.00 |
520.40 |
18.40 |
7.32 |
FKD_625 |
528.83 |
544.00 |
15.17 |
4.06 |
FKD_626 |
558.80 |
577.80 |
19.00 |
4.38 |
FKD_629 |
444.20 |
463.00 |
18.80 |
3.17 |
FKD_631 |
472.85 |
481.30 |
8.45 |
3.36 |
and |
487.30 |
494.66 |
7.36 |
5.72 |
FKD_632 |
502.14 |
506.00 |
3.86 |
9.73 |
FKD_633 |
508.67 |
519.60 |
10.93 |
3.59 |
and |
526.70 |
530.20 |
3.50 |
3.39 |
FKD_636 |
627.76 |
635.00 |
7.24 |
5.90 |
FKD_638 |
430.00 |
435.40 |
5.40 |
3.26 |
and |
443.35 |
461.20 |
17.85 |
5.86 |
and |
469.30 |
477.60 |
8.30 |
3.28 |
FKD_639 |
638.20 |
642.40 |
4.20 |
7.82 |
FKD_641 |
529.00 |
548.15 |
19.15 |
4.28 |
FKD_644 |
540.25 |
544.00 |
3.75 |
4.98 |
Composites are uncapped and reported
above 1.85 g/t gold cutoff, which approximates current underground cut-off grades. Core lengths are approximately 85-90% of true width.
Anaconda Area Exploration
On March
23, 2022, the Company announced an updated and significantly increased Mineral Resource estimate for the Anaconda area,
comprised of the Menankoto permit and the Bantako North permit, located approximately 25 kilometres from the Fekola Mine. The updated
and significantly increased Anaconda Mineral Resource estimate, constrained within a conceptual pit shell at a gold price of $1,800 per
ounce, included an initial Indicated Mineral Resource estimate of 32,400,000 tonnes at 1.08 g/t gold for a total 1,130,000 ounces of gold,
and Inferred Mineral Resource estimate of 63,700,000 tonnes at 1.12 g/t gold for 2,280,000 ounces of gold. The Mineral Resource estimate
included first time reporting of 1,130,000 ounces of Indicated Mineral Resources and an increase of 1,510,000 ounces (196% increase) of
Inferred Mineral Resources since the initial Inferred Mineral Resource estimate in 2017 (21,590,000 tonnes at 1.11 g/t gold, for 767,000
ounces.
On
the Mamba zone, drill hole BND_090, which returned 4.34 g/t gold over 5.6 metres, from 130.1 metres, and hole MSD_212, which returned
8.09 g/t gold over 15.8 metres, from 431.10 metres, are particularly significant as they confirm the continuity of high grade sulphide
mineralization 110 metres below the limit of the updated Mineral Resource pit boundaries. In the main Anaconda area Mineral Resource pit,
drill hole MSR_938, which returned 3.32 g/t gold over 10 metres, from 92 metres, and drill hole MSR_939, which returned 1.49 g/t gold
over 50 metres, from 71 metres, demonstrate the potential to add sulphide Mineral Resources beneath the currently defined saprolite resources,
where the mineralization remains open at depth.
Select results
from the Anaconda area exploration drilling include:
Hole ID |
From |
To |
Metres |
Au g/t |
Domain |
BND_088 |
71.30 |
95.20 |
23.90 |
1.85 |
Saprolite |
and |
143.00 |
147.55 |
4.55 |
7.08 |
Sulphide |
BND_089 |
42.20 |
62.50 |
20.30 |
1.34 |
Saprolite |
BND_090 |
131.10 |
136.70 |
5.60 |
4.34 |
Saprolite |
BNR_542 |
0.00 |
13.00 |
13.00 |
3.26 |
Saprolite |
MSD_212 |
431.10 |
446.90 |
15.80 |
8.09 |
Sulphide |
and |
567.00 |
586.00 |
19.00 |
2.64 |
Sulphide |
MSR_918 |
21.00 |
42.00 |
21.00 |
3.96 |
Saprolite |
MSR_920 |
26.00 |
48.00 |
22.00 |
1.59 |
Saprolite |
and |
60.00 |
71.00 |
11.00 |
4.15 |
Sulphide |
MSR_923 |
13.00 |
58.80 |
45.80 |
1.11 |
Saprolite |
MSR_924 |
113.90 |
149.30 |
35.40 |
1.03 |
Sulphide |
MSR_926 |
4.00 |
28.00 |
24.00 |
1.12 |
Saprolite |
MSR_936 |
0.00 |
52.00 |
52.00 |
0.71 |
Saprolite |
MSR_938 |
41.00 |
62.00 |
21.00 |
2.06 |
Sulphide |
and |
92.00 |
102.00 |
10.00 |
3.31 |
Sulphide |
MSR_939 |
22.00 |
31.00 |
9.00 |
2.23 |
Saprolite |
and |
35.00 |
50.00 |
15.00 |
1.45 |
Saprolite |
and |
71.00 |
121.00 |
50.00 |
1.49 |
Sulphide |
MSR_943 |
15.00 |
43.00 |
28.00 |
1.88 |
Saprolite |
MSR_943 |
44.00 |
70.00 |
26.00 |
1.12 |
Sulphide |
MSR_944 |
40.00 |
63.00 |
23.00 |
1.31 |
Sulphide |
Saprolite composites are reported above a 0.2 g/t gold
cutoff.
Sulphide composites are uncapped and reported above 0.6 g/t gold cutoff.
Ongoing drilling by the Company on the Anaconda
areas to infill and extend the saprolite Mineral Resource area and to follow up on the sulphide mineralization, including the Mamba and
Adder zones, as well as several other targets below the saprolite mineralization, continues to generate positive drill results in both
saprolite and sulphide domains and demonstrates strong potential to further increase the updated Anaconda area Mineral Resource estimate.
2022 Fekola and West Mali Regional Exploration
For the remainder of 2022, the Company will continue
to drill to infill and extend the saprolite Mineral Resource area and to follow up on the sulphide mineralization at the Anaconda area,
including the Mamba and Adder zones, and several other targets below the saprolite mineralization. The good grade and width combinations
at the Anaconda area continue to provide a strong indication of the potential for Fekola-style south plunging bodies of sulphide mineralization,
which remain open down plunge. Six drill rigs are currently drilling in the Anaconda area.
In April 2022, the Company acquired the Bakolobi
permit in Mali from a local Malian company. The Bakolobi permit is located between the Menankoto permit, to the North, and the
Fekola Mine's Medinandi permit, wrapping around the latter to its south-west end, covering an area of 100 km2 and
providing approximately 25 km of contiguous exploration potential along the Senegal-Mali Shear Zone An initial $3.4 million
exploration program on the Bakolobi permit is scheduled for the second half of 2022. Drilling will focus on the southward extension
of known resources in the Anaconda area. The Company believes that the Bakolobi permit is a highly prospective area that has the
potential to provide for the near-term addition of both saprolite- and sulphide-hosted gold deposits.
B2Gold’s proposed acquisition of Oklo Resources
Limited and its flagship Dandoko project, which remains subject to completion, will extend the footprint of B2Gold’s exploration
in Mali to over 1,700 km2 and add the Dandoko project’s JORC 2012 compliant Measured and Indicated Mineral Resource estimate
of 8.70 million tonnes at 1.88 g/t for 528,000 ounces of gold and an Inferred Mineral Resource estimate of 2.63 million tonnes at 1.67
g/t for 141,000 ounces of gold, to B2Gold’s rapidly growing Mineral Resource inventory in the region. The Company believes there
is strong potential to extend the mineralization at the Dandoko project
The Company also has one drill rig active on the Kolomba
regional target, which is located approximately 15 kilometers from the Anaconda area, with assay results pending.
Anaconda Development Update
In
2022, the Company has budgeted $33 million for development of infrastructure for Phase I saprolite mining at the Anaconda area,
including road construction. Based on the updated Mineral Resource estimate and B2Gold's preliminary planning, the Company has demonstrated
that a pit situated on the Anaconda area could provide selective higher grade saprolite material (average grade of 2.2 g/t)
to be trucked to and fed into the Fekola mill commencing as early as late 2022 at a rate of 1.5 million tonnes per annum. Subject to obtaining
all necessary permits and completion of a final development plan, the trucking of selective higher grade saprolite material to the Fekola
mill would increase the ore processed and annual gold production from the Fekola mill, with the potential to add an average of approximately
80,000 to 100,000 ounces per year to the Fekola mill's annual gold production. The plan to truck the selective higher grade saprolite
material is not included in the Company’s 2022 production guidance and the Anaconda area Mineral Resources have not been
included in the current Fekola life of mine plan.
Based
on the updated Mineral Resource estimate and the 2022 exploration drilling results, the Company has commenced a Phase II scoping study
to review the project economics of constructing a stand-alone mill near the Anaconda area. Subject to receipt of a positive
Phase II scoping study, the Company expects that the saprolite material would continue to be trucked to and fed into the Fekola mill during
the construction period for the Anaconda area stand-alone mill.
QA/QC on Sample Collection and Assaying
The primary laboratories for the Fekola Mine and West Mali regional exploration are SGS Laboratories in Bamako, Mali and Bureau Veritas
Laboratories in Abidjan, Cote d'Ivoire. Periodically, exploration samples will be analyzed at the Fekola Mine laboratory. At each laboratory,
samples are prepared and analyzed using 50-gram fire assay with atomic absorption finish and/or gravimetric finish. Umpire assays are
used to monitor lab performance monthly.
Quality assurance and quality control procedures include
the systematic insertion of blanks, standards and duplicates into the core, reverse circulation and aircore drilling sample strings. The
results of the control samples are evaluated on a regular basis with batches re-analyzed and/or resubmitted as needed. All results stated
in this announcement have passed B2Gold’s quality assurance and quality control protocols.
Qualified Person
Tom Garagan, Senior Vice President of Exploration
at B2Gold, a qualified person under National Instrument 43-101, has reviewed and approved the information contained in this news release.
About B2Gold Corp.
B2Gold
is a low-cost international senior gold producer headquartered in Vancouver, Canada. Founded in 2007, today, B2Gold has operating gold
mines in Mali, Namibia and the Philippines and numerous exploration and development projects in various countries including Mali, Colombia,
Finland and Uzbekistan. B2Gold forecasts total consolidated gold production of between 990,000 and 1,050,000 ounces in 2022.
On
Behalf of B2GOLD CORP.
“Clive T. Johnson”
President & Chief
Executive Officer
For more information
on B2Gold, please visit the Company’s website at www.b2gold.com or contact:
Randall Chatwin |
Cherry DeGeer |
SVP, Legal & Corporate Communications |
Director, Corporate Communications |
+1 604-681-8371 |
+1 604-681-8371 |
rchatwin@b2gold.com |
cdegeer@b2gold.com |
The Toronto Stock Exchange and NYSE American LLC neither
approve nor disapprove the information contained in this news release.
Production guidance presented in this news
release reflect total production at the mines B2Gold operates on a 100% project basis. Please see our Annual Information Form dated March
30, 2022 for a discussion of our ownership interest in the mines B2Gold operates.
This news release includes certain "forward-looking
information" and "forward-looking statements" (collectively forward-looking statements") within the meaning of applicable
Canadian and United States securities legislation, including: projections; outlook; guidance; forecasts; estimates; statements regarding
future or estimated financial and operational performance, gold production and sales, revenues and cash flows, and capital costs (sustaining
and non-sustaining) and operating costs, and including, without limitation: statements regarding the Transaction, including, without limitation,
the completion of the Oklo transaction, including receipt of all necessary regulatory approvals, including from the TSX and NYSE MKT,
and the satisfaction of conditions; total consolidated gold production of between 990,000 and 1,050,000 ounces in 2022. All statements
in this news release that address events or developments that we expect to occur in the future are forward-looking statements. Forward-looking
statements are statements that are not historical facts and are generally, although not always, identified by words such as "expect",
"plan", "anticipate", "project", "target", "potential", "schedule", "forecast",
"budget", "estimate", "intend" or "believe" and similar expressions or their negative connotations,
or that events or conditions "will", "would", "may", "could", "should" or "might"
occur. All such forward-looking statements are based on the opinions and estimates of management as of the date such statements are made.
Forward-looking statements necessarily involve
assumptions, risks and uncertainties, certain of which are beyond B2Gold's control, including risks associated with or related to: the
duration and extent of the COVID-19 pandemic, the effectiveness of preventative measures and contingency plans put in place by the Company
to respond to the COVID-19 pandemic, including, but not limited to, social distancing, a non-essential travel ban, business continuity
plans, and efforts to mitigate supply chain disruptions; escalation of travel restrictions on people or products and reductions in the
ability of the Company to transport and refine doré; the volatility of metal prices and B2Gold's common shares; changes in tax
laws; the dangers inherent in exploration, development and mining activities; the uncertainty of reserve and resource estimates; not achieving
production, cost or other estimates; actual production, development plans and costs differing materially from the estimates in B2Gold's
feasibility and other studies; the ability to obtain and maintain any necessary permits, consents or authorizations required for mining
activities; environmental regulations or hazards and compliance with complex regulations associated with mining activities; climate change
and climate change regulations; the ability to replace mineral reserves and identify acquisition opportunities; the unknown liabilities
of companies acquired by B2Gold; the ability to successfully integrate new acquisitions; fluctuations in exchange rates; the availability
of financing; financing and debt activities, including potential restrictions imposed on B2Gold's operations as a result thereof and the
ability to generate sufficient cash flows; operations in foreign and developing countries and the compliance with foreign laws, including
those associated with operations in Mali, Namibia, the Philippine and Colombia and including risks related to changes in foreign laws
and changing policies related to mining and local ownership requirements or resource nationalization generally, including in response
to the COVID-19 outbreak; remote operations and the availability of adequate infrastructure; fluctuations in price and availability of
energy and other inputs necessary for mining operations; shortages or cost increases in necessary equipment, supplies and labour; regulatory,
political and country risks, including local instability or acts of terrorism and the effects thereof; the reliance upon contractors,
third parties and joint venture partners; the lack of sole decision-making authority related to Filminera Resources Corporation, which
owns the Masbate Project; challenges to title or surface rights; the dependence on key personnel and the ability to attract and retain
skilled personnel; the risk of an uninsurable or uninsured loss; adverse climate and weather conditions; litigation risk; competition
with other mining companies; community support for B2Gold's operations, including risks related to strikes and the halting of such operations
from time to time; conflicts with small scale miners; failures of information systems or information security threats; the ability to
maintain adequate internal controls over financial reporting as required by law, including Section 404 of the Sarbanes-Oxley Act; compliance
with anti-corruption laws, and sanctions or other similar measures; social media and B2Gold's reputation; risks affecting Calibre having
an impact on the value of the Company's investment in Calibre, and potential dilution of our equity interest in Calibre; as well as other
factors identified and as described in more detail under the heading "Risk Factors" in B2Gold's most recent Annual Information
Form, B2Gold's current Form 40-F Annual Report and B2Gold's other filings with Canadian securities regulators and the U.S. Securities
and Exchange Commission (the "SEC"), which may be viewed at www.sedar.com and www.sec.gov, respectively (the "Websites").
The list is not exhaustive of the factors that may affect B2Gold's forward-looking statements
B2Gold's forward-looking statements are based
on the applicable assumptions and factors management considers reasonable as of the date hereof, based on the information available to
management at such time. These assumptions and factors include, but are not limited to, assumptions and factors related to B2Gold's ability
to carry on current and future operations, including: the duration and effects of COVID-19 on our operations and workforce; development
and exploration activities; the timing, extent, duration and economic viability of such operations, including any mineral resources or
reserves identified thereby; the accuracy and reliability of estimates, projections, forecasts, studies and assessments; B2Gold's ability
to meet or achieve estimates, projections and forecasts; the availability and cost of inputs; the price and market for outputs, including
gold; foreign exchange rates; taxation levels; the timely receipt of necessary approvals or permits; the ability to meet current and future
obligations; the ability to obtain timely financing on reasonable terms when required; the current and future social, economic and political
conditions; and other assumptions and factors generally associated with the mining industry.
B2Gold's forward-looking statements are based
on the opinions and estimates of management and reflect their current expectations regarding future events and operating performance and
speak only as of the date hereof. B2Gold does not assume any obligation to update forward-looking statements if circumstances or management's
beliefs, expectations or opinions should change other than as required by applicable law. There can be no assurance that forward-looking
statements will prove to be accurate, and actual results, performance or achievements could differ materially from those expressed in,
or implied by, these forward-looking statements. Accordingly, no assurance can be given that any events anticipated by the forward-looking
statements will transpire or occur, or if any of them do, what benefits or liabilities B2Gold will derive therefrom. For the reasons set
forth above, undue reliance should not be placed on forward-looking statements.
This regulatory filing also includes additional resources:
ex991.pdf
B2Gold (AMEX:BTG)
Historical Stock Chart
From Jan 2025 to Feb 2025
B2Gold (AMEX:BTG)
Historical Stock Chart
From Feb 2024 to Feb 2025