VANCOUVER, May 13, 2019 /CNW/ - Mawson Resources
Limited ("Mawson") or (the "Company") (TSX:MAW) (Frankfurt:MXR)
(PINKSHEETS: MWSNF) announces a new drill discovery at the
Rumajärvi prospect of shallow gold-cobalt mineralization located
700 metres west and 1.1 kilometres south of the Raja and Palokas
resource areas respectively, at the Company's 100% owned Rajapalot
Project in northern Finland. Highlights include PAL0182 which
intersected 7.4 metres @ 4.4 g/t gold equivalent
("AuEq"), 3.4 g/t gold ("Au") and 597 ppm cobalt ("Co") from
86.3 metres.
Assay results continue to be received from drill holes that
tested both the boundaries of Mineral Resources at the Raja,
Palokas and South Palokas prospects, and earlier stage prospect
areas including the Hut, Terry's Hammer and Rumajärvi (Figures
1 and 2). Mawson recently completed 44 holes
(PAL0159–PAL0201D1) for 15,059 metres during the 2019 winter drill
season. Results from 6 holes from the Rumajärvi prospect are
provided here, with additional results to be reported on a
prospect-by-prospect basis. Twenty-three holes with full assays
remain to be reported that were drilled predominantly down
plunge from resource areas. Sulphidic (pyrrhotite-rich)
intersections with visible gold provide encouraging signs in drill
holes PAL0190 and PAL0191(Raja), PAL0194 (Palokas) and PAL0198
(South Palokas), where assays are yet to be received.
"Our exploration success at Rumajärvi provides encouragement
of continued growth of the Rajapalot mineral system," said Mr.
Michael Hudson, Chairman and CEO of
Mawson. "The discovery of these new gold-cobalt zones at Rumajärvi
clearly demonstrate the potential to increase Rajapalot's
gold-cobalt resources. Rajapalot is a significant and strategic
growing gold-cobalt resource already positioned as one of
Finland's top three gold resources
by grade and contained ounces and one of a small group of cobalt
resources in Europe prepared in
accordance with NI 43-101 policy. We still have over half the
winter season drill holes to report, and look forward to sharing
results over the coming month."
The newly discovered gold-cobalt corridor at Rumajärvi lies on
the western flank of the mineralized Rajapalot trend and is
indicated with dashed lines in Figures 1 and 2. The resource
areas at Rajapalot trend to the north and east of this discovery
within an overall 4 kilometre trend. Rajapalot remains untested to
the south, west and north.
The new Rumajärvi corridor is located 700m west and 1.1 km south of the Raja and
Palokas Inferred Mineral Resources and represents a new
drill-defined mineralized area within the best-developed boulder
field in Rajapalot where a total of 55 boulders and outcrops
with >0.1 g/t gold have been discovered. Gold grades from
a 10 hectare area range from 0.1 g/t gold to 3,870 g/t gold,
with an average of 184 g/t gold and median of 0.6 g/t gold.
Samples from boulders are grab samples, which are selective by
nature and are unlikely to represent average grades on the
property
Results are available from 6 of 9 holes drilled at Rumajärvi
over winter (PAL0177, 179, 181, 182, 183 and 184). Results
from 3 drill holes from Rumajärvi are awaited (PAL0178, 185 and
186). Better drill holes from this release include PAL0182
which intersected 7.4 metres @ 4.4 g/t gold equivalent
("AuEq"), 3.4 g/t gold ("Au") and 597 ppm cobalt ("Co") from
86.3 metres. PAL0179, drilled 200 metres to the NE of PAL0182
intersected 4.7 metres @ 1.9 g/t AuEq, 1.0 g/t Au and 578 ppm
Co from 6.0 metres and PAL0183 intersected 0.6 metres @ 2.8 g/t
AuEq, 2.2 g/t Au and 340 ppm Co from 142.5 metres.
Geological Discussion
Rumajärvi prospect area is a discovery at its early stages
within the Rajapalot project. Drilling at depth at Rajapalot
is driven by electromagnetic geophysics. At Rumajärvi six
modelled geophysical conductors (two ground-based TEM and four
airborne VTEMplus) have only been tested by four drill
holes. The discovery is a result of systematically following up
boulder trains, geophysical surveys and scout drilling to target
further mineralization.
Vein and fracture fill mineralization formed at multiple
stratigraphic levels appears to be the main style associated with
Rumajärvi. It is interpreted that drilling may have only
intersected "thin" structurally controlled transgressive veins
marginal to a main mineralized position. PAL0182 (7.4 metres @ 4.4
g/t AuEq from 86.3 m) was
drilled to intersect an inferred linear, NNW plunging Au-Co
sulphidic intersection down-plunge from earlier hole PAL0037 (19.5
metres @ 1.8 g/t AuEq, 0.7 g/t Au, 659ppm Co from 20.5 metres).
Mineralization commences at the lower intersection of albite-rich
rocks with schists in association with fine-grained muscovite
schists. Unlike at Raja where mineralization lies close to the
basal muscovite quartzite marker, mineralization at Rumajärvi is
located over 300 metres structurally above this marker horizon.
Drill hole PAL0179 (4.7 metres @ 1.9 g/t AuEq, 1.0 g/t Au and 578
ppm Co from 6.0 metres), commenced in mineralization at the base of
the glacial till overburden in moderately foliated sulphidic
breccia comprising pyrrhotite, pyrite chalcopyrite, sphalerite and
galena in a silicate host comprising chlorite, biotite, Mg-Fe
amphiboles, albite, quartz and tourmaline.
Geological interpretation suggest that mineralization may extend
more than 300 metres to the west of current drilling at Rumajärvi
where VTEMplus electromagnetic plates have not been drill
tested. Notably, the only two holes drilled 320 metres NNW from
PAL0182 (PAL0043 (3.0 metres @ 3.0 g/t AuEq, 2.6 g/t Au,
273 ppm Co from 10.6 metres) and PAL0184 (1.0 metre @ 1.7
g/t AuEq, 1.3 g/t Au, 206 ppm Co from 117.6 metres) have both
intersected gold-cobalt mineralization. The principal undrilled
target occurs in the large fold hinge where the sequence inverts
from right-way-up in the north (South Palokas and upper sequence at
The Hut) to upside down in the south (Raja and Rumajärvi).
The construction of a 3D model (grade and structure/stratigraphy)
to merge with geophysics (especially EM) is planned over the coming
months to help target drilling at the end of the year.
Technical and Environmental Background
The gold
equivalent ("AuEq") value used in the resource and this press
release was calculated using the following formula: AuEq g/t = Au
g/t + (Co ppm/608) with assumed prices of Co $30/lb; and Au $1,250/oz. AuEq varies with gold and cobalt
prices. A long-term price point has been chosen for both
commodities to maintain consistency of reporting individual drill
holes against the resource dated December 2018. Approximate
spot prices for gold and cobalt are currently $1280/oz and $16/lb
respectively.
Assuming a predominant stratabound control, the true thickness
of the mineralized interval is interpreted to be approximately 90%
of the sampled thickness. Quality control duplicates for all holes
show good repeatability of gold assays. Intersections are reported
with a lower-cut of 0.5g/t gold or 304ppm Co over 2 metre lower
cut, except where indicated. No upper cut-off was applied.
Four diamond drill rigs (K3 & K8) from the Arctic Drilling
Company OY ("ADC"), Kati OY ("Kati")
and MK Core Drilling OY ("MK"), all with water recirculation and
drill cuttings collection systems were used for the drill program.
Core diameter is NQ2 (50.7 mm). Core recoveries were excellent and
average close to 100% in fresh rock. After photographing and
logging in Mawson's Rovaniemi facilities, core intervals averaging
1 metre for mineralized samples and 2 metres for barren samples
were cut in half at the Geological Survey of Finland (GTK) core facilities in Rovaniemi,
Finland. The remaining half core
is retained for verification and reference purposes. Analytical
samples were transported by Mawson personnel or commercial
transport from site to the CRS Minlab Oy facility in Kempele,
Finland. Samples were prepared and
analyzed for gold using the PAL1000 technique which involves
grinding the sample in steel pots with abrasive media in the
presence of cyanide, followed by measuring the gold in solution
with flame AAS equipment. Multi-element assays, including cobalt
are determined using the ICP-MS method (IMS-230) of MS Analytical
shipped directly from the CRS Minlab Oy facility. The QA/QC program
of Mawson consists of the systematic insertion of certified
standards of known gold content, duplicate samples by quartering
the core, and blanks the within interpreted mineralized rock. In
addition, CRS and MS Analytical insert blanks and standards into
the analytical process.
The qualified person for Mawson's Finnish projects, Dr.
Nick Cook, President for Mawson and
a Fellow of the Australasian Institute of Mining Metallurgy has
reviewed and verified the contents of this release.
NI 43-101 Technical Report
On December 19, 2018, Mawson filed an independent
National Instrument 43-101 Technical Report (the "NI 43-101
Technical Report") on the Mineral Resource Estimate for the Raja
and Palokas Prospects, at the 100% owned Rajapalot Project in
Finland, (the "NI 43-101
Technical Report"), in support of the Company's news release
dated December 17, 2018. The NI
43-101 Technical Report was authorized by Mr. Rod Webster of AMC Consultants Pty
Ltd ("AMC") of Melbourne,
Australia, and Dr. Kurt Simon
Forrester of Arn Perspective of Surrey, England. Each of Mr. Webster and Dr.
Forrester are independent "qualified persons" as defined by
National Instrument 43-101. The NI 43-101 Technical Report may be
found on the Company's website
at www.mawsonresources.com or under the Company's profile
on SEDAR at www.sedar.com.
About Mawson Resources Limited (TSX:MAW, FRANKFURT:MXR,
PINKSHEETS:MWSNF)
Mawson Resources Limited is a sustainable and ethical
exploration and development company. Mawson has distinguished
itself as a leading Nordic Arctic exploration company with a focus
on the flagship Rajapalot gold-cobalt project in Finland.
On behalf of the Board,
"Michael Hudson"
_____________________
Michael Hudson, Chairman &
CEO
Forward-Looking Statement
This news release contains forward-looking statements or
forward-looking information within the meaning of applicable
securities laws (collectively, "forward-looking statements"). All
statements herein, other than statements of historical fact, are
forward-looking statements. Although Mawson believes that such
statements are reasonable, it can give no assurance that such
expectations will prove to be correct. Forward-looking
statements are typically identified by words such as: believe,
expect, anticipate, intend, estimate, postulate, and similar
expressions, or are those, which, by their nature, refer to future
events. Mawson cautions investors that any forward-looking
statements are not guarantees of future results or performance, and
that actual results may differ materially from those in
forward-looking statements as a result of various factors,
including, but not limited to, capital and other costs varying
significantly from estimates, changes in world metal markets,
changes in equity markets, planned drill programs and results
varying from expectations, delays in obtaining results, equipment
failure, unexpected geological conditions, local community
relations, dealings with non-governmental organizations, delays in
operations due to permit grants, environmental and safety risks,
and other risks and uncertainties disclosed under the heading "Risk
Factors" in Mawson's most recent Annual Information Form filed on
www.sedar.com. Any forward-looking statement speaks only as of the
date on which it is made and, except as may be required by
applicable securities laws, Mawson disclaims any intent or
obligation to update any forward-looking statement, whether as a
result of new information, future events or results or
otherwise.
Table 1: Collar Information from 2019 Winter drilling at the
Rajapalot Project (Finnish Grid, Projection KKJ3)
HoleID
|
East
|
North
|
Azimuth
|
Dip
|
RL
|
Depth
|
Prospect
|
Comment
|
PAL0159
|
3408545.8
|
7372603.5
|
56
|
-71
|
179.162
|
473.8
|
Raja
|
Au results Mar 04
2019
Co results Apr 23
2019
|
PAL0160
|
3408485.8
|
7372581.1
|
67
|
-79
|
177.865
|
447
|
Raja
|
Au and Co results Apr
23 2019
|
PAL0161
|
3408696.1
|
7372556.6
|
57
|
-75
|
179.24
|
405.8
|
Raja
|
Au results Mar 04
2019
Co results Apr 23
2019
|
PAL0162
|
3408446.4
|
7372648.4
|
46
|
-84.5
|
180.158
|
482.9
|
Raja
|
Au results Mar 04
2019
Co results Apr 23
2019
|
PAL0163
|
3408487.0
|
7372587.9
|
65
|
-73.5
|
178.218
|
470.05
|
Raja
|
Au results Mar 04
2019
Co results Apr 23
2019
|
PAL0164
|
3408545.4
|
7372603.2
|
61.1
|
-75.6
|
178.586
|
441.7
|
Raja
|
Au and Co results Apr
23 2019
|
PAL0165
|
3408612.7
|
7372312.2
|
60
|
-79
|
176.25
|
167.9
|
Raja
|
Au results Mar 04
2019
Co results Apr 23
2019
|
PAL0166
|
3408897.7
|
7372385.3
|
240
|
-83
|
170.452
|
238.6
|
Raja
|
Au and Co results Apr
23 2019
|
PAL0167
|
3408486.0
|
7372587.0
|
96
|
-85
|
178
|
398.6
|
Raja
|
Au results Mar 04
2019
Co results
awaited
|
PAL0168
|
3408554.5
|
7372806.4
|
233
|
-83
|
173.987
|
45.6
|
Raja
|
Abandoned
hole
|
PAL0169
|
3408553.5
|
7372806.4
|
233
|
-83
|
173.987
|
545.8
|
Raja
|
Au and Co results Apr
23 2019
|
PAL0170
|
3408713.0
|
7372255.4
|
60
|
-79
|
172.803
|
200.2
|
Raja
|
Results
Awaited
|
PAL0171
|
3408603.8
|
7372636.0
|
58
|
-73
|
179.753
|
497.6
|
Raja
|
Au and Co results Apr
23 2019
|
PAL0172
|
3408447.4
|
7372648.4
|
47
|
-79.5
|
180.158
|
491.9
|
Raja
|
Au and Co results Apr
23 2019
|
PAL0173
|
3408255.8
|
7373707.9
|
116
|
-56
|
173.48
|
427.9
|
South
Palokas
|
Au results Mar 04
2019
Co results
awaited
VG
|
PAL0174
|
3408255.8
|
7373707.9
|
116
|
-69.5
|
173.48
|
8.3
|
South
Palokas
|
Abandoned
hole
|
PAL0175
|
3408830.5
|
7372237.5
|
60
|
-74
|
172.071
|
120.1
|
Raja
|
Results
Awaited
|
PAL0176
|
3408937.3
|
7372300.3
|
240
|
-79.5
|
173.012
|
140.0
|
Raja
|
Au and Co results Apr
23 2019
|
PAL0177
|
3408434.0
|
7372388.0
|
240
|
-60
|
176.1
|
250.5
|
Rumajärvi
|
Results
here
|
PAL0178
|
3408225.9
|
7372340.1
|
60
|
-75
|
177.064
|
237.2
|
Rumajärvi
|
Results
awaited
|
PAL0179
|
3408105.5
|
7372350.5
|
60
|
-80
|
180.572
|
209.0
|
Rumajärvi
|
Results
here
|
PAL0180
|
3408128.3
|
7372706.1
|
41
|
-61
|
173.634
|
778.65
|
Terry's
Hammer
|
Results
Awaited
|
PAL0181
|
3407954.6
|
7372245.0
|
150
|
-60
|
177.834
|
161.7
|
Rumajärvi
|
Results
here
|
PAL0182
|
3407944.8
|
7372476.5
|
60
|
-70
|
176.8
|
439.65
|
Rumajärvi
|
Results
here
|
PAL0183
|
3408094.0
|
7372422.1
|
160
|
-70
|
178.624
|
170.0
|
Rumajärvi
|
Results
here
|
PAL0184
|
3407754.4
|
7372867.6
|
120
|
-50
|
173.07
|
211.8
|
Rumajärvi
|
Results
here
|
PAL0185
|
3407900.4
|
7372519.6
|
60
|
-68
|
173.064
|
381.1
|
Rumajärvi
|
Results
Awaited
|
PAL0186
|
3407905.2
|
7372446.2
|
55
|
-75
|
174.386
|
341.85
|
Rumajärvi
|
Results
Awaited
|
PAL0187
|
3408547.0
|
7372492.4
|
47
|
-63.5
|
176.807
|
474
|
Raja
|
Results
Awaited
|
PAL0188
|
3408630.2
|
7372440.6
|
53
|
-63.5
|
176.974
|
379.4
|
Raja
|
Au and Co results Apr
23 2019
|
PAL0189
|
3408768.8
|
7372378.8
|
48
|
-77
|
173.301
|
245.5
|
Raja
|
Au results Apr 23
2019, Cobalt results awaited
VG
|
PAL0190
|
3408576.2
|
7372512.8
|
63
|
-65
|
177.732
|
427.9
|
Raja
|
Results
Awaited
VG
|
PAL0191
|
3408547.0
|
7372492.4
|
44
|
-58.5
|
176.807
|
492.1
|
Raja
|
Results
Awaited
VG
|
PAL0192
|
3408221.8
|
7373180.6
|
130
|
-60
|
171.892
|
203.2
|
Hut
|
Results
Awaited
|
PAL0193
|
3408255.3
|
7373706.4
|
104
|
-53
|
173.478
|
427.15
|
South
Palokas
|
Results
Awaited
|
PAL0194
|
3408312.2
|
7373980.0
|
74
|
-57
|
173.8
|
497.8
|
Palokas
|
Results
Awaited
VG
|
PAL0195
|
3408353.9
|
7373580.2
|
65
|
-77
|
174.918
|
245.6
|
South
Palokas
|
Results
Awaited
|
PAL0196
|
3408089.1
|
7373031.9
|
90.5
|
-60
|
172.308
|
317.4
|
Hut
|
Results
Awaited
|
PAL0197
|
3408271.4
|
7373630.1
|
63
|
-66.5
|
173.603
|
466.8
|
South
Palokas
|
Results
Awaited
|
PAL0198
|
3408414.1
|
7373660.3
|
117
|
-70
|
174.417
|
296.2
|
South
Palokas
|
Results
Awaited
VG
|
PAL0199
|
3408126.6
|
7373140.2
|
215
|
-80
|
173.042
|
386.7
|
Hut
|
Results
Awaited
|
PAL0200
|
3408312.2
|
7373979.0
|
62
|
-61.8
|
173.8
|
536.8
|
Palokas
|
Results
Awaited
|
PAL0201
|
3408545.8
|
7372603.5
|
57
|
-67.25
|
179.162
|
281.0
|
Raja
|
Results
Awaited
|
PAL0201D1
|
3408545.8
|
7372603.5
|
57
|
-67.25
|
179.162
|
195.0-392.2
|
Raja
|
Results
Awaited
|
Table 2: Better intersections report from the 2019 Winter Drill
Program.
Intersections are reported with a lower cut of 0.5g/t gold
over 2 metre lower cut except where stated in the text. No upper
cut-off was applied.
Prospect
|
Hole_id
|
from
|
to
|
width
|
AuEq
|
Au
|
Co
|
Raja
|
PAL0159
|
419.0
|
437.0
|
18.0
|
1.4
|
0.5
|
547
|
|
including
|
419.0
|
420.2
|
1.2
|
0.8
|
0.2
|
378
|
|
including
|
422.0
|
426.0
|
4.0
|
2.5
|
0.3
|
1377
|
Raja
|
PAL0159
|
434.0
|
437.0
|
3.0
|
3.4
|
2.3
|
672
|
Raja
|
including
|
429.0
|
432.0
|
3.0
|
0.9
|
0.1
|
488
|
Raja
|
PAL0159
|
451.0
|
455.5
|
4.5
|
3.2
|
1.9
|
754
|
Raja
|
PAL0161
|
305.5
|
313.0
|
7.5
|
1.1
|
0.0
|
636
|
Raja
|
PAL0161
|
336.0
|
338.0
|
2.0
|
2.7
|
2.1
|
362
|
Raja
|
PAL0161
|
344.0
|
349.0
|
5.0
|
3.3
|
2.3
|
600
|
Raja
|
PAL0162
|
323.0
|
324.0
|
1.0
|
1.2
|
0.0
|
701
|
Raja
|
PAL0162
|
452.0
|
453.0
|
1.0
|
0.9
|
0.0
|
562
|
Raja
|
PAL0163
|
416.6
|
419.4
|
2.8
|
10.9
|
0.0
|
6604
|
Raja
|
PAL0164
|
406.0
|
414.3
|
8.3
|
1.3
|
0.4
|
519
|
Raja
|
PAL0164
|
418.4
|
419.7
|
1.3
|
0.9
|
0.0
|
546
|
Raja
|
PAL0166
|
55.3
|
56.3
|
1.0
|
0.6
|
0.1
|
355
|
Raja
|
PAL0166
|
67.8
|
68.8
|
1.0
|
1.0
|
0.0
|
568
|
Raja
|
PAL0166
|
76.6
|
77.6
|
1.0
|
1.1
|
0.1
|
596
|
Raja
|
PAL0166
|
79.3
|
80.3
|
1.0
|
1.6
|
0.0
|
958
|
Raja
|
PAL0169
|
522.3
|
524.4
|
2.1
|
0.7
|
0.1
|
368
|
Raja
|
PAL0171
|
299.0
|
300.1
|
1.1
|
0.9
|
0.0
|
528
|
Raja
|
PAL0172
|
120.0
|
122.0
|
2.0
|
0.9
|
0.0
|
541
|
Raja
|
PAL0172
|
329.0
|
332.0
|
3.0
|
1.0
|
0.0
|
573
|
South
Palokas
|
PAL0173
|
232.8
|
233.7
|
0.8
|
|
0.5
|
|
South
Palokas
|
PAL0173
|
264.0
|
281.0
|
17.0
|
|
3.4
|
|
|
including
|
264.0
|
269.0
|
5.0
|
|
4.9
|
|
|
including
|
276.1
|
281.0
|
4.9
|
|
4.6
|
|
South
Palokas
|
PAL0173
|
380.0
|
381.1
|
1.1
|
|
0.8
|
|
South
Palokas
|
PAL0173
|
384.8
|
385.8
|
1.0
|
|
2.0
|
|
Raja
|
PAL0176
|
14.0
|
15.6
|
1.6
|
2.5
|
2.4
|
58
|
Raja
|
PAL0176
|
20.5
|
31.9
|
11.4
|
1.4
|
0.8
|
382
|
Raja
|
PAL0176
|
33.8
|
35.7
|
1.9
|
1.2
|
1.0
|
105
|
Raja
|
PAL0176
|
49.0
|
52.0
|
3.0
|
4.0
|
3.8
|
86
|
Rumajärvi
|
PAL0179
|
6.0
|
10.7
|
4.7
|
1.9
|
1.0
|
578
|
Rumajärvi
|
PAL0179
|
37.0
|
38.0
|
1.0
|
0.6
|
0.1
|
311
|
Rumajärvi
|
PAL0179
|
39.0
|
40.0
|
1.0
|
1.0
|
0.0
|
592
|
Rumajärvi
|
PAL0179
|
48.0
|
51.0
|
3.0
|
0.6
|
0.0
|
344
|
Rumajärvi
|
PAL0179
|
73.8
|
76.3
|
2.5
|
0.6
|
0.1
|
342
|
Rumajärvi
|
PAL0182
|
86.3
|
93.7
|
7.4
|
4.4
|
3.4
|
597
|
Rumajärvi
|
PAL0183
|
54.3
|
55.1
|
0.8
|
1.6
|
0.4
|
728
|
Rumajärvi
|
PAL0183
|
112.3
|
114.2
|
1.9
|
0.7
|
0.1
|
364
|
Rumajärvi
|
PAL0183
|
142.5
|
143.1
|
0.6
|
2.8
|
2.2
|
340
|
Rumajärvi
|
PAL0184
|
117.6
|
118.6
|
1.0
|
1.7
|
1.3
|
206
|
Raja
|
PAL0188
|
298.3
|
329.6
|
31.3
|
6.0
|
4.3
|
1030
|
Raja
|
PAL0188
|
298.3
|
315.6
|
17.4
|
4.8
|
2.9
|
1113
|
Raja
|
PAL0188
|
320.6
|
329.6
|
9.0
|
11.7
|
9.4
|
1412
|
Raja
|
PAL0188
|
337.9
|
338.9
|
1.0
|
3.1
|
3.1
|
35
|
Raja
|
PAL0189
|
165.0
|
165.8
|
0.8
|
1.1
|
1.1
|
0
|
Raja
|
PAL0189
|
182.9
|
186.0
|
3.2
|
4.5
|
4.5
|
0
|
Raja
|
PAL0189
|
194.0
|
195.0
|
1.0
|
1.1
|
1.1
|
0
|
Raja
|
PAL0189
|
202.0
|
205.0
|
3.0
|
4.5
|
4.5
|
0
|
Raja
|
PAL0189
|
210.0
|
211.0
|
1.0
|
1.6
|
1.6
|
0
|
Raja
|
PAL0189
|
213.2
|
214.3
|
1.1
|
7.2
|
7.2
|
0
|
Raja
|
PAL0189
|
220.6
|
221.6
|
1.0
|
0.5
|
0.5
|
0
|
Table 3: Individual assay data from key drill holes reported in
this release.
hole_id
|
Prospect
|
from
(m)
|
to
(m)
|
width
(m)
|
Au
g/t
|
Co
ppm
|
PAL0179
|
Rumajärvi
|
6
|
7
|
1.0
|
1.73
|
493
|
PAL0179
|
Rumajärvi
|
7
|
8.0
|
1.0
|
2.56
|
898
|
PAL0179
|
Rumajärvi
|
8.0
|
8.7
|
0.7
|
0.09
|
709
|
PAL0179
|
Rumajärvi
|
8.7
|
9.7
|
1.0
|
<0.05
|
252
|
PAL0179
|
Rumajärvi
|
37.0
|
38.0
|
1.0
|
0.05
|
311.1
|
PAL0179
|
Rumajärvi
|
38.0
|
39.0
|
1.0
|
<0.05
|
59.8
|
PAL0179
|
Rumajärvi
|
39.0
|
40.0
|
1.0
|
<0.05
|
592.3
|
PAL0170
|
Rumajärvi
|
48.0
|
49.0
|
1.0
|
<0.05
|
440.5
|
PAL0179
|
Rumajärvi
|
49.0
|
50.0
|
1.0
|
<0.05
|
263.3
|
PAL0179
|
Rumajärvi
|
50.0
|
51.0
|
1.0
|
<0.05
|
328.2
|
PAL0179
|
Rumajärvi
|
73.8
|
74.8
|
1.0
|
<0.05
|
422.5
|
PAL0182
|
Rumajärvi
|
86.3
|
87.0
|
0.7
|
0.56
|
976
|
PAL0182
|
Rumajärvi
|
87.0
|
87.9
|
0.9
|
2.01
|
1000
|
PAL0182
|
Rumajärvi
|
87.9
|
88.5
|
0.6
|
0.31
|
96
|
PAL0182
|
Rumajärvi
|
88.5
|
89.5
|
1.0
|
4.26
|
542
|
PAL0182
|
Rumajärvi
|
89.5
|
90.4
|
1.0
|
5.21
|
817
|
PAL0182
|
Rumajärvi
|
90.4
|
91.4
|
1.0
|
6.37
|
414
|
PAL0182
|
Rumajärvi
|
91.4
|
92.2
|
0.8
|
5.81
|
237
|
PAL0182
|
Rumajärvi
|
92.2
|
93.2
|
1.0
|
2.89
|
552
|
PAL0182
|
Rumajärvi
|
93.2
|
93.7
|
0.5
|
0.08
|
708
|
PAL0183
|
Rumajärvi
|
54.3
|
55.1
|
0.8
|
0.42
|
728
|
PAL0183
|
Rumajärvi
|
55.1
|
56.0
|
0.9
|
0.2
|
221
|
PAL0183
|
Rumajärvi
|
56.0
|
57.0
|
1.0
|
<0.05
|
212
|
PAL0183
|
Rumajärvi
|
112.3
|
113.3
|
1.0
|
<0.05
|
379
|
PAL0183
|
Rumajärvi
|
113.3
|
114.2
|
0.9
|
0.09
|
347
|
PAL0183
|
Rumajärvi
|
142.6
|
143.1
|
0.5
|
2.2
|
340
|
PAL0184
|
Rumajärvi
|
117.6
|
118.6
|
1.0
|
1.33
|
206
|
View original content to download
multimedia:http://www.prnewswire.com/news-releases/mawson-expands-rajapalot-project-with-new-gold-cobalt-discovery-at-rumajarvi-finland-300848644.html
SOURCE Mawson Resources Ltd.